RFI Official Responses - 2.pdf

PDF 150 KB Posted

Attached to
127EAW22R0037 - Loop 6 Bridge Replacement Federal contract opportunity
Solicitation number
127EAW22R0037
Issued by
Department of Agriculture Forest Service

About this file

This document contains a Request for Information (RFI) related to solicitation 127EAW22R0037 for the Loop 6 Bridge Replacement project. The RFI responses will be provided through amendments posted to beta.SAM.gov by the contracting officer. One question was asked regarding substituting 3/8 inch A588 steel in place of 5/16 inch due to availability and cost issues, to which the response was that the substitution would be acceptable. The solicitation is for the Loop 6 Bridge Replacement project managed by the Tahoe National Forest of the Department of Agriculture Forest Service. The total value of the construction project is between $250,000 and $500,000, and it is set aside for total small business. Responses to the RFI are due by May 18, 2022.

View the file

Other files for this federal contract opportunity

Other files attached to 127EAW22R0037 - Loop 6 Bridge Replacement, newest first.
File Type Posted
RFI Official Responses - 3.pdf PDF
A00004 - RFIs.pdf PDF
A00003 - RFIs.pdf PDF
A00002 - RFIs.pdf PDF
RFI Official Responses - 1.pdf PDF
A00001 - Time Extension.pdf PDF
6. Forest Service Supplemental Specifications.pdf PDF
5. Bridge Pictures.pdf PDF
2. Fire Plan.pdf PDF
127EAW22R0037 - Loop 6 Bridge Replacement.pdf PDF
1. Statement of Work.pdf PDF
3. Schedule.docx DOCX document
4. Map and Drawings.pdf PDF
7. Davis-Bacon Act WD # CA20220007.pdf PDF
8. RFI Form.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES

127EAW22R0037 - Loop 6 Bridge Replacement

RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov

Telephone requests for information will not be accepted or returned.

RFI #1 – Grade A588 Steel is not readily available in 5/16”, this is not a common thickness in the

A588 Industry, can 3/8” A588 be substituted ILO of 5/16”?

5/16” is available but in such a small quantity it would add significant cost to the project as there are minimums of materials that need to be produced for the mill to be do it.

USFS Response –

Yes, 3/8” A588 can be substituted ILO of 5/16”.

-H. Dodini/Bridge Engineer