This Addendum, issued by Barry Isett & Associates for Penn Forest Township, pertains to the Transfer Station Ramp Remediation project located at 2010 PA 309, Jim Thorpe, PA. The document is an official modification to the original contract documents, incorporating several technical specification sections including Concrete Reinforcing, Cast In-Place Concrete, Earth Moving, Asphalt Paving, Concrete Paving, and Storm Utility Drainage Piping. The addendum includes responses to Requests for Information (RFI) from potential bidders, clarifying project details such as contract type (confirmed as a single prime contract) and specific dimensional specifications for proposed concrete pads and ramp areas.

The project involves remediation of a transfer station ramp, with an approximate ramp length of 150 feet and width of 14 feet (inside dimension) and 16 feet (outside dimension). Bidders are required to acknowledge receipt of this addendum through the PennBid system, with potential disqualification for non-compliance. The addendum includes attachments for each technical specification section, ranging from 4 to 10 pages in length, which provide detailed requirements for materials, installation, and quality control. Bidders are advised to make their own determination of project value, and the document emphasizes adherence to specific construction and material standards as outlined in the attached specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum

August 27th, 2025 Addendum # 001 Project #: 312024.005

RE: PENN FOREST TOWNSHIP

TRANSFER STATION RAMP REMEDIATION

2010 PA 309, Jim Thorpe, PA 18229

Dear Prospective Bidders:

This Addendum shall be incorporated into the Contract Documents and shall take precedence over any instructions that conflict therein. All items contained herein shall be considered in preparation of your proposal for the subject Project. Acknowledge receipt of this Addendum in the space provided within the Bidder Acknowledgments – Questionnaires tab on PennBid. Failure to do so may subject Bidder to disqualification.

This Addendum consists of two (2) pages, plus attachments as noted.

CHANGES TO SPECIFICATIONS:

Section 032000 – Concrete Reinforcing

1.1.This section shall become part of the contract documents.

Section 033000 – Cast In Place Concrete

1.2.This section shall become part of the contract documents.

Section 312000 – Earth Moving

1.3.This section shall become part of the contract documents.

Section 321216 – Asphalt Paving

1.4.This section shall become part of the contract documents.

Section 321313 – Concrete Paving

1.5.This section shall become part of the contract documents.

Section 334100 – Storm Utility Drainage Piping

1.6.This section shall become part of the contract documents.

Addendum

REQUESTS FOR INFORMATION (RFI) RECEIVED:

1.7. RFI 01: Is there a budget for this project? For bonding purposes. Also, is this a multi-prime contract or is it a single prime contract?

Answer: Bidders shall make their own determination of project value. Project will be constructed under a single prime contract - See Section 011000 "Summary".

1.8. RFI 02: There is a note a GP-1 "Proposed 50' long x 10' wide Reinforced concrete pad, 8" Thick Reinforced Concrete (Typ. of 2 locations). Each pad scales out at 7.5' wide x 22' long.

Which is correct? Also, there appears to be 4 of these pads all with poured walls around them. Please verify. Also, is there overall dimensioning for the ramp? I see some dimensions on the S-1 drawing and other dimensions on the GP-1 drawing. But nothing appears to give specific continuous directions (length or width).

Answer: The reinforced concrete is 50’x10’ respectively, typical of two (2) location as shown on plans. The shaded dumpsters measured 22’x7.5’ as identified on the plans, typical of four

(4) and are shown for reference only. These are not pads. The overall length of the ramp is approximately 150 ft by 14 ft wide (inside dimension) as shown on the plans. Outside dimension is 16 ft wide.

ATTACHMENTS:

032000 Concrete Reinforcing 4 Pages 033000 Cast In-Place Concrete 9 Pages 312000 Earth Moving 10 Pages 321216 Asphalt Paving 6 Pages 321313 Concrete Paving 7 Pages 334100 Storm Utility Drainage Piping 5 Pages

Contractor shall acknowledge receipt of this Addendum within the Bidder’s Acknowledgements on PennBid.

Sincerely, Corey McAndrew Project Manager

End of Addendum #001

CONCRETE REINFORCING 032000 - 1

SECTION 032000 - CONCRETE REINFORCING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Steel reinforcement bars.

2. Welded-wire reinforcement.

1.2 ACTION SUBMITTALS

A. Product Data: For the following:

1. Each type of steel reinforcement.

2. Bar supports.

3. Mechanical splice couplers.

B. Shop Drawings: Comply with ACI SP-066:

1. Include placing drawings that detail fabrication, bending, and placement.

2. Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement.

1.3 INFORMATIONAL SUBMITTALS

A. Welding certificates.

1. Reinforcement to Be Welded: Welding procedure specification in accordance with

AWS D1.4/D1.4M.

