36C24219B0008-003.pdf
PDF 4 MB Posted
- Attached to
- 528A4-14-202 BATAVIA REPLACE ROOFS Federal contract opportunity
- Solicitation number
- 36C24219B0008
About this file
36C24219B0008 S02 - Drawing Package - Full - Replace Roofs.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24219B0008-0002004.pdf | ||
| 36C24219B0008-0002001.pdf | ||
| 36C24219B0008-0002000.docx | DOCX document | |
| 36C24219B0008-0002003.pdf | ||
| 36C24219B0008-0002002.pdf | ||
| 36C24219B0008-0001002.pdf | ||
| 36C24219B0008-0001004.pdf | ||
| 36C24219B0008-0001001.pdf | ||
| 36C24219B0008-0001000.docx | DOCX document | |
| 36C24219B0008-0001005.pdf | ||
| 36C24219B0008-0001003.pdf | ||
| 36C24219B0008-002.pdf | ||
| 36C24219B0008-004.pdf | ||
| 36C24219B0008-000.docx | DOCX document | |
| 36C24219B0008-001.pdf | ||
| 36C24219B0008.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECT
VA WESTERN NEW YORK HEALTHCARE SYSTEM
BATAVIA, NEW YORK 14020
222 RICHMOND AVE
th re e q u a rt e rs in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Revisions
Date th re e e ig h th s in c h o n e fo o t
F o n e h a lf in c h o n e fo o t
E
D
3 4 5 o n e in c h o n e fo o t
C 6 o n e a n d o n e h a lf in c h o n e fo o t
B th re e in c h e s o n e fo o t
A
1 2 3 4 5
Drawing Title
Location
V.A.M.C. BATAVIA, NEW YORK
7 8
Building Number
Project Title
Checked Drawn
Offi ce of Fac ilit ies
Station No.
Date
F E
D
6 7 8
C B
A
JULY 01, 2018
528A
SAFETY OFFICER
ENGINEERING MANAGERCARDIOLOGY MANAGER
DATE DATECHIEF OF STAFF
DATE
DATE
CARELINE MANAGER DATE
DATE
DATE
DATE
CHIEF ENGINEER
INFECTION CONTROL
DADRAD
PROJECT ENGINEER
DATE
DATE
stamp
10-208-
TRM DESIGN & PLANNING LLC
104 DARWIN DRIVE
BUFFALO, NEW YORK 14043
P: 716.946.9092
REPAIR/REPLACE ROOF
BATAVIA VA MEDICAL CENTER
60% SUBMISSION MARCH 09.2018
T1
TITLE SHEET
Martin Brothers
Chris Hall,P.E.
90% SUBMISSION JUNE 04.2018
BIDDING DOCUMENTS JULY 01.2018
6 20
27 21
VA WESTERN NEW YORK HEALTHCARE SYSTEM
222 RICHMOND AVENUE
BATAVIA, NY 14020
SCALE
X
X
X-X
X X-X
X X-X
X X-X
X X-X
ROOM NAME
X-X
X-X
B
SUBTITLE
DRAWING TITLEXX
A
X X-X
X X-X
D
X X-X
XXX
X
C
R EPA IR / R EPLA CE R O O F BATAVIA VA M ED I CA L CE N T E R
A B B R E V I A T I O N S
SHEET NUMBER
DETAIL NUMBER
SHEET NUMBER
DETAIL NUMBER
DETAIL NUMBER
SHEET NUMBER
DETAIL NUMBER
SHEET NUMBER
XXX
SECTION NUMBER
SHEET NUMBER
X
SURFACE
0'-0"
SHEET NUMBER
ELEVATION LETTER
ENLARGED AREA IDENTIFICATION
PLAN DETAIL IDENTIFICATION
WALL SECTION IDENTIFICATION
BUILDING SECTION IDENTIFICATION
INTERIOR ELEVATION IDENTIFICATION
PARTIAL SECTION OR DETAIL
IDENTIFICATION
STEEL
REVISION NUMBER
CONCRETE
EARTH
RIGID INSULATION
GYPSUM BOARD
PLYWOOD
INSULATION (BATT OR ICYNENE)
WOOD
MASONRY/BLOCK
DOOR NUMBER
ELEVATION TARGET
ROOM NAME & NUMBER
DRAWING TITLE IDENTIFICATION
NORTH ARROW
BRICK
CRUSHED STONE
S Y M B O L SDR A W I N G I N D EX
LETTER
OR
ELEVATION
A B B R E V I A T I O N S
ELECTRIC
EQUIPMENT
EXPANSION/EXPOSED
EXTERIOR
EQUIP.
EL/ELEV
ELEC
EXP
EXTR.
EXT.
EQ.
EXTRUDED
EQUAL
EXISTING
ALUM
ASPH
A.F.F.
AB.
ACT
ACST
ACRY
ALUMINUM
ASPHALT
ABOVE FINISH FLOOR
ALUMINUM THRESHOLD
ABOVE
ACOUSTIC CEILING TILE
ACOUSTIC
ACRYLIC WALL COATING
ADJUSTABLE / ADJACENT
EXG./EXIST.
S
MAR
MAS
M.O.
MACH
MAX
MECH
M.C.
M.H.
MTL
MISC
MIN
MLDG
MAT / MAT'L
MARBLE
MASONRY
MASONRY OPENING
MATERIAL
MACHINE
MAXIMUM
MECHANICAL
MEDICINE CABINET
MAN HOLE
METAL
MINIMUM
MISCELLANEOUS
MOULDING
M.R.
MRD
MOP RECEPTOR
MOISTURE RESISTANT DRYWALL
MTP METAL TOILET PARTITION
M.B. MARKERBOARD
SDL
SECT
SGT
SHT
SLV
SPEC
SQ
S./P.V.
S.S.
STL
SC
STD
ST.STL.
SUSP
SW
STR.
SADDLE
SECTION
STRUCTURAL GLAZED TILE
SHEET
SLEEVE
SPECIFICATION
STAINED / POLYURETHANE VARNISH
SQUARE
SERVICE SINK
STEEL
STANDARD
STAIN
STAINLESS STEEL
SUSPENDED
SWITCH
STRUCTURE
STAINED CONCRETE
FLOOR DRAINF.D.
F.F.
F.E.
FINISH FLOOR
FIRE EXTINGUISHER
FLOOR
F.M.
FIN
F.O.
FLOOR MATS
FRAMED OPENING
FINISH
F.R.P.
F.R. FIRE RESISTANT
FL /FLR
FIBERGLASS REINFORCED PLASTIC
FRZ FREEZER
FT FLOOR TILE
TYP.
TEMP
TER./TERR
T.S.
T & G T.C.
T.B.B.
T/ T.O.
T.BD. / T.B.
TONGUE & GROOVE
TYPICAL
TEMPERED
TUBE STEEL
TERRAZZO
TERRA COTTA
TACK BOARD
TILE BACKING BOARD
TOP OF...
TREADS
GL
GR
GRD
G.P.
GYP.BD.
GA
GALV
GRADE
GROUND
GREASE PROOF
GYPSUM BOARD
GAUGE
GALVANIZED
GLASS
UNFIN
U.V.
U / S U.N.O.
UNFINISHED
UNIT VENTILATOR
UNDERSIDE
UNLESS NOTED OTHERWISE
HAZ HAZARDOUS
V.P.
VAT
V.B.
VB PT
VWC
VSF
VENT
V.I.F.
VEST
VCT
VAPOR BARRIER
VENT PIPE
VENTILATOR
VINYL WALL COVERING
VINYL SHEET FLOORING
VERIFY IN FIELD
VESTIBULE
VINYL COMPOSITION TILE
VINYL ASBESTOS TILE
LIQUID APPLIED VAPOR BARRIER PAINT
W.W.F.
W.V.
WTCS
W.I.
WT
W.P.
W.L.
W.F.
WD
WCP
W.CR.
WELDED WIRE FABRIC
WATER VALVE
WALL TEXTURED COATING SYSTEM
WROUGHT IRON
WALL TILE
WATER PROOFING
WIDE FLANGE
WATER LINE
WOOD
WEATHERCAP
WATER COOLER
HT
H.M.
H.P.
HEIGHT
HOLLOW METAL
HIGH POINT
I.D.
INSUL
INV
INT./INTER.
INSIDE DIAMETER
INSULATION
INVERT
INTERIOR
JAN
JT
JANITOR
JOINT
KAL KALAMEIN
L
LINO
LAM
LGT
ANGLE
LINOLEUM
LAMINATE
LENGTH
HD. WD. HARD WOOD
B/
B.F.F.
BLK
BSMT
BAL.
BOTTOM OF...
BOARD
BELOW FINISH FLOOR
BLOCK
BASEMENT
BOTH SIDES
BALANCE
BASE TILE
CAB
CEM
CER
C.L.
CLG
C.M.P.
CH.BD.
CLR
CORR.
C,O, C.M.U.
COND
CONST
CONTR
CONV
COMPO
COP
COL.
CONC.
C.M.T.
C.T.W
CATCH BASIN
CAST IRON
CABINET
CEMENT
CERAMIC
COURSES/CHANNEL
CENTER LINE
CEILING
CORRUGATED METAL PIPE
CHALK BOARD
COOLER
CLEAN OUT
CONCRETE MASONRY UNIT
CERAMIC TILE
COLD ROLLED
CONTROL JOINT
CARPET
CORRIDOR
COLUMN
CONCRETE
CONDUCTOR
CONSTRUCTION
CONTRACTOR
CONVECTOR
COPPER
COMPOSITION
CERAMIC MOSAIC TILE
CERAMIC TILE WAINSCOT
DWG
DET
DIM
DRAWING
DRYWALL/GYP. BD.
DRINKING FOUNTAIN
DETAIL
DRAIN INLET
DIAMETER
DIMENSION
DITTO
DIVISION
DOWN
DRAIN
N.I.C.
NO
NOT IN CONTRACT
NUMBER
OBS OBSCURE
O.C. ON CENTER
OPNG
OPP
OPENING
OPPOSITE
O.D. OUTSIDE DIAMETER
O.S.C.I OWNER SUPPLIED,CONTRACTOR INSTALLED
O.S.O.I OWNER SUPPLIED,OWNER INSTALLED
P.C.T.
