36C10B22R0016.docx
DOCX document 298 KB Posted
- Attached to
- Automated Inventory Management Using Passive Radiofrequency Identification Federal contract opportunity
- Solicitation number
- 36C10B22R0016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT A - PRICE SCHEDULE RFID.xlsx | XLSX spreadsheet | |
| Questions and Answers.xlsx | XLSX spreadsheet | |
| ATTACHMENT A - PRICE SCHEDULE RFID.xlsx | XLSX spreadsheet | |
| 36C10B22R0016 0001.docx | DOCX document | |
| ATTACHMENT A - PRICE SCHEDULE RFID.xlsx | XLSX spreadsheet | |
| COMBINED SYNOPSIS SOLICITATION NOTICE.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C10B22R0016
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C10B22R0016 8/22/2022 Laura Startek 848-377-5089 09-6-2022 3:00pm
EDT
36C10B Department of Veterans Affairs Technology Acquisition Center
23 Christopher Way Eatontown NJ 07724
X
541614 $16.5 Million
N/A
36C10B Department of Veterans Affairs Technology Acquisition Center
23 Christopher Way Eatontown NJ 07724
36C10A Department of Veterans Affairs Technology Acquisition Center Financial Services Center PO Box 149971 Austin TX 78714-8971
TITLE: Automated Inventory Management Using Passive Radiofrequency Identification
Type of Order: Firm-Fixed Price
Contracting Officer: Matthew J. Truex, Matthew.Truex1@va.gov
Contract Specialist: Laura Startek, Laura.Startek@va.gov
Matthew J. Truex Contracting Officer
Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 4 |
| B.1 CONTRACT ADMINISTRATION DATA | 4 |
| B.2 GOVERNING LAW | 5 |
| B.3 SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT | 6 |
| B.4 PRICE SCHEDULE | 9 |
| B.5 PERFORMANCE WORK STATEMENT | 20 |
| SECTION C - CONTRACT CLAUSES | 64 |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 64 |
| C.2 52.216-18 ORDERING (AUG 2020) | 65 |
| C.3 52.216-19 ORDER LIMITATIONS (OCT 1995) | 65 |
| C.4 52.216-22 INDEFINITE QUANTITY (OCT 1995) | 66 |
| C.5 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021) (DEVIATION) | 66 |
| C.6 SUPPLEMENTAL INSURANCE REQUIREMENTS | 67 |
| C.7 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020) | 67 |
| C.8 VAAR (MAR 2020) | 69 |
| C.9 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 70 |
| C.10 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) | 70 |
| C.11 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 72 |
| C.12 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2022) (JUL 2020) (DEVIATION) | 72 |
| C.13 MANDATORY WRITTEN DISCLOSURES | 80 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 81 |
| SECTION E - SOLICITATION PROVISIONS | 82 |
| E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 82 |
| E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 82 |
| E.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 85 |
| E.4 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2022) (JUL 2020) (DEVIATION) | 86 |
| E.5 52.216-1 TYPE OF CONTRACT (APR 1984) | 103 |
| E.6 52.233-2 SERVICE OF PROTEST (SEP 2006) | 103 |
| E.7 VIP VERIFICATION REQUIREMENT FOR SDVOSBS AND VOSBS | 104 |
| E.8 BASIS FOR AWARD | 104 |
| E.9 EVALUATION APPROACH | 104 |
| E.10 SUBMISSION INSTRUCTIONS | 105 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT: Contracting Officer Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] See Section B.4 Price Schedule |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 GOVERNING LAW
Federal law and regulations, including the Federal Acquisition Regulations (FAR), shall govern this Contract/Order. Commercial license agreements may be made a part of this Contract/Order but only if both parties expressly make them an addendum hereto. If the commercial license agreement is not made an addendum, it shall not apply, govern, be a part of or have any effect whatsoever on the Contract/Order; this includes, but is not limited to, any agreement embedded in the computer software (clickwrap), any agreement that is otherwise delivered with or provided to the Government with the commercial computer software or documentation (shrinkwrap), or any other license agreement otherwise referred to in any document. If a commercial license agreement is made an addendum, only those provisions addressing data rights regarding the Government’s use, duplication and disclosure of data (e.g., restricted computer software) are included and made a part of this Contract/Order, and only to the extent that those provisions are not duplicative or inconsistent with Federal law, Federal regulation, the incorporated FAR clauses and the provisions of this Contract/Order; those provisions in the commercial license agreement that do not address data rights regarding the Government’s use, duplication and disclosure of data shall not be included or made a part of the Contract/Order. Federal law and regulation including, without limitation, the Contract Disputes Act (41 U.S.C. § 7101 et seq.), the Anti-Deficiency Act (31 U.S.C. § 1341 et seq.), the Competition in Contracting Act (41 U.S.C. § 3301 et seq.), the Prompt Payment Act (31 U.S.C. §3901 et seq.), Contracts for Data Processing or Maintenance (38 USC § 5725), and FAR clauses 52.212-4, 52.227-14, 52.227-19 shall supersede, control, and render ineffective any inconsistent, conflicting, or duplicative provision in any commercial license agreement. In the event of conflict between this Clause and any provision in the Contract/Order or the commercial license agreement or elsewhere, the terms of this Clause shall prevail. Claims of patent or copyright infringement brought against the Government as a party shall be defended by the U.S. Department of Justice (DOJ). 28 U.S.C. § 516. At the discretion of DOJ, the Contractor may be allowed reasonable participation in the defense of the litigation. Any additional changes to the Contract/Order must be made by contract/order modification (Standard Form 30) and shall only be effected by a warranted Contracting Officer. Nothing in this Contract/Order or any commercial license agreement shall be construed as a waiver of sovereign immunity.
