Solicitation 36C10E18R0165
Contractor Questions
Q
1
The third document with the following description will not open: P07 - DB wage Det, MS180143, 01-05-2018, MS143 - Copy.pdf
A
1
The correct wage determination was uploded in a previous amendment.
Q
2
Are any drawings available for the air handler replacement project at the Jackson Regional Office ?
A
2
Original Plans of existing units are available for reference. Pleas see uploded drawings for the specific drawing you may need. No other drawings of the facility or equipment are available.
Q
3
I downloaded the specifications from the website, but there was a PDF that would not download.
A
3
See question 1
Q
4
I was looking at your solicitation for the Replacement of Air Handling Unit and form 1442 states at the top that this project is for "Construction, Alteration, or Repair" so and the limitation on subcontracting data, and would assume that the limitation percentage for construction would be 15%, is this correct?
A
4
This is a construction requirement and thus contractors are required to follow the limitation on subcontracting in accordance with the FAR which apply to construction.
Q
5
Note that your wage determination will not open. The file is corrupted.
A
5
See question 1
Q
6
In order to price out this project, I need plans of the existing units, duct, and piping.
A
6
See question 2
Q
7
Please provide cooling and heating coil capacities.
A
7
See Attachment 1 of the SOW for the available coil design minimum specifications.
Q
8
Who is your BAS provider?
A
8
Schneider Management Control
Q
9
What is the current electrical load for these units?
A
9
The Government does not have the current electrical load for the exisiting units. The government has provided the build specification nameplate model number, type number, and serial number of these units in section 1.01 of the SOW. It is the contractor responsibility to ensure all electrical loads are capable of supporting the new units in accordance with the manufacturers specifications.
Q
10
I have tried on multiple platforms and I cannot load the PDF on the solicitation. Issue with it?
A
10
See question 1
Q
11
Can we get the following building plans: A) Site plans showing overall building dimensions and surrounding parking areas and grades; B) Building elevations or sections showing the roof height above grade and any parapets or other obstructions on the roof; C) Roof plans showing the distances from the exterior wall to the AHU’s; D)Mechanical Roof plans showing the sizes of the existing ductwork and roof curbs; E)Mechanical plans for each floor of the building showing the locations of all VAV boxes and air distribution (This is needed so the Test & Balance Contractor can validate their pricing.); F) Piping plans showing the affected existing piping sizes and configuration; G) Electrical plans showing the power sources and their locations.
A
11
See question 2
Q
12
Paragraph 3.02.C describes areas where ductwork as well as hot and cold potable water distribution lines are to be replaced without stating what those areas are. Please define the extent of the ductwork and piping to be replaced.
A
12
Section 3.02 part C describes these area as being located under the penthouse
Q
13
Are we to reuse the existing electrical feeder wiring and breakers or install new electrical components from the AHU back to the source of power? Are we to replace the breakers in the panel or reuse the existing? Neither point is addressed.
A
13
It is the contractor responsibility to determine the suitability of the existing components. If the contractor chooses to reuse the existing components, they are accepting full responsibility for the suitability and durability of said component and must ensure the component meets the minimum manufacturer specifications. Any parts that are reused and fail are the contractors responsibility to repair and/or replace at no adidtional cost to the Government during the warranty period.
Q
14
Under Air Purification System, Paragraph 2.2.F.1 reads “Where so indicated on the plans and/or schedules Plasma Generators shall be supplied and installed.” As no plans or schedules were provided, how are we to determine where and how many Plasma Generators are to be provided and installed?
A
14
It is the Governments interpretation of the SOW that the reference to plans in statement in 2.2.F.1 refers to the plans developed by the manufacturer when building the new Air Handler Units. In addition section 2.2.A reads "Air handling equipment, so designated on the plans, details, equipment schedules and/or specifications shall contain a Plasma Generator with Bi-polar Ionization output as described here within." It is the Government interpretation of this statement that this means each air handler will have its own air purification system.
Q
15
What is the source of power for the added Air Purification System?
A
15
It is the contractors responsibility to determine the best source of power for each purification system which meets the manufacturers specifications.
Q
16
Under paragraph 5 Air Balance of System, line 3 call for the contractor to “put in place advanced airside economizer controls”. What are the specific advanced control functions desired.
A
16
See section 5 of the SOW. This section has been updated to reflect the required system settings.
Q
17
The section titled DOWNTIME indicates that most work will be required to be performed after normal duty hours. Is this requirement driven by the need to minimize the noise associated with the work or the need to maintain airflow? Given the timing of this solicitation and the likely lead time for the AHU’s, this work will probably take place during January 2019. During January, the average temperatures in Jackson are 58 deg for the high and 38 deg for the low. Does this lack of a need for cooling somewhat mitigate the need to perform the work after hours? While this section addresses performing work after hours, it does not address any need to keep the AHU’s operating during business hours. Is there a need to maintain airflow during normal hours?
A
17
Yes. Yes, the AHU's must continue to work during normal business hours. Yes, airflow must be maintained during normal business hours. As such the work will be scheduled after normal business hours and on weekends.
Q
18
The Wage Determination file on FBO is corrupted and will not open could you please repost or email to me?
A
18
See question 1
Q
19
Wondering when the drawings will be released for project
A
19
See question 2
Q
20
The PDF file provided in FBO is corrupt and we are unable to tell if they are drawings or not.
A
20
See question 1
Q
21
We would like to have the opportunity to view the drawings prior to the site visit.
A
21
Drawings were not made available prior to the site visit. See answer to question 2
Q
22
Are there drawings for this project, either as-builts or new work?
A
22
See question 2
Q
23
Can I obtain copy of roster of people attending this visit?
A
23
A roster of the site visit was posted in a previous amendment.
Q
24
Would you consider changing the time for receipt of these bids on 8-7-2018 until after noon? If the bid has to be received by 7:00 on the 7th (Tuesday) then it will have to be send on the 3rd (Friday). It can be difficult obtain quotes from suppliers that far ahead of the bid date.
A
24
See all amendments for the most recent proposal due date.
Q
25
Any analytical on asbestos for this project & equipment.
A
25
None Required.
Q
26
Can we get a set of Drawing, all we had at the site visit was a set of drawing we were told to take a photo of. You can’t bid this project correctly off a photos.
A
26
See question 2
Q
27
I would like to ask for a 7 days extension once we get the asbestos reports, and some drawing
A
27
See question 24
Q
28
The last PDF on FBO was corrupt, no one at the site could open it.
A
28
See question 1
Q
29
Please confirm that proposals are able to be submitted to by email.
A
29
That is correct. Please review the size limitations and ensure all documents are received prior to the due date and time.
Q
30
If proposals are submitted by email, is contractor also required to submit hard copy of bid bond to contracting office prior to offer deadline?
A
30
No, Please provide an electronic copy with a rubbing to verify the seal
Q
31
During the site visit, existing as-builts/drawings were shown of the facility and equipment. Will contracting please provide scans of these documents ?
A
31
See question 2
Q
32
Please confirm that a tax exempt certificate will be provided for this project.
A
32
IAW FAR 52.229-3 Federal, State, and Local Taxes. The contract price includes all applicable Federal, State, and local taxes and duties except as provided in subparagraph (b)(2)(i) of this clause. It is the contractor responsibility to determine any and all tax liability and include it within the proposed price.
Q
33
Can the site superintendent dual role as the SSHO ?
A
33
This is a non personal services construction contract. It is the Contractor's responsibilty to assign duties to employees to ensure they are in compliance with the SOW.
No Further Questions
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
A
Q
Q
A
Q
A
Q
A
File details come from the government source that posted it.