PART
PART.BD.
PLMB
POL
PREFAB
PT
PLYWD
P.A.F.
P.BD.
PLAS / PLS
P.L. / P.LAM.
P.L.
PF / PRE-FIN. PRE-FINISHED
PORCELIN CERAMIC TILE
PARTITION
PLASTER
PARTICLE BOARD
PLUMBING
PLATE
PLYWOOD
POLISHED
PLASTIC LAMINATE
PREFABRICATED
PAINT
PEG BOARD
POWDER ACTUATED FASTENER
P.T.
PV
PRESSURE TREATED
POLYURETHANE VARNISH
Q.T. QUARRY TILE
RB
REF
REG
REINF
R
RAD
RUBBER BASE
REFRIGERATOR
REGISTER
REINFORCING
RISER /RADIUS
RADIATOR
R.D.
R.O.
RWL
RUB
RM
R.T.U.
REQ / REQ'D
ROOF DRAIN
ROUGH OPENING
RAIN WATER LEADER
RUBBER
ROOM
ROOF TOP UNIT
REQUIRED
SI TE P L A N
SCA LE: N.T.S.
BD
ARCHITECTURAL:
T1 TITLE SHEET
AS01 ROOF LOCATION SITE PLAN
LP01 LIGHTING PROTECTION SITE PLAN
A1.0 ROOF PLAN BUILDING 1
A1.1 ROOF PLAN BUILDING 1
A2.0 ROOF PLAN BUILDING 2
A3.0 ROOF PLAN BUILDING 3
A4.0 ROOF PLAN BUILDING 4
A5.0 ROOF PLAN BUILDING 5
D1.0 DETAILS
D2.0 DETAILS
D3.0 DETAILS
D4.0 DETAILS
D5.0 DETAILS
BATAVIA, NEW YORK 14020
222 RICHMOND AVE
th re e q u a rt e rs in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Revisions
Date th re e e ig h th s in c h o n e fo o t
F o n e h a lf in c h o n e fo o t
E
D
3 4 5 o n e in c h o n e fo o t
C 6 o n e a n d o n e h a lf in c h o n e fo o t
B th re e in c h e s o n e fo o t
A
1 2 3 4 5
Drawing Title
Location
V.A.M.C. BATAVIA, NEW YORK
7 8
Building Number
Project Title
Checked Drawn
Offi ce of Fac ilit ies
Station No.
Date
F E
D
6 7 8
C B
A
JULY 01, 2018
528A
SAFETY OFFICER
ENGINEERING MANAGERCARDIOLOGY MANAGER
DATE DATECHIEF OF STAFF
DATE
DATE
CARELINE MANAGER DATE
DATE
DATE
DATE
CHIEF ENGINEER
INFECTION CONTROL
DADRAD
PROJECT ENGINEER
DATE
DATE
stamp
10-208-
TRM DESIGN & PLANNING LLC
104 DARWIN DRIVE
BUFFALO, NEW YORK 14043
P: 716.946.9092
REPAIR/REPLACE ROOF
BATAVIA VA MEDICAL CENTER
60% SUBMISSION MARCH 09.2018
A1.0
ROOF PLAN
Martin Brothers
Chris Hall,P.E.
90% SUBMISSION JUNE 04.2018
BIDDING DOCUMENTS JULY 01.2018
BUILDING 1 (PARTIAL) SCALE: 1/8"=1'-0"
ROOF PLAN
D2.0
D4.0
D3.0
D5.0
D1.0
D5.0
D5.0
D5.0
D5.0
D3.0
D1.0
D5.0
D5.0
D5.0
D1.0
D1.0
D5.0
D1.0
D1.0
D1.0
D4.0
D1.0
D1.0
D1.03
D1.0
D1.0
D1.0
D1.0
D1.0
D2.0
D1.0
D1.0
D1.0
D1.0
D4.0
D4.0
D4.0
D4.0
D1.0
D4.0
D3.0
D3.0
D1.0
D1.0
D4.0
D1.0
D1.0
D4.0
GUTTER OUTLETS TIE BACK INTO INTERIOR BUILDING
(TYP. @ GUTTERS
1,753.3SF 1,753.3SF
1,381.5SF 1,381.5SF
1,012.8SF
1,012.8SF
1,220.7SF
1,220.7SF
679.5SF
1,121.3SF
399.0 SF
197.9SF
110.4SF
63.8 SF
569.2SF
246.5SF
121.8SF
1,080.5SF
1,080.5SF
407.4 SF
864.2SF
EXIST. PIPE RAIL GUARD TO BE REMOVED
INSTALL NEW PIPE RAIL GUARD ON NEW
METAL ROOF (APPROX. 18 LIN. FT. @ 36"
HIGH )
REMOVE ALL EXISTING METAL EDGES
AND PROVIDE NEW PREFINISHED METAL
EDGES
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SLOPE
SLOPE
SLOPE
EXIST. LADDER TO REMAIN
EXIST. BUILT-IN COPPER GUTTERS TO BE
REMOVED INSTALL NEW CUSTOM
PREFINISHED COMMERCIAL GRADE
METAL GUTTERS IN SAME LOCATION &
CONFIGURATION (.040 MIN.) TIE INTO
EXIST. DOWNSPOUTS
EXIST. LIMESTONE CHIMNEYS CAPS TO REMAIN
EXIST. CHIMNEYS W/ LIMESTONE CAPS
TO REMAIN
EXIST. ROOF VENT TO REMAIN
NEW FLASHING & SLEEVE TO
BE PROVIDED (SEE DETAIL)
SLOPE
121.8SF
SLOPE
SLOPESLOPE
SL
O
PE
SLOPE SLOPE
SLOPE SLOPE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
EXIST. ROOF PENETRATION TO REMAIN
EXIST. PIPE RAIL (PAINTED) W/ UMBRELLA
TYPE FLASHING W/ SLEEVES TO REMAIN
EXIST. EQUIPMENT RAILS TO REMAIN
EXIST. EQUIPMENT RAILS TO REMAIN
EXIST. EQUIPMENT CURBS TO REMAIN
EXIST. DUCTWORK PENETRATES SLOPED ROOF
EXIST. BUILT IN COPPER GUTTERS TO BE
REMOVED & REPLACE WITH NEW CUSTOM
PREFINISHED COMMERCIAL GRADE
METAL GUTTERS IN SAME LOCATION &
CONFIGURATION (.040 MIN.) TIE NEW
GUTTERS INTO EXISTING INTERNAL
DOWNSPOUTS
617.5SF
1AA
1F
EXIST. BUILT-IN GUTTER LINED
W/ EPDM (EA. SIDE)
EXISTING SCUPPER TO
REMAIN
EXIST. ROOF DRAIN TO REMAIN, REMOVE
CLEAN ALONG WITH RAIN WATER LEADER
AND REINSTALL
PROVIDE NEW SEALANT AS REQUIRED AT
LIMESTONE COPING (APPROX. 50 LIN. FT. )
EXIST. BUILT-IN COPPER GUTTERS TO BE
REMOVED INSTALL NEW CUSTOM
PREFINISHED COMMERCIAL GRADE
METAL GUTTERS IN SAME LOCATION &
CONFIGURATION (.040 MIN.) ATTACH TO
EXIST. DOWNSPOUTS
PROVIDE APPROX. 6 S.F. OF MISSING &
DAMAGED ROOF TILES AND ADD FIRE RETARDANT
TREATED WOOD SHEATHING, IN THICKNESS & KIND
TO MATCH EXISTING
EXIST. EQUIPMENT WITH CURB TO
REMAIN, PROVIDE NEW ROOF
SYSYEM CURB FLASHING PER DETAIL
PONDED WATER W/GREEN
ALGIE TO BE REMOVED FOR
INSTALLATION OF NEW ROOF
EXIST. ROOF PENETRATION TO REMAIN
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
REMOVE EXISTING COPPER VALLEYS,
NEW PREFINISHED METAL VALLEY FLASHING
TO BE PROVIDED AT VALLEY INTERSECTION
OF SLATE ROOF
EXIST. BUILT-IN COPPER GUTTERS TO BE
REMOVED INSTALL NEW CUSTOM
PREFINISHED COMMERCIAL GRADE
METAL GUTTERS IN SAME LOCATION &
CONFIGURATION (.040 MIN.) ATTACH TO
EXIST. DOWNSPOUTS
REMOVE & REINSTALL EXISTING LIGHTNING
PROTECTION SYSTEM ON NEW COPING
EXIST. LIMESTONE CHIMNEYS CAPS TO REMAIN
REMOVE EXIST. COPPER CRICKET & FLASHING
INSTALL NEW PREFINISHED CRICKET & FLASHING
REMOVE ENTIRE STANDING COPPER ROOF
INSTALL NEW PREFINISHED STANDING SEAM
METAL ROOF ON ICE AND WATER SHIELD.
EXIST. ROOF PENETRATION TO REMAIN
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
ALL SLATE SIDING TO BE REMOVED FROM EXTERIOR 2x4 WALLS.
NEW SHEATHING AND ICE & WATER SHIELD TO BE PROVIDED ON
EXISTING 2x4 FRAMING. DISCARD DEFECTIVE TILES AND PROVIDE SALVAGED
EXISTING SLATE IN GOOD CONDITION,OR NEW SLATE TO MATCH
EXISTING IN SIZE AND COLOR .
462 S.F.
PROVIDE NEW FLASHINGS AT THE ROOF CURB
AND PENETRATIONS (SEE DETAIL)
CLEAN RAIN WATER
LEADERS AND ROOF
DRAINS
EXIST. ROOF PENETRATION TO REMAIN
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
REMOVE ALL PERIMETER FLASHINGS AND EXPANSION
JOINTS AND INSTALL NEW INCLUDING SEALANTS (SEE
DETAIL AND SPEC'S.)
PROVIDE NEW JOINT SEALANTS
AT EXISTING LIMESTONE COPING
NOTE:
NO ACTION EPDM ROOF
MEMBRANE TO REMAIN AS IS
EPDM/WRAPS COVERS
METAL EDGE
EXISTING WOOD RAILS & PEDESTALS
TO REMAIN
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK PROVIDE AND INSTALL
NEW MODIFIED SBS GRANULATED BUILT-UP ROOF ON
NEW RIGID TAPERED INSULATION TO DRAIN ON EXISTING DECK
REMOVE ALL PERIMETER FLASHINGS AT WALL CONDITION
AND INSTALL NEW INCLUDING SEALANTS (SEE DETAIL & SPEC'S.)
