This document is an Engineering Specification for two types of vacuum chambers, VC01 and VC16, that are part of the Advanced Light Source Upgrade (ALS-U) project at Lawrence Berkeley National Laboratory (LBNL).
The VC01 chambers have three variants (A, B, and C) and the VC16 chambers have two variants (A and B). The chambers are primarily constructed from stainless steel and must comply with various cleanliness, material, fabrication, and testing requirements outlined in the specification. Key technical requirements include a maximum thermal outgassing rate of 1.00e-11 Torr.l.s-1.cm-2, achieving a final pressure of 5.00e-10 Torr, and applying a NEG coating between 0.5 to 1.5 microns thick using a PVD process. The chambers must also undergo dimensional inspection, water pressure testing, bakeout, residual gas analysis, and helium leak testing prior to final acceptance. This specification is referenced in the LBNL RFP HW-04152024 for the manufacturing and delivery of these vacuum chambers for the ALS-U project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.
SR - VC01 & VC16 - ESD
Thomas GAUCHER
Release Date: Mar 28 2024 8:49:27 AM PDT
Document Number: AL-1704-8932 Revision: A
Document Status: Released
Document Type: SPECIFICATION
Category Code: AL7531
ALS-U - STORAGE RING
VACUUM CHAMBERS
O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
Downloaded by: Olusola Omolayo at March 29, 2024 09:39:11
AL-1704-8932 Rev. A Doc. Status: Released Page 2 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
TABLE OF CONTENTS
1 Revision History
2 Approvals
3 Abbreviations and Acronyms
4 Introduction
4.1 Introduction to ALS-U
4.2 Subject of this Engineering Specification
5 Document Definitions
6 Description of the chamber
6.1 VC01 – Variant A
6.2 VC01 – Variant B and C
6.3 VC16 – Variant A and B
7 NEG Coating
8 Final design if geometry changed
9 Fiducialization
10 Environmental requirements
10.1 Codes and Standards
10.2 Cleanliness environment
10.3 Cleaning fluids
10.4 Cutting fluids
10.5 Fasteners
10.6 Flange and Gaskets
11 Technical requirement
11.1 Vacuum pressure
11.2 NEG Coating
11.3 Manufacturing process
11.3.1 Material
11.3.2 Fabrication
11.3.2.1 Part fabrication
11.3.2.2 Cleaning after manufacturing
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 3 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
11.3.2.3 Part joining
11.4 Final Cleaning
11.5 Final Assembly
11.6 Final test and NEG coating
11.6.1 CMM Measurement before bakeout
11.6.2 Water pressure test
11.6.3 Bakeout
11.6.4 Residual Gas Analysis
11.6.5 Final He Leak Test
11.6.6 NEG coating Inspection
11.6.7 Final Pressure measurement
11.6.8 HPN2 Backfill
11.6.9 CMM Measurement after Bakeout
11.7 Packing and shipping
12 Applicable Documents ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 4 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
1 REVISION HISTORY
Rev. CM Number Description of Change A Baseline
2 APPROVALS
The following individual(s) must approve this document:
Approver Project Role Ken Chow Chief Engineer and System Engineer Jiani Niu Project QA manager Olusola Omolayo Vacuum CAM Windchill Approved / Concurred By oomolayo,jianiniu,KPChow
3 ABBREVIATIONS AND ACRONYMS
ALS Advanced Light Source ALS-U Advanced Light Source Upgrade ASTM American Society for Testing and Materials AR Accumulator Ring CC Cooling Chanel CF Conflat Flange CMM Coordinate Measuring Machine COTS Commercial Off The Shelve DCC Document Control Center He Helium HPN2 High Pressure Nitrogen EN-ISO European International Organization for Standardization LBNL Lawrence Berkeley National Laboratory
US
UHV
Ultra sound Ultra High Vacuum
VC Vacuum Chamber VCR Vacuum Coupling Radiation WPS Welding Procedure Specification ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 5 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
4 INTRODUCTION
4.1 Introduction to ALS-U
ALS-U is an upgrade project to the LBNL Advanced Light Source (ALS). The ALS is a 1.9
GeV storage ring operating at 500 mA of beam current. It is optimized to produce intense beams of soft x-rays, which offer spectroscopic contrast, nanometer-scale resolution, and broad temporal sensitivity. The ALS facility includes an accelerator complex and photon delivery system that is capable of providing the foundations for an upgrade that will achieve world-leading soft x-ray coherent flux. The existing ALS provides a ready-made foundation, including conventional facilities and also includes extensive beamlines (up to
40 simultaneously operating beamlines) and instrumentation, an experimental hall, computing resources, ancillary laboratories, offices, and related infrastructure that will be heavily utilized in an upgrade scenario.
