36C24218R0219-001.pdf
PDF 158 KB Posted
- Attached to
- 620A4-18-204 Relocation of Audiology
- Solicitation number
- 36C24218R0219
About this file
36C24218R0219 ATTACHMENT 1 - PPQs.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24218R0219-002.docx | DOCX document | |
| 36C24218R0219-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 - PAST PERFORMANCE QUESTIONAIRE AND COVER LETTER
Complete one set of letters and forms for at least three projects identified in your firm’s SF 330 Section F, Example Projects Which Best Illustrate Proposed Team’s Qualifications For This Contract. Additional space or blank sheets may be added to answer any question.
Transmittal Letter to Accompany Past Performance Questionnaire
FROM: [Insert Company Official Name, Title, and Company Name]
SUBJECT: Past Performance Questionnaire for Contract(s):
[Insert Company Name] is currently responding to Castle Point VAMC request for SF 330, Architect-Engineer Qualifications for the “Relocation of Audiology”. This Request for SF 330’s requires respondents to identify customers and solicit their response regarding [Insert Company Name] performance.
[Insert Company Name] is providing past performance data to Castle Point VA Medical Center relating to our performance on contract [Insert contract name/number] and have identified [Insert name of reference] as the point of contact for this contract.
The request for SF 330 instructs that respondents provide customers with the attached questionnaire. Please complete the questionnaire and submit it by March 13th 2018 NLT 5:00PM EST directly to the VISN 2/Network Contracting Office (NCO) Contract Specialist. The requested data may be submitted by mail or email to the government representative identified below. If the Past Performance Questionnaire is emailed, DO NOT send a hard copy via mail.
Jason M. Rundle Contracting Officer Network Contracting Office (NCO) 2 1304 Buckley Road Suite #104 Syracuse, NY 13210
Email: jason.rundle@va.gov
The information contained in the completed Past Performance Questionnaire is considered sensitive and cannot be released to [Insert Company Name]. Please direct any questions about the acquisition or the attached questionnaire to the NCO2 point of contact identified above.
Thank you, [Insert Company Official Name and Title]
A. GENERAL INFORMATION
A-E FIRM TO BE EVALUATED:
Firm Name: ________________________ Telephone: __________________________
Address: __________________________ Email address: ________________________ mailto:jason.rundle@va.gov
__________________________ Point of Contact: ______________________
Firm Cage Code: ____________________
Firm Tax ID Number: ________________
Firm DUNS Number: ________________
Project Title: _____________________________________
Description of Project: __________________________________________________________
Description of A-E Firms’
Responsibilities:_________________________________________________________________
Contract Number: ______________________ Dollar Amount: ______________________
Contract Period of Performance: _______________________
The A-E Firm performed as the Prime Contractor Sub-Contractor/Consultant/Team Member
Percent of work performed by A-E Firm: Other (Please describe) __________________
B. EVALUATOR INFORMATION:
Evaluator’s Company or Agency
Name: ____________________________ Evaluator’s Name: _____________________
Address: __________________________ Title of Evaluator: _____________________
__________________________ Telephone: __________________________
__________________________ E-mail: ______________________________
C. SEND COMPLETED QUESTIONAIRE (SECTIONS B through D)TO:
Jason M. Rundle Contracting Officer Network Contracting Office (NCO) 2 1304 Buckley Road Suite #104 Syracuse, NY 13210
Email: jason.rundle@va.gov
D. PERFORMANCE INFORMATION: Choose the appropriate rating that most accurately describes the A/E’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ALL RATINGS OF Marginal or Unsatisfactory on page 7 under Narrative Summary.
Exceptional (5) Very Good (4) Satisfactory (3) Marginal (2) Unsatisfactory (1) N/A
-Performance meets or met contractual requirements and exceeds or exceeded many of your company’s expectations The contractual performance reflects or reflected few minor problems and corrective actions taken by the contractor appear to be highly effective or corrective actions taken were effective.
-Performance meets or met contractual requirements and exceeds or exceeded some of your company’s expectations. The contractual performance reflects or reflected some minor problems and corrective actions being taken by the contractor appear to be effective or Corrective actions taken were effective.
-Performance meets or met contractual requirements. The contractual performance reflects or reflected some minor problems.
Corrective actions being taken by the contractor appear to be effective or Corrective actions taken were effective.
-Performance does or did not meet some contractual requirements. The contractual performance reflects or reflected serious problems(s) for which the contractor has not yet identified acceptable corrective actions or did not provide acceptable corrective actions.
-Performance does or did not meet most contractual requirements and recovery is not likely or did not occur. The contractual performance contains or contained serious problem (s) for which the contractor’s corrective actions appear ineffective or were ineffective.
-Not applicable or rater has not observed performance in this area.
A-E FIRM’S NAME: _______________ PROJECT NAME: _______________
Contract Period of Performance: _______________________
Note: Include this information on each page of the questionnaire form to ensure there is no mix up in information among contracts surveyed for respective primes/subs, etc.
mailto:jason.rundle@va.gov
Place an “X” in the appropriate column using the definitions matrix on page 4.
Ite m
FACTORS TO BE RATED
E xc ep tio na l (
5)
V er y G oo d
(4
S at is fa ct or y (3
M ar gi na
2)
U ns at is fa ct or y
(1
N /A
Design Services:
1. Overall skill level and technical competence of A/E’s personnel.
2. A/E’s ability to identify and resolve design issues expeditiously.
3. A/E’s responsiveness to design review questions.
4. A/E’s ability to effectively coordinate, integrate and manage their consultants/subcontractors/team
5. A/E’s effectiveness and responsiveness in interfacing with the Client’s staff
6. Overall accuracy, completeness and coordination of final design documents. (Quality)
7. A/E’s ability to provide detailed, accurate cost estimates.
8. A/E’s ability to meet contract schedule.
Follow-On Construction Support Services:
9. Thoroughness and timely review of construction submittals.
10. Timely resolution of construction design issues.
11. Overall quality, responsiveness and timeliness of A/E follow-on construction support services.
LEED (If Applicable):
12. Overall accuracy, completeness, timeliness and coordination of LEED documentation.
13. A/E’s ability and understanding of the overall LEED process.
Ite m
FACTORS TO BE RATED
E xc ep tio na
5)
V er y G oo d
(4
S at is fa ct or y (3
M ar gi na
2)
U ns at is fa ct or y
(1
N /A
BIM (If Applicable):
14. Overall accuracy, completeness, timeliness and coordination of BIM documentation.
15. A/E’s ability and understanding of the overall BIM process.
Owner’s Representative on Design/Build Projects (If applicable):
16. Overall accuracy, completeness, timeliness and coordination of requirements documents and bridging documents.
17. A/E’s ability, thoroughness, timeliness and support as Owner’s Representative throughout the project.
Overall:
18. How would you rate the A/E’s ability to control cost?
19. How would you rate the A/E’s overall management performance on this contract?
20. How would you rate the A/E’s overall technical/quality performance on this contract?
21. Would you use this A/E again? (If “No”, please comment in the Narrative Summary)
YES
NO
Number of A/E Design Errors & Omissions on Project: _______________
Increased Project Cost Due to A/E Design Errors & Omissions:_______________
CONTRACTOR’S NAME: ___________________ PROJECT NAME ______________________
Contract Period of Performance: _______________________
Note: Include this information on each page of the questionnaire form to ensure there is no mix up in information among contracts surveyed for respective primes/subs, etc.
NARRATIVE SUMMARY (Use this section to explain any rating from the previous page)
Item COMMENTS
File details come from the government source that posted it.