34. MTTF JML 3123V002_signed.pdf

PDF 300 KB Posted

Attached to
HOSE, NON-METALLIC: VERSILON FEP TLCT
Solicitation number
N3225323Q0028
Issued by

About this file

This memorandum documents the use of other than full and open competition for an acquisition under the simplified acquisition threshold. The required item is a hose, non-metallic Versilon FEP TLCT, 2" ID, 250 PSI maximum working pressure, 1000 PSI minimum burst pressure, 13.5" minimum bend radius, FEP inner core reinforced with polyester plycords and green EPDM rubber, Saint-Gobain part number 3832TLCTO. The justification for limiting competition is that the required hose features are essential to meet the government's technical requirements for certain evolutions, and market research found no other hoses that meet the criteria or could be modified to do so. The hose must be delivered by March 1, 2024 to avoid significant delays to project schedules and increased resource usage. The related solicitation is number N3225323Q0028 for this hose from the Department of the Navy Naval Sea Systems Command.

View the file

Other files

File Type Posted
RFQ N32253-23-Q-0028.pdf PDF
34. MTTF JML 3037V001_signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM TO THE FILE

Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN

ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE: (Provide a description of the item or service required, to include its intended use, the name of the required source or brand name, and the required delivery date/period of performance.)

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING (select all that apply):

A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

DON SAP Guide Enclosure 3 PHNSY C410.4 Version 1

Saint-Gobain P/N: 3832TLCTO

HOSE, NON-METALLIC: VERSILON FEP TLCT, SMOOTH BORE FLUOROPOLYMER, 2" ID, 250 PSIMAX WORKING PRESSURE, 1000 PSI MINIMUM BURST PRESSURE, 13.5" MINIMUM BEND RADIUS, FEP INNER CORE REINFORCED WITH POLYESTER PLYCORDS AND GREEN EPDM RUBBER, SAINT-GOBAIN

PN 3832TLCTO.

Required Delivery Date 3/1/24

1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

(Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government’s need.)

2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM. (Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.)

OR

Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).

DON SAP Guide Enclosure 3 PHNSY C410.4 Version 2

3. ___ OTHER REASONS. Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.

B. ___ BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer. Discuss why you are precluding consideration of a product manufactured by another company. Describe how the particular brand name, product, or feature is essential to the Government’s requirements and why a “brand name or equal” purchase description cannot be used (see FAR 11.104). Describe how market research indicates other companies’ similar products or products lacking the particular feature do not meet, or cannot be modified to meet, the agency’s needs.

C. ___UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.

Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified: _________________________

2. Required delivery date/period of performance: _____________________________

DON SAP Guide Enclosure 3 PHNSY C410.4 Version 3

THE SUBJECT HOSES ARE REQUIRED FOR EVOLUTIONS WHERE FLUSHING WATER PRIOR TO

USE OR DAILY PER NAVSEA WATER CHEMISTRY MANUAL ARTICLE 252 WOULD CAUSE

SIGNIFICANT DELAYS TO PROJECT SCHEDULE AND INCREASE RESOURCES. LAB REPORT NO.

2022PHW0029 RESULTS FOR THE VERSILON FEP HOSES SHOWED THAT THESE HOSES WOULD

BE EXEMPT FROM THE DAILY FLUSHING REQUIREMENT WHILE ALSO MEETING THE

TECHNICAL REQUIREMENTS OF THE EVOLUTION.

3. Explanation of why delivery/commencement of services by the date mentioned above is required: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.

4. If appropriate, include any additional pertinent information.

IV. CERTIFICATIONS/APPROVALS:

A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

Signature Name (Printed) / Phone # Date

B. Certification/Approval. See FAR 13.501

Signature Name (Printed) / Phone # Date

DON SAP Guide Enclosure 3 PHNSY C410.4 Version 4

LUM.JARED.TAI

HIDEO.1539084

Digitally signed by

LUM.JARED.TAI

HIDEO.1539084654

Date: 2023.04.14 08:38:38 -10'00'

Jared T Lum / x2771 4/14/2023

7/19/2023Evangeline Calaustro / x 6572

2023-07-19T13:58:52-1000
CALAUSTRO.EVANGELINE.B.1180320675

File details come from the government source that posted it. Updated .