The ALS will be upgraded with a multibend achromat (MBA) lattice design that will provide a soft x-ray source that is orders of magnitudes brighter — an up to 100-1000 times increase in brightness and will provide a significantly higher fraction of coherent light in the soft x-ray region than is currently available at ALS.
4.2 Subject of this Engineering Specification
The VC01 and VC16 are located in the 12 sectors of the Storage Ring (SR). Further introductory details of these chambers can be found in the SR - VC01 & VC16 - SOW - AL-
1704-8931-Rev A, in the section 4.2.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 6 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
5 DOCUMENT DEFINITIONS
Must, will, may, and should are used to define every specification listed in this document.
The definitions of these terms are as follows
May – is used to indicate a desire or goal of a specification. This can also be interpreted
‘as nice to have’ and are not contractually binding.
Must –is a specification that is contractually binding and must be implemented.
Should – is used to indicate a desire or goal of a specification. This can also be interpreted ‘as nice to have’ and are not contractually binding.
Will – is used to inform intent or declaration of purpose. This is not a specification.
Example, the author will use the word ‘must’ to indicate that a specification is contractually binding and must be implemented.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 7 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6 DESCRIPTION OF THE CHAMBER
6.1 VC01 – Variant A
The main functions and requirements of the SR VC01 –Variant are:
Provide a round shaped electron beam channel.
Provide ports for BPM block or housing to host BPM buttons
Provide a cooling channel
The VC01 – Variant A has been designed by LBNL to meet these requirements and perform these functions. Vc01 – Variant A is shown in Figure 6-1.
Figure 6-1: VC01 – Variant A
Upstream
Downstream
Round aperture
BPM
housing Fiducial Post
Cooling Channel ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 8 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
The chamber is primarily constructed from 316L and 316LN stainless steel. The fabrication process for the parts (flanges and BPM block) involves CNC machining. The parts are joined by TIG welding. The BPM housing body is machined from a monolithic block of stainless. The beam entry port, exit port and BPM port flanges utilizes Helicoflex vacuum seals.
Figure 6-2: VC01 – Variant A (Explode View)
The copper cooling channels are brazed on the beam channel stainless tube. The stainless steel cooling channel and the fiducial post are TIG welded on the BPM housing.
Figure 6-3: VC01 – Variant A
Brazing process
TIG process ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 9 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.2 VC01 – Variant B and C
The main functions and requirements of the SR VC01 –Variant are:
Provide an elliptical shaped electron beam channel.
Provide a cooling system
The VC01 – Variant B and C have been designed by LBNL to meet these requirements and perform these functions. Vc01 – Variant B and C is shown in Figure 6-4 and Figure 6-5.
Figure 6-4: VC01- Variant - C Chamber
Figure 6-5: VC01- Variant - B Chamber
Downstream BPM housing
Cooling Channel
Elliptical aperture
Fiducial Post
Female flange
Male flange ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 10 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
The chamber is primarily constructed from 316L and 316LN stainless steel. The fabrication process for the parts involves CNC and EDM machining. The parts are joined by TIG welding. The BPM housing body is machined from a monolithic block of stainless.
The beam entry port, exit port and BPM port flanges utilizes Helicoflex vacuum seals.