EXISTING LIMESTONE COPING PROVIDE NEW
SEALANT AS REQUIRED (APPROX. 50 LIN. FT.)
EXIST. ROOF DRAIN REMOVE CLEAN & REINSTALL
PROVIDE NEW FLASHING AT SMOKE VENT CURB
(SEE DETAIL)
EXISTING SMOKE HATCH TO REMAIN
REMOVE STANDING WATER & DEBRIS FROM ROOF
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK PROVIDE AND INSTALL
NEW MODIFIED SBS GRANULATED BUILT-UP ROOF ON
NEW RIGID TAPERED INSULATION TO DRAIN ON EXISTING DECK
REMOVE ALL METAL EDGE STRIPS AND
REPLACE WITH NEW PREFINISHED EDGE STRIPS
EXIST. ROOF DRAIN TO REMAIN, REMOVE
CLEAN AND REINSTALL
EXIST. ROOF DRAIN TO REMAIN, REMOVE
CLEAN AND REINSTALL
CLEAN RAIN WATER LEADER AT ROOF DRAIN
COPPER CAP ON RAILS TO REMAIN
EXISTING WOOD RAILS & PEDESTALS
TO REMAIN
SL
O
PE
SL
O
PE
ALUMINUM SNOW FENCE
TO REMAIN
EXIST. BUILT IN COPPER GUTTERS TO BE
REMOVED & REPLACE WITH NEW CUSTOM
PREFINISHED COMMERCIAL GRADE
METAL GUTTERS IN SAME LOCATION &
CONFIGURATION (.040 MIN.)
EXIST. ROOF PENETRATION TO REMAIN
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
EXIST. ROOF DRAIN TO REMAIN, REMOVE
CLEAN AND REINSTALL
EXIST. ROOF DRAIN TO REMAIN, REMOVE
CLEAN AND REINSTALL
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK PROVIDE AND INSTALL
NEW MODIFIED SBS GRANULATED BUILT-UP ROOF ON
NEW RIGID TAPERED INSULATION TO DRAIN ON EXISTING DECK
REMOVE ALL PERIMETER FLASHINGS AT WALL CONDITION
AND INSTALL NEW INCLUDING SEALANTS (SEE DETAIL & SPEC'S.)
PROVIDE NEW SEALANT AS REQUIRED AT
LIMESTONE COPING (APPROX. 50 LIN. FT.)
PROVIDE NEW FLASHING AT SMOKE VENT CURB
SLOPE
SLOPE
PREFINISHED METAL EDGE TO REMAIN (PATINA GREEN)
EXISTING ALUMINUM SNOW
FENCE TO REMAIN
EXIST. BUILT-IN COPPER GUTTERS TO BE
REMOVED INSTALL NEW CUSTOM
PREFINISHED COMMERCIAL GRADE
METAL GUTTERS IN SAME LOCATION &
CONFIGURATION (.040 MIN.) ATTACH TO
EXIST. DOWNSPOUTS
EXIST. ROOF PENETRATION TO REMAIN
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
REMOVE EXISTING COPPER RIDGE CAP
NEW PREFINISHED METAL RIDGE CAP
TO BE PROVIDED AT ALL ROOF TILE RIDGES
SL
O
PE
SL
O
PE
SL
O
PE
EXIST. PREFIN. METAL EDGE
TO BE REMOVED INSTALL
NEW BREAK METAL .040 MIN.
(SEE DETAIL)
EXIST. BUILT-IN COPPER GUTTERS TO BE
REMOVED INSTALL NEW CUSTOM
PREFINISHED COMMERCIAL GRADE
METAL GUTTERS IN SAME LOCATION &
CONFIGURATION (.040 MIN.) ATTACH TO
EXIST. DOWNSPOUTS
EXIST. PREFIN. METAL EDGE TO BE REMOVED
INSTALL NEW PREFIN. METAL EDGE (SEE DETAIL )
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK, PROVIDE AND
INSTALL NEW MODIFIED SBS GRANULATED
BUILT-UP ROOF ON NEW RIGID TAPERED
INSULATION TO DRAIN ON EXISTING DECK
PROVIDE NEW FLASHINGS AT SMOKE VENT CURB
REMOVE ALL PERIMETER FLASHINGS AT ROOF
TO WALL CONDITION AND INSTALL NEW INCLUDING
SEALANTS ( SEE SPEC'S.)
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK, PROVIDE AND
INSTALL NEW MODIFIED SBS GRANULATED
BUILT-UP ROOF ON NEW RIGID TAPERED
INSULATION TO DRAIN ON EXISTING DECK
EXIST. ROOF HATCH TO BE REMOVED INSTALL
NEW ROOF HATCH (SEE DETAIL & SPEC'S.)
EXIST. ROOF HATCH TO BE REMOVED INSTALL
NEW ROOF HATCH (SEE DETAIL & SPEC'S.)
EXIST. ROOF HATCH TO BE REMOVED INSTALL
NEW ROOF HATCH (SEE DETAIL & SPEC'S.)
ENTIRE ROOF AREA INCLUDING PERIMETER FLASHINGS, CURBS
AND EQUIPMENT RAIL FLASHINGS TO BE PREPARED AND COATED
WITH NEW ROOF COATING. (SEE SPEC'S.) LEAVING EQUIPMENT IN
PLACE AS ROOF IS BEING RECOATED.
ENTIRE ROOF AREA INCLUDING PERIMETER
FLASHINGS, CURBS AND EQUIPMENT RAIL
FLASHINGS TO BE PREPARED AND COATED
WITH NEW ROOF COATING. (SEE SPEC'S.)
LEAVING EQUIPMENT IN PLACE AS ROOF
IS BEING RECOATED.
SL
O
PE
SLOPE
SL
O
PE
SL
O
PE
SLOPE
SL
O
PE
SLOPE
PROVIDE AND INSTALL PERMANENT STAINLESS STEEL
D-RING ANCHOR AS A FALL-ARREST TIE-OFF POINT.
D-RING SHALL BE EQUIVALENT TO GRAINGER,DBI-SALA,
ITEM # 2UZE5. INSTALLATION: PERMINENT W/LAG BOLTS
W/CAPACITY TO SUPPORT INDIVIDUAL LOADS.
RING DIA. 3 1/4"
WEIGHT CAPACITY: 310 ILS.
TENSILE STRENGTH: 5000 LBS.
STDS.: OSHA,ANSI Z359
BOLT D-RING TO COPING/
BLOCKING NEAR DOOR
BOLT TO COPING/
BLOCKING NEAR LADDER
BOLT D-RING ANCHOR TO INSIDE
HATCH (SEE NOTE THIS SHEET)
TO BLDG. #3
TO
B
LD
G
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE A THIS SHEET)
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
RE-ROOF USING EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE A THIS SHEET)
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE A THIS SHEET)
SL
O
PE
A
AA A
A
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE A THIS SHEET)
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE A THIS SHEET)
A
A
A
A
A A
B
OPEN ENDED GUTTER DRAINS
TO FLAT ROOF
A A
BOLT D-RING ANCHOR TO INSIDE
HATCH (SEE NOTE THIS SHEET)
EXIST. ROOF PENETRATION TO REMAIN
NEW FLASHING AND SLEEVE AS REQUIRED
PER NEW STANDING SEAM ROOF
REQUIREMENTS (SEE DETAIL)
FLAT ROOF AREA
NOT IN CONTRACT
FLAT ROOF AREA
NOT IN CONTRACT
FL
AT
R O
O F
A
RE
A N
O T
IN
C
O N
TR
AC
T
SEE SHEET # 10-208-LP01
FOR LOCATION OF LIGHTING
PROTECTION FOR BUILDINGS
(1-5) AS DIRECTED UNDER THIS
CONTRACT.
KEY NOTES:
A
B ICE AND SNOW GUARD TO BE ADDED (SEE SPEC'S.) ALSO SEE DETAIL SHEET.
NOTES:
PENETRATIONS SHOWN ON THIS PLAN
ARE APPROX. BY LOCATION & QUANITY.
CONTRACTOR TO VERIFY LOCATION AND
QUANITY IN FIELD. (TYP.)
A
A
(SLATE ROOF TILE AREAS)
1.) CAREFULLY REMOVE FOR REUSE THE EXISTING SLATE ROOF TILES WITHIN THIS AREA.
2.) STORE SLATE ROOF TILES IN SAFE LOCATION FOR REUSE.
3.) REMOVE ALL EXISTING WATER BARRIER, FELT AND ROOF PAPER.
4.) INSPECT EXISTING WOOD ROOF DECK FOR DAMAGE AND DECAY.
5.) REPLACE 50% OF WOOD ROOF DECK WITH WOOD PLANKING AND PLYWOOD OF FIRE
RETARDANT TREATED TYPE. IN THICKNESS AND KIND TO MATCH EXISTING WOOD
DECK TO REMAIN. (SEE SPECIFICATION SECTION 061000).
6.) INSTALL NEW ROOF MEMBRANE PER SPECIFICATIONS.
7.) INSTALL SALVAGED SLATE ROOF TILES ALONG WITH 30% OF NEW
REPLACEMENT SLATE TILES TO MATCH.
8.) SEE SPECIFICATIONS SECTIONS FOR ADDITIONAL INFORMATION.
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE A THIS SHEET)
C
IT IS INTENDED THAT ANY AND ALL EXISTING COPPER METAL FLASHINGS ,COPINGS,
MASONRY STEP FLASHINGS AND RIDGE CAPS IN THE SCOPE OF WORK AREA ARE
TO BE CAREFULLY REMOVED AND TEMPORARILY STORED ON THE SITE FOR REUSE
ON THE ROOF AREAS. NEW COPPER METAL FLASHINGS ,COPINGS, MASONRY STEP
FLASHINGS AND RIDGE CAPS SHALL BE REPLACED WITH NEW COPPER METAL TO
MATCH SHAPES,PATTERNS, PROFILES AND GAUGE AFTER THE INSPECTION, DIRECTION
AND APPROVAL OF THE COR AT THE VAMC FACILITY.