B.3 SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT:
1. Definitions.
1. Licensee. The term “licensee” shall mean the U.S. Department of Veterans Affairs (“VA”) and is synonymous with “Government.”
1. Licensor. The term “licensor” shall mean the contractor having the necessary license or ownership rights to deliver license, software maintenance and support of the computer software being acquired. The term “contractor” is the party identified in Block 17a on the SF1449. If the contractor is a reseller and not the Licensor, the contractor remains responsible for performance under this order.
1. Software. The term “software” shall mean the licensed computer software product(s) cited in the Schedule of Supplies/Services.
1. Maintenance. The term “maintenance” is the process of enhancing and optimizing software, as well as remedying defects. It shall include all new fixes, patches, releases, updates, versions and upgrades, as further defined below.
1. Technical Support. The term “technical support” refers to the range of services providing assistance for the software via the telephone, email, a website or otherwise.
1. Release or Update. The term “release” or “update” are terms that refer to a revision of software that contains defect corrections, minor enhancements or improvements of the software’s functionality. This is usually designated by a change in the number to the right of the decimal point (e.g., from Version 5.3 to 5.4). An example of an update is the addition of new hardware.
1. Version or Upgrade. The term “version” or “upgrade” are terms that refer to a revision of software that contains new or improved functionality. This is usually designated by a change in the number to the left of the decimal point (e.g., from Version 5.4 to 6).
1. Software License
1. Unless otherwise stated in the Schedule of Supplies/Services, the Performance Work Statement or Product Description, the software license provided to the Government is a perpetual, nonexclusive license to use the software
1. The Government may use the software in a networked environment.
1. Any dispute regarding the license grant or usage limitations shall be resolved in accordance with the Disputes Clause incorporated in FAR 52.212-4(d).
1. All limitations of software usage are expressly stated in the Schedule of Supplies/Services and the Performance Work Statement/Product Description.
1. Software Maintenance and Technical Support
| (a) | If the Government desires to continue software maintenance and support beyond the period of performance identified in this contract or order, the Government will issue a separate contract or order for maintenance and support. Conversely, if a contract or order for continuing software maintenance and technical support is not received the contractor is neither authorized nor permitted to renew any of the previously furnished services. |
| (b) | The contractor shall provide software support services, which includes periodic updates, enhancements and corrections to the software, and reasonable technical support, all of which are customarily provided by the contractor to its commercial customers so as to cause the software to perform according to its specifications, documentation or demonstrated claims. |
| (c) | Any telephone support provided by contractor shall be at no additional cost. |
| (d) | The contractor shall provide all maintenance services in a timely manner in accordance with the contractor’s customary practice or as defined in the Performance Work Statement/Product Description. However, prolonged delay (exceeding 2 business days) in resolving software problems will be noted in the Government’s various past performance records on the contractor (e.g., www.ppirs.gov). |
| (e) | If the Government allows the maintenance and support to lapse and subsequently wishes to reinstate it, any reinstatement fee charged shall not exceed the amounts that would have been charged if the Government had not allowed the subscription to lapse. |
1. Disabling Software Code. The Government requires delivery of computer software that does not contain any code that will, upon the occurrence or the nonoccurrence of any event, disable the software. Such code includes but is not limited to a computer virus, restrictive key, node lock, time-out or other function, whether implemented by electronic, mechanical, or other means, which limits or hinders the use or access to any computer software based on residency on a specific hardware configuration, frequency of duration of use, or other limiting criteria. If any such disabling code is present, the contractor agrees to indemnify the Government for all damages suffered as a result of a disabling caused by such code, and the contractor agrees to remove such code upon the Government’s request at no extra cost to the Government. Inability of the contractor to remove the disabling software code will be considered an inexcusable delay and a material breach of contract, and the Government may exercise its right to terminate for cause. In addition, the Government is permitted to remove the code as it deems appropriate and charge the Contractor for consideration for the time and effort expended in removing the code.
Manuals and Publications. Upon Government request, the contractor shall furnish the most current version of the user manual and publications for all products/services provided under this contract or order at no cost.
B.4 PRICE SCHEDULE
All deliverables will be destination inspection and acceptance and due 30 days after award unless otherwise specified. Deliverables with due dates falling on a weekend or holiday shall be submitted the following Government workday after the weekend or holiday. All deliverables will be electronically submitted to the VA PM, COR, and CS. All deliverables will be destination inspection and acceptance.
NOTE: Vendors are instructed to complete Attachment A – Price Schedule.
Vendors are cautioned that alterations to the line items as specified below may render quotes unacceptable. All questions shall be directed to the Contract Specialist Laura.Startek@va.gov to the closing date and time specified in the Request for Quote (RFQ) on Page 1, Block 8.
