313B_Pricing_05_27_25__C1_.xlsx
XLSX spreadsheet 51 KB Posted
- Attached to
- Competitive Selection OH|DOT313B26-1
- Contract number
- DOT313B26-1
- Issued by
- Ohio
About this file
This document is a state-level pricing contract (ITB 313B-26) for the Ohio Department of Transportation (ODOT), covering joint seal materials, joint seal installation, and geosynthetic cementitious composite mat materials. The contract is awarded to HydraTech Engineered Products, LLC, a vendor located in Cincinnati, Ohio, with contact information for Jennifer Williams, who can be reached at 513-403-2265 or jennifer.williams@hydratechllc.com.
The contract provides detailed pricing for joint seal materials and installation across 12 ODOT districts, with prices varying based on pipe diameter and joint length. Pricing includes mobilization costs, mileage reimbursement, and additional work rates, with mobilization fees ranging from $645 to $1,015 per district and flagger rates at $75 per hour. The contract also covers geosynthetic cementitious composite mat materials in three types, priced at $11 and $18 per square foot depending on thickness and district. Additional options include equipment purchase or rental, such as a hydraulic expander for $3,950 or $500 for rental, and various delivery vehicle options with costs ranging from $85 to $110 per delivery across different districts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Affirmation_and_Disclosure_Form.pdf | ||
| Signature__4___1___002_.pdf | ||
| 313B_Spec__05_27_25__Bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VENDOR INFO
ITB 313B-26 Pricing 5 / 27 / 25
| Joint Seal Materials Joint Seal Materials + Install | |
| Geosynthetic Cementitious Composite Mat | |
| Vendor Name: -----> | HydraTech Engineered Products, LLC |
| Telephone orders may be followed with fax confirmation sent by the Department. | |
| Identify locations where orders will be placed, the name of an individual responsible for taking the orders, their telephone, and fax numbers. |
Vendor Location: 10448 Chester Rd, Cincinnati, OH 45215
Contact Person: Jennifer Williams
Telephone Number: 513-403-2265
Fax Number: 513-827-9171
Email Address: jennifer.williams@hydratechllc.com
DO NOT PROVIDE CONDITIONAL INFORMATION THAT WILL CHANGE THE TERMS OF THE CONTRACT. DOING SO MAY RESULT IN REJECTION OF YOUR BID.
SUBMIT ANY QUESTIONS, CLARIFICATIONS AND INQUIRIES REGARDING THIS INVITATION TO BID THROUGH INQUIRY LINK IN OHIO BUYS
DO NOT DELETE ROWS, COLUMNS, OR TABS FROM THIS BID DOCUMENT
Do not submit previous versions (pricing pages) of the same contract.
Sheet3
Joint Seal Material + Install
| ITB 313B-26 Pricing 5 / 27 / 25 |
| HydraTech Engineered Products, LLC |
PRICING PAGE FOR "JOINT SEAL INSTALLATION"
| NOTE: | ||
| - Joint Seal | a) The vendor must enter bids for each diameter and size or range they wish to seal and the District Mobilization. | |
| b) There are five additional blank lines for Joint Diameters. These are optional entries for various Joint types/sizes | ||
| - Mobilization | Mobilization cost for each project. One project may consist of up to four sites. ODOT will compensate the awarded vendor a lump sum plus mileage for the second, third, and fourth sites, if applicable. Compensation will be a lump sum of $150.00 for each additional site plus mileage. One vehicle for equipment and one vehicle for material will be paid at a rate of $0.655 per mile. If one vehicle is used for both equipment and material, then the mileage compensation will only apply to that vehicle Example: An equipment vehicle and material vehicle traveled 15 miles from site one to site two. The awarded vendor would receive $150.00 + (15 miles) x $.655 + (15 miles) x $.655 = $169.65 |
- Extra Work When it is determined that additional work is necessary, outside the vendors original scope of work necessary to properly install the items listed below, the vendor will be compensated based on the additional work performed. Additional work will be identified and mutually agreed upon by ODOT and the vendor.