D
IT IS INTENDED THAT ANY AND ALL EXISTING COPPER METAL STANDING SEAM EAVE PANELS
IN THE SCOPE OF WORK AREA ARE TO BE CAREFULLY REMOVED AND TEMPORARILY STORED
ON THE SITE FOR REUSE ON THE ROOF AREAS . NEW COPPER METAL STANDING SEAM EAVE
PANELS SHALL BE REPLACED WITH NEW COPPER METAL TO MATCH SHAPES, PATTERNS,
PROFILES AND GAUGE AFTER THE INSPECTION, DIRECTION AND APPROVAL OF THE COR AT
THE VAMC FACILITY.
ROOF CORE TAKEN #5
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
ROOF CORE TAKEN #4A
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
ROOF CORE TAKEN #4
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
ROOF CORE TAKEN #3
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
ROOF CORE TAKEN #6
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
EXISTING COPPER MASONRY STEP FLASHING SHALL
BE REUSED. PROVIDE NEW JOINT SEALANT AND MORTAR
AS REQUIRED TO MAKE WATERTIGHT. SEE KEY NOTE C
FOR ADDITIONAL INFORMATION. (TYPICAL)
EXISTING COPPER MASONRY STEP FLASHING SHALL
BE REUSED. PROVIDE NEW JOINT SEALANT AND MORTAR
AS REQUIRED TO MAKE WATERTIGHT. SEE KEY NOTE C
FOR ADDITIONAL INFORMATION. (TYPICAL)
CAREFULLY REMOVE FOR REINSTALLATION & REUSE
ALL THE EXISTING COPPER METAL RIDGE CAPS &
VALLEY FLASHINGS. SEE KEY NOTE C FOR
ADDITIONAL INFORMATION (TYPICAL)
CAREFULLY REMOVE FOR REINSTALLATION & REUSE
ALL THE EXISTING COPPER METAL RIDGE CAPS &
VALLEY FLASHINGS. SEE KEY NOTE C FOR
ADDITIONAL INFORMATION (TYPICAL)
EXISTING COPPER MASONRY STEP FLASHING SHALL
BE REUSED. PROVIDE NEW JOINT SEALANT AND MORTAR
AS REQUIRED TO MAKE WATERTIGHT. SEE KEY NOTE C
FOR ADDITIONAL INFORMATION. (TYPICAL)
CAREFULLY REMOVE FOR REINSTALLATION &
REUSE ALL THE EXISTING COPER METAL STANDING
SEAM EAVE PANELS. SEE NOTE D FOR ADDITIONAL
INFORMATION. TYPICAL
CAREFULLY REMOVE FOR REINSTALLATION &
REUSE ALL THE EXISTING COPER METAL STANDING
SEAM EAVE PANELS. SEE NOTE D FOR ADDITIONAL
INFORMATION. TYPICAL
CAREFULLY REMOVE FOR REINSTALLATION &
REUSE ALL THE EXISTING COPER METAL STANDING
SEAM EAVE PANELS. SEE NOTE D FOR ADDITIONAL
INFORMATION. TYPICAL
EXIST. GUTTER TO BE REMOVED, INSTALL
NEW BREAK METAL .040 MIN. GUTTER (SEE
DETAIL )
A. REPLACE ROOFS: PROVIDE ALL LABOR, MATERIALS, TOOLS EQUIPMENT AND SUPERVISION
NECESSARY TO REPLACE EXISTING ROOF SYSTEMS LOCATED AT THE VA MEDICAL CENTER,
222 RICHMOND AVENUE BATAVIA, NEW YORK,14020. WORK INCLUDES REMOVAL, REPLACEMENT.
OF EXISTING MATERIALS, SYSTEMS, CONSTRUCTION AND CERTAIN OTHER ITEMS.
B. NEW ROOFING SYSTEMS SHALL INCLUDE ALL ASSOCIATED ITEMS AND MATERIALS, CONSISTING OF BUT NOT LIMITED TO A MODIFIED BUILT-UP-ROOF SYSTEM, ALUMINUM FLASHINGS,TAPERED INSULATION, FASTENING, VAPOR BARRIER, DRAINS, SCUPPERS, PARAPET WALLS, AND MASONRY JOINT REPAIRS, CAULKING, WALK PADS, PRESSURE TREATED WOOD BLOCKING, CURBS, AND ITEMS FASTENED, ATTACHED, AND/OR PROJECTING THROUGH THE ROOF LAYERS. EXISTING ROOFING SHALL INCLUDE THE COMPLETE REMOVAL OF ALL MATERIALS, DOWN TO HARD DECK SURFACE. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH THE APPLICABLE FEDERAL , STATE , AND LOCAL REGULATIONS , STANDARDS , CODE RULE 56 AND CODES GOVERNING ASBESTOS ABATEMENT , AND ANY OTHER TRADE WORK DONE IN CONJUNCTION WITH THE ABATEMENT . BUILDING WATERTIGHT INTEGRITY SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES . WHERE ROOF WORK ABUTS TO ADJOINING ROOF SURFACES AND APPENDENCIES , THESE PORTIONS SHALL BE INCLUDED WITHIN STATEMENT OF WORK.
ALL WORK SHALL BE IN ACCORDANCE WITH SCOPE OF WORK , MANUFACTURES AND VA SPECIFICATIONS.
C. SEE SPECIFICATIONS SECTIONS FOR ROOF TYPES.
D. WORKING HOURS : HOURS OF WORK SHALL BE AS DETERMINED BY COTR.
E. SUBMITTALS : ALL PRODUCT DATA SUBMITTALS SHALL BE REQUIRED AT TIME OF PRE-CONSTRUCTION MEETING.
F. AS-BUILT DRAWINGS : INCLUDE WITH CLOSEOUT SUBMITTALS.
G. TEMPORARY PROTECTION : INSTALL TEMPORARY PROTECTION CONSISTING OF A TEMPORARY SEAL, COVER AND WATER CUT-OFF'S AT THE END OF EACH DAY'S WORK AND WHEN WORK IS HALTED FOR AN INDEFINITE PERIOD OR WORK IS STOPPED WHEN PRECIPITATION IMMINENT. INSTALL TEMPORARY ROOF WHEN WEATHER DOES NOT PERMIT INSTALLATION OF A COMPLETED PERMANENT ROOF SYSTEM OR ROOF WOULD BE SUBJECT TO PHASING OF ROOF WORK.
PROVIDE TEMPORARY PROTECTION AGAINST DAMAGE FOR PORTIONS OF EXISTING STRUCTURES, GROUNDS AND INTERIORS
AT ALL TIMES, FROM DAMAGE, DUST, AND WEATHER INCLEMENCY .
H. PHASING: FURNISH THE COTR WITH THE SCHEDULE OF APPROXIMATE DATES ON WHICH THE CONTRACTOR INTENDS TO ACCOMPLISH WORK IN EACH SPECIFIC AREA. NOTIFY THE COTR TWO WEEKS IN ADVANCE OF THE PROPOSED DATE OF OF STARTING WORK IN EACH SPECIFIC AREA. ARRANGE DATES TO INSURE ACCOMPLISHMENT OF THIS WORK IN EACH SPECIFIC AREA. ARRANGE DATES TO INSURE ACCOMPLISHMENT OF THIS WORK IN SUCCESSIVE PHASES MUTUALLY TO
COTR AND CONTRACTOR.
I . UTILITIES & BUILDING SERVICES: MAINTAIN EXISTING UTILITY AND BUILDING SERVICES FOR MEDICAL CENTER AT ALL TIMES.
PROVIDE TEMPORARY SERVICES, LABOR, MATERIALS, EQUIPMENT, CONNECTIONS, AND UTILITIES TO ASSURE UNINTERRUPTED SERVICES. NO SERVICE MAY BE INTERRUPTED WITHOUT PRIOR APPROVAL OF COTR. SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, 48 HOURS IN ADVANCE OR PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION.
J. USE OF ROADWAYS: USE ONYL ESTABLISHED PUBLIC ROADS AND ROADS ON MEDICAL CENTER PROPERTY AND, WHEN AUTHORIZED BY THE COTR. WHEN NECESSARY TO CROSS CURBING, SIDEWALKS, OR SIMILAR CONSTRUCTION, THEY MUST BE PROTECTED BY WELL-CONSTRUCTED BRIDGES. WHEN PRE-APPROVED BY COTR, EQUIPMENT AND VEHICLES MAY TRAVERSE AND STAGE ON LAWNS AT ASSIGNED LOCATIONS. LAWNS SHALL BE PROTECTED FROM SEVER DAMAGE AND RUTS. ALL
LOCATIONS SHALL BE SUBJECT TO RESTORATION AND RE-SEEDING.
K. IT HAS BEEN DETERMINED UTILIZING NFPA 780 STANDARD THAT ALL BUILDINGS WITHIN THIS PROJECT SHOULD BE PROVIDED WITH A LIGHTNING PROTECTION SYSTEM. REFER TO SHEET LPO1 FOR SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL NOTES
BREAKLINE: SEE SHT. A3.O FOR
CONTINUATION
BLDG. #1
TO
B
LD
G
KEY PLAN
BREAKLINE:
SEE SHT.# A1.1
FOR CONTINUATION
1 (PARTIAL)
BATAVIA, NEW YORK 14020
222 RICHMOND AVE
th re e q u a rt e rs in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Revisions
Date th re e e ig h th s in c h o n e fo o t
F o n e h a lf in c h o n e fo o t
E
D
3 4 5 o n e in c h o n e fo o t
C 6 o n e a n d o n e h a lf in c h o n e fo o t
B th re e in c h e s o n e fo o t
A
1 2 3 4 5
Drawing Title
Location
V.A.M.C. BATAVIA, NEW YORK
7 8
Building Number
Project Title
Checked Drawn
Offi ce of Fac ilit ies
Station No.
