36C24219B0008-001.pdf

PDF 154 KB Posted

Attached to
528A4-14-202 BATAVIA REPLACE ROOFS Federal contract opportunity
Solicitation number
36C24219B0008
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

36C24219B0008 S02 - SOW Replace Roofs Batavia.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 528A4-14-202 BATAVIA REPLACE ROOFS, newest first.
File Type Posted
36C24219B0008-0002002.pdf PDF
36C24219B0008-0002001.pdf PDF
36C24219B0008-0002000.docx DOCX document
36C24219B0008-0002004.pdf PDF
36C24219B0008-0002003.pdf PDF
36C24219B0008-0001005.pdf PDF
36C24219B0008-0001003.pdf PDF
36C24219B0008-0001002.pdf PDF
36C24219B0008-0001004.pdf PDF
36C24219B0008-0001001.pdf PDF
36C24219B0008-0001000.docx DOCX document
36C24219B0008-003.pdf PDF
36C24219B0008-004.pdf PDF
36C24219B0008-002.pdf PDF
36C24219B0008-000.docx DOCX document
36C24219B0008.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Batavia Replace Roofs

CONSTRUCTION SERVICES

Project # 528A4-14-202

Period of Performance: 240 days from NTP

General Information:

Project Description:

Project Overview

The Batavia, New York Veterans Hospital is requesting construction services to repair and or replace the roofing systems at the Batavia VA Hospital Buildings 1 through 5. The Batavia VA

Hospital is located at 222 Richmond Avenue in Batavia, N.Y. 14020.

General Description:

Refer to the drawings, specifications and complete contract for all details pertaining to this project. This project consists of repairing and or replacing the roofs on Five (5) separate buildings in Batavia (Buildings 1 through 5). The roofing systems are made of slate shingles, copper metal trim with some aluminum trim and flat roofs. Some of the shingles may be re-used however new shingles will be required throughout the project area.

Provide new underlayment wood as designed in the project scope for the roofs. Some of the wood will need to be replaced and a percentage of wood is allocated for this project.

Provide lightning protection on all Five (5) buildings.

The metal (copper and aluminum) will need to be repaired and replaced on many areas of the project. Refer to the contract documents for areas to replace the metal.

Part I Construction

1. General:

Construction shall take place during normal working hours and after hours to meet the construction timeframe if necessary and through coordinating with the VA COR. During construction the boiler plant will be occupied by facility personal..

1.1 GENERAL INTENTION

A. Contractor shall repair work that is outlined under General Description at the VA

Medical Center, Batavia NY. Furnish all necessary labor and materials.

B. Visits to the site by Bidders may be made only by appointment with the Contracting

Officer or COR.

C. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

D. Prior to commencing work, general contractor shall provide proof that a OSHA certified

“competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

E. Training:

1. All employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and /or other relevant competency training, as determined by VA CP with input from the ICRA team. The supervisor of the work shall have a 30-hour OSHA certificate.

2. Submit training records of all such employees for approval before the start of work.

1.2 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION:

1.3 SCOPE OF WORK

A. GENERAL CONSTRUCTION

1. Provide all mobilization and demobilizations services. The mobilization work associated with the facilities mentioned shall be done in a safe and workmanlike manner and shall conform to all pertinent state and local laws and regulations.

2. It is the CONTRACTOR'S responsibility to develop a work plan detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the safety plan to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

3. General Contractor to provide site supervision during all work.

1.4 CONSTRUCTION SAFETY

A. General:

1. Contractors are required to comply with the Occupational Safety and Health Act of

1970. This will include the safety and health standard found in CFR 1910 and 1926.

2. Questions regarding occupational safety and health issues can be addressed to the COR or Contracting Officer.

B. Tools/Equipment:

1. Under no circumstances are equipment, tools and other items of work to be left unattended for any reason. All tools, equipment and items of work must be under the immediate control of your employee.

C. Signs:

1. Signs must be placed at the entrance to work areas warning people of your work.

Signs must be suitable for the condition of the work. Small pieces of paper with printing or writing are not acceptable.

D. Accidents and Injuries

1. Contractors must report all accidents and injuries to the COR.

REFER TO 010000 GENERAL REQUIREMENTS AND OTHER SPECIFICATIONS

FOR WORK PERTAINING TO THIS PROJECT.

>>>END<<<

SCOPE OF WORK
Batavia Replace Roofs
General Information:
Part I Construction
1.2 STATEMENT OF BID ITEM(S)
1.3 SCOPE OF WORK
A. GENERAL CONSTRUCTION