Inspection: Destination Acceptance: Destination Free on Board (FOB): Destination Ordering Period is 36 months.
| CLIN / SLIN |
| DELIVERABLE DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL |
| 0001 |
| Project Management |
In accordance with (IAW) PWS Section 5.1 through 5.1.2 Pricing shall include SLINS 1001AA-0001AB
| 1 |
| LO |
| 0001AA |
| Contractor Project Management Plan |
Deliverable: Contractor Project Management Plan One Per Task Order, Updated Throughout Period of Performance Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.1.1
| 1 |
| LO |
| NSP |
| NSP |
| 0001AB |
| Reporting Requirements |
Deliverable: Monthly Progress Report Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.1.2
| 1 |
| LO |
| NSP |
| NSP |
| 0002 |
| Implementation and Expansion |
IAW PWS Section 5.2 through 5.2.1
| 1 |
| LO |
| 0002AA |
| Deliverable: Authorized Reseller or Distributor for the (OEM) Documentation |
Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.2.1
| 1 |
| LO |
| NSP |
| NSP |
| 0002AB |
| Deliverable: Authorized Reseller or Distributor for the Original Software Manufacturer of the User Interfaces Documentation |
Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.2.1
| 1 |
| LO |
| NSP |
| NSP |
| 0003 |
| Site Assessment |
IAW PWS Section 5.3
| 1 |
| LO |
0003AA
Deliverable: Site Assessment Report One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.3
| 1 |
| LO |
| NSP |
| NSP |
| 0004 |
| Design |
IAW PWS Section 5.4 through 5.4.3 Pricing shall include SLIN 1004A
| 1 |
| LO |
| 0004AA |
| Timestamp |
IAW PWS Section 5.4.1
| 1 |
| LO |
| NSP |
| NSP |
| 0004AB |
| Wireless Technology |
IAW PWS Section 5.4.2
| 1 |
| LO |
| NSP |
| NSP |
| 0004AC |
| Deliverable: Hardware and Server Design Document (HSDD) |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.4.3
| 1 |
| LO |
| NSP |
| NSP |
| 0005 |
| Hardware Provisioning and Configuration |
IAW PWS Section 5.5
| 1 |
| LO |
| 0005AA |
| Deliverable: Facility Receiving Report |
Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov Inspection: Destination Acceptance: Destination IAW PWS Section 5.5
| 1 |
| LO |
| NSP |
| NSP |
| 0006 |
| Installation and Configuration |
IAW PWS Section 5.5.1
| 1 |
| LO |
| 0006AA |
| Deliverable: Infrastructure Device Maps |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.5.1
| 1 |
| LO |
| NSP |
| NSP |
| 0007 |
| Software Provisioning and Configuration |
IAW PWS Section 5.6
| 1 |
| LO |
| NSP |
| NSP |
| 0008 |
| Hardware-Specific Software |
IAW PWS Section 5.6.1
| 1 |
| LO |
| 0008AA |
| Deliverable: Software Installation Report |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.6.1
| 1 |
| LO |
| NSP |
| NSP |
| 0009 |
| User Interface Provisioning and Configuration |
IAW PWS Section 5.6.2
| 1 |
| LO |
| 0010 |
| Infor® LBI Software Configuration |
IAW PWS Section 5.6.3
| 1 |
| LO |
| 0011 |
| Professional Services |
IAW PWS Section 5.7
| 1 |
| LO |
| NSP |
| NSP |
| 0012 |
| Asset Tagging |
IAW PWS Section 5.7.1
| 1 |
| LO |
| 0012AA |
| Deliverable: Tagging and Commissioning Plan |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS 5.7.1
| 1 |
| LO |
| NSP |
| NSP |
| 0012AB |
| Deliverable: Tagging and Commissioning Instruction |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS 5.7.1
| 1 |
| LO |
| NSP |
| NSP |
| 0013 |
| System Administration |
IAW PWS Section 5.7.2
| 1 |
| LO |
| 0014 |
| Professional Service Hours |
IAW PWS Section 5.7.3
| 1 |
| LO |
| 0015 |
| Acceptance Testing |
IAW PWS Section 5.8 through 5.8.2
| 1 |
| LO |
| 0015AA |
| Deliverable: Acceptance Test Plan |
Draft due 60 days after contract award, final due within 90 days, and updated as required thereafter.
Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.8
| 1 |
| LO |
| NSP |
| NSP |
| 0016 |
| Phase One: Performance Testing |
IAW PWS Section 5.8.1
| 1 |
| LO |
| 0016AA |
| Deliverable: Performance Test Plan |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.8.1
| 1 |
| LO |
| NSP |
| NSP |
| 0016AB |
| Deliverable: Facility Remediation Hardware Report |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.8.1
| 1 |
| LO |
| NSP |
| NSP |
| 0016AC |
| Deliverable: Final Hardware Deployment Document |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination IAW PWS Section 5.8.1
| 1 |
| LO |
| NSP |
| NSP |
| 0017 |
| Phase Two: User Acceptance Testing |
IAW PWS Section 5.8.2
| 1 |
| LO |
| 0017AA |
| Deliverable: User Acceptance Test Plan |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.8.2
| 1 |
| LO |
| NSP |
| NSP |
| 0017AB |
| Deliverable: Facility Acceptance Test Report |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.8.2
| 1 |
| LO |
| NSP |
| NSP |
| 0018 |
| Transition Planning |
IAW PWS Section 5.9
| 1 |
| LO |
| 0018AA |
| Deliverable: Transition Plan |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.9
| 1 |
| LO |
| NSP |
| NSP |
| 0018AB |
| Deliverable: User and Technical Manuals |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.9
| 1 |
| LO |
| NSP |
| NSP |
| 0019 |
| Training Requirements |
IAW PWS Section 5.10
| 1 |
| LO |
| 0019AA |
| Deliverable: Training Plan |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.10
| 1 |
| LO |
| NSP |
| NSP |
| 0019AB |
| Deliverable: Training Material and Schedules |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.10
| 1 |
| LO |
| NSP |
| NSP |
| 0019AC |
| Deliverable: List of Attendees |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.10
| 1 |
| LO |
| NSP |
| NSP |
| 0020 |
| Warranty Services |
Support for one (1) year following each site acceptance by VA.
IAW PWS Section 5.11
| 1 |
| LO |
| 0020AA |
| Deliverable: Warranty Status Report |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 5.11
| 1 |
| LO |
| NSP |
| NSP |
| 0021 |
| General Requirements |
IAW PWS Section 6.1 through 6.7 and Addendums
| 1 |
| LO |
| NSP |
| NSP |
| 0021AA |
| Deliverable: Contractor Staff Roster |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 6.2.2
| 1 |
| LO |
| NSP |
| NSP |
| 0021AB |
| Deliverable: Master Delivery Schedule |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 6.7
| 1 |
| LO |
| NSP |
| NSP |
| 0021AC |
| Deliverable: Shipment/Delivery Weekly Progress Report |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section 6.7
| 1 |
| LO |
| NSP |
| NSP |
| 0021AD |
| Deliverable: Final Section 508 Compliance Test Results |
One Per Task Order Electronic Submission to: Phuc.Nguyen@va.gov
Inspection: Destination Acceptance: Destination
IAW PWS Section A3.4
| 1 |
| LO |
| NSP |
| NSP |
| TOTAL IDIQ PRICE |
| $ |
B.5 PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
DEPARTMENT OF VETERANS AFFAIRS
Veteran Health Administration Veteran Integrated Service Network 21 (VISN 21)
Automated Inventory Management Using Passive Radiofrequency Identification
Date: 3/29/2022
TAC VA-22-00058687
PWS Version Number: 1.0
1.0 BACKGROUND
The mission of the Department of Veterans Affairs (VA), Veteran Integrated Service Network 21 (VISN 21) is to provide benefits and services to Veterans of the United States. In meeting these goals, VISN 21 strives to provide high quality, effective, and efficient Information Technology (IT) services to those responsible for providing care to the Veterans at the point-of-care as well as throughout all the points of the Veterans’ health care in an effective, timely and compassionate manner.
VISN 21 currently uses CenTrak® proprietary active radiofrequency identification (active RFID) real time locating systems (RTLS) to track asset, staff, and patient locations. CenTrak® Active Asset Tracking (AT) deployed at VISN 21 Health Care Systems (HCS) is supplemented with the Infor® Location Based Intelligence (LBI) user interface (UI). The hardware and software are designed for locating assets in real time at a zonal, room-level, and within-room level accuracy.
Currently, however, active (i.e., battery powered) CenTrak® asset tracking (AT) only provides coverage for a portion of VISN 21’s assets due to the trade-off between tag size, maintenance cost (e.g., battery management), and the ability to locate assets in real time. However, it is not necessary to locate in real time the majority of non-expendable (NX) equipment at medical centers. Therefore, VISN 21 is seeking a passive (i.e., non-powered) RFID solution to complement CenTrak® active AT in locating non-expendable equipment not suitable for use with active RFID tags.