Date
F E
D
6 7 8
C B
A
JULY 01, 2018
528A
SAFETY OFFICER
ENGINEERING MANAGERCARDIOLOGY MANAGER
DATE DATECHIEF OF STAFF
DATE
DATE
CARELINE MANAGER DATE
DATE
DATE
DATE
CHIEF ENGINEER
INFECTION CONTROL
DADRAD
PROJECT ENGINEER
DATE
DATE
stamp
10-208-
TRM DESIGN & PLANNING LLC
104 DARWIN DRIVE
BUFFALO, NEW YORK 14043
P: 716.946.9092
REPAIR/REPLACE ROOF
BATAVIA VA MEDICAL CENTER
60% SUBMISSION MARCH 09.2018
A1.1
ROOF PLAN
Martin Brothers
Chris Hall,P.E.
90% SUBMISSION JUNE 04.2018
BIDDING DOCUMENTS JULY 01.2018
BUILDING 1 (PARTIAL) SCALE: 1/8"=1'-0"
ROOF PLAN
D1.0
D-1.0
D1.0
D1.0
D4.0
D1.0
D2.0
D5.0
D3.0
D4.0
D2.0
D5.0
D5.0
D1.0
D5.0
D1.0
D1.0
D1.0
D1.0
D1.0
D1.0
D4.0
D4.0
D4.0
D4.0
D1.0
D1.0
D1.0
D3.0
D1.0
D4.0
D1.0
D5.0
1,753.3SF 1,753.3SF
1,381.5SF 1,381.5SF
1,012.8SF
1,012.8SF
1,220.7SF
1,220.7SF
1,121.3SF
197.9SF
246.5SF
187.7SF
1,080.5SF
EXIST. ROOF DRAIN TO REMAIN,
REMOVE CLEAN AND REINSTALL
SLOPE SLOPE
EXIST. ROOF DRAIN TO REMAIN, REMOVE
CLEAN AND REINSTALL
SLOPE
EXIST. PIPE RAIL (PAINTED) W/ UMBRELLA
TYPE FLASHING W/ SLEEVES, NEW
FLASHING AND SLEEVE AS REQUIRED (SEE
DETAIL)
EXIST. ROOF DRAIN TO REMAIN, REMOVE
CLEAN & REINSTALL (SEE DETAIL)
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
EXIST. BUILT-IN COPPER GUTTERS TO BE
REMOVED INSTALL NEW CUSTOM
PREFINISHED COMMERCIAL GRADE
METAL GUTTERS IN SAME LOCATION &
CONFIGURATION (.040 MIN.) TIE INTO
EXIST. DOWNSPOUTS
EXIST. ROOF VENTILATOR TO REMAIN
INSTALL NEW FLASHING AND SLEEVES
EXIST. CHIMNEYS W/ LIMESTONE CAPS
TO REMAIN
EXIST. ROOF VENTILATOR TO REMAIN NEW
FLASHING AND SLEEVE TO BE PROVIDED
TO BLDG. #4
EXIST. CURB & ROOFTOP UNIT
TO REMAIN
SL
O
PE
ALUM. SNOW FENCE
TO REMAIN
SLOPE SLOPE
SLOPE
EXISTING VENT TO REMAIN NEW FLASHING
& SLEEVE TO BE PROVIDED (SEE DETAIL )
PROVIDE NEW SEALANT AS REQUIRED AT LIMESTONE
COPING (APPROX. 50 LIN. FT.)
SL
O
PE
ALUM. SNOW FENCE
TO REMAIN
EXIST. ROOF DRAIN TO REMAIN, REMOVE
CLEAN ALONG WITH RAIN WATER LEADER
AND REINSTALL
PROVIDE NEW SEALANT AS REQUIRED AT
LIMESTONE COPING (APPROX. 50 LIN. FT. )
EXIST. COPPER GUTTERS TO BE REMOVED
INSTALL NEW CUSTOM PREFINISHED
COMMERCIAL GRADE METAL GUTTERS IN
SAME LOCATION & CONFIGURATION
(.040 MIN.) ATTACH TO EXIST.
DOWNSPOUTS
EXIST. ROOF PENETRATION TO REMAIN
NEW FLASHING AND SLEEVE TO BE
PROVIDED (SEE DETAIL)
EXIST. ROOF HATCH TO BE REMOVED
INSTALL NEW "BILCO" TYPE ROOF HATCH
(SEE DETAIL)
EXIST. BUILT-IN COPPER GUTTERS TO BE
REMOVED INSTALL NEW CUSTOM
PREFINISHED COMMERCIAL GRADE
METAL GUTTERS IN SAME LOCATION &
CONFIGURATION (.040 MIN.) TIE INTO
EXIST. DOWNSPOUTS
EXIST. ROOF PENETRATION TO REMAIN
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
PROVIDE NEW STEPPED FLASHING INTERSECTION OF
EXISTING SLATE TILES IN GOOD CONDITION, OR NEW
SLATE TO MATCH EXISTING SIZE & COLOR
EXIST. EQUIPMENT WITH CURB TO
REMAIN, PROVIDE NEW ROOF
SYSYEM CURB FLASHING PER DETAIL
PONDED WATER W/GREEN
ALGIE TO BE REMOVED FOR
INSTALLATION OF NEW ROOF
EXIST. BUILT-IN COPPER GUTTERS TO BE
REMOVED INSTALL NEW CUSTOM
PREFINISHED COMMERCIAL GRADE
METAL GUTTERS IN SAME LOCATION &
CONFIGURATION (.040 MIN.) ATTACH TO
EXIST. DOWNSPOUTS
EXIST. ROOF PENETRATION TO REMAIN
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
EXIST. COPPER GUTTERS TO BE REMOVED
INSTALL NEW CUSTOM PREFINISHED
COMMERCIAL GRADE METAL GUTTERS IN
SAME LOCATION & CONFIGURATION
(.040 MIN.) ATTACH TO EXIST.
DOWNSPOUTS
EXIST. ROOF PENETRATION TO REMAIN
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK, PROVIDE AND
INSTALL NEW MODIFIED SBS GRANULATED
BUILT-UP ROOF ON NEW RIGID TAPERED
INSULATION TO DRAIN ON EXISTING DECK
EXIST. PREFIN. METAL EDGE
TO BE REMOVED INSTALL
NEW BREAK METAL .040 MIN.
(SEE DETAIL)
BALLASTED EPDM TO REMAIN
(NO ACTION REQUIRED)
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK, PROVIDE AND
INSTALL NEW MODIFIED SBS GRANULATED
BUILT-UP ROOF ON NEW RIGID TAPERED
INSULATION TO DRAIN ON EXISTING DECK
REMOVE ALL PERIMETER FLASHING AT ROOF
TO WALL CONDITION & INSTALL NEW INCLUDING
SEALANTS (SEE SPEC'S.)
PROVIDE NEW FLASHING AT SMOKE VENT CURB
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK, PROVIDE AND
INSTALL NEW MODIFIED SBS GRANULATED
BUILT-UP ROOF ON NEW RIGID TAPERED
INSULATION TO DRAIN ON EXISTING DECK
PREFIN. METAL EDGE TO BE REMOVED
INSTALL NEW PREFINISHED METAL EDGE STRIPS
.040 MIN.) (SEE DETAIL)
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK, PROVIDE AND
INSTALL NEW MODIFIED SBS GRANULATED
BUILT-UP ROOF ON NEW RIGID TAPERED
INSULATION TO DRAIN ON EXISTING DECK
PROVIDE NEW FLASHINGS AT SMOKE VENT CURB
REMOVE ALL PERIMETER FLASHINGS AT ROOF
TO WALL CONDITION AND INSTALL NEW INCLUDING
SEALANTS ( SEE SPEC'S.)
EXIST. ROOF HATCH TO BE REMOVED INSTALL
NEW ROOF HATCH (SEE DETAIL & SPEC'S.)
SL
O
PE
SL
O
PE
SLOPE
SL
O
PE
PROVIDE AND INSTALL PERMANENT STAINLESS STEEL
D-RING ANCHOR AS A FALL-ARREST TIE-OFF POINT.
D-RING SHALL BE EQUIVALENT TO GRAINGER,DBI-SALA,
ITEM # 2UZE5. INSTALLATION: PERMINENT W/LAG BOLTS
W/CAPACITY TO SUPPORT INDIVIDUAL LOADS.
RING DIA. 3 1/4"
WEIGHT CAPACITY: 310 ILS.
TENSILE STRENGTH: 5000 LBS.
STDS.: OSHA,ANSI Z359
FLAT ROOF AREA
NOT IN CONTRACT
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE A THIS SHEET)
BOLT D-RING ANCHOR TO INSIDE
HATCH (SEE NOTE THIS SHEET)
FLAT ROOF AREA
NOT IN CONTRACT
FLAT ROOF AREA
NOT IN CONTRACT
FLAT ROOF AREA
NOT IN CONTRACT
FLAT ROOF AREA
NOT IN CONTRACT
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE A THIS SHEET)
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE A THIS SHEET)
FLAT ROOF AREA
NOT IN CONTRACT
SLOPE
SL
O
PE
SL
O
PE
AA
AA
B
A A
A
A
A
B
A
A A
A
BOLT D-RING ANCHOR TO INSIDE HATCH
(SEE NOTE THIS SHEET)
BOLT D-RING ANCHOR TO INSIDE HATCH
(SEE NOTE THIS SHEET)EXIST. LADDER TO REMAIN
B
SEE SHEET # 10-208-LP01
FOR LOCATION OF LIGHTING
PROTECTION FOR BUILDINGS
(1-5) AS DIRECTED UNDER THIS
CONTRACT.
KEY NOTES:
A
B ICE AND SNOW GUARD TO BE ADDED (SEE SPEC'S.) ALSO SEE DETAIL SHEET.
NOTES:
PENETRATIONS SHOWN ON THIS PLAN
ARE APPROX. BY LOCATION & QUANITY.
CONTRACTOR TO VERIFY LOCATION AND
QUANITY IN FIELD. (TYP.)
(SLATE ROOF TILE AREAS)
1.) CAREFULLY REMOVE FOR REUSE THE EXISTING SLATE ROOF TILES WITHIN THIS AREA.
2.) STORE SLATE ROOF TILES IN SAFE LOCATION FOR REUSE.
3.) REMOVE ALL EXISTING WATER BARRIER, FELT AND ROOF PAPER.
4.) INSPECT EXISTING WOOD ROOF DECK FOR DAMAGE AND DECAY.
