This quality assurance letter of instruction outlines inspection requirements for inert firing assemblies produced under a Department of the Air Force contract. Martin Baker Aircraft Co is the incumbent supplier under Contract No. 20-50064 awarded to provide inert firing assemblies for the T-38 aircraft program. Key parts include propellant actuated release assemblies with part numbers MBEU185980 and MBEU201075. The Defense Contract Management Agency inspector will conduct random quality assurance inspections twice per year, inspecting a different part each time and ensuring labeling and documentation accuracy. Inspection points include verifying calibration of test equipment, conformance of paperwork to government standards, and compliance with packaging, packing, preservation, and marking requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821320R3022 Amendment 03.pdf | ||
| FA821320R3022 Amendment 04.pdf | ||
| FA821320R3022 Amendment 02.pdf | ||
| FA821320R3022 Amendment 01.pdf | ||
| 4_ES7034_Rework_and_Repair_of_Nonconforming_Material.pdf | ||
| 9_CDRLs.pdf | ||
| 2_Ammunition_Data_Card_SOW.pdf | ||
| 11_Packaging_SOW_MILB.pdf | ||
| 11_Packaging_SOW_SPI.pdf | ||
| 12_Special_Packing_Instructions.pdf | ||
| 13_Item_Description_(9367).pdf | ||
| 1_Airmunition_Specification.pdf | ||
| 7_Report_of_Shipment.pdf | ||
| 13_Item_Description_(0709).pdf | ||
| Solicitation FA821320R3022.pdf | ||
| 8_CADPAD_Item_Marking.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name CAGE code
DCMA QAR Reviewer
Date Review Completed
Date Issued to Contractor
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
Concurrence Signature by QAR/DCMA:
QAR/DCMA Signature
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer Signature
Date
Rev Date: 30 Sept 2019
Sheet1
| Text49: | |
| Text46: 4/30/2019 | |
| 2019-04-30T10:55:34-0600 | |
| KRAMER.LAWRENCE.C.1141472808 |
| undefined_9: |
| Text32: |
| undefined_8: |
| Text31: |
| undefined_7: |
| Text30: |
| undefined_6: |
| Text29: |
| undefined_5: |
| Text28: 5. Additional Requirements |
| undefined_4: M |
| Text27: 4. Shippers (DD250, DD1149, Reports) |
| undefined_3: V |
| Text26: 3. Preparation for Shipment |
| undefined_2: W |
| Text25: 2. Inspection/Testing |
| undefined: V |
| Text36: QALI to be completed randomly twice a year for |
duration of the contract to spot check Martin Baker processes. Inspect a different part each time.
1. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.
2. Prior to Inspection/Testing ensure proper calibration and validation of all test equipment.
Testing should occur in accordance with latest government approved ATP or Martin Baker test procedures (MBA-DS-T-122 Initial Issue).
3. Ensure Paperwork is correct.
4. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
5. Any additional requirements imposed by DCMA shall be approved by Project Engineer
| Text24: 1. X-Ray/N-Ray |
| Part Number: MBEU200429, MBEU200389, MBEU200371, MBEU185720, MBEU200370, MBEU105980, MBEU201075 |
| Text23: |
| DODIC: |
| Text22: |
| Text21: |
| Text20: U1604 |
| Text19: Martin Baker |
| Part Number Line 2: |
| Contract No: 20-50064 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: T-38 |