3. Schedule.docx
DOCX document 15 KB Posted
- Attached to
- 127EAW22R0037 - Loop 6 Bridge Replacement Federal contract opportunity
- Solicitation number
- 127EAW22R0037
- Issued by
- Department of Agriculture Forest Service
About this file
This document contains a schedule of items for a bridge replacement project. The project involves replacing an existing wooden bridge superstructure with structural steel and timber components. Key details include a base construction estimate totaling over $250,000 but less than $500,000. The project is a total small business set aside being conducted by the Forest Service of the Department of Agriculture. The schedule lists estimated quantities and unit pricing for various construction items in the base scope and a single-item optional scope for dismantling the existing wooden superstructure. Accompanying notes specify that quantities are estimates requiring field verification and that payment for bonds will not be in addition to the contract price. Responses are due by the dates specified in the related federal contract opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A00004 - RFIs.pdf | ||
| RFI Official Responses - 3.pdf | ||
| A00003 - RFIs.pdf | ||
| RFI Official Responses - 2.pdf | ||
| A00002 - RFIs.pdf | ||
| RFI Official Responses - 1.pdf | ||
| A00001 - Time Extension.pdf | ||
| 6. Forest Service Supplemental Specifications.pdf | ||
| 5. Bridge Pictures.pdf | ||
| 127EAW22R0037 - Loop 6 Bridge Replacement.pdf | ||
| 1. Statement of Work.pdf | ||
| 4. Map and Drawings.pdf | ||
| 7. Davis-Bacon Act WD # CA20220007.pdf | ||
| 8. RFI Form.docx | DOCX document | |
| 2. Fire Plan.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
| Item |
| Construction Items |
| Qty |
| UNIT |
| Unit Price |
| Total Price |
| 15101 |
| Mobilization |
| 1 |
| LS |
| $ |
| $ |
| 20301 |
| Removal of Obstructions & Preparation of Old Bridge Materials for Removal |
| 1 |
| LS |
| $ |
| $ |
| 55501 |
| Structural Steel |
| 9878 |
| LBS |
| $ |
| $ |
| 55601 |
| Timber Bridge Railing |
| 708 |
| LF |
| $ |
| $ |
| 55701 |
| Treated Structural Timber and Lumber |
| MFBM |
| 2.05 |
| $ |
| $ |
| 56401 |
| Elastomeric Bearing Device |
| EA |
| 4 |
| $ |
| $ |
| 63306 |
| Object Marker, Type 3 |
| EA |
| 4 |
| $ |
| $ |
| BASE TOTAL: |
| $___________ |
B.1 SCHEDULE OF ITEMS – OPTION 1
| Item |
| Construction Items |
| Qty |
| UNIT |
| Unit Price |
| Total Price |
| 20301 |
| Dismantling of Wooden Superstructure |
| L.S. |
| 1 |
| $ |
| $ |
| OPTION 1 TOTAL: |
| $___________ |
| BASE + OPTION 1 TOTAL: |
| $___________ |
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.