B. Material Certificates: For each of the following, signed by manufacturers:

1. Epoxy-Coated Reinforcement: CRSI's "Epoxy Coating Plant Certification."

C. Material Test Reports: For the following, from a qualified testing agency:

1. Steel Reinforcement:

a. For reinforcement to be welded, mill test analysis for chemical composition and carbon equivalent of the steel in accordance with ASTM A706/A706M.

Penn Forest Township Transfer Station Ramp Remediation Project #312024.005

CONCRETE REINFORCING 032000 - 2

2. Mechanical splice couplers.

D. Field quality-control reports.

1.4 QUALITY ASSURANCE

A. Welding Qualifications: Qualify procedures and personnel in accordance with

AWS D1.4/D 1.4M.

PART 2 - PRODUCTS

2.1 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A615/A615M, Grade 60 (Grade 420), deformed.

B. Epoxy-Coated Reinforcing Bars:

1. Steel Bars: ASTM A615/A615M, Grade 60 (Grade 420), deformed bars.

2. Epoxy Coating: ASTM A775/A775M with less than 2 percent damaged coating in each

12-inch (305-mm) bar length.

C. Deformed-Steel Welded-Wire Reinforcement: ASTM A1064/A1064M, flat sheet.

2.2 REINFORCEMENT ACCESSORIES

A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place.

1. Manufacture bar supports from steel wire, plastic, or precast concrete in accordance with

CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:

a. For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire, all-plastic bar supports, or

CRSI Class 2 stainless steel bar supports.

b. For epoxy-coated reinforcement, use CRSI Class 1A epoxy-coated or other dielectric-polymer-coated wire bar supports.

B. Mechanical Splice Couplers: ACI 318 (ACI 318M), same material of reinforcing bar being spliced; dowel-bar type.

C. Steel Tie Wire: ASTM A1064/A1064M, annealed steel, not less than 0.0508 inch (1.2908 mm) in diameter.

1. Finish: Plain, ASTM A884/A884M, Class A, Type 1, epoxy coated, with less than 2 percent damaged coating in each 12-inch (305-mm) wire length.

CONCRETE REINFORCING 032000 - 3

2.3 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

PART 3 - EXECUTION

3.1 PREPARATION

A. Protection of In-Place Conditions:

1. Do not cut or puncture vapor retarder.

2. Repair damage and reseal vapor retarder before placing concrete.

B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.

3.2 INSTALLATION OF STEEL REINFORCEMENT

A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.

B. Accurately position, support, and secure reinforcement against displacement.

1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.

2. Do not tack weld crossing reinforcing bars.

C. Preserve clearance between bars of not less than 1 inch (25 mm), not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.

D. Provide concrete coverage in accordance with ACI 318 (ACI 318M).

E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

F. Splices: Lap splices as indicated on Drawings.

1. Bars indicated to be continuous, and all vertical bars to be lapped not less than 36 bar diameters at splices, or 24 inches (610 mm), whichever is greater.

2. Stagger splices in accordance with ACI 318 (ACI 318M).

3. Mechanical Splice Couplers: Install in accordance with manufacturer's instructions.

4. Weld reinforcing bars in accordance with AWS D1.4/D 1.4M, where indicated on

Drawings.

CONCRETE REINFORCING 032000 - 4

G. Install welded-wire reinforcement in longest practicable lengths.

1. Support welded-wire reinforcement in accordance with CRSI "Manual of Standard

Practice."

a. For reinforcement less than W4.0 or D4.0, continuous support spacing to not exceed 12 inches (305 mm).

2. Lap edges and ends of adjoining sheets at least one wire spacing plus 2 inches (50 mm) for plain wire and 8 inches (200 mm) for deformed wire.

3. Offset laps of adjoining sheet widths to prevent continuous laps in either direction.

4. Lace overlaps with wire.

3.3 JOINTS

A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.

1. Place joints perpendicular to main reinforcement.

2. Continue reinforcement across construction joints unless otherwise indicated.

3. Do not continue reinforcement through sides of strip placements of floors and slabs.

3.4 INSTALLATION TOLERANCES

A. Comply with ACI 117 (ACI 117M).

3.5 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare test reports.

B. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.

END OF SECTION 032000

CAST-IN-PLACE CONCRETE 033000 - 1

SECTION 033000 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Concrete standards.

2. Concrete materials.

3. Admixtures.

4. Vapor retarders.

5. Curing materials.

6. Accessories.

7. Repair materials.

8. Concrete mixture materials.

9. Concrete mixture class types.

10. Concrete mixing.

B. Related Requirements:

1. Section 312000 "Earth Moving" for drainage fill under slabs-on-ground.

2. Section 321313 "Concrete Paving" for concrete pavement and walks.

1.2 ACTION SUBMITTALS

A. Product data.

B. Design Mixtures: For each concrete mixture.

C. Shop Drawings:

1. Construction Joint Layout: Indicate proposed construction joints required to construct the structure.

CAST-IN-PLACE CONCRETE 033000 - 2

1.3 INFORMATIONAL SUBMITTALS

A. Testing Agency: Include documentation indicating compliance with ASTM E329 or

ASTM C1077 and copies of applicable ACI certificates for testing technicians or ACI Concrete

Construction Special Inspector - MH, ASCC.

