36C24218B0068-008.pdf
PDF 355 KB Posted
- Solicitation number
- 36C24218B0068
About this file
36C24218B0068 S02 PCRA ICRA.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24218C0043-000.docx | DOCX document | |
| 36C24218B0068-006.pdf | ||
| 36C24218B0068-009.xlsx | XLSX spreadsheet | |
| 36C24218B0068-003.pdf | ||
| 36C24218B0068-001.docx | DOCX document | |
| 36C24218B0068-007.pdf | ||
| 36C24218B0068-004.pdf | ||
| 36C24218B0068-005.pdf | ||
| 36C24218B0068-002.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title: Project #:
Location: Project COR:
Start Date: Phone:
Step 1 - GENERAL SAFETY
GUIDELINE
GUIDE
MET AREA(s)
IMPACTED CONTROL ACTIVITIES NEEDED
Y N
AIR QUALITY: Will there be any compromise to the quality of building air?
Asbestos
Lead
Dust
Other hazardous chemicals
VENTILATION: Will there be any compromise to the building ventilation or air handling systems?
MOISTURE & TEMPERATURE: Are there any anticipated moisture or temperature concerns?
UTILITIES: Are there any anticipated utility disruptions?
• Communication/Telephone
• Electrical Systems
• Security Systems
• Steam Systems
• HVAC
• Medical Gases/Vacuum
• Natural Gas
• Sewer/Sanitary
• Water
• OTHER:
NOISE: Will there be any unusually loud or high-pitched noise levels anticipated?
VIBRATION: Will vibration levels be excessive to effect the operation of hospital type equipment or machinery?
EMERGENCY MANAGEMENT: Does construction present any conflicts or challenges to the facility EM Plan?
SECURITY: Will the construction anticipate general security concerns?
OTHER ANTICIPATED HAZARDS NOT LISTED
Off-tour Construction necessary?
Permit Required Confined Space (PRCS) Entry necessary?
Welding, cutting or brazing necessary that requires Hot Work permit?
Potential exposure to BBP or other infectious agents?
Excavation of soil?
Work on live electrical systems or hot taps?
Work on energized non-electrical systems?
Lift of materials with crane?
NOTE: If a Guideline is not met, additional actions are required based upon the risk assessment. If required, additional safety actions shall be performed and implemented PRIOR to start of work involving locations affected by the assessment.
Step 2 – LIFE SAFETY
Requirement Met Actions Required
ILSM
Req’d
Y N Y N
EXIT ROUTES (MEANS OF EGRESS COMPONENTS)
Exit from occupied areas will remain unchanged?
Exit stairs will remain unobstructed and fire separated?
FIRE PROTECTION SYSTEMS:
Fire alarm devices will remain functional & in-service throughout construction?
Sprinkler systems will remain functional & in-service throughout construction?
Fire Suppression systems will remain functional & in-service throughout construction?
FDC’s will remain functional & unobstructed?
SMOKE AND FIRE BARRIERS:
All fire and smoke barriers will remain intact throughout?
All vertical openings will remain intact throughout?
CONSTRUCTION SPACES:
Will be separated by non-combustible, smoke tight partitions?
Will be separated by a fire rated barrier?
At least one accessible and unobstructed exit is provided?
Excessive distance to exits?
Hazardous area protected?
GENERAL:
Access for emergency responders will remain unchanged?
Load bearing building assemblies are maintained throughout?
NOTE: All required ILSM’s shall be in accordance with the facility ILSM Policy and developed separate from this assessment. If required, ILSM’s shall be performed and implemented PRIOR to start of work involving locations affected by the ILSM.