Figure 6-6: VC01 – Variant C (Explode View)
The stainless steel cooling channel and the fiducial pole are TIG welded on the BPM housing.
Figure 6-7: VC01 – Variant C
TIG welding
Heater groove ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 11 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.3 VC16 – Variant A and B
The main functions and requirements of the SR VC16 –Variant are:
Provide a round shaped electron beam channel.
Provide a cooling system
The VC16 – Variant A and B have been designed by LBNL to meet these requirements and perform these functions. Vc16 – Variant A and B is shown in Figure 6-8 and Figure 6-9.
Figure 6-8: VC16 - Variant A Chamber
Figure 6-9: VC16- Variant B Chamber
Downstream
Keyhole aperture Cooling Channel
Female flange
Male flange
Center support ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 12 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
The chamber is primarily constructed from 316L and 316LN stainless steel. The fabrication process for the parts involves CNC machining or / and sinker EDM. The parts are joined by TIG welding. The main body is machined from a monolithic block of stainless. The beam entry port and exit port flanges utilizes Helicoflex vacuum seals.
Figure 6-10: Explode view of VC16 – Variant B
Main body
Heater groove ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 13 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
7 NEG COATING
ID NUM
(SYY-XX-)
Specification
S09-05- 000295 The chamber shall be NEG Coated. See section 11.2 for technical requirement on the NEG coating.
8 FINAL DESIGN IF GEOMETRY CHANGED
ID NUM
(SYY-XX-) Specification
S09-05- 000296 The final design shall incorporate features to alleviate the risk of trapped volume along the weld preparation.
S09-05- 000297 The mechanical deformation of any part of the chamber under atmospheric loads shall not exceed 0.2mm at any location on the chamber.
S09-05- 000298 There shall be no features that cross within +/- 2mm of the beam plane of the chamber except the external walls.
S09-05- 000301 The electron beam channel shall be void on any abrupt geometry change through the chamber.
9 FIDUCIALIZATION
(SYY-XX-) Specification
S09-05- 000299 The center axis through the BPM section shall be fiducialised.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 14 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
10 ENVIRONMENTAL REQUIREMENTS
10.1 Codes and Standards
ID NUM
(SYY-XX-) Specification
S09-94-000151
The following standards must apply for the fabrication and test of the SR
VC01 and VC16 Chambers:
EN ISO 13919 or EN ISO 5817
EN ISO 17637
ASTM E498.
EN ISO 17640
ASTM E2734/E2734 M − 10.
10.2 Cleanliness environment
ID NUM
(SYY-XX-) Specification
S09-94-000152 The cleaning environment must comply with UHV Chamber and Component Production Requirements AL-1220-7841-Rev F, §7.2
10.3 Cleaning fluids
ID NUM
(SYY-XX-) Specification
S09-94-000153 The cleaning fluids must comply with UHV Chamber and Component Production Requirements AL-1220-7841-Rev F, §7.3
10.4 Cutting fluids
ID NUM
(SYY-XX-) Specification
S09-94-000154 The cutting fluids must comply with UHV Chamber and Component Production Requirements AL-1220-7841-Rev F, §7.4
10.5 Fasteners
ID NUM
(SYY-XX-) Specification
S09-94-000155 The fasteners of the of vacuum chambers must comply with AL- 1220-7841-Rev F, §7.6 ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 15 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
10.6 Flange and Gaskets
(SYY-XX-) Specification
S09-94-000156 The flanges and gaskets of the vacuum chambers must comply with AL-1220-7841-Rev F, §7.7
11 TECHNICAL REQUIREMENT
11.1 Vacuum pressure
ID NUM
(SYY-XX-)
Specification
S09-94-000157 The maximum thermal outgassing rate must be better than 1.00e-11 Torr.l.s-1.cm-2
S09-94-000158 Achievable final pressure must be 5.00e-10 Torr
11.2 NEG Coating
ID NUM
(SYY-XX-)
Specification
S09-05-000310 The thickness of the NEG coating shall be between 0.5 to 1.5 micron
S09-05-000311 The NEG material shall be 30%,30%,40% atomic weight. TiZrV +/- 10%
S09-05- 000312
The NEG film shall be deposited using PVD process using Krypton gas
S09-05- 000313
The vacuum pressure achieved on the NEG coating station prior to NEG coating shall be better than 1e-8 Torr and a clean RGA scan
S09-05- 000314
The NEG coated chamber shall be free of surface oxides and sufficiently cleaned prior to NEG coating to ensure adhesion
S09-05- 000315 The NEG coating coverage on the internal surface of the chamber along the electron beam path channel shall be greater than 99%
S09-05- 000316
The NEG coating shall be carried out at a chamber temperature of 100oC +40 oC /- 0oC
S09-05- 000317 The coating recipe shall be maintained from the first article to the production chamber coatings ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 16 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
11.3 Manufacturing process
11.3.1 Material
The procurement of the raw material by the Sub-contractor must comply with the following requirements
ID NUM
(SYY-XX-) Specification
S09-94-000163 All materials must be new.
