36C24219B0049-004.pdf

PDF 3 MB Posted

Attached to
528A5-19-503 INSTALL AC AT WAREHOUSE Federal contract opportunity
Solicitation number
36C24219B0049
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

36C24219B0049 S02 - Drawings PDFs.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 528A5-19-503 INSTALL AC AT WAREHOUSE, newest first.
File Type Posted
36C24219B0049-0001001.pdf PDF
36C24219B0049-0001001.pdf PDF
36C24219B0049-0001000.docx DOCX document
36C24219B0049-0001000.docx DOCX document
36C24219B0049-005.pdf PDF
36C24219B0049-004.pdf PDF
36C24219B0049-001.docx DOCX document
36C24219B0049-002.pdf PDF
36C24219B0049-003.docx DOCX document
36C24219B0049-003.docx DOCX document
36C24219B0049-001.docx DOCX document
36C24219B0049-005.pdf PDF
36C24219B0049-002.pdf PDF
36C24219B0049-000.docx DOCX document
36C24219B0049-000.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Canandaigua VAMC

CAMPUS SITE PLAN

VAMC Canandaigua

PARKING

WATER TOWER

PA

RK

IN

G

P A

R K

IN

G

DISCIPLINE/

SHEET NO.

DESCRIPTION

G-001 COVER SHEET & DRAWING INDEX

G-101 GENERAL NOTES

Demolition/

AD101 DEMOLITION

Installation/

A-102 RETURN INSTALLATION

A-103

SUPPLY INSTALLATION

Elevation/

A-201 EXTERIOR DUCT ELEVATION

A-202 FOUNDATION DESIGN

Elevation/

M-501 DUCT DETAIL

M-502 ELEVATIONS

A-101 INSULATION

2 3 4 5 7 8

B

C

D

E

F

1 2 3 4 5 7 86

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

VA MEDICAL

CENTER

ENGINEERING

CANANDAIGUA /

BATH, NEW YORK

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

No. Revision: Date:

NOTE:

USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING EXISTING DIMENSIONS AND

CONDITIONS IN THE FIELD.

SCALE: (FOR REFERENCE ONLY)

528A5-19-503

G-001

B11 Warehouse A/C

Canandaigua, NY

COVER SHEET 100% Design

AutoCAD SHX Text

BUILDING 11 A/C AND

DEPARTMENT OF VETERANS AFFAIRS

PROJECT NO. 528-A5-19-503

BUILDING #11

CANANDAIGUA, NY

SCALE: NONE

%%USITE PLAN

SCALE: NONE

%%USITE LOCATION

INSULATION

COURTYARD 1

COURTYARD 2

EAST STREET

GOLF

FORT HILL

SONNENBERG

NORTH

COURSE

GARDENS

AVENUE

COURSE

GOLF

STREET

CHAPEL

PARK

EXERCISE

EAST STREET

94 GARAGE (SCHOOL LEASE)

80 S.T.P. CONTROL HOUSE

73 (SCHOOL LEASE)

39 ENGINEERING STORAGE

37 FORMER PATIENT CARE, IS

36 FORMER PATIENT CARE, DAY TREATMENT CENTER

34 SPD, A&MMS, DAYCARES, NETWORK STORAGE

14 VACANT

13 EMERGENCY GENERATOR

5 AUDITORIUM, RECREATION SVC.

NO. BUILDING SCHEDULE

4 ADMINISTRATIVE, CANTEEN

18 (SCHOOL LEASE)

