This scope of work document outlines requirements for a roof repair and gutter installation project at the US Coast Guard Base in Portsmouth, Virginia. The contractor will be required to repair the roof and install gutters on the Cybex hallway roof and an adjacent room roof, totaling approximately 120 square feet for the hallway roof work. Services include installing ice and water shield, aluminum snap lock panels, drip edge, ridge caps, counterflashing, and 15 linear feet of 6-inch box gutters on each side with downspouts. For the adjacent Cybex roof, the contractor must install approximately 100 linear feet of 6-inch box gutters with associated end caps and downspouts. The contract award is solicitation number 31040PR230000312 from the Department of Homeland Security's US Coast Guard. The work must be completed within 30 days of award. The contractor will be provided a 12-month workmanship warranty and 20-year finish warranty upon completion.

View the file

Other files

File Type Posted
CONSTRUCTION DAVIS-BACON SERVICE CONTRACT ACT.pdf PDF
Construction Clauses and Provisions FAC 2023 01.doc DOC document
31040PR230000312 RFQ.pdf PDF
31040PR230000312 Picture.jpg JPG image
31040pr230000312 WDOL.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to repair Cybex hallway roof and install gutters on both hallway roof and adjacent Cybex room roof located at USCG Base Portsmouth, 4000 Coast Guard Blvd., Portsmouth, VA 23703.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT five (5) days after notice to proceed and work diligently to complete the entire work ready for use by 30 working days after contract award or as negotiated during the preconstruction / award meeting.

3. SCOPE OF WORK: see site map for overhead view Cybex hallway roof:

Install high temp ice and water shield over entire roof area.120 sq ft.

Fabricate add install drip edge to be installed before panels at eave.

Fabricate and Install .032 Aluminum snap lock panels over entire roof area. (Color to be chosen before ordering) Fabricate and install Z-bar and ridge cap at top of roof panels.

Fabricate and install counter flashing for two sides of roof.

Fabricate and install 15 LF of 6” commercial box gutter on both sides of Cybex hallway roof .

Fabricate and install 1 downspout for each side of roof. (2 total) Ensure trash and material is cleaned up and disposed of properly off-site.

12-month workmanship warranty will be in effect upon completion.

20-year finish warranty will be provided upon completion.

Cybex roof gutters:

Fabricate and install 100 LF of 6” commercial box gutter on CYBEX roof.

Install all associated end caps, expansion joints, sealants and downspouts.

2 downspouts per side.

12-month workmanship warranty will be in effect upon completion.

4. SITE VISIT: All bidders are strongly encouraged to visit the site to field verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with Hayden Heyer (757)284-6873 Gary.h.heyer@uscg.mil. All site visits are to be prearranged a minimum of (3) days in advance. To arrange a site visit, the following information is to be provided Full name, date of birth, and last 4 of SSN.

5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project Hayden Heyer (757)284-6873 Gary.h.heyer@uscg.mil . Inquiries concerning any phase of the specification before or after award shall be made to Hayden Heyer (757)284-6873 Gary.h.heyer@uscg.mil.

6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

All contractors that require Base access will have to be pre-vetted for entry prior to commencement of work. All work that exceeds a completion time greater than 10 days, may be subject presenting RapidGate as a method of Base entry.

7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.

8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station’s regular hours, he may submit his request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

13. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.

14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The Base Portsmouth Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

15. SAFETY REQUIREMENTS:

1. Responsibilities:

a. All contractors working on CG Base Portsmouth shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.

b. Written notification must be provided to the Base Safety Officer; Noah Reinhart (757)638-2793 noah.w.reinhart@uscg.mil in their capacity as Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Base, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

c. Copies of the following must be provided to the Base Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. A facility dig chit is required in addition to a Miss Utility dig chit. The systems on Base Portsmouth are not limited to what the City of Portsmouth has on file. In order to ensure electrical safety and integrity of systems, a facility chit is required.

d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Base Portsmouth. A Facilities Division representative is required for all contractor Lock Out/Tag Out needs.

2. Rights:

a. Every employee working on Base Portsmouth has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

16. ENVIRONMENTAL PROTECTION REQUIREMENTS:

a. All contractors working on CG Base Portsmouth shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist; Jon Cooper (757)483-8598 jonathan.a.cooper2@uscg.mil . prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide.

b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Base Portsmouth. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.

File details come from the government source that posted it. Updated .