B. Material certificates.

C. Material test reports.

D. Field quality-control reports.

1.4 QUALITY ASSURANCE

A. Installer Qualifications: A qualified Installer who employs Project personnel qualified as an

ACI-certified Concrete Flatwork Associate and Concrete Flatwork Finisher and a supervisor who is a certified ACI Advanced Concrete Flatwork Finisher/Technician or an ACI Concrete

Flatwork Finisher with experience installing and finishing concrete.

1. Post-Installed Concrete Anchors Installers: ACI-certified Adhesive Anchor Installer.

B. Laboratory Testing Agency Qualifications: A testing agency qualified in accordance with

ASTM C1077 and ASTM E329 for testing that performs duties on behalf of the

Engineer/Engineer.

C. Field Quality-Control Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.

1.5 WARRANTY

A. Manufacturer's Warranty: Manufacturer agrees to furnish replacement sheet vapor retarder/termite barrier material and accessories for sheet vapor retarder/ termite barrier and accessories that do not comply with requirements or that fail to resist penetration by termites within specified warranty period.

1. Warranty Period: 10 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 CONCRETE STANDARDS

A. ACI Publications: Comply with ACI 301 (ACI 301M) unless modified by requirements in the

Contract Documents.

CAST-IN-PLACE CONCRETE 033000 - 3

2.2 CONCRETE MATERIALS

A. Cementitious Materials:

1. Portland Cement: ASTM C150/C150M, Type II, gray.

B. Normal-Weight Aggregates:

1. Coarse Aggregate: ASTM C33/C33M.

2. Maximum Coarse-Aggregate Size: 3/4 inch (19 mm) nominal.

3. Fine Aggregate: ASTM C33/C33M.

2.3 ADMIXTURES

A. Air-Entraining Admixture: ASTM C260/C260M.

B. Chemical Admixtures: Do not use calcium chloride or admixtures containing calcium chloride in steel-reinforced concrete.

1. Water-Reducing Admixture: ASTM C494/C494M, Type A.

2. Retarding Admixture: ASTM C494/C494M, Type B.

3. Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C494/C494M, Type F.

5. High-Range, Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type G.

6. Admixtures with special properties, with documentation of claimed performance enhancement, ASTM C494/C494M, Type S.

2.4 VAPOR RETARDERS

A. Sheet Vapor Retarder, Class A: ASTM E1745, Class A. Include manufacturer's recommended thickness and adhesive or pressure-sensitive tape.

2.5 CURING MATERIALS

A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.

B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. (305 g/sq. m) when dry.

C. Moisture-Retaining Cover: ASTM C171, polyethylene film burlap-polyethylene sheet.

CAST-IN-PLACE CONCRETE 033000 - 4

D. Water: Potable water that does not cause staining of the surface.

E. Clear, Waterborne, Membrane-Forming, Dissipating Curing Compound: ASTM C309, Type 1, Class B.

2.6 ACCESSORIES

A. Expansion- and Isolation-Joint-Filler Strips: ASTM D1751, asphalt-saturated cellulosic fiber.

B. Bonding Agent: ASTM C1059/C1059M, Type II, nonredispersible, acrylic emulsion or styrene butadiene.

2.7 CONCRETE MIXTURE MATERIALS

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301 (ACI 301M).

1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.

B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland or hydraulic cement in concrete assigned to Exposure Class F3 as follows:

1. Fly Ash or Other Pozzolans: 25 percent by mass.

2. Slag Cement: 50 percent by mass.

3. Silica Fume: 10 percent by mass.

4. Total of Fly Ash or Other Pozzolans, Slag Cement, and Silica Fume: 50 percent by mass, with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.

5. Total of Fly Ash or Other Pozzolans and Silica Fume: 35 percent by mass with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.

C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.

1. Use corrosion-inhibiting admixture in concrete mixtures where indicated.

2. Use permeability-reducing admixture in concrete mixtures where indicated.

2.8 CONCRETE MIXTURE CLASS TYPES

A. Class A: Normal-weight concrete used for footings.

1. Exposure Class: ACI 318 (ACI 318M) Class F1.

CAST-IN-PLACE CONCRETE 033000 - 5

2. Minimum Compressive Strength: 4000 psi (27.6 MPa)

3. Maximum w/cm Ratio: 0.45.

4. Slump Limit: 4 inches (100 mm), plus or minus 1 inch (25 mm).

5. Air Content:

a. Exposure Class F1: 5.0 percent, plus or minus 1.5 percent at point of delivery for concrete containing 3/4-inch (19-mm) nominal maximum aggregate size.