5.) REPLACE 50% OF WOOD ROOF DECK WITH WOOD PLANKING AND PLYWOOD OF FIRE
RETARDANT TREATED TYPE. IN THICKNESS AND KIND TO MATCH EXISTING WOOD
DECK TO REMAIN. (SEE SPECIFICATION SECTION 061000).
6.) INSTALL NEW ROOF MEMBRANE PER SPECIFICATIONS.
7.) INSTALL SALVAGED SLATE ROOF TILES ALONG WITH 30% OF NEW
REPLACEMENT SLATE TILES TO MATCH.
8.) SEE SPECIFICATIONS SECTIONS FOR ADDITIONAL INFORMATION.
C
IT IS INTENDED THAT ANY AND ALL EXISTING COPPER METAL FLASHINGS ,COPINGS,
MASONRY STEP FLASHINGS AND RIDGE CAPS IN THE SCOPE OF WORK AREA ARE
TO BE CAREFULLY REMOVED AND TEMPORARILY STORED ON THE SITE FOR REUSE
ON THE ROOF AREAS. NEW COPPER METAL FLASHINGS ,COPINGS, MASONRY STEP
FLASHINGS AND RIDGE CAPS SHALL BE REPLACED WITH NEW COPPER METAL TO
MATCH SHAPES,PATTERNS, PROFILES AND GAUGE AFTER THE INSPECTION, DIRECTION
AND APPROVAL OF THE COR AT THE VAMC FACILITY.
D
IT IS INTENDED THAT ANY AND ALL EXISTING COPPER METAL STANDING SEAM EAVE PANELS
IN THE SCOPE OF WORK AREA ARE TO BE CAREFULLY REMOVED AND TEMPORARILY STORED
ON THE SITE FOR REUSE ON THE ROOF AREAS . NEW COPPER METAL STANDING SEAM EAVE
PANELS SHALL BE REPLACED WITH NEW COPPER METAL TO MATCH SHAPES, PATTERNS,
PROFILES AND GAUGE AFTER THE INSPECTION, DIRECTION AND APPROVAL OF THE COR AT
THE VAMC FACILITY.
ROOF CORE TAKEN #13
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
ROOF CORE TAKEN #2
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
ROOF CORE TAKEN #1
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
ROOF CORE TAKEN #7
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
ROOF CORE TAKEN #14
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
CAREFULLY REMOVE FOR REINSTALLATION & REUSE
ALL THE EXISTING COPPER METAL RIDGE CAPS &
VALLEY FLASHINGS. SEE KEY NOTE C FOR
ADDITIONAL INFORMATION (TYPICAL)
CAREFULLY REMOVE FOR REINSTALLATION &
REUSE ALL THE EXISTING COPER METAL STANDING
SEAM EAVE PANELS. SEE NOTE D FOR ADDITIONAL
INFORMATION. TYPICAL
CAREFULLY REMOVE FOR REINSTALLATION &
REUSE ALL THE EXISTING COPER METAL STANDING
SEAM EAVE PANELS. SEE NOTE D FOR ADDITIONAL
INFORMATION. TYPICAL
EXIST. GUTTER TO BE REMOVED, INSTALL
NEW BREAK METAL .040 MIN. GUTTER (SEE
DETAIL )
A. REPLACE ROOFS: PROVIDE ALL LABOR, MATERIALS, TOOLS EQUIPMENT AND SUPERVISION
NECESSARY TO REPLACE EXISTING ROOF SYSTEMS LOCATED AT THE VA MEDICAL CENTER,
222 RICHMOND AVENUE BATAVIA, NEW YORK,14020. WORK INCLUDES REMOVAL, REPLACEMENT.
OF EXISTING MATERIALS, SYSTEMS, CONSTRUCTION AND CERTAIN OTHER ITEMS.
B. NEW ROOFING SYSTEMS SHALL INCLUDE ALL ASSOCIATED ITEMS AND MATERIALS, CONSISTING OF BUT NOT LIMITED TO A MODIFIED BUILT-UP-ROOF SYSTEM, ALUMINUM FLASHINGS,TAPERED INSULATION, FASTENING, VAPOR BARRIER, DRAINS, SCUPPERS, PARAPET WALLS, AND MASONRY JOINT REPAIRS, CAULKING, WALK PADS, PRESSURE TREATED WOOD BLOCKING, CURBS, AND ITEMS FASTENED, ATTACHED, AND/OR PROJECTING THROUGH THE ROOF LAYERS. EXISTING ROOFING SHALL INCLUDE THE COMPLETE REMOVAL OF ALL MATERIALS, DOWN TO HARD DECK SURFACE. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH THE APPLICABLE FEDERAL , STATE , AND LOCAL REGULATIONS , STANDARDS , CODE RULE 56 AND CODES GOVERNING ASBESTOS ABATEMENT , AND ANY OTHER TRADE WORK DONE IN CONJUNCTION WITH THE ABATEMENT . BUILDING WATERTIGHT INTEGRITY SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES . WHERE ROOF WORK ABUTS TO ADJOINING ROOF SURFACES AND APPENDENCIES , THESE PORTIONS SHALL BE INCLUDED WITHIN STATEMENT OF WORK.
ALL WORK SHALL BE IN ACCORDANCE WITH SCOPE OF WORK , MANUFACTURES AND VA SPECIFICATIONS.
C. SEE SPECIFICATIONS SECTIONS FOR ROOF TYPES.
D. WORKING HOURS : HOURS OF WORK SHALL BE AS DETERMINED BY COTR.
E. SUBMITTALS : ALL PRODUCT DATA SUBMITTALS SHALL BE REQUIRED AT TIME OF PRE-CONSTRUCTION MEETING.
F. AS-BUILT DRAWINGS : INCLUDE WITH CLOSEOUT SUBMITTALS.
G. TEMPORARY PROTECTION : INSTALL TEMPORARY PROTECTION CONSISTING OF A TEMPORARY SEAL, COVER AND WATER CUT-OFF'S AT THE END OF EACH DAY'S WORK AND WHEN WORK IS HALTED FOR AN INDEFINITE PERIOD OR WORK IS STOPPED WHEN PRECIPITATION IMMINENT. INSTALL TEMPORARY ROOF WHEN WEATHER DOES NOT PERMIT INSTALLATION OF A COMPLETED PERMANENT ROOF SYSTEM OR ROOF WOULD BE SUBJECT TO PHASING OF ROOF WORK.
PROVIDE TEMPORARY PROTECTION AGAINST DAMAGE FOR PORTIONS OF EXISTING STRUCTURES, GROUNDS AND INTERIORS
AT ALL TIMES, FROM DAMAGE, DUST, AND WEATHER INCLEMENCY .
H. PHASING: FURNISH THE COTR WITH THE SCHEDULE OF APPROXIMATE DATES ON WHICH THE CONTRACTOR INTENDS TO ACCOMPLISH WORK IN EACH SPECIFIC AREA. NOTIFY THE COTR TWO WEEKS IN ADVANCE OF THE PROPOSED DATE OF OF STARTING WORK IN EACH SPECIFIC AREA. ARRANGE DATES TO INSURE ACCOMPLISHMENT OF THIS WORK IN EACH SPECIFIC AREA. ARRANGE DATES TO INSURE ACCOMPLISHMENT OF THIS WORK IN SUCCESSIVE PHASES MUTUALLY TO
COTR AND CONTRACTOR.
I . UTILITIES & BUILDING SERVICES: MAINTAIN EXISTING UTILITY AND BUILDING SERVICES FOR MEDICAL CENTER AT ALL TIMES.
PROVIDE TEMPORARY SERVICES, LABOR, MATERIALS, EQUIPMENT, CONNECTIONS, AND UTILITIES TO ASSURE UNINTERRUPTED SERVICES. NO SERVICE MAY BE INTERRUPTED WITHOUT PRIOR APPROVAL OF COTR. SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, 48 HOURS IN ADVANCE OR PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION.
J. USE OF ROADWAYS: USE ONYL ESTABLISHED PUBLIC ROADS AND ROADS ON MEDICAL CENTER PROPERTY AND, WHEN AUTHORIZED BY THE COTR. WHEN NECESSARY TO CROSS CURBING, SIDEWALKS, OR SIMILAR CONSTRUCTION, THEY MUST BE PROTECTED BY WELL-CONSTRUCTED BRIDGES. WHEN PRE-APPROVED BY COTR, EQUIPMENT AND VEHICLES MAY TRAVERSE AND STAGE ON LAWNS AT ASSIGNED LOCATIONS. LAWNS SHALL BE PROTECTED FROM SEVER DAMAGE AND RUTS. ALL
LOCATIONS SHALL BE SUBJECT TO RESTORATION AND RE-SEEDING.
K. IT HAS BEEN DETERMINED UTILIZING NFPA 780 STANDARD THAT ALL BUILDINGS WITHIN THIS PROJECT SHOULD BE PROVIDED WITH A LIGHTNING PROTECTION SYSTEM. REFER TO SHEET LPO1 FOR SPECIFICATIONS FOR ADDITIONAL INFORMATION.
BLDG. #1
SEE SHEET A1.O
FOR CONTINUATION
KEY PLAN
1 (PARTIAL)
BATAVIA, NEW YORK 14020
222 RICHMOND AVE
th re e q u a rt e rs in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Revisions
Date th re e e ig h th s in c h o n e fo o t
F o n e h a lf in c h o n e fo o t
E
D
3 4 5 o n e in c h o n e fo o t
C 6 o n e a n d o n e h a lf in c h o n e fo o t
B th re e in c h e s o n e fo o t
A
1 2 3 4 5
Drawing Title
Location
V.A.M.C. BATAVIA, NEW YORK
7 8
Building Number
Project Title
Checked Drawn
Offic e o f F aci liti es
Station No.
Date
F E
D
6 7 8
C B
A
528A
SAFETY OFFICER
ENGINEERING MANAGERCARDIOLOGY MANAGER
DATE DATECHIEF OF STAFF
DATE
DATE
CARELINE MANAGER DATE
DATE
DATE
DATE
INFECTION CONTROL
DADRADPROJECT ENGINEER
DATE
DATE
CHIEF ENGINEERstamp
REPAIR/REPLACE ROOF
BATAVIA VA MEDICAL CENTER
60% SUBMISSION
10-208-
TRM DESIGN & PLANNING LLC
104 DARWIN DRIVE
BUFFALO, NEW YORK 14043
P: 716.946.9092 A2.0
ROOF PLAN
BUILDING # 2
JULY 01, 2018
MARCH 09.2018
90% SUBMISSION JUNE 04.2018
BIDDING DOCUMENTS JULY 01.2018 MARTIN BROTHERS
CHRIS HALL, P.E.