| LENGTH OF JOINT SEAL | |||||
| Identify additional Lengths (i.e. 16 inches, 24inches, etc) or Range of Lengths ( 14 to 17.99 inches, 18 to 21.99 inches, etc.) in boxes below. | |||||
| Liner Pipe Dimension | |||||
| (Inside Diameter in Inches) | 11.17 | 14.44 | 21.66 |
| 12 | |||
| 15 | |||
| 18 | |||
| 21 | |||
| 24 | 798 | 963 | 1323 |
| 27 | 842 | 1007 | 1387 |
| 30 | 874 | 1041 | 1446 |
| 36 | 954 | 1109 | 1574 |
| 42 | 984 | 1247 | 1625 |
| 48 | 1040 | 1392 | 1716 |
| 54 | 1140 | 1437 | 1877 |
| 60 | 1340 | 1569 | 2212 |
| 66 | 1580 | 1778 | 2630 |
| 72 | 1623 | 1928 | 2683 |
| 84 | 1885 | 2158 | 3119 |
| 96 | 2422 | 2770 | 3995 |
| 102 | 2515 | 2988 | 4162 |
| 108 | 2972 | 3355 | 4911 |
| 114 | 3363 | 3840 | 5590 |
| 120 | 3497 | 4414 | 5816 |
Backing plates $22 per LF $29 per LF $37 per LF
Additional Product Notes From Vendor.
| Mobilization | Traffic Control Flagger(s) | Traffic Control |
| Cost per District | Cost per hour per Flagger | Lump Sum |
| District 1 | $970.00 | District 1 | $75.00 | District 1 | $2,575.00 |
| District 2 | $1,015.00 | District 2 | $75.00 | District 2 | $2,575.00 |
| District 3 | $1,015.00 | District 3 | $75.00 | District 3 | $2,575.00 |
| District 4 | $1,015.00 | District 4 | $75.00 | District 4 | $2,575.00 |
| District 5 | $970.00 | District 5 | $75.00 | District 5 | $2,575.00 |
| District 6 | $645.00 | District 6 | $75.00 | District 6 | $2,575.00 |
| District 7 | $645.00 | District 7 | $75.00 | District 7 | $2,575.00 |
| District 8 | $645.00 | District 8 | $75.00 | District 8 | $2,575.00 |
| District 9 | $645.00 | District 9 | $75.00 | District 9 | $2,575.00 |
| District 10 | $970.00 | District 10 | $75.00 | District 10 | $2,575.00 |
| District 11 | $1,015.00 | District 11 | $75.00 | District 11 | $2,575.00 |
| District 12 | $1,015.00 | District 12 | $75.00 | District 12 | $2,575.00 |
| Description of Additional EQ or LABOR | U/M | Cost per Unit of Measure | |
| PROVIDE EQUIPMENT AND LABOR RATES FOR ADDITIONAL WORK THAT MAY BE |
NECESSARY, ABOVE AND BEYOND THE STANDARD LINER INSTALLATION.
ANY ADDITIONAL WORK WILL BE IDENTIFIED AND AGREED UPON AT THE FIELD REVIEW.