6. Limit water-soluble, chloride-ion content in hardened concrete to 0.30 percent by weight of cement.

B. Class B: Normal-weight concrete used for foundation walls.

1. Exposure Class: ACI 318 (ACI 318M) Class F1.

2. Minimum Compressive Strength: 4000 psi (27.6 MPa)

3. Maximum w/cm Ratio: 0.45.

4. Slump Limit: 4 inches (100 mm), plus or minus 1 inch (25 mm).

5. Air Content:

a. Exposure Class F1: 5.0 percent, plus or minus 1.5 percent at point of delivery for concrete containing 3/4-inch (19-mm) nominal maximum aggregate size.

6. Limit water-soluble, chloride-ion content in hardened concrete to 0.30 percent by weight of cement.

2.9 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete in accordance with

ASTM C94/C94M and furnish delivery ticket.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Before placing concrete, verify that installation of concrete forms, accessories, reinforcement, and embedded items is complete and that required inspections have been performed.

B. Do not proceed until unsatisfactory conditions have been corrected.

CAST-IN-PLACE CONCRETE 033000 - 6

3.2 TOLERANCES

A. Comply with ACI 117 (ACI 117M).

3.3 INSTALLATION OF VAPOR RETARDERS

A. Sheet Vapor Retarders: Place, protect, and repair sheet vapor retarder in accordance with

ASTM E1643 and manufacturer's written instructions.

3.4 INSTALLATION OF CAST-IN-PLACE CONCRETE

A. Before placing concrete, verify that installation of formwork, reinforcement, embedded items, and vapor retarder is complete and that required inspections are completed.

B. Notify Engineer and testing and inspection agencies 24 hours prior to commencement of concrete placement.

C. Water addition in transit or at the Project site must be in accordance with ASTM C94/C94M and must not exceed the permitted amount indicated on the concrete delivery ticket.

D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.

E. Deposit and consolidate concrete for slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.

3.5 INSTALLATION OF JOINTS

A. Construct joints true to line, with faces perpendicular to surface plane of concrete.

B. Construction Joints: Coordinate with floor slab pattern and concrete placement sequence.

1. Install so strength and appearance of concrete are not impaired, at locations indicated on

Drawings or as approved by Engineer.

2. Place joints perpendicular to main reinforcement.

a. Continue reinforcement across construction joints unless otherwise indicated.

3. Form keyed joints as indicated. Embed keys at least 1-1/2 inches (38 mm) into concrete.

4. Locate horizontal joints in walls and columns at underside of slabs, and at the top of footings or slabs.

5. Space vertical joints in walls as indicated on Drawings.

CAST-IN-PLACE CONCRETE 033000 - 7

C. Control Joints in Slabs-on-Ground: Form weakened-plane control joints, sectioning concrete into areas as indicated. Construct control joints for a depth equal to at least one-fourth of concrete thickness as follows:

1. Grooved Joints: Form control joints after initial floating by grooving and finishing each edge of joint to a radius of 1/8 inch (3 mm). Repeat grooving of control joints after applying surface finishes. Eliminate groover tool marks on concrete surfaces.

D. Isolation Joints in Slabs-on-Ground: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.

1. Extend joint-filler strips full width and depth of joint, terminating flush with finished concrete surface unless otherwise indicated on Drawings.

2. Terminate full-width joint-filler strips not less than 1/2 inch (13 mm) or more than 1 inch

(25 mm) below finished concrete surface.

3. Install joint-filler strips in lengths as long as practicable. Where more than one length is required, lace or clip sections together.

E. Doweled Joints:

1. Install dowel bars and support assemblies at joints where indicated on Drawings.

2. Lubricate or asphalt coat one-half of dowel bar length to prevent concrete bonding to one side of joint.

3.6 APPLICATION OF FINISHING SLABS

A. Broom Finish: Apply a broom finish to exterior concrete platforms, steps, ramps, and locations indicated on Drawings.

1. Immediately after float finishing, slightly roughen trafficked surface by brooming with a fiber-bristle broom perpendicular to main traffic route.

2. Coordinate required final finish with Engineer before application.

3.7 APPLICATION OF FINISHING FORMED SURFACES

A. As-Cast Surface Finishes:

1. ACI 301 (ACI 301M) Surface Finish SF-2.0: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams.

a. Patch voids larger than 3/4 inch (19 mm) wide or 1/2 inch (13 mm) deep.

b. Remove projections larger than 1/4 inch (6 mm).

CAST-IN-PLACE CONCRETE 033000 - 8

c. Patch tie holes.

d. Surface Tolerance: ACI 117 (ACI 117M), Class B.

e. Locations: Apply to concrete surfaces exposed to public view, to receive a rubbed finish.

