About this file

This quality assurance letter of instruction outlines inspection requirements for inert firing assemblies produced under a Department of the Air Force contract. Martin Baker Aircraft Co is the incumbent supplier under Contract No. 20-50064 awarded to provide inert firing assemblies for the T-38 aircraft program. Key parts include propellant actuated release assemblies with part numbers MBEU185980 and MBEU201075. The Defense Contract Management Agency inspector will conduct random quality assurance inspections twice per year, inspecting a different part each time and ensuring labeling and documentation accuracy. Inspection points include verifying calibration of test equipment, conformance of paperwork to government standards, and compliance with packaging, packing, preservation, and marking requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Inert Firing Assemblies MBA, newest first.
File Type Posted
FA821320R3022 Amendment 03.pdf PDF
FA821320R3022 Amendment 04.pdf PDF
FA821320R3022 Amendment 02.pdf PDF
FA821320R3022 Amendment 01.pdf PDF
4_ES7034_Rework_and_Repair_of_Nonconforming_Material.pdf PDF
9_CDRLs.pdf PDF
2_Ammunition_Data_Card_SOW.pdf PDF
11_Packaging_SOW_MILB.pdf PDF
11_Packaging_SOW_SPI.pdf PDF
12_Special_Packing_Instructions.pdf PDF
13_Item_Description_(9367).pdf PDF
1_Airmunition_Specification.pdf PDF
7_Report_of_Shipment.pdf PDF
13_Item_Description_(0709).pdf PDF
Solicitation FA821320R3022.pdf PDF
8_CADPAD_Item_Marking.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA Signature

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Date

Rev Date: 30 Sept 2019

Sheet1

Text49:
Text46: 4/30/2019
2019-04-30T10:55:34-0600
KRAMER.LAWRENCE.C.1141472808
undefined_9:
Text32:
undefined_8:
Text31:
undefined_7:
Text30:
undefined_6:
Text29:
undefined_5:
Text28: 5. Additional Requirements
undefined_4: M
Text27: 4. Shippers (DD250, DD1149, Reports)
undefined_3: V
Text26: 3. Preparation for Shipment
undefined_2: W
Text25: 2. Inspection/Testing
undefined: V
Text36: QALI to be completed randomly twice a year for

duration of the contract to spot check Martin Baker processes. Inspect a different part each time.

1. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.

2. Prior to Inspection/Testing ensure proper calibration and validation of all test equipment.

Testing should occur in accordance with latest government approved ATP or Martin Baker test procedures (MBA-DS-T-122 Initial Issue).

3. Ensure Paperwork is correct.

4. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

5. Any additional requirements imposed by DCMA shall be approved by Project Engineer

Text24: 1. X-Ray/N-Ray
Part Number: MBEU200429, MBEU200389, MBEU200371, MBEU185720, MBEU200370, MBEU105980, MBEU201075
Text23:
DODIC:
Text22:
Text21:
Text20: U1604
Text19: Martin Baker
Part Number Line 2:
Contract No: 20-50064
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: T-38