BUILDING 2 SCALE: 1/8"=1'-0"
ROOF PLAN
D1.0
D1.0
D1.0
D5.0
D1.0
D4.0
D4.0
D4.0
D5.0
D1.0
D4.0
D5.0
D1.0
D1.0
D3.0
D5.0
D3.0
D5.0
D3.0
D1.0
D5.0
D3.0
D4.0
D4.0
D1.0
D1.0
D4.0
D4.0
D4.0
D4.0
D3.0
D1.0
D4.0
D4.0
D1.0
D3.0
D3.0
D3.0
D4.0
D1.0
D1.0
D1.0
D1.0
D3.0
D1.0
D1.0
D1.0
D1.0
D4.0
1,770.7SF
1,770.7SF
281.2SF
281.2SF
869.3SF
869.3SF
2004.4SF
1942.5SF
2,688.8SF
720.5F
TYP. STANDING SEAM COPPER (40" EXPOSURE
& 15" WIDE BETWEEN RIBS) (COVERING EXIST.
BUILT-IN GUTTERS) (CIRCA 1980)
LIMESTONE COPING BELOW (BA. SIDE)
TO BLDG #1
TYP. ROOF DORMER SLATE TILE
ROOF W/ NEW BREAKMETAL
RIDGE CAP . SLATE ON SIDES
OF DORMERS, REMOVE
DISGUARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING
SLATE IN GOOD CONDITION.
OR NEW SLATE TO MATCH IN
SIZE AND COLOR (SEE NOTE A
THIS SHEET)
COPPER ROOF
VENTILATOR
SL
O
PE
SLOPE
SLOPE SLOPE
SLOPE
SLOPE
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK . PROVIDE AND
INSTALL NEW MODIFIED SBS GRANULATED
BUILT-UP ROOF ON NEW RIGID TAPERED
INSULATION TO DRAIN ON EXISTING DECK
SLOPE SLOPE
SLOPESLOPE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
EXISTING DOWNSPOUT TO REMAIN
50 SF
EXIST. ROOF HATCH TO BE REMOVED INSTALL
NEW ROOF HATCH (SEE DETAIL & SPEC'S.)
EXIST. ROOF PENETRATION TO REMAIN .
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
REMOVE EXISTING STONE COPING AND
PROVIDE NEW PREFINISHED METAL COPING
ON NEW PRESSURE TREATED WOOD BLOCKING
REMOVE ALL PERIMETER FLASHING AT BRICK PARAPET
AND INSTALL NEW INCLUDING SEALANTS AT MORTAR
JOINTS
REMOVE EXISTING STONE COPING AND
PROVIDE NEW PREFINISHED METAL COPING
ON NEW PRESSURE TREATED WOOD BLOCKING
REMOVE EXISTING STONE COPING AND
PROVIDE NEW PREFINISHED METAL COPING
ON NEW PRESSURE TREATED WOOD BLOCKING
EXIST. ROOF PENETRATION TO REMAIN .
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
REMOVE ALL PERIMETER FLASHING AT BRICK PARAPET
AND INSTALL NEW INCLUDING SEALANTS AT MORTAR
JOINTS
REMOVE EXISTING STONE COPING AND
PROVIDE NEW PREFINISHED METAL COPING
ON NEW PRESSURE TREATED WOOD BLOCKING
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK, PROVIDE AND
INSTALL NEW MODIFIED SBS GRANULATED
BUILT-UP ROOF ON NEW RIGID TAPERED
INSULATION TO DRAIN ON EXISTING DECK
EXIST. ROOF PENETRATION TO REMAIN .
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
PROVIDE NEW FLASHING AT
THRU WALL SCUPPERS (4 LOCATIONS)
PROVIDE NEW FLASHING AT
THRU WALL SCUPPERS (4 LOCATIONS)
PROVIDE NEW FLASHING AT LARGER
THRU WALL SCUPPERS (2 LOCATIONS)
CONTRACTOR TO REMOVE ELEVATED ROOF
AREA AND REWORK TO MATCH NEW ROOF
REMOVE EXISTING 2-PLY BUILT-UP ROOF DOWN
TO EXISTING CONCRETE DECK . PROVIDE AND
INSTALL NEW MODIFIED SBS GRANULATED
BUILT-UP ROOF ON NEW RIGID TAPERED
INSULATION TO DRAIN ON EXISTING DECK
REMOVE ALL PERIMETER FLASHING AT BRICK PARAPET
AND INSTALL NEW INCLUDING SEALANTS AT MORTAR
JOINTS
SL
O
PE
EXISTING ROOFTOP UNIT TO REMAIN
REMOVE EXISTING STONE COPING AND
PROVIDE NEW PREFINISHED METAL COPING
ON NEW PRESSURE TREATED WOOD BLOCKING
(12'-0" ± )
PROVIDE NEW FLASHING AT LARGER
THRU WALL SCUPPERS (2 LOCATIONS)
PROVIDE NEW FLASHINGS AND SLEEVE AT ALL
ROOF PENETRATIONS
EXISTING CHAIN LINK POST TO REMAIN REATTACH TO NEW ROOF
REMOVE AND REINSTALL EXISTING LARGE
SHEET METAL CAPS ON EXISTING CURBS
REPOINT AND REPAIR BRICK PARAPET ON NORTHEAST
SIDE OF ROOF AREA (250 SF OF AREA)
REMOVE EXISTING RUSTED METAL DECK PANELS
PROVIDE & INSTALL NEW PREFINISHED STANDING SEAM
TYPE ROOF PANELS ON EXISTING STEEL FRAMING.
ICE AND SNOW GUARDS TO BE ADDED
(SEE SPEC. )
PROVIDE AND INSTALL NEW COMMERCIAL STYLE
6" SURFACE MOUNTED PREFINISHED METAL GUTTER
WITH DOWNSPOUT ON EDGE OF EXISTING ROOF .
(25' GUTTER AND 20' DOWNSPOUT) DOWNSPOUT
TO DRAIN TO GRADE
PROVIDE AND INSTALL NEW COMMERCIAL STYLE
6" SURFACE MOUNTED PREFINISHED METAL GUTTER
WITH DOWNSPOUT ON EDGE OF EXISTING ROOF .
(25' GUTTER AND 20' DOWNSPOUT) DOWNSPOUT
TO DRAIN TO GRADE
REMOVE METAL ROOF EDGE AND PROVIDE NEW PREFINISHED METAL EDGE
(SEE DETAIL)
EXISTING DOWNSPOUT TO REMAIN
NEW FLASHING AND SLEEVES BE PROVIDED FOR
THE EXISTING ROOF PENETRATIONS (SEE DETAIL)
EXISTING STANDING SEAM COPPER ROOF AT EAVES
TO BE REMOVED AND REPLACED WITH NEW PREFINISHED
METAL STANDING SEAM ROOF ON NEW UNDERLAYMENT
OF 1/2" CDX PLYWOOD SHEATHING OVER EXISTING
ROOF DECK
EXISTING WHITE ALUMINUM GUTTER TO REMAIN
NO ACTION REQUIRED:
THE ROOF APPEARS TO DO ADEQUATE TO PROVIDE
CONTINUED COVERAGE OVER THE EXISTING EXTERIOR
STAIR.
NO ACTION REQUIRED:
THE ROOF APPEARS TO DO ADEQUATE TO PROVIDE
CONTINUED COVERAGE OVER THE EXISTING EXTERIOR
STAIR.
NO ACTION REQUIRED: THE EXISTING STANDING SEAM COPPER ROOF TO REMAIN AS IS.
NO ACTION REQUIRED: THE EXISTING STANDING
SEAM COPPER ROOF TO REMAIN AS IS.
SEE NOTE "B"
SEE NOTE "A"
SEE NOTE "B"
SL
O
PE
SLOPE
SL
O
PE
SL
O
PE
SLOPESLOPE
SLOPESLOPE
SL
O
PE
EXIST. BUILT- IN COPPER GUTTERS TO BE
REMOVED AND REPLACED WITH NEW
CUSTOM PREFINISHED COMMERCIAL
GRADE METAL GUTTERS IN SAME LOCATION
AND CONFIGURATION ( SEE DETAIL AND
SPEC'S.)
SEE SHEET # 10-208-LP01
FOR LOCATION OF LIGHTING
PROTECTION FOR BUILDINGS
(1-5) AS DIRECTED UNDER THIS
CONTRACT.
KEY NOTES:
A
B ICE AND SNOW GUARD TO BE ADDED (SEE SPEC'S.) ALSO SEE DETAIL SHEET.
NOTES:
PENETRATIONS SHOWN ON THIS PLAN
ARE APPROX. BY LOCATION & QUANITY.
CONTRACTOR TO VERIFY LOCATION AND
QUANITY IN FIELD. (TYP.)
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE "A" THIS SHEET)
PROVIDE NEW WHITE ALUMINUM GUTTERS WITH DOWNSPOUTS
TO MATCH (WEST SIDE OF BUILDING #2)
FLAT ROOF AREA
NOT IN CONTRACT
FLAT ROOF AREA
NOT IN CONTRACT
FLAT ROOF AREA
NOT IN CONTRACT
FLAT ROOF AREA
NOT IN CONTRACT
BB
B
B
BBBB
B
B B B
B
A
A
A
A
AA
AA
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE "A" THIS SHEET)
PROVIDE NEW WHITE ALUMINUM GUTTERS WITH DOWNSPOUTS
TO MATCH (WEST SIDE OF BUILDING #2)
PROVIDE NEW WHITE ALUMINUM GUTTERS WITH DOWNSPOUTS
TO MATCH (WEST SIDE OF BUILDING #2)
ENTIRE EXISTING SLATE ROOF WITH FELT
UNDERLAYMENT TO BE REMOVED, REMOVE ALL
EXISTING SLATE TILES. DISCARD DEFECTIVE TILES AND
PROVIDE SALVAGED EXISTING SLATE IN GOOD
CONDITION, OR NEW SLATE TO MATCH EXISTING IN
SIZE AND COLOR. (SEE KEY NOTE A THIS SHEET)
PROVIDE AND INSTALL PERMANENT STAINLESS STEEL
D-RING ANCHOR AS A FALL-ARREST TIE-OFF POINT.