B. Rubbed Finish: Apply the following to as-cast surface finishes where indicated on Drawings:

1. Smooth-Rubbed Finish:

a. Perform no later than one day after form removal.

b. Moisten concrete surfaces and rub with carborundum brick or another abrasive until producing a uniform color and texture.

c. If sufficient cement paste cannot be drawn from the concrete by the rubbing process, use a grout made from the same cementitious materials used in the in-place concrete.

3.8 APPLICATION OF CONCRETE CURING

A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

1. Comply with ACI 301 (ACI 301M) for cold weather protection during curing.

2. Comply with ACI 301 (ACI 301M) and ACI 305.1 (ACI 305.1M) for hot-weather protection during curing.

3. Maintain moisture loss no more than 0.2 lb/sq. ft. x h (1 kg/sq. m x h), calculated in accordance with ACI 305R, before and during finishing operations.

3.9 INSTALLATION OF JOINT FILLING

A. Prepare, clean, and install joint filler in accordance with manufacturer's written instructions.

3.10 INSTALLATION OF CONCRETE SURFACE REPAIRS

A. Defective Concrete:

1. Repair and patch defective areas when approved by Engineer.

2. Remove and replace concrete that cannot be repaired and patched to meet specification requirements.

B. Patching Mortar: Mix dry-pack patching mortar, consisting of 1 part portland cement to 2-

1/2 parts fine aggregate passing a No. 16 (1.18-mm) sieve, using only enough water for handling and placing.

CAST-IN-PLACE CONCRETE 033000 - 9

C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks in excess of 0.01 inch (0.25 mm) spalls, air bubbles exceeding surface finish limits, honeycombs, rock pockets, fins and other projections on the surface exceeding surface finish limits, and stains and other discolorations that cannot be removed by cleaning.

1. Immediately after form removal, cut out honeycombs, rock pockets, and voids more than

1/2 inch (13 mm) in any dimension to solid concrete.

a. Limit cut depth to 3/4 inch (19 mm).

b. Make edges of cuts perpendicular to concrete surface.

c. Clean, dampen with water, and brush-coat holes and voids with bonding agent.

d. Fill and compact with patching mortar before bonding agent has dried.

e. Fill form-tie voids with patching mortar or cone plugs secured in place with bonding agent.

2. Repair defects on surfaces exposed to view by blending white portland cement and standard portland cement, so that, when dry, patching mortar matches surrounding color.

a. Patch a test area at inconspicuous locations to verify mixture and color match before proceeding with patching.

b. Compact mortar in place and match surrounding surface.

3. Repair defects on concealed formed surfaces that will affect concrete's durability and structural performance, as determined by Engineer.

D. Repairing Unformed Surfaces:

1. Test unformed surfaces, such as floors and slabs, for finish, and verify surface tolerances specified for each surface.

a. Correct low and high areas.

b. Test surfaces sloped to drain for trueness of slope and smoothness; use a sloped template.

2. Repair finished surfaces containing surface defects, including spalls, popouts, honeycombs, rock pockets, crazing, and cracks in excess of 0.01 inch (0.25 mm) wide or that penetrate to reinforcement or completely through unreinforced sections regardless of width.

3. After concrete has cured at least 14 days, correct high areas by grinding.

4. Correct localized low areas during, or immediately after, completing surface-finishing operations by adding patching mortar.

a. Finish repaired areas to blend into adjacent concrete.

CAST-IN-PLACE CONCRETE 033000 - 10

5. Repair random cracks and single holes 1 inch (25 mm) or less in diameter with patching mortar.

a. Groove top of cracks and cut out holes to sound concrete, and clean off dust, dirt, and loose particles.

b. Dampen cleaned concrete surfaces and apply bonding agent.

c. Place patching mortar before bonding agent has dried.

d. Compact patching mortar and finish to match adjacent concrete.

e. Keep patched area continuously moist for at least 72 hours.

E. Perform structural repairs of concrete, subject to Engineer's approval, using epoxy adhesive and patching mortar.

F. Repair materials and installation not specified above may be used, subject to Engineer's approval.

3.11 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare testing and inspection reports.

B. Testing Agency: Owner will engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.

C. Delivery Tickets: Comply with ASTM C94/C94M.

3.12 PROTECTION

A. Protect concrete surfaces.

B. Protect from petroleum stains.

C. Prohibit vehicles from interior concrete slabs.

D. Prohibit placement of steel items on concrete surfaces.

END OF SECTION 033000

EARTH MOVING 312000 - 1

SECTION 312000 - EARTH MOVING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Excavating and filling for rough grading the Site.

2. Preparing subgrades for slabs-on-grade, and pavements.

3. Excavating and backfilling for structures.

4. Drainage course for concrete slabs-on-grade.

5. Subbase course for concrete pavements.

6. Subbase course for asphalt paving.

1.2 DEFINITIONS

A. Backfill: Soil material used to fill an excavation.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

2. Final Backfill: Backfill placed over initial backfill to fill a trench.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

C. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe.

D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.