2.0 APPLICABLE DOCUMENTS
In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:
1. 44 U.S.C. § 3541, “Federal Information Security Management Act (FISMA) of 2002”
2. Federal Information Processing Standards (FIPS) Publication 140-2, “Security Requirements For Cryptographic Modules”
3. FIPS Pub 201-2, “Personal Identity Verification of Federal Employees and Contractors,” August 2013
4. 10 U.S.C. § 2224, "Defense Information Assurance Program"
5. Carnegie Mellon Software Engineering Institute, Capability Maturity Model® Integration for Development (CMMI-DEV), Version 1.3 November 2010; and Carnegie Mellon Software Engineering Institute, Capability Maturity Model® Integration for Acquisition (CMMI-ACQ), Version 1.3 November 2010
6. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”
7. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”
8. VA Directive 0710, “Personnel Suitability and Security Program,” June 4, 2010, http://www.va.gov/vapubs/
9. VA Handbook 0710, Personnel Suitability and Security Program, September 10, 2004, http://www.va.gov/vapubs
10. VA Directive and Handbook 6102, “Internet/Intranet Services,” July 15, 2008
11. 36 C.F.R. Part 1194 “Electronic and Information Technology Accessibility Standards,” July 1, 2003
12. Office of Management and Budget (OMB) Circular A-130, “Management of Federal Information Resources,” November 28, 2000
13. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services (CHAMPUS)”
14. An Introductory Resource Guide for Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule, October 2008
15. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended by the Workforce Investment Act of 1998 (P.L. 105-220), August 7, 1998
16. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004
17. VA Directive 6500, “Managing Information Security Risk: VA Information Security Program,” September 20, 2012
18. VA Handbook 6500, “Risk Management Framework for VA Information Systems – Tier 3: VA Information Security Program,” March 10, 2015
19. VA Handbook 6500.1, “Electronic Media Sanitization,” November 03, 2008
20. VA Handbook 6500.2, “Management of Data Breaches Involving Sensitive Personal Information (SPI)”, January 6, 2012
21. VA Handbook 6500.3, “Assessment, Authorization, And Continuous Monitoring Of VA Information Systems,” February 3, 2014
22. VA Handbook 6500.5, “Incorporating Security and Privacy in System Development Lifecycle” March 22, 2010
23. VA Handbook 6500.6, “Contract Security,” March 12, 2010
24. VA Handbook 6500.8, “Information System Contingency Planning”, April 6, 2011
25. Project Management Accountability System (PMAS) portal (reference https://www.voa.va.gov/pmas/)
26. OI&T ProPath Process Methodology (reference process maps at http://www.va.gov/PROPATH/Maps.asp and templates at http://www.va.gov/PROPATH/Templates.asp NOTE: In the event of a conflict, OI&T ProPath takes precedence over other processes or methodologies.
27. One-VA Technical Reference Model (TRM) (reference at http://www.va.gov/trm/TRMHomePage.asp)
28. National Institute Standards and Technology (NIST) Special Publications (SP)
29. VA Directive 6508, VA Privacy Impact Assessment, October 3, 2008
30. VA Directive 6300, Records and Information Management, February 26, 2009
31. VA Handbook, 6300.1, Records Management Procedures, March 24, 2010
32. OMB Memorandum, “Transition to IPv6”, September 28, 2010
33. VA Directive 0735, Homeland Security Presidential Directive 12 (HSPD-12) Program, February 17, 2011
34. VA Handbook 0735, Homeland Security Presidential Directive 12 (HSPD-12) Program, March 20, 2014
35. OMB Memorandum M-06-18, Acquisition of Products and Services for Implementation of HSPD-12, June 30, 2006
36. OMB Memorandum 05-24, Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors, August 5, 2005
37. OMB memorandum M-11-11, “Continued Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors, February 3, 2011
38. OMB Memorandum, Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation, May 23, 2008
39. Federal Identity, Credential, and Access Management (FICAM) Roadmap and Implementation Guidance, December 2, 2011
40. NIST SP 800-116, A Recommendation for the Use of Personal Identity Verification (PIV) Credentials in Physical Access Control Systems, November 20, 2008
41. OMB Memorandum M-07-16, Safeguarding Against and Responding to the Breach of Personally Identifiable Information, May 22, 2007
42. NIST SP 800-63-2, Electronic Authentication Guideline, August 2013
43. Draft NIST Special Publication 800-157, Guidelines for Derived PIV Credentials, March 2014
44. NIST Special Publication 800-164, Guidelines on Hardware-Rooted Security in Mobile Devices (Draft), October 2012
45. Draft National Institute of Standards and Technology Interagency Report (NISTIR) 7981 Mobile, PIV, and Authentication, March 2014
46. VA Memorandum, VAIQ #7100147, Continued Implementation of Homeland Security Presidential Directive 12 (HSPD-12), April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
47. VA Memorandum, VAIQ # 7011145, VA Identity Management Policy, June 28, 2010 (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
48. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
49. Trusted Internet Connections (TIC) Reference Architecture Document, Version 2.0, Federal Interagency Technical Reference Architectures, Department of Homeland Security, October 1, 2013, https://www.fedramp.gov/files/2015/04/TIC_Ref_Arch_v2-0_2013.pdf
50. OMB Memorandum M-08-05, “Implementation of Trusted Internet Connections (TIC), November 20, 2007
51. OMB Memorandum M-08-23, Securing the Federal Government’s Domain Name System Infrastructure, August 22, 2008
52. VA Memorandum, VAIQ #7497987, Compliance – Electronic Product Environmental Assessment Tool (EPEAT) – IT Electronic Equipment, August 11, 2014 (reference Document Libraries, EPEAT/Green Purchasing Section, https://www.voa.va.gov/documentlistpublic.aspx?NodeID=552)
53. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (Public Law 110–140), December 19, 2007
54. Section 104 of the Energy Policy Act of 2005, (Public Law 109–58), August 8, 2005
55. Executive Order 13514, “Federal Leadership in Environmental, Energy, and Economic Performance,” October 5, 2009
56. Executive Order 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” January 24, 2007
57. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August 2, 2001
58. VA Directive 0058, “VA Green Purchasing Program”, July 19, 2013
59. VA Handbook 0058, “VA Green Purchasing Program”, July 19, 2013
60. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote Access”, January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
61. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103
62. VA Directive 6071, Project Management Accountability System (PMAS), February 20, 2013
63. VA Memorandum, “Implementation of Federal Personal Identity Verification (PIV) Credentials for Federal and Contractor Access to VA IT Systems”, (VAIQ# 7614373) July 9, 2015, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
64. VA Memorandum “Mandatory Use of PIV Multifactor Authentication to VA Information System” (VAIQ# 7613595), June 30, 2015, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
65. VA Memorandum “Mandatory Use of PIV Multifactor Authentication for Users with Elevated Privileges” (VAIQ# 7613597), June 30, 2015; https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
3.0 SCOPE OF WORK
The Contractor shall provide the professional services, hardware, and software required by individual Task Orders (TOs) for the implementation of a radiofrequency-based asset tagging system at VISN 21 Health Care Systems.