D-RING SHALL BE EQUIVALENT TO GRAINGER,DBI-SALA,
ITEM # 2UZE5. INSTALLATION: PERMINENT W/LAG BOLTS
W/CAPACITY TO SUPPORT INDIVIDUAL LOADS.
RING DIA. 3 1/4"
WEIGHT CAPACITY: 310 ILS.
TENSILE STRENGTH: 5000 LBS.
STDS.: OSHA,ANSI Z359
BOLT D-RING ANCHOR TO INSIDE
HATCH (SEE NOTE THIS SHEET)
EXIST. ROOF PENETRATION TO REMAIN .
NEW FLASHING AND SLEEVE AS REQUIRED
(SEE DETAIL)
(SLATE ROOF TILE AREAS)
1.) CAREFULLY REMOVE FOR REUSE THE EXISTING SLATE ROOF TILES WITHIN THIS AREA.
2.) STORE SLATE ROOF TILES IN SAFE LOCATION FOR REUSE.
3.) REMOVE ALL EXISTING WATER BARRIER, FELT AND ROOF PAPER.
4.) INSPECT EXISTING WOOD ROOF DECK FOR DAMAGE AND DECAY.
5.) REPLACE 50% OF WOOD ROOF DECK WITH WOOD PLANKING AND PLYWOOD OF FIRE
RETARDANT TREATED TYPE. IN THICKNESS AND KIND TO MATCH EXISTING WOOD
DECK TO REMAIN. (SEE SPECIFICATION SECTION 061000).
6.) INSTALL NEW ROOF MEMBRANE PER SPECIFICATIONS.
7.) INSTALL SALVAGED SLATE ROOF TILES ALONG WITH 30% OF NEW
REPLACEMENT SLATE TILES TO MATCH.
8.) SEE SPECIFICATIONS SECTIONS FOR ADDITIONAL INFORMATION.
C
IT IS INTENDED THAT ANY AND ALL EXISTING COPPER METAL FLASHINGS ,COPINGS,
MASONRY STEP FLASHINGS AND RIDGE CAPS IN THE SCOPE OF WORK AREA ARE
TO BE CAREFULLY REMOVED AND TEMPORARILY STORED ON THE SITE FOR REUSE
ON THE ROOF AREAS. NEW COPPER METAL FLASHINGS ,COPINGS, MASONRY STEP
FLASHINGS AND RIDGE CAPS SHALL BE REPLACED WITH NEW COPPER METAL TO
MATCH SHAPES,PATTERNS, PROFILES AND GAUGE AFTER THE INSPECTION, DIRECTION
AND APPROVAL OF THE COR AT THE VAMC FACILITY.
D
IT IS INTENDED THAT ANY AND ALL EXISTING COPPER METAL STANDING SEAM EAVE PANELS
IN THE SCOPE OF WORK AREA ARE TO BE CAREFULLY REMOVED AND TEMPORARILY STORED
ON THE SITE FOR REUSE ON THE ROOF AREAS . NEW COPPER METAL STANDING SEAM EAVE
PANELS SHALL BE REPLACED WITH NEW COPPER METAL TO MATCH SHAPES, PATTERNS,
PROFILES AND GAUGE AFTER THE INSPECTION, DIRECTION AND APPROVAL OF THE COR AT
THE VAMC FACILITY.
ROOF CORE TAKEN #8
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
ROOF CORE TAKEN HERE
OF ROOF CEMENT SEE INSPECTION REPORT
CONTAINED IN PROJECT MANUAL
ROOF CORE TAKEN #9
SEE INSPECTION REPORT
CONTAINED IN PROJECT
MANUAL
CAREFULLY REMOVE FOR REINSTALLATION & REUSE
ALL THE EXISTING COPPER METAL RIDGE CAPS &
VALLEY FLASHINGS. SEE KEY NOTE C FOR
ADDITIONAL INFORMATION (TYPICAL)
CAREFULLY REMOVE FOR REINSTALLATION & REUSE
ALL THE EXISTING COPPER METAL RIDGE CAPS &
VALLEY FLASHINGS. SEE KEY NOTE C FOR
ADDITIONAL INFORMATION (TYPICAL)
CAREFULLY REMOVE FOR REINSTALLATION & REUSE
ALL EXISTING SLATE TILES FROM SIDE WALLS . DISGUARD
DEFECTIVE TILES AND PROVIDE SALVAGED EXISTING
SLATE TILE IN GOOD CONDITION, OR NEW SLATE TILE
TO MATCH EXISTING IN SIZE & COLOR . (SEE KEY NOTE A
THIS SHEET) AS SIMILAR INSTALLATION OF (5) DORMERS.
EXISTING COPER MASONRY STEP FLASHING SHALL
BE REUSED . PROVIDE NEW JOINT SEALANT AND MORTAR
AS REQUIRED TO MAKE WATER TIGHT . SEE KEY NOTE C
FOR ADDITIONAL INFORMATION .
A. REPLACE ROOFS: PROVIDE ALL LABOR, MATERIALS, TOOLS EQUIPMENT AND SUPERVISION
NECESSARY TO REPLACE EXISTING ROOF SYSTEMS LOCATED AT THE VA MEDICAL CENTER,
222 RICHMOND AVENUE BATAVIA, NEW YORK,14020. WORK INCLUDES REMOVAL, REPLACEMENT.
OF EXISTING MATERIALS, SYSTEMS, CONSTRUCTION AND CERTAIN OTHER ITEMS.
B. NEW ROOFING SYSTEMS SHALL INCLUDE ALL ASSOCIATED ITEMS AND MATERIALS, CONSISTING OF BUT NOT LIMITED TO A MODIFIED BUILT-UP-ROOF SYSTEM, ALUMINUM FLASHINGS,TAPERED INSULATION, FASTENING, VAPOR BARRIER, DRAINS, SCUPPERS, PARAPET WALLS, AND MASONRY JOINT REPAIRS, CAULKING, WALK PADS, PRESSURE TREATED WOOD BLOCKING, CURBS, AND ITEMS FASTENED, ATTACHED, AND/OR PROJECTING THROUGH THE ROOF LAYERS. EXISTING ROOFING SHALL INCLUDE THE COMPLETE REMOVAL OF ALL MATERIALS, DOWN TO HARD DECK SURFACE. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH THE APPLICABLE FEDERAL , STATE , AND LOCAL REGULATIONS , STANDARDS , CODE RULE 56 AND CODES GOVERNING ASBESTOS ABATEMENT , AND ANY OTHER TRADE WORK DONE IN CONJUNCTION WITH THE ABATEMENT . BUILDING WATERTIGHT INTEGRITY SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES . WHERE ROOF WORK ABUTS TO ADJOINING ROOF SURFACES AND APPENDENCIES , THESE PORTIONS SHALL BE INCLUDED WITHIN STATEMENT OF WORK.
ALL WORK SHALL BE IN ACCORDANCE WITH SCOPE OF WORK , MANUFACTURES AND VA SPECIFICATIONS.
C. SEE SPECIFICATIONS SECTIONS FOR ROOF TYPES.
D. WORKING HOURS : HOURS OF WORK SHALL BE AS DETERMINED BY COTR.
E. SUBMITTALS : ALL PRODUCT DATA SUBMITTALS SHALL BE REQUIRED AT TIME OF PRE-CONSTRUCTION MEETING.
F. AS-BUILT DRAWINGS : INCLUDE WITH CLOSEOUT SUBMITTALS.
G. TEMPORARY PROTECTION : INSTALL TEMPORARY PROTECTION CONSISTING OF A TEMPORARY SEAL, COVER AND WATER CUT-OFF'S AT THE END OF EACH DAY'S WORK AND WHEN WORK IS HALTED FOR AN INDEFINITE PERIOD OR WORK IS STOPPED WHEN PRECIPITATION IMMINENT. INSTALL TEMPORARY ROOF WHEN WEATHER DOES NOT PERMIT INSTALLATION OF A COMPLETED PERMANENT ROOF SYSTEM OR ROOF WOULD BE SUBJECT TO PHASING OF ROOF WORK.
PROVIDE TEMPORARY PROTECTION AGAINST DAMAGE FOR PORTIONS OF EXISTING STRUCTURES, GROUNDS AND INTERIORS
AT ALL TIMES, FROM DAMAGE, DUST, AND WEATHER INCLEMENCY .
H. PHASING: FURNISH THE COTR WITH THE SCHEDULE OF APPROXIMATE DATES ON WHICH THE CONTRACTOR INTENDS TO ACCOMPLISH WORK IN EACH SPECIFIC AREA. NOTIFY THE COTR TWO WEEKS IN ADVANCE OF THE PROPOSED DATE OF OF STARTING WORK IN EACH SPECIFIC AREA. ARRANGE DATES TO INSURE ACCOMPLISHMENT OF THIS WORK IN EACH SPECIFIC AREA. ARRANGE DATES TO INSURE ACCOMPLISHMENT OF THIS WORK IN SUCCESSIVE PHASES MUTUALLY TO
COTR AND CONTRACTOR.
I . UTILITIES & BUILDING SERVICES: MAINTAIN EXISTING UTILITY AND BUILDING SERVICES FOR MEDICAL CENTER AT ALL TIMES.
PROVIDE TEMPORARY SERVICES, LABOR, MATERIALS, EQUIPMENT, CONNECTIONS, AND UTILITIES TO ASSURE UNINTERRUPTED SERVICES. NO SERVICE MAY BE INTERRUPTED WITHOUT PRIOR APPROVAL OF COTR. SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, 48 HOURS IN ADVANCE OR PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION.
J. USE OF ROADWAYS: USE ONYL ESTABLISHED PUBLIC ROADS AND ROADS ON MEDICAL CENTER PROPERTY AND, WHEN AUTHORIZED BY THE COTR. WHEN NECESSARY TO CROSS CURBING, SIDEWALKS, OR SIMILAR CONSTRUCTION, THEY MUST BE PROTECTED BY WELL-CONSTRUCTED BRIDGES.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.