E. Drainage Course: Aggregate layer supporting the slab-on-grade that also minimizes upward capillary flow of pore water.

F. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.

1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Architect. Authorized additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Architect. Unauthorized excavation, as well as remedial work directed by Architect, will be without additional compensation.

EARTH MOVING 312000 - 2

G. Fill: Soil materials used to raise existing grades.

H. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other fabricated stationary features constructed above or below the ground surface.

I. Subbase Course: Aggregate layer placed between the subgrade and base course for hot-mix asphalt pavement, or aggregate layer placed between the subgrade and a cement concrete pavement or a cement concrete or hot-mix asphalt walk.

J. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.

K. Utilities: On-site underground pipes, conduits, ducts, and cables as well as underground services within buildings.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of the following manufactured products required:

1. Geotextiles.

2. Controlled low-strength material, including design mixture.

3. Warning tapes.

B. Samples for Verification: For the following products, in sizes indicated below:

1. Geotextile: 12 by 12 inches.

2. Warning Tape: 12 inches (300 mm) long; of each color.

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified testing agency.

B. Material Test Reports: For each on-site and borrow soil material proposed for fill and backfill as follows:

1. Classification according to ASTM D 2487.

2. Laboratory compaction curve according to ASTM D 1557.

1.5 QUALITY ASSURANCE

A. Blasting: Blasting is not allowed.

EARTH MOVING 312000 - 3

B. Contractor Responsibilities:

1. Tests and inspections not explicitly assigned to Owner are Contractors responsibility. Perform additional quality-control activities to verify that the Work complies with requirements whether specified or not.

a. Unless otherwise indicated, provide quality-control services specified required of Contractor by authorities having jurisdiction, whether specified or not.

b. Engage a qualified testing agency to perform these quality control services.

1) Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by Owner.

c. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting will be performed.

d. Submit a certified written report, in duplicate, of each quality control service.

C. Department of Environmental Protection Bureau of Land Recycling and Waste Management – Clean Fill Policy:

1. Reference Department of Environmental Protection Bureau of Land Recycling and Waste Management Document No. 258-2182-773 as a condition to the Contract.

a. Imported Fill: Contractor shall perform environmental due diligence to determine whether imported fill is clean or regulated as specified in DEP Clean Fill Policy. Contractor shall manage the fill following the guidelines of the policy including the furnishing of any calculations, testing, or permits that may be required. Testing that may be required shall be included in the Contract Sum.

b. Exported Fill: Contractor shall perform due diligence and testing to determine that the excavated material scheduled to be spoiled off site qualifies as clean fill under DEP Clean Fill Policy. Should materials be uncovered that are suspected of being other than clean fill, Contractor shall immediately notify Engineer. Testing requirements shall be included in the Contract Sum. If evidence of release of regulated substance is found, material shall be disposed of as regulated fill and will be paid for according to Contract provisions for Changes in the Work.

1.6 FIELD CONDITIONS

A. Site Information: Data in subsurface investigation reports was used for the basis of the design and is made available to Contractor for information only. Conditions are not intended as representations or warranties of accuracy or continuity between soil borings/ test pits. Owner, Engineer, or Engineer shall not be responsible for Contractor interpretations or conclusions drawn from this data.

B. Test borings and other exploratory operations may be performed by Contractor, at Contractor’s expense and option; however, no charge in the Contract Sum will be authorized for such additional exploration.

EARTH MOVING 312000 - 4

C. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during earth-moving operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Owner or authorities having jurisdiction.

D. Utility Locator Service: Notify “One Call” for area where Project is located before beginning earth-moving operations.

E. Contractor shall be responsible to determine, to his satisfaction and by his own means, the locations and depths of existing utilities and to abide by the provisions of Act 187. Contactor shall engage the services of a qualified agency to locate utilities on site not covered by PA One Call.

F. Prior to starting any construction, contractor shall coordinate, field verify, and excavate test holes as necessary to determine actual location and elevations of existing underground utilities where proposed utilities, structures or other work will cross existing utilities or structures. Any discrepancies or conflicts between existing utilities and appurtenances and proposed work shall be resolved with Engineer before proceeding with any work. Prepare and provide a sketch to Engineer legibly recording type and size of underground utilities and appurtenances and measured horizontal and vertical locations referenced to permanent site improvements.

G. Whenever underground utilities and appurtenances are encountered in a manner inconsistent with the Contract Documents, prepare and provide a sketch to Engineer legibly recording type and size of underground utilities and appurtenances and measured horizontal and vertical locations referenced to permanent site improvements. Resolve discrepancies or conflicts with Engineer before proceeding with any work.

H. Do not interrupt existing utilities serving facilities occupied by Owner or others, during occupied hours, except when permitted in writing by Owner and then only after acceptable temporary utility services have been provided.

I. Do not commence earth-moving operations until temporary erosion- and sedimentation-control measures are in place.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS

A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.

