3__PWS_BLCA_to_HNWR.docx

DOCX document 1 MB Posted

Attached to
E41 CRANE SERVICES FOR THE YUMA DREDGE
Solicitation number
140R3022Q0006
Issued by

View the file

Other files

File Type Posted
Sol_140R3022Q0006_Amd_0001.pdf PDF
Questions_and_Answers_0001.docx DOCX document
3__PWS_BLCA_to_HNWR_0001.docx DOCX document
3__PWS_BLCA_to_HNWR_1.docx DOCX document
Combined_Synopsis_Solicitation.docx DOCX document
Sol_140R3022Q0006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

CRANE SERVICE

1.0 INTRODUCTION:

Reclamation’s Lower Colorado River Multi Species Conservation Program (LCR MSCP) requires a crane service to perform the lifting of up to 95,000 pounds to assist in the disassembly and reassembly of the Yuma Dredge at Beal Lake Conservation Area (BLCA) in Topock, Arizona and moved 4.5 miles to the Havasu National Wildlife Refuge (HNWR) river launch site in Topock, Arizona.

2.0 LOCATION:

Disassembly located at Beal Lake Conservation Area (BLCA), Topock, Arizona. 34.774713, -114.526917

Reassembly located at Havasu National Wildlife Refuge (HNWR) river launch site, Topock, Arizona. 34.786866, -114.564361

Figure 1: The current dredge location at BLCA identified in green where it will be disassembled and loaded on to government trucks. The dredge will be hauled to and reassembled at the HNWR location identified in red.

3.0 SCOPE:

The contractor shall provide crane, crane operator, rigging, rigger, lift supervisor, and incidental services necessary to safely and satisfactorily load the three components of the dredge: the center section and two side cans on to government owned trucks and offload at the river launch site located at the Havasu National Wildlife Refuge directly across from the HNWR maintenance yard.

3.1 The Yuma Dredge consist of three major components (center section tank and two side tanks), and multiple subcomponents (ladder, spuds, control house, anchor booms). The center section tank is approximately 58 feet long, 10 feet wide and 95,000 lbs. and will require the use of at least one spreader bar to lift. The two side cans are 58 feet long, 10 feet wide and weigh 25,000 pounds per side can. See Lifting and Handling Guidelines (attached).

3.2 The Contractor shall provide experienced, qualified, and professional personnel to perform the most economic and efficient manner under the requirement.

3.3 The Contractor shall load and offload all three pieces: the center section tank and two side cans to/from government owned and operated trucks and place the pieces at the reassembly location.

4.0 DELIVERABLES:

The contractor shall be responsible for loading and unloading the following dredge components:

4.1 Center Tank of Dredge: Lift center tank of dredge and place onto truck for transport to site for reassembly. Contractor will then need to set up the crane at the assembly site and off load the center tank of dredge. This will include a crane, crane operator, rigger, rigging, and lift supervisor.

4.2 Two Side Cans: Individually lift port and starboard side cans of dredge and place on to government truck for transport to site for reassembly. Contractor will then need to set up the crane at the assembly site and off load both side cans of the dredge. This will include a crane, crane operator, rigger, rigging, and lift supervisor.

4.3 The contractor shall furnish all equipment, personnel, materials, supplies, incidentals, etc. required to successfully complete the tasks identified in this section.

Figure 2: Configurations for Lifting Side Tanks.

Figure 3: Configuration for Lifting Center Tank.

5.0 PERIOD OF PERFORMANCE:

The work required by this PWS is to be determined by completion of current project. Projected time of completion is January 17, 2022 to February 18, 2022. Estimated 20 hours (2 – 10-hour workdays), to complete deliverables of this PWS.

6.0 GOVERNMENT-FURNISHED EQUIPMENT (GFE) AND MATERIALS:

No Government property/materials will be furnished for use by the contractor for this requirement. Government trucks and government personnel will be used to transport the center tank and two side cans from BLCA to the HNWR river launch site.

7.0 REGULATIONS/POLICIES:

The Contractor is responsible for the safety and health of all Contractor and subcontractor personnel. The Contractor shall comply with Reclamations Safety and Health Standards (RSHS), available at http://www.usbr.gov/ssle/safety/RSHS/rshs.html.

7.1 The Contractor shall appoint a qualified Safety Administrator to be on site during the performance of the work. The Contractor shall submit the Safety Administrator’s resume showing safety qualifications and training, see 10.0 Submittals and Reclamations Safety and Health Standards (RSHS).

8.0 SECURITY:

Only authorized contract employees shall be permitted at job site. A Reclamation employee must be on-site with the Contractor during performance of work. The Contractor shall comply with all site security requirements under WBR 1452.237-80, Security Requirements.

8.1 A Government Representative will assist with the Contractor’s entry into secure areas and inform the Contractor of security procedures. The Contractor shall comply with all security procedures.

9.0 PROJECT COORDINATION:

A Contracting Officer’s Representative (COR) will be designated for this project and contact information will be provided upon award of this requirement.

10.0 PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective
Paragraph Number
Acceptable Quality Level
Method of Surveillance
Incentive/Disincentive
Center Tank:
4.1
Center tank of dredge is lifted and loaded per the Lifting and Handling Guidelines
100% inspection by COR
Positive past performance evaluation.

Negative past performance evaluation

2 Side Cans:
4.2
2 Side Cans of dredge are lifted and loaded per the Lifting and Handling Guidelines
100% inspection by COR
Positive past performance evaluation.

Negative past performance evaluation

Contractor furnishes all equipment and personnel to complete the lifts:
4.3
No more than two (2) day delay of completion of work.
100% inspection by COR.
Positive past performance evaluation.

Negative past performance evaluation image1.jpg image2.emf image3.emf