3.1 ISSUANCE OF TOS
The CO shall issue a TO to the Contractor. Contractor work shall commence only after issuance of the TO by the CO.
3.1.1 Request for Post Award Action
Upon identification of the need for a modification to a TO, the Government shall issue a Request for Post Award Action, designated by an action number, to the Contractor. The CO shall designate individuals authorized to issue such requests upon TO award, in writing. The Contractor shall respond to requests from these authorized individuals only. All Contractor correspondence shall reference the Government designated action number. The Government’s Request for Post Award Action does NOT constitute an authorization to start work. A Request for Post Award action may include, but not limited to cost and no cost changes, period of performance extensions, within scope changes, shipping or inspections changes.
4.0 PERFORMANCE DETAILS
This is an Indefinite Delivery/Indefinite Quantity (IDIQ) contract. Individual TOs shall be issued on a Firm Fixed Price (FFP) basis.
The Contractor shall provide and/or acquire the services, hardware, and software required by individual TOs pursuant to the general requirements specified below.
4.1 PERFORMANCE PERIOD
The ordering period shall be three (3) years from the date of award. The period of performance (PoP) for any task order may go up to 16 months beyond the last day of the ordering period. Each TO will have its own PoP.
Any work at the Government site shall not take place on Federal holidays or weekends unless directed by the Contracting Officer (CO).
There are eleven (11) Federal holidays set by law (USC Title 5 Section 6103) that VA follows:
Under current definitions, four are set by date:
| New Year's Day | January 1 | |
| Juneteenth | June 19 | |
| Independence Day | July 4 | |
| Veterans Day | November 11 | |
| Christmas Day | December 25 |
If any of the above falls on a Saturday, then Friday shall be observed as a holiday. Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday.
The other six are set by a day of the week and month:
| Martin Luther King's Birthday | Third Monday in January | ||||
| Washington's Birthday | Third Monday in February | ||||
| Memorial Day | Last Monday in May | ||||
| Labor Day | First Monday in September | ||||
| Columbus Day | Second Monday in October | ||||
| Thanksgiving | Fourth Thursday in November | ||||
| 4.2 | PLACE OF PERFORMANCE |
The place of performance shall be identified in individual Task Orders within VISN 21. The list of current VISN 21 Health Care Systems and their addresses are given in Table 1.
| ID |
| Name |
| Address |
| 570 |
| Central California Health Care System (CCHCS) |
| 2615 E. Clinton Ave. Fresno, CA 93703-2286 |
| 612 |
| Northern California Health Care System (NNHCS) |
| 10535 Hospital Way Mather, CA 95655 |
| 640 |
| Palo Alto Health Care System (PAHCS) |
| 3801 Miranda Ave. Palo Alto, CA 94304 |
| 654 |
| Sierra Nevada Health Care System (SNHCS) |
| 975 Kirman Avenue Reno, NV 89502 |
| 662 |
| San Francisco Health Care System (SFHCS) |
| 4150 Clement St. San Francisco, CA 94121 |
| 593 |
| North Las Vegas Health Care System (NLVHCS) |
| 6900 N. Pecos Road North Las Vegas, NV 89086 |
| 459 |
| Pacific Islands Health Care System (PIHCS) |
| 459 Patterson Road Honolulu, HI 96819 |
Table 1: VISN 21 Health Care Systems
4.3 TRAVEL
The Government anticipates travel under this effort to perform the tasks associated with the effort. Include all estimated travel costs in your firm-fixed price line items. These costs will not be directly reimbursed by the Government.
The total estimated number of trips in support of the program related meetings for this effort will be dependent on each Task Order.
5.0 SPECIFIC TASKS AND DELIVERABLES
Individual TO(s) may encompass more than one functional area listed below. Functional area details are described to provide greater insight into the complexity and uniqueness of some potential TO requirements covered by this Performance Work Statement (PWS). Functional area requirements are not mutually exclusive, and an individual TO requirements may fall within multiple functional areas.
5.1 PROJECT MANAGEMENT
5.1.1 CONTRACTOR PROJECT MANAGEMENT PLAN
The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s approach, timeline and tools to be used in execution of the contract. The CPMP should take the form of both a narrative and graphic format that displays the schedule, milestones, risks and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc requests as identified within the PWS. The initial baseline CPMP shall be concurred upon and updated with approval from the Government. The Contractor shall update and maintain the CPMP throughout the period of performance.
Deliverable:
A. Contractor Project Management Plan
5.1.2 REPORTING REQUIREMENTS
The Contractor shall provide the COR with Monthly Progress Reports (MPR) in electronic format. The MPR shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including a plan and timeframe for resolving the issue. The Contractor shall monitor performance against the CPMP and report all deviations. The Contractor shall communicate with the Government any potential issues that may arise. The MPR reports shall reflect progress as of the last day of the preceding month.
