About this file

This document is a cost schedule spreadsheet (30DOE-S3449) associated with a Department of Energy (DOE) procurement opportunity with an estimated total project value of $35,000.00. The spreadsheet appears to be a pricing template requiring vendor completion of shaded areas with proposed pricing across multiple line items, with space for 15 discrete line items plus a travel cost line. The document instructs vendors to ensure calculation accuracy and indicates that travel costs are billable at current GSA rates.

The pricing document allows for travel expenses as a reimbursable cost, with an estimated annual travel cost component built into the overall project budget. The maximum estimated project value is set at $35,000.00, though specific line item values are currently blank, suggesting vendors must populate these sections with their proposed pricing. The spreadsheet provides a structured format for vendors to detail their cost proposal, with an expectation that vendors will comprehensively break down their pricing across the requested line items while adhering to GSA travel reimbursement guidelines.

View the file

Other files for this state and local contract opportunity

Other files attached to Pupil Centered Funding Plan (PCFP) Effectiveness - Competency Based Education, newest first.
File Type Posted
Department of Education -reference-questionnaire-30DOE-S3449.pdf PDF
Standard form-contract.docx DOCX document
Certification-regarding-lobbying.pdf PDF
INSURANCE REQUIREMENTS 30DOE-S3449.docx DOCX document
Terms-and-conditions-for-services~1.pdf PDF
30DOES3449 Q and A.xlsx XLSX spreadsheet
Deparmtent of Education- request-for-proposals-30DOE-S3449.docx DOCX document
Quote Instructions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost schedule

30DOE-S3349 cost schedule $35,000.00
Vendor
Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct.
LineDescription and termTypePriceEst. UsageExtended
1$ - 0
2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
8$ - 0
9$ - 0
10$ - 0
11$ - 0
12$ - 0
13$ - 0
14$ - 0
15$ - 0
16Estimated travel costsper year4$ - 0
Estimated project value$ - 0
Travel is allowed as a billable costs of this contract, at then current GSA rates.