36C24219B0038-0003002.pdf
PDF 95 KB Posted
- Attached to
- 561-18-107 Upgrade Pharmacy to 800HD
- Solicitation number
- 36C24219B0038
About this file
36C24219B0038 0003 RFI Responses 2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24219C0197-000.docx | DOCX document | |
| 36C24219B0038-0005001.pdf | ||
| 36C24219B0038-0005000.docx | DOCX document | |
| 36C24219B0038-0004002.pdf | ||
| 36C24219B0038-0004000.docx | DOCX document | |
| 36C24219B0038-0004001.pdf | ||
| 36C24219B0038-0003000.docx | DOCX document | |
| 36C24219B0038-0003001.pdf | ||
| 36C24219B0038-0002001.pdf | ||
| 36C24219B0038-0002000.docx | DOCX document | |
| 36C24219B0038-0001000.docx | DOCX document | |
| 36C24219B0038-0001001.pdf | ||
| 36C24219B0038-003.pdf | ||
| 36C24219B0038-001.docx | DOCX document | |
| 36C24219B0038-002.pdf | ||
| 36C24219B0038-000.docx | DOCX document | |
| 36C24219B0038-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Responses
1. What height shelving is required?
a. How many levels are required in each section?
ThinkForm Response:
Drawing 2/AS201 notes that mobile unit shelving is to be coordinated with user prior to ordering. For pricing, unit is shown w/ 6 shelves high (approx. 7’-2” overall height).
2. What depth shelving is required?
a. Is the shelving to be back to back for independent adjustability on each side or full depth shelving?
ThinkForm Response:
Plan shows back to back shelving. 5 units that are 7’ long by 2’-4” deep (1’-2” back to back).
3. Is fire retardant plywood required for the raised subfloor between the rails?
ThinkForm Response:
Yes, all wood used for framing or blocking on the project is to be fire retardant.
4. Spec section 01 45 00 para 1.1. states 'This section specifies requirements for Contractor Quality Control (CQC) for Design-Bid-Build (DBB) or Design-Build (DB) construction projects. This section can be used for both project types'. -- As this is not a design-build project then this spec section should not be applicable for this project, correct? As this section has extensive requirements of various CQC personnel's.
ThinkForm Response:
Specification Section 01 45 00, QUALITY CONTROL, applies to Design-Bid-Build (DBB), and bidders shall comply with requirements accordingly.