The deliverables defined below are required for the basic contract and each resulting TO, unless otherwise specified, and shall be forwarded electronically to the Government. The basic contract report shall be a rollup of each TO. Each individual TO report shall be delivered to the COR for that TO. Any differences between the requirements for the overall basic contract report versus the TO report are noted below. For monthly reports, the reporting period shall be from the first day of each month (or the date of TO award) through the last day of that month; each deliverable for that period shall then be submitted by the 15th day of each the following months. Deliverables with due dates falling on a weekend or holiday shall be submitted the following Government work day after the weekend or holiday.
The Contractor shall provide a Monthly Progress Report at the basic contract level that provides a roll up of each TO.
Deliverable:
A. Monthly Progress Report
5.2 IMPLEMENTATION AND EXPANSION
5.2.1 COMPATIBILITY REQUIREMENTS
Due to the existing implementation of CenTrak® active RTLS and Infor® LBI at VISN 21 Medical Centers and CBOCs, the following requirements apply to all specific tasks and deliverables in this PWS:
· The Contractor shall propose a hardware solution that is compatible with Infor® LBI. Location and asset data from the proposed passive RFID system must be transmissible to Infor LBI® and conform to the CenTrak® and Infor® Data Standards.
· The Contractor shall propose a software interface that is compatible with CenTrak® hardware and software for asset tracking. The proposed software and user interfaces must be able to accept CenTrak® location data.
· The Contractor shall propose a solution that is compatible with CenTrak® and Infor® data architecture.
The requirements above ensure that there is possible cross-talks between the passive and active asset management systems at VISN 21. In addition, VA VISN 21 requires that:
· The Contractor shall provide proof as an authorized reseller or distributor for the original equipment manufacturer (OEM) and remain an authorized reseller or distributor for the duration of the POP.
· The Contractor shall provide proof as an authorized reseller or distributor for the original software manufacturer of the user interfaces.
Deliverables:
A. Authorized Reseller or Distributor for the (OEM) Documentation B. Authorized Reseller or Distributor for the Original Software Manufacturer of the User Interfaces Documentation
5.3 SITE ASSESSMENT
The Contractor shall perform a detailed site assessment at the site(s) identified in individual TOs to provide a full scope of requirements for site needs. A VAMC or CBOC in a different city shall be considered a different site for site assessment purposes. The Contractor shall coordinate with the COR and site POCs to schedule site assessments. The Contractor shall conduct a pre-assessment conference call at least two (2) weeks in advance of the site assessment. The Contractor shall coordinate the call with the COR to ensure attendance by facility stakeholders and subcontractor(s).
The Contractor shall provide a Site Assessment Report that outlines all requirements and line items per site to include hardware, software and services. Line items shall be listed in the format of the price cost schedule with the description of the item, quantity, cost per unit, and CLIN number. The Assessment Report shall include narrative and diagrams where appropriate to demonstrate understanding of the project goals. The assessment shall include a timeline for the entire project lifecycle with the following milestones defined as a minimum:
1. Equipment installation schedule
2. Limited installation capability demonstration
3. Equipment installation completion
4. User acceptance testing
5. User training
Milestones may be based on TO award date. The limited installation capability demonstration is defined to be a technical feasibility report in which the steps required for complete equipment installation is detailed for each task order.
Deliverables A. Site Assessment Report
5.4 DESIGN
5.4.1 Time Stamp
The Contractor shall ensure all applications synchronize with internal VA site time standard. The synchronization of time on this network is critical in every aspect of managing, securing, planning, and debugging as it involves determining when an event occurred.
5.4.2 Wireless Technology
The Contractor shall utilize the existing Wi-Fi infrastructure at each facility for the implementation of the technology. The Contractor shall notify the Government when known existing Wi-Fi infrastructure at each facility is not available or is insufficient and supplemental technologies will be required where Wi-Fi is not available or insufficient to achieve the resolution objectives of the applications.
5.4.3 Hardware and Server Design Document
The Contractor shall ensure there is a Hardware and Server Design Document (HSDD) for every site. The Contractor shall update the HSDD throughout the remaining implementation so that it remains current with the existing design. The HSDD shall include:
1. Proposed changes, corrections and/or updates to the VA-provided maps and Engineering Space Files as noted during the Contractor’s site validation.
2. Proposed location for installation of hardware.
3. The Contractor shall provide a draft of the server configuration and architecture that shall be configured and optimized to meet the needs of the facility. This draft documentation shall include a diagram that lays out the server requirements at each location along with expected bandwidth utilization for the WAN links, expected application latency requirements, server specification (including power, BTUs, and network connections).
4. The Contractor shall provide the specification for the number of tags that can be supported per server.
Deliverables
A. Hardware and Server Design Document (HSDD)
5.5 HARDWARE PROVISIONING AND CONFIGURATION
The Contractor shall provide all necessary hardware components delivered to sites as specified in the Hardware and Server Design Document (HSDD) and ordered at the task order level. The hardware provided shall be compatible with VISN 21’s existing interface software and additional proposed interface software. Hardware components shall include, but not limited to, handheld RFID scanners, passive RFID tags, infrastructure components. Wireless hardware proposed shall be FIPS-compliant.