1. All stone specified herein shall be natural stone. No slag is permitted.

EARTH MOVING 312000 - 5

B. Satisfactory Soils: Soil Classification for backfill and borrow Groups GW, GP, GM, SW, SP, and SM according to ASTM D 2487 or a combination of these groups; free of rock or gravel larger than 2 inches in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.

1. Liquid Limit: As determined by the geotechnical engineer.

2. Plasticity Index: As determined by the geotechnical engineer.

C. Unsatisfactory Soils: Soil Classification Groups GC, SC, CL, ML, OL, CH, MH, OH, and PT according to ASTM D 2487, or a combination of these groups.

1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.

2. Limit the particle size for mass fill to 6-inches.

3. Limit the particle size for backfills under walls, foundations, and utility backfill.

D. Subbase Material: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch sieve and not more than 12 percent passing a No. 200 sieve.

E. Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95 percent passing a 1-1/2-inch sieve and not more than 8 percent passing a No. 200 sieve.

F. Engineered Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch sieve and not more than 12 percent passing a No. 200 sieve.

G. Bedding Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; except with 100 percent passing a 1-inch sieve and not more than 8 percent passing a No. 200 sieve.

H. Drainage Course: Narrowly graded mixture of washed crushed stone or crushed or uncrushed gravel;

ASTM D 448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2-inch sieve and zero to 5 percent passing a No. 8 sieve.

I. Filter Material: Narrowly graded mixture of natural or crushed gravel, or crushed stone and natural sand;

ASTM D 448; coarse-aggregate grading Size 67; with 100 percent passing a 1-inch sieve and zero to 5 percent passing a No. 4 sieve.

J. Sand: ASTM C 33/C 33M; fine aggregate.

K. Impervious Fill: Clayey gravel and sand mixture capable of compacting to a dense state.

2.2 ACCESSORIES

A. Detectable Warning Tape: Acid- and alkali-resistant, polyethylene film warning tape manufactured for marking and identifying underground utilities, a minimum of 6 inches wide and 4 mils thick, continuously inscribed with a description of the utility, with metallic core

EARTH MOVING 312000 - 6

encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches deep; colored as follows:

1. Red: Electric.

2. Yellow: Gas, oil, steam, and dangerous materials.

3. Orange: Telephone and other communications.

4. Blue: Water systems.

5. Green: Sewer systems.

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth-moving operations.

B. Protect and maintain erosion and sedimentation controls during earth-moving operations.

C. Protect subgrades and foundation soils from freezing temperatures and frost. Remove temporary protection before placing subsequent materials.

3.2 EXCAVATION, GENERAL

A. Unclassified Excavation: Excavate to subgrade elevations regardless of the character of surface and subsurface conditions encountered. Unclassified excavated materials may include rock, soil materials, and obstructions. No changes in the Contract Sum or the Contract Time will be authorized for rock excavation or removal of obstructions.

1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.

3.3 EXCAVATION FOR STRUCTURES

A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 1 inch (25 mm). If applicable, extend excavations a sufficient distance from structures for placing and removing concrete formwork, for installing services and other construction, and for inspections.

1. Excavations for Footings and Foundations: Do not disturb bottom of excavation. Excavate by hand to final grade just before placing concrete reinforcement. Trim bottoms to required lines and grades to leave solid base to receive other work.

3.4 EXCAVATION FOR PAVEMENTS

A. Excavate surfaces under pavements to indicated lines, cross sections, elevations, and subgrades.

EARTH MOVING 312000 - 7

3.5 SUBGRADE INSPECTION

A. Proof-roll subgrade below the slabs and pavements with a pneumatic-tired dump truck to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.

B. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction activities, as directed by Architect, without additional compensation.

3.6 UNAUTHORIZED EXCAVATION

A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation of concrete foundation or footing to excavation bottom, without altering top elevation. Lean concrete fill, with 28-day compressive strength of 2500 psi (17.2 MPa), may be used when approved by Architect.

1. Fill unauthorized excavations under other construction, pipe, or conduit as directed by Architect.

3.7 STORAGE OF SOIL MATERIALS

A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

3.8 BACKFILL

A. Place and compact backfill in excavations promptly, but not before completing the following:

1. Construction below finish grade.

2. Removing concrete formwork.

3. Removing trash and debris.

4. Removing temporary shoring, bracing, and sheeting.

5. Installing permanent or temporary horizontal bracing on horizontally supported walls.

B. Place backfill on subgrades free of mud, frost, snow, or ice.

3.9 BACKFILL

A. Place backfill on subgrades free of mud, frost, snow, or ice.

B. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.

C. Initial Backfill: Place and compact initial backfill of satisfactory soil free of particles larger than 1 inch in any dimension.