SAFETY NARRATIVE:
Signature of Safety Officer Date
Signature of Engineering COR Date
Signature of Project Supervisor Date
| Using the following table, identify the Type of Construction Project Activity (Type A-D) |
| TYPE A |
| TYPE B |
| TYPE C |
| TYPE D |
| Low Risk |
| Medium Risk |
| High Risk |
| Very High Risk |
| DESCRIPTION OFREQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS: |
| undefined_9: | |
| undefined_11: Sawcutting, work during off hrs if needed | |
| machinery: | |
| undefined_12: | |
| undefined_13: Potentially, work during off hrs if needed | |
| EM Plan: | |
| undefined_14: | |
| undefined_15: | |
| undefined_16: | |
| undefined_17: | |
| undefined_18: | |
| undefined_21: As needed | |
| Lift of materials with craneRow1: | |
| Lift of materials with craneRow2: | |
| undefined_10: | |
| Text1: B33 Sewer Repairs | |
| Check Box2: Off | |
| Check Box3: Off | |
| undefined_20: | |
| undefined_22: | |
| undefined_23: | |
| Text4: Maureen A. Downen | |
| Text5: 585-393-7467 | |
| 2017-10-02T08:28:05-0400 | |
| Robert D Palmer 145648 |
| 2017-10-02T13:08:11-0400 | |
| Maureen A. Downen 1482900 |
| 2017-10-02T13:15:03-0400 | |
| Eric C Smith 710208 |
| Text10: |
| Text11: |
| Text15: |
| Text16: |
| Text22: |
| Check Box23: Off |
| Text24: |
| Text2: 528A5-18-510 |
| Text3: B33 |
| Text6: TBD |
| Text7: |
| Text8: Full asbestos abatement/monitoring |
| Text9: |
| Text12: ICRA |
| Text13: |
| Text14: As needed |
| Text17: |
| Text18: |
| Text19: |
| Text20: Isolation of areas during work |
| Text21: |
| Text23: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
| Text35: |
| Text36: Coordination w/customers |
| Text37: |
| Text38: |
| Text39: |
| Text40: |
| Check Box1: Yes |
| Check Box4: Yes |
| Check Box5: Yes |
| Check Box6: Off |
| Check Box7: Yes |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Yes |
| Check Box12: Off |
| Check Box13: Yes |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Yes |
| Check Box17: Off |
| Check Box18: Yes |
| Check Box19: Off |
| Check Box20: Yes |
| Check Box21: Off |
| Check Box22: Yes |
| Check Box24: Yes |
| Check Box25: Off |
| Check Box26: Yes |
| Check Box27: Off |
| Check Box28: Yes |
| Check Box29: Yes |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Yes |
| Check Box33: Off |
| Check Box34: Yes |
| Check Box35: Yes |
| Check Box36: Off |
| Check Box37: Yes |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Yes |
| Check Box41: Off |
| Check Box42: Yes |
| Check Box43: Yes |
| Check Box44: Off |
| Check Box45: Off |
| Check Box46: Yes |
| Check Box47: Yes |
| Check Box48: Off |
| Check Box49: Off |
| Check Box50: Yes |
| Check Box51: Yes |
| Check Box52: Off |
| Check Box53: Off |
| Check Box54: Yes |
| Check Box55: Off |
| Check Box56: Yes |
| Check Box57: Off |
| Check Box58: Yes |
| Check Box61: Off |
| Check Box62: Off |
| Check Box63: Off |
| Check Box64: Off |
| Check Box65: Off |
| Check Box66: Yes |
| Check Box67: Yes |
| Check Box68: Off |
| Check Box69: Yes |
| Check Box70: Off |
| Check Box71: Yes |
| Check Box72: Off |
| Check Box73: Yes |
| Check Box74: Off |
| Check Box75: Yes |
| Check Box76: Off |
| Check Box77: Off |
| Check Box78: Yes |
| Check Box79: Off |
| Check Box80: Yes |
| Check Box81: Yes |
| Check Box82: Off |
| Check Box83: Yes |
| Check Box84: Off |
| Check Box85: Yes |
| Check Box86: Off |
| Check Box87: Off |
| Check Box88: Yes |
| Check Box89: Yes |
| Check Box90: Off |
| Check Box91: Off |
| Check Box92: Yes |
| Check Box93: Yes |
| Check Box94: Off |
| Check Box95: Off |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Off |
| Check Box100: Off |
| Check Box101: Off |
| Check Box102: Off |
| Check Box103: Off |
| Check Box104: Off |
| Check Box105: Off |
| Check Box106: Off |
| Check Box107: Yes |
| Check Box108: Off |
| Check Box109: Off |
| Check Box110: Off |
| Check Box111: Off |
| Check Box112: Off |
| Check Box113: Yes |
| Check Box114: Off |
| Check Box115: Off |
| Check Box116: Off |
| Check Box117: Off |
| Check Box118: Off |
| Check Box119: Off |
| Check Box120: Off |
| Check Box121: Off |
| Check Box122: Off |
| Check Box123: Off |
| Check Box124: Off |
| Check Box125: Yes |
| Check Box126: Off |
| Check Box127: Yes |
| Check Box128: Off |
| undefined_24: |
| undefined_25: Obtain hot permit from FD |
| undefined_26: |
| undefined_27: |
| undefined_28: |
| undefined_29: Removal of subgrade soil |
| undefined_30: |
| undefined_31: |
| undefined_32: |
| undefined_33: |
| undefined_34: |
| undefined_35: |
| undefined_36: |
| undefined_37: |
| undefined_38: |
| undefined_39: |
| Text41: |
| Text42: |
| Text43: |
| Text44: |
| Text45: |
| Text46: |
| Text47: |
| Text48: |
| Text49: |
| Text50: |
| Text51: |
| Text52: |
| Text53: |
| Text54: |
| Text55: |
| Text56: |
| Text57: ILSM request shall be 48 hours prior to work being done. |
| Text58: 10-2-2017 |
| Text59: 10/2/2017 |
| Text60: 10/2/2017 |