The Contractor shall coordinate with the COR and site POCs to schedule delivery and receive written or e-mail COR concurrence is required to ship hardware. The Contractor shall provide a copy of the signed Facility Receiving Report to the COR once components are delivered. The Contractor shall submit a copy of the signed Facility Receiving Reports for each site. The Facility Receiving Report shall contain:
1. Confirmation of the order and delivery of the components
2. Reconciliation (if any) of what was planned to be delivered versus what was delivered. Details of where items were delivered, what time they were delivered, and who from the Government received them.
Deliverable A. Facility Receiving Report
5.5.1 Installation and Configuration
The Contractor shall install all hardware components delivered to sites. The Contractor shall coordinate with the COR and site POCs to schedule installation.
The Contractor shall ensure that hardware installed and configured do not interfere with other wireless technologies in the same environment. In the event of interference, the Contractor shall propose a plan for resolution of interference to the Government.
The Contractor shall install supporting hardware and components to blend in (or not be visible at all) with the general surface treatments of the facility. The Contractor shall install components to have minimal impact on the business operations of the facility and meet applicable infection control and health and safety requirements such as Joint Commission and local Infection Control Risk Assessment (ICRA) findings and standards. Hardware installation shall occur during normal business hours. This may include use of containment units for any above the ceiling work.
When installation of an infrastructure device requires a data connection, the Contractor shall use existing data connections whenever possible. If a new data connection and cabling is required, the Contractor shall provide the cabling and the cabling services.
The Contractor shall provide rendered maps of installed infrastructure device locations (i.e., “as-built drawings”).
Deliverable A. Infrastructure Device Maps
5.6 SOFTWARE PROVISIONING AND CONFIGURATION
5.6.1 Hardware-Specific Software
The Contractor shall provide and install all necessary software compatible with the proposed hardware (i.e., middleware). The Government will provide virtual servers. If a virtual server platform is not feasible, the Contractor shall provision compatible physical servers for software installation. The Contractor shall provide a Software Installation Report. This Report shall include:
1) A list of all servers configured
2) Software and licenses that are installed on each server
3) Software validations
4) Server data architecture diagram
Deliverable A. Software Installation Report
5.6.2 User Interface Provisioning and Configuration
The User Interface (UI) shall be a web-based UI and include at minimum the following capabilities:
1. Web-based UI
2. Display individual item information to allow users to uniquely identify individual assets
3. Displays facility assets in a list view; assets may be searched by asset number (identifier), asset type, asset model, asset manufacturer, or tag ID
4. Display facility assets in a map view; asset location shall be displayed on a facility floorplan in a pictographic method
5. Asset information may be exported from the system in an excel format
6. Access past year of asset location history (capability may be developed)
7. Fully customizable business rules
8. Asset egress alerts (capability may be developed as designated by VA)
9. Report generation and integration with Microsoft® Power BI
The UI shall be capable of interfacing with the following automated inventory management system / computerized inventory and maintenance management systems (CMMS):
1. VA Automated Engineering Management System/Medical Equipment Reporting System (AEMS-MERS)
2. IBM Maximo® Enterprise Asset Management System (Maximo EAM)
3. Nuvolo©
The interface for data exchange between the UI and VA AEMS-MERS/Maximo®/Nuvolo© shall at least be bidirectional and have at least the following capabilities:
1. Provide the UI and VA-AEMS/MERS and Maximo AEM the ability to identify a unique asset using a combination of unique asset ID and facility number.
2. Update the UI at least once every 24 hours.
3. Allow the UI shall display individual asset information from VA-AEMS/MERS and Maximo AEM to allow user to unique identify individual assets.
4. Provide designated users the capability to adjust the periodicity of bidirectional updates.
5. Post inventory date and time to VA-AEMS/MERS and Maximo AEM
6. Have the option to be run on demand
7. Update the UI with space creation from VA-AEMS/MERS and Maximo AEM
8. Update the UI when an asset has been decommissioned in VA-AEMS/MERS and Maximo AEM
9. Stop sending location/inventory date updates to VA-AEMS/MERS and Maximo AEM when assets are marked as decommissioned in the UI.
5.6.3 Infor® LBI Software Configuration
VISN 21 currently uses Infor® LBI as a UI for active RFID-based asset tracking. To streamline clinical and operational workflow, compatibility with Infor® LBI is required for all proposed hardware, software, and user interfaces. Therefore, if the proposed UI is not Infor® LBI, the Contractor shall provide configuration services for integrating the proposed passive RFDI system interfaces with Infor LBI®. The Contractor must maintain a current Reseller Agreement with Infor® for all tasks requiring Infor® LBI software installation, configuration, and maintenance.
Per hardware design changes and/or VA reconfiguration requirements, the Contractor shall update rendered maps in Infor® LBI application. Naming shall conform to data standards as outlined in the RTLS Enterprise Data Architecture (EDA) Standards Workbook. Configuration changes shall be scoped during the site assessment at each facility.
5.7 PROFESSIONAL SERVICES
5.7.1 Asset Tagging
The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .