36C24218B0068-008.pdf

PDF 355 KB Posted

Attached to
REPLACE SEWER MAIN B33 CANANDAIGUA, NY VA Medical Center
Solicitation number
36C24218B0068
Issued by

About this file

36C24218B0068 S02 PCRA ICRA.pdf

View the file

Other files

File Type Posted
36C24218C0043-000.docx DOCX document
36C24218B0068-006.pdf PDF
36C24218B0068-009.xlsx XLSX spreadsheet
36C24218B0068-003.pdf PDF
36C24218B0068-001.docx DOCX document
36C24218B0068-007.pdf PDF
36C24218B0068-004.pdf PDF
36C24218B0068-005.pdf PDF
36C24218B0068-002.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Title: Project #:

Location: Project COR:

Start Date: Phone:

Step 1 - GENERAL SAFETY

GUIDELINE

GUIDE

MET AREA(s)

IMPACTED CONTROL ACTIVITIES NEEDED

Y N

AIR QUALITY: Will there be any compromise to the quality of building air?

Asbestos

Lead

Dust

Other hazardous chemicals

VENTILATION: Will there be any compromise to the building ventilation or air handling systems?

MOISTURE & TEMPERATURE: Are there any anticipated moisture or temperature concerns?

UTILITIES: Are there any anticipated utility disruptions?

• Communication/Telephone

• Electrical Systems

• Security Systems

• Steam Systems

• HVAC

• Medical Gases/Vacuum

• Natural Gas

• Sewer/Sanitary

• Water

• OTHER:

NOISE: Will there be any unusually loud or high-pitched noise levels anticipated?

VIBRATION: Will vibration levels be excessive to effect the operation of hospital type equipment or machinery?

EMERGENCY MANAGEMENT: Does construction present any conflicts or challenges to the facility EM Plan?

SECURITY: Will the construction anticipate general security concerns?

OTHER ANTICIPATED HAZARDS NOT LISTED

Off-tour Construction necessary?

Permit Required Confined Space (PRCS) Entry necessary?

Welding, cutting or brazing necessary that requires Hot Work permit?

Potential exposure to BBP or other infectious agents?

Excavation of soil?

Work on live electrical systems or hot taps?

Work on energized non-electrical systems?

Lift of materials with crane?

NOTE: If a Guideline is not met, additional actions are required based upon the risk assessment. If required, additional safety actions shall be performed and implemented PRIOR to start of work involving locations affected by the assessment.

Step 2 – LIFE SAFETY

Requirement Met Actions Required

ILSM

Req’d

Y N Y N

EXIT ROUTES (MEANS OF EGRESS COMPONENTS)

Exit from occupied areas will remain unchanged?

Exit stairs will remain unobstructed and fire separated?

FIRE PROTECTION SYSTEMS:

Fire alarm devices will remain functional & in-service throughout construction?

Sprinkler systems will remain functional & in-service throughout construction?

Fire Suppression systems will remain functional & in-service throughout construction?

FDC’s will remain functional & unobstructed?

SMOKE AND FIRE BARRIERS:

All fire and smoke barriers will remain intact throughout?

All vertical openings will remain intact throughout?

CONSTRUCTION SPACES:

Will be separated by non-combustible, smoke tight partitions?

Will be separated by a fire rated barrier?

At least one accessible and unobstructed exit is provided?

Excessive distance to exits?

Hazardous area protected?

GENERAL:

Access for emergency responders will remain unchanged?

Load bearing building assemblies are maintained throughout?

NOTE: All required ILSM’s shall be in accordance with the facility ILSM Policy and developed separate from this assessment. If required, ILSM’s shall be performed and implemented PRIOR to start of work involving locations affected by the ILSM.

SAFETY NARRATIVE:

Signature of Safety Officer Date

Signature of Engineering COR Date

Signature of Project Supervisor Date

Using the following table, identify the Type of Construction Project Activity (Type A-D)
TYPE A
TYPE B
TYPE C
TYPE D
Low Risk
Medium Risk
High Risk
Very High Risk
DESCRIPTION OFREQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS:
undefined_9:
undefined_11: Sawcutting, work during off hrs if needed
machinery:
undefined_12:
undefined_13: Potentially, work during off hrs if needed
EM Plan:
undefined_14:
undefined_15:
undefined_16:
undefined_17:
undefined_18:
undefined_21: As needed
Lift of materials with craneRow1:
Lift of materials with craneRow2:
undefined_10:
Text1: B33 Sewer Repairs
Check Box2: Off
Check Box3: Off
undefined_20:
undefined_22:
undefined_23:
Text4: Maureen A. Downen
Text5: 585-393-7467
2017-10-02T08:28:05-0400
Robert D Palmer 145648
2017-10-02T13:08:11-0400
Maureen A. Downen 1482900
2017-10-02T13:15:03-0400
Eric C Smith 710208
Text10:
Text11:
Text15:
Text16:
Text22:
Check Box23: Off
Text24:
Text2: 528A5-18-510
Text3: B33
Text6: TBD
Text7:
Text8: Full asbestos abatement/monitoring
Text9:
Text12: ICRA
Text13:
Text14: As needed
Text17:
Text18:
Text19:
Text20: Isolation of areas during work
Text21:
Text23:
Text25:
Text26:
Text27:
Text28:
Text29:
Text30:
Text31:
Text32:
Text33:
Text34:
Text35:
Text36: Coordination w/customers
Text37:
Text38:
Text39:
Text40:
Check Box1: Yes
Check Box4: Yes
Check Box5: Yes
Check Box6: Off
Check Box7: Yes
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Yes
Check Box12: Off
Check Box13: Yes
Check Box14: Off
Check Box15: Off
Check Box16: Yes
Check Box17: Off
Check Box18: Yes
Check Box19: Off
Check Box20: Yes
Check Box21: Off
Check Box22: Yes
Check Box24: Yes
Check Box25: Off
Check Box26: Yes
Check Box27: Off
Check Box28: Yes
Check Box29: Yes
Check Box30: Off
Check Box31: Off
Check Box32: Yes
Check Box33: Off
Check Box34: Yes
Check Box35: Yes
Check Box36: Off
Check Box37: Yes
Check Box38: Off
Check Box39: Off
Check Box40: Yes
Check Box41: Off
Check Box42: Yes
Check Box43: Yes
Check Box44: Off
Check Box45: Off
Check Box46: Yes
Check Box47: Yes
Check Box48: Off
Check Box49: Off
Check Box50: Yes
Check Box51: Yes
Check Box52: Off
Check Box53: Off
Check Box54: Yes
Check Box55: Off
Check Box56: Yes
Check Box57: Off
Check Box58: Yes
Check Box61: Off
Check Box62: Off
Check Box63: Off
Check Box64: Off
Check Box65: Off
Check Box66: Yes
Check Box67: Yes
Check Box68: Off
Check Box69: Yes
Check Box70: Off
Check Box71: Yes
Check Box72: Off
Check Box73: Yes
Check Box74: Off
Check Box75: Yes
Check Box76: Off
Check Box77: Off
Check Box78: Yes
Check Box79: Off
Check Box80: Yes
Check Box81: Yes
Check Box82: Off
Check Box83: Yes
Check Box84: Off
Check Box85: Yes
Check Box86: Off
Check Box87: Off
Check Box88: Yes
Check Box89: Yes
Check Box90: Off
Check Box91: Off
Check Box92: Yes
Check Box93: Yes
Check Box94: Off
Check Box95: Off
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Check Box102: Off
Check Box103: Off
Check Box104: Off
Check Box105: Off
Check Box106: Off
Check Box107: Yes
Check Box108: Off
Check Box109: Off
Check Box110: Off
Check Box111: Off
Check Box112: Off
Check Box113: Yes
Check Box114: Off
Check Box115: Off
Check Box116: Off
Check Box117: Off
Check Box118: Off
Check Box119: Off
Check Box120: Off
Check Box121: Off
Check Box122: Off
Check Box123: Off
Check Box124: Off
Check Box125: Yes
Check Box126: Off
Check Box127: Yes
Check Box128: Off
undefined_24:
undefined_25: Obtain hot permit from FD
undefined_26:
undefined_27:
undefined_28:
undefined_29: Removal of subgrade soil
undefined_30:
undefined_31:
undefined_32:
undefined_33:
undefined_34:
undefined_35:
undefined_36:
undefined_37:
undefined_38:
undefined_39:
Text41:
Text42:
Text43:
Text44:
Text45:
Text46:
Text47:
Text48:
Text49:
Text50:
Text51:
Text52:
Text53:
Text54:
Text55:
Text56:
Text57: ILSM request shall be 48 hours prior to work being done.
Text58: 10-2-2017
Text59: 10/2/2017
Text60: 10/2/2017

File details come from the government source that posted it.