1 OUTPATIENT SERVICES, MAIN ADMIN

2 MAIN KITCHEN & DINING RM., OUTPT PHARM

3 GEC OFFICES, PATIENT CARE

6 SUBSTANCE ABUSE OFFICES, EMS

7 NHCU, VOLUNTARY SVC., HRMS

9 PATIENT CARE/DOM, LIBRARY, MAIL RM.

11 WAREHOUSE

12 BOILER PLANT

16 FIRE STATION, GARAGE, GROUNDS MTN.

24 VALOR HEADQUARTERS

33 PATIENT CARE NHCU, INPATIENT PHARMACY

40 GATE HOUSE

41 OUTDOOR FIREPLACE

42 STONE GRANDSTAND

48 GARAGE

70 MISCELLANEOUS STORAGE

81 SLUDGE DIGESTORS

82 SLUDGE BED

76 STORAGE

8 NHCU, ADULT DAYCARE

10 LAUNDRY

20 VA POLICE

75 OIL HOUSE

77 STORAGE

DRAWING INDEX

JEP

06-18-2019

ES

NOT USED

Sheets and Views

Cover30x42 (2)

Ex. FDC

" TYP

Ex. Conduit

Demo (2) holes to accommodate 20"x40" new duct work

8" centered from bottom of window to top of duct

8" between ducts

VAULT

DOOR

LOADING DOCK

RAMP

DN

DOCK

LEVELER

Demo (4) holes to accommodate 20" round holes for new duct work. Allow room for insulation of duct

SCALE: (FOR REFERENCE ONLY) 528A5-19-503

AD101

Demolition 100% Design

Building 11

1/4"=1'-0"

Demo

Sheets and Views

Demo

Ex. Conduit x e c t a n g u l r x

ELECTRIC

RTU

New Elec.

Disconnect o i h f s d f q f q

Elevation

1/2"=1'-0"

A-201

Elevation 100% Design

A-104

Sheets and Views

Elevation

20"x40" rectangle r o u r o u

Condensate-

Power-

4" offset from building

8' long, 6" Bollards, 4' deep, 12" diameter to grade.

TYP

Conduit to run beneath the the new concrete slab

Condensate run to be coordinated with COR on site

DD

M-502

A-202

Foundation 100% Design

Foundation

Sheets and Views

Foundation

GENERAL NOTES:

1. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL DIMENSIONS.

2. WORK THAT IS TYPICALLY REQUIRED BUT NOT SPECIFICALLY CALLED OUT IS IMPLIED AND SHOULD BE CONSIDERED

PART OF THE DRAWINGS AND SPECIFICATIONS.

3. IN THE EVENT THERE IS A DISCREPANCY BETWEEN THE DRAWINGS AND THE SPECIFICATION, THE SPECIFICATIONS

WILL GOVERN. DISCREPANCIES SHOULD IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE COR.

4. IN THE EVENT CONDITIONS ARE DIFFERENT THAN ADDRESSED IN SCOPE OF THIS CONTRACT, THE CONTRACTOR MUST

IMMEDIATELY AND BEFORE PROCEEDING NOTIFY THE COR AND CONTRACTING OFFICER.

5. CONTRACTOR IS REQUIRED TO ADHERE TO ALL OSHA SAFETY STANDARDS.

6. ALL PERSONNEL ENTERING THE CANANDAIGUA VA MEDICAL CENTER ARE SUBJECT TO THE RULES AND REGULATIONS

OF THE FACILITY. CONTRACTOR IS RESPONSIBLE FOR SCREENING EMPLOYEES, SUBCONTRACTORS, AND VENDORS

PRIOR TO THEM ENTERING VAMC PROPERTY.

7. CONTRACTOR WILL COORDINATE WITH THE COR FOR ACCESS TO VA CAMPUS, BUILDINGS, AND WORK AREAS.

8. ANY UTILITY SHUT DOWNS MUST BE COORDINATED WITH THE COR AND MEDICAL CENTER ENGINEERING DEPARTMENT

A MINIMUM OF 14 DAYS PRIOR.

9. CONTRACTOR WILL COORDINATE PRIOR TO MOBILIZATION FOR MATERIAL LAYDOWN AREA.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ANY CONSTRUCTION DEBRIS RELATED TO THIS PROJECT.

11. THE CONTRACTOR IS RESPONSIBLE FOR SPRAY INSULATION TO MEET PROPER THICKNESS FOR R-38 VALUE. ANY

REMOVAL TEMPORARY OR OTHERWISE OF EXISTING SPRINKLER HEADS MUST BE ADDRESSED TO THE COR AND FIRE

DEPARTMENT AHEAD OF TIME.

12. THE CONTRACTOR SHALL INSTALL ALL NEW DUCT WORK ACCORDING TO SPECIFICATIONS. DUCT WORK IS TO BE

INSTALLED AT HEIGHTS REFERENCED IN THE DRAWINGS AND SCOPE OF WORK.

13. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE DEMOLITION OF THIS PROJECT, INCLUDING

REMOVAL OF EXISTING BLOCK AND ALL OTHER DEBRI ASSOCIATED WITH REMOVAL OF BLOCK.

14. REFER TO DRAWINGS FOR SPECIFICATIONS ON CONCRETE SLAB.

Symbols and Abbreviations

AREAS OF DEMOLITION

General Notes

100% Design

B11 A/C AND INSULATION

G-101

Sheets and Views

General Notes

Ex.

Conduit

Roughly 5600 SqFt of roof deck to be insulated

AA

Roof Deck Insulation

A-101

Spray insulation 100% Design

Sheets and Views

INSULATION

20"x40" Return plenum

20" round

Adjustable

Dampers

4' long, 10" round return duct TYP

Adjustable

Damper TYP

20" sq to 20" round with offset to allow spacing for insulation and vertical truss member.

12' long, 10" round supply duct with insulation

Window TYP

Exterior brick wall

Window TYP

20" sq to 20" round with offset to allow spcaing for vertical truss member.

10" Diameter Round

Ceiling Diffuser TYP

20"x40" Insulated Supply

Plenum

10" Diameter Round

Ceiling Diffuser TYP

Supply Duct Detail

Return Duct Detail

M-501

Duct Detail 100% Design

A-102

Sheets and Views

Layout1

#6 REBAR, 12" OC GRID PATTERN, BOTTOM

of SLAB, DIMENSION OF CONCRETE SLAB

TO BE DETERMINED BASED UPON TYPE OF

UNIT SUBMITTED AND APPROVED BY COR

Linear diffuser

2' from elbow to discharge TYP

Steel purlin to be used to secure hangers to kindorf for duct work. Hangers to be duct to duct TYP. Field verify location of purlins. TYP

Steel purlin to be used to secure hangers to kindorf for duct work. Field verify location of purlins. TYP

6" of #2 Crusher run gravel

6" concrete slab

Duct to be suspended from purlins using hangers

Duct to be suspended from purlins using hangers

6" Closed Cell Fire Retardant

Spray Insulation, flush to end of rafters

" x 6" Rafter

18" deep x 12" wide trench slab

Return Duct Elevation

1/2""=1'-0"

Supply Duct Elevation

Insulation Elevation

Sections 100% Design

Foundation

BB

CC

AA

DD

Sheets and Views

Layout3

20"x40" Return Plenum

70'

85'

56'

41'

26'

4'

BB

Location of Exisiting panelbox. Panelbox is currently 150 amp main. Contractor responsible for replacing box with 200amp main and any changes in wiring out to the transformer. Coordinate with COR any scheduled shut downs

Return Install

Return Duct Install 100% Design

Sheets and Views

Return install

16" round

16" round

94'

81'

66'

52'

37'

22'

7'

20"x40" Insulated Supply

Plenum

CC

10" Round to linear diffuser

Location of Exisiting panelbox. Panelbox is currently 150 amp main. Contractor responsible for replacing box with 200amp main and any changes in wiring out to the transformer. Coordinate with COR any scheduled shut downs

Supply Duct Install 100% Design

Supply Duct Install

Sheets and Views

Supply Install

File details come from the government source that posted it.