| Foreman | HR | $78.00 |
| Laborer | HR | $72.00 |
Joint Seal Material Only
| ITB 313B-26 Pricing 5 / 27 / 25 |
| HydraTech Engineered Products, LLC |
PRICING PAGE FOR "JOINT SEAL MATERIAL ONLY"
| NOTE: | ||||||
| - Joint Seal | a) The vendor must enter bids for each diameter and size or range they wish to supply and the District Delivery Cost. | |||||
| b) There are five additional blank lines for Joint Diameters. These are optional entries for various Joint types/sizes | ||||||
| - Pick Up | ODOT has the Option to Pick Up items at Vendor Plant or Other Vendor Specified locations in lieu of paying Delivery Costs. | |||||
| LENGTH OF JOINT SEAL | ||||||
| Identify additional Lengths (i.e. 16 inches, 24inches, etc) or Range of Lengths ( 14 to 17.99 inches, 18 to 21.99 inches, etc.) in boxes below. | ||||||
| Liner Pipe Dimension | ||||||
| (Inside Diameter in Inches) | 11.17 inches | 14.44 inches | 21.44 inches |
| 12 | |||
| 15 | |||
| 18 | |||
| 21 | |||
| 24 | 400 | 460 | 660 |
| 27 | 470 | 550 | 785 |
| 30 | 470 | 550 | 785 |
| 36 | 535 | 630 | 895 |
| 42 | 595 | 710 | 1005 |
| 48 | 660 | 785 | 1115 |
| 54 | 725 | 870 | 1230 |
| 60 | 790 | 945 | 1340 |
| 66 | 1005 | 1180 | 1680 |
| 72 | 1075 | 1270 | 1805 |
| 84 | 1225 | 1450 | 2060 |
| 96 | 1470 | 1725 | 2460 |
| 102 | 1550 | 1820 | 2595 |
| 108 | 1620 | 1910 | 2720 |
| 114 | 2295 | 2615 | 3760 |
| 120 | 2295 | 2615 | 3760 |
Additional Product Notes From Vendor.
| Optional Materials and Equipment for ODOT to install | |||||||
| Item | Description | Cost | U/M | Item | Description | Cost | U/M |
| Hydraulic expander - Buy | Tool needed to install seals | $3,950 | EA | ||||
| Hydraulic expander - rental | Tool needed to install seals | $500 |
| DELIVERY COST PER LOAD | TYPE OF DELIVERY VEHICLE OR SERVICE |
| Quantity and Size may dictate type of Delivery Vehicle. (Van, Box Truck, FlatBed, etc.) Identify Delivery Options and Cost to District. |
| Box truck | Van | Flat bed | |
| District 1 | 170.0000 | $95.00 | 825.0000 |
| District 2 | 185.0000 | $110.00 | 840.0000 |
| District 3 | 185.0000 | $110.00 | 840.0000 |
| District 4 | 185.0000 | $110.00 | 840.0000 |
| District 5 | 170.0000 | $95.00 | 825.0000 |
| District 6 | 150.0000 | $85.00 | 800.0000 |
| District 7 | 150.0000 | $85.00 | 800.0000 |
| District 8 | 150.0000 | $85.00 | 800.0000 |
| District 9 | 150.0000 | $85.00 | 800.0000 |
| District 10 | 170.0000 | $95.00 | 825.0000 |
| District 11 | 185.0000 | $110.00 | 840.0000 |
| District 12 | 185.0000 | $110.00 | 840.0000 |
GMMC Pricing, Material Only
| ITB 313B-26 Pricing 5 / 27 / 25 | |
| Vendor Name: | HydraTech Engineered Products, LLC |
| PRICING PAGE FOR "GEOSYNTHETIC CEMENTITIOUS COMPOSITE MAT" MATERIAL ONLY |
| Refer to Supplemental Specification 936 for description of Material TYPE characteristics |
| Material | |||
| Material Type ---> | Type 1 | Type 2 | Type 3 |
| Min. Thickness ---> | 0.2 | 0.3 | 0.5 |
| ($/SQFT) | ($/SQFT) | ($/SQFT) |
| DISTRICT | ||
| 1 | $11.00 | $18.00 |
| 2 | $11.00 | $18.00 |
| 3 | $11.00 | $18.00 |
| 4 | $11.00 | $18.00 |
| 5 | $11.00 | $18.00 |
| 6 | $11.00 | $18.00 |
| 7 | $11.00 | $18.00 |
| 8 | $11.00 | $18.00 |
| 9 | $11.00 | $18.00 |
| 10 | $11.00 | $18.00 |
| 11 | $11.00 | $18.00 |
| 12 | $11.00 | $18.00 |
File details come from the government source that posted it. Updated .