S09-94-000164 All material must be free from surface cracks and fissures, forge and other tool marks, burns, delamination and other defects that would make it incompatible with a high vacuum environment.
S09-94-000165 Certification must be in accordance with EN ISO 10204 3.1.
S09-94-000211 Magnetic permeability for vacuum chamber base material must be
1.01 and for welds or braze joints 1.04
S09-94-000168 The tube of the chamber must be seamless
S09-94-000169 The material must be compatible with synchrotron radiation ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 17 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
11.3.2 Fabrication
11.3.2.1 PART FABRICATION
The fabrication of the SR VC01 and VC16 Chamber must comply with the following requirements
Cutting fluids
ID NUM
(SYY-XX-) Specification
S09-94-000170 A water-soluble and non-halogenated cutting fluids must be used for fabrication
S09-94-000171 All others requirements relative to the vacuum components fabrication must comply with AL-1220-7841-Rev F, §8.1, §8.2, §8.3
11.3.2.2 CLEANING AFTER MANUFACTURING
An intermediate cleaning must be done after manufacturing and must comply with the following requirements
ID NUM
(SYY-XX-) Specification
S09-94-000172 UHV surfaces must be protected as per best practices during handling operations.
S09-94-000173 Parts must be stored in a clean area from the workshop (See §10.2).
S09-94-000174 Parts must be suspended in tanks by wire, hooks or in baskets
S09-94-000175 All others requirements relative to the vacuum components cleaning must comply with AL-1220-7841-Rev F, §9
11.3.2.3 PART JOINING
The joining process of the components must comply with the following requirements
General requirement
ID NUM
(SYY-XX-) Specification
S09-94-000176 Step change in geometrical profile across weld must be less than 0.2mm
S09-94-000177 All parts must be cleaned prior to welding (See §11.4)
S09-94-000178 A WPS is not required
S09-94-000179 The weld quality must be level D according to EN ISO 13919 or EN
ISO 5817
S09-94-000182 All welds must be free from cracks and fissures or other defects that would make it incompatible with a high vacuum environment.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 18 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Inspection of welded joints
(SYY-XX-) Specification
S09-94-000183 100% of the vacuum boundary welded joints must be visually inspected
S09-94-000184 The visual inspection must comply with EN ISO 17637
Component leak check
ID NUM
(SYY-XX-) Specification
S09-94-000185 100% of the vacuum boundary welded joints must be leak tested.
S09-94-000186 The leak test of the welded joint must comply with ASTM E498.
S09-94-000187 The criteria and parameter expected for the He leak check must comply with AL-1220-7841-Rev F, §14
11.4 Final Cleaning
The final cleaning of the SR VC01 and VC16 Chamber must comply with the following requirements
General requirement
ID NUM
(SYY-XX-) Specification
S09-94-000188 Once the final cleaning process has started, it must not be stopped before the end.
