36C24120Q0176-001.docx

DOCX document Posted

Attached to
S222--Services for Pharmacy Trailer Water Tanks Unrestricted
Solicitation number
36C24120Q0176
Issued by

About this file

36C24120Q0176 P09_PWS Final.docx

View the file

Other files

File Type Posted
36C24120Q0176-002.pdf PDF
36C24120Q0176-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Department of Veterans Affairs (VA)

A. Purpose The purpose of this contract is to establish a gray water tank pumping schedule for the compound pharmacy trailer at the West Haven VA Medical Center. A contract shall be awarded for a base year (12 months) with four (4) potential annual option years to be exercised at the discretion of the Contracting Officer.

B. Location of VA Facility

VA Medical Center
950 Campbell Ave
West Haven, CT 06516

C. General Information:

1. Title of Project: Compound Pharmacy Trailer gray water tank draining

2. Scope of Work: The contractor shall provide all resources, services and supervision to drain and dispose of two (2) 50-gallon gray water tanks (contents of tank only) in accordance with local state and federal regulations.

3. Gray water tanks shall be drained weekly (52 times a year) on Tuesdays between the hours of 2:30 PM – 8:00 PM EST. excluding federal holidays. Any deviation from the Tuesday schedule shall be coordinated between the contractor and Pharmacy Point of Contact to include pumping changes attributed to holidays.

4. Emergency Calls: The contractor shall allow for emergency drain call services not to exceed ten (10) calls per year with a 24-hour drainage response time.

D. Interference to Normal Function: The contractor may be required to interrupt their work at any time as not to interfere with the function of the facility, including facility repair etc..

1. In the event of an emergency, contractor services may be stopped and rescheduled at no additional cost to the government.

E. Period of Performance: Performance will commence starting on the award date for 12-months.