36C24119R0031_1.docx
DOCX document 14 KB Posted
- Attached to
- PVC Replacement 523A4-19-002 Federal contract opportunity
- Solicitation number
- 36C24119R0031
About this file
36C24119R0031 36C24119R0031_1.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| -16028.docx | DOCX document | |
| 36C24119R0031_0003.docx | DOCX document | |
| 36C24119R0031_0002.docx | DOCX document | |
| 36C24119R0031_0001.docx | DOCX document | |
| 36C24119R0031.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FedBizOpps Presolicitation Notice
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Presolicitation Notice Rev. March 2010 J PVC Replacement on Cooling Tower 02301 36C24119R0031 12-28-2018 N 238220 Department of Veterans Affairs VA Boston Healthcare System Contracting Officer (90C) 940 Belmont Street Brockton MA 02301 Gail Grundy Department of Veterans Affairs VAMC West Roxbury 1400 VFW Parkway West Roxbury, MA 02132
USA
Gail.Grundy@va.gov Contract Specialist Email Provide all labor, material, and equipment necessary to replace fill on both cells of the building 3 Marley Model NC 8309G2 cooling tower, serial number 241518. This work covers both cells being shut down with removal and replacement of existing PVC fill materials, and replacement of all casing panels to restore the towers to their original design cooling capacity to include:
1. Disassembly of cooling tower fill and removal of old material by crane.
1. New material lifted to the roof by crane.
1. Disposal of old material by contractor in contractor provided dumpster.
1. Installation of new Marley MX75 LEV fill to manufactures specifications.
1. Installation of all new supports and new stainless-steel casing panels (16 total).
1. Use of new hardware and sealer.