S09-94-000189 After the final cleaning, all subsequent operations must be performed in a cleanroom.
Cleaning
ID NUM
(SYY-XX-) Specification
S09-94-000190 The cleaning agent used must be identified and approved by LBNL prior to the Factory acceptance test.
S09-94-000191 All other requirements regarding the final cleaning and intermediate inspection must comply with AL-1220-7841-Rev F, §11 and §12.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 19 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
11.5 Final Assembly
(SYY-XX-) Specification
S09-94-000192 All requirement with final assembly must comply AL-1220-7841- Rev F, §13
11.6 Final test and NEG coating
The final tests to ensure the performance of the SR VC01 and VC16 Chamber must be performed in the sequence shown in Figure 11-1.
Figure 11-1: Final test sequence ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 20 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
General requirement
(SYY-XX-) Specification
S09-94-000193 All test must take place in a clean room
S09-94-000194 During pumping down of the part, all connection above the turbo pump must be all-metal
S09-94-000195 The HPN2 port must be all-metal
S09-94-000196 The HPN2 port must be a VCR to CF16 adapter that is replaced with a CF16 blank as the last connection to the chamber prior to shipping.
S09-94-000197 LBNL must have right to visit the contractor during these tests
11.6.1 CMM Measurement before bakeout
ID NUM
(SYY-XX-) Specification
S09-94-000198 A CMM measurement must be performed, on all SR VC01 and VC16 Chamber
S09-94-000200 The dimensions to be controlled must be specified by the University technical representative.
11.6.2 Water pressure test
The water pressure for the cooling channel must comply with the following requirements
ID NUM
(SYY-XX-) Specification
S09-94-000201 The cooling channel pressure test must be conducted at 120 psi
S09-94-000202 The cooling channel pressure test must last 10 mins
Criteria
ID NUM
(SYY-XX-) Specification
S09-94-000203 No leak must appear at the completion of the pressure test
11.6.3 Bakeout
ID NUM
(SYY-XX-) Specification
S09-94-000204 Bakeout must comply with AL-1220-7841-Rev F, §14.1 ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 21 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
11.6.4 Residual Gas Analysis
(SYY-XX-) Specification
S09-94-000205 Residual Gas Analysis must comply with AL-1220-7841-Rev F, §14.2
11.6.5 Final He Leak Test
ID NUM
(SYY-XX-) Specification
S09-94-000208 Final pressure measurement must comply with AL-1220-7841-Rev F, §14.5
11.6.6 NEG coating Inspection
ID NUM
(SYY-XX-)
Specification
S09-05-000353 NEG coating coverage shall be inspected on the first article by insertion of a camera probe through the chamber
S09-05-000354
A short Stainless ribbon sample shall be placed in the extension chamber in series with every coated chamber. The thickness of coating on the ribbon sample shall be reported in a least 3 locations around the circumference of the ribbon.
11.6.7 Final Pressure measurement
ID NUM
(SYY-XX-) Specification
S09-94-000207 Final He leak test must comply with UHV Chamber and Component Production Requirements AL-1220-7841-Rev F, §14.4
11.6.8 HPN2 Backfill
ID NUM
S09-94-000209 HPN2 Back fill must comply with AL-1220-7841-Rev F, §14.6 ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
AL-1704-8932 Rev. A Doc. Status: Released Page 22 of 22
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
11.6.9 CMM Measurement after Bakeout
(SYY-XX-) Specification
S09-94-000328 A CMM measurement must be performed on all SR VC01 and VC16 Chamber with the same critical dimension given in §8.6.1 after the bakeout
11.7 Packing and shipping
ID NUM
S09-94-000210 Packing and shipping must comply with AL-1220-7841-Rev F, §15
12 APPLICABLE DOCUMENTS
See applicable document table 11-1 in the AL-1704-8931-Rev A, SR - VC01 & VC16 – SOW.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
8t h, D
C C
A ut h K ey : X
Q
JQ
7E
U
File details come from the government source that posted it. Updated .