MEMORANDUM TO THE FILE

Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN

ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE: (Provide a description of the item or service required, to include its intended use, the name of the required source or brand name, and the required delivery date/period of performance.)

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING (select all that apply):

A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

DON SAP Guide Enclosure 3 PHNSY C410.4 Version 1

1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

(Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government’s need.)

2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM. (Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.)

OR

Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).

DON SAP Guide Enclosure 3 PHNSY C410.4 Version 2

3. ___ OTHER REASONS. Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.

B. ___ BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer. Discuss why you are precluding consideration of a product manufactured by another company. Describe how the particular brand name, product, or feature is essential to the Government’s requirements and why a “brand name or equal” purchase description cannot be used (see FAR 11.104). Describe how market research indicates other companies’ similar products or products lacking the particular feature do not meet, or cannot be modified to meet, the agency’s needs.

C. ___UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.

Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified: _________________________

2. Required delivery date/period of performance: _____________________________

DON SAP Guide Enclosure 3 PHNSY C410.4 Version 3

3. Explanation of why delivery/commencement of services by the date mentioned above is required: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.

4. If appropriate, include any additional pertinent information.

IV. CERTIFICATIONS/APPROVALS:

A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

Signature Name (Printed) / Phone # Date

B. Certification/Approval. See FAR 13.501

Signature Name (Printed) / Phone # Date

DON SAP Guide Enclosure 3 PHNSY C410.4 Version 4

MEMORANDUM TO THE FILE

2023-04-24T11:18:26-1000
LUM.JARED.TAI HIDEO.1539084654
Name Printed Phone: Jared T Lum / x2771
2023-06-13T08:35:41-1000
CALAUSTRO.EVANGELINE.B.1180320675
Name Printed Phone_2: Evangeline Calaustro / x6572
Date: 4/24/23
Date_2: 06/13/2023
Text4: Purolator Facet P/N F-141 (MetalEdge)

FILTER: 304 SS HEAD AND BOWL, 75 MICRON, .003" ELEMENT SPACING, 316 SS WEDGE WOUND WIRE FILTER ELEMENT, 2"-11.5 NPT THREAD INLET/OUTLET PORTS, MANUAL 304 SS CLEANING KNIFE, 150 PSIG MAX OP PRESSURE, 275 MAX OP TEMP, 57 GPM CAPACITY, PTFE PACKING, 2" NPT DRAIN PORT, PUROLATOR FACET P/N F-141

Requested delivery date: 3/1/24

Check Box5: Off
Check Box6: Off
Text7:
Check Box10: Off
Text11:
Text12:
Check Box13: Off
Check Box14: Yes
Text15:
Text16: The Purolator Facet MetalEdge filter P/N F-141 meets the pressure, temperature, flow rate, filtration capability, and material requirements required for its application. The relatively light weight (40 lbs when empty) makes it easy to remove and reinstall from the system to allow for extensive inspection and cleaning, which are frequently required to control bacteria growth in Guam. These filters are already being used in PHNSY's pure water system and have proven to be durable and free from internal corrosion issues. PHNSY is already proficient with the disassembly and reassembly of the filter. The procurement of these filters for Guam will allow PHNSY to stay on top of spare part inventory and allow quick technical support for these filters to minimize or eliminate work stoppage of pure water operations in Guam.