EARTH MOVING 312000 - 8

D. Final Backfill: Place and compact final backfill of satisfactory soil to final subgrade elevation.

E. Warning Tape: Install warning tape directly above utilities, 12 inches (300 mm) below finished grade, except 6 inches (150 mm) below subgrade under pavements and slabs.

3.10 SOIL FILL

A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.

B. Place and compact fill material in layers to required elevations as follows:

1. Under walks and pavements, use satisfactory soil material.

2. Under slabs, use engineered fill.

3. Under footings and foundations, use engineered fill.

3.11 SOIL MOISTURE CONTROL

A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil layer before compaction to within 2 percent of optimum moisture content.

1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, or contain frost or ice.

2. Remove and replace, or scarify and air dry, otherwise satisfactory soil material that exceeds optimum moisture content by 2 percent and is too wet to compact to specified dry unit weight.

3.12 COMPACTION OF SOIL BACKFILLS AND FILLS

A. Place backfill and fill soil materials in layers not more than 8 inches (200 mm) in loose depth for material compacted by heavy compaction equipment and not more than 4 inches (100 mm) in loose depth for material compacted by hand-operated tampers.

B. Place backfill and fill soil materials evenly on all sides of structures to required elevations and uniformly along the full length of each structure.

C. Compact soil materials to not less than the following percentages of maximum dry unit weight according to ASTM D698:

1. Under structures, building slabs, steps, and pavements, scarify and recompact top 12 inches (300

mm) of existing subgrade and each layer of backfill or fill soil material at 95 percent.

2. Under walkways, scarify and recompact top 6 inches (150 mm) below subgrade and compact each layer of backfill or fill soil material at 92 percent.

3. Under turf or unpaved areas, scarify and recompact top 6 inches (150 mm) below subgrade and compact each layer of backfill or fill soil material at 85 percent.

EARTH MOVING 312000 - 9

3.13 GRADING

A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.

B. Site Rough Grading: Slope grades to direct water away from buildings and to prevent ponding. Finish subgrades to elevations required to achieve indicated finish elevations, within the following subgrade tolerances:

1. Pavements: Plus or minus 1/2 inch (13 mm).

3.14 SUBBASE AND BASE COURSES UNDER PAVEMENTS

A. Place subbase course on subgrades free of mud, frost, snow, or ice.

B. On prepared subgrade, place subbase course under pavements as follows:

1. Shape subbase course to required crown elevations and cross-slope grades.

2. Place subbase course that exceeds 6 inches (150 mm) in compacted thickness in layers of equal thickness, with no compacted layer more than 6 inches (150 mm) thick or less than 3 inches (75

mm) thick.

3. Compact subbase course at optimum moisture content to required grades, lines, cross sections, and thickness to not less than 95 percent of maximum dry unit weight according to ASTM D698.

3.15 DRAINAGE COURSE UNDER CONCRETE SLABS-ON-GRADE

A. Place drainage course on subgrades free of mud, frost, snow, or ice.

B. On prepared subgrade, place and compact drainage course under cast-in-place concrete slabs-on-grade as follows:

1. Place drainage course that exceeds 6 inches (150 mm) in compacted thickness in layers of equal thickness, with no compacted layer more than 6 inches (150 mm) thick or less than 3 inches (75

mm) thick.

2. Compact each layer of drainage course to required cross sections and thicknesses to not less than 95 percent of maximum dry unit weight according to ASTM D698.

3.16 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a qualified special inspector to perform inspections:

B. Testing Agency: Owner will engage a qualified geotechnical engineering testing agency to perform tests and inspections.

C. Allow testing agency to inspect and test subgrades and each fill or backfill layer. Proceed with subsequent earth moving only after test results for previously completed work comply with requirements.

EARTH MOVING 312000 - 10

D. Footing Subgrade: At footing subgrades, at least one test of each soil stratum will be performed to verify design bearing capacities. Subsequent verification and approval of other footing subgrades may be based on a visual comparison of subgrade with tested subgrade when approved by Architect.

E. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil materials to depth required;

recompact and retest until specified compaction is obtained.

3.17 PROTECTION

A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.

B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.

C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.

1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.

3.18 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove surplus satisfactory soil and waste materials, including unsatisfactory soil, trash, and debris, and legally dispose of them off Owner's property.

END OF SECTION 312000

ASPHALT PAVING 321216 - 1

SECTION 321216 - ASPHALT PAVING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Hot-mix asphalt paving.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product. All mix designs and approved suppliers in accordance to PennDOT PUB 408 Specifications.

1. Include technical data and tested physical and performance properties.

2. Job-Mix Designs: Certification, by authorities having jurisdiction, of approval of each job mix proposed for the Work.

3. Job-Mix Designs: For each job mix proposed for the Work.

1.3 INFORMATIONAL SUBMITTALS

A. Qualification Data: For manufacturer from PennDOT Bulletin 41 - Producers of Bituminous Mixtures

B. Material Certificates: For each paving material.

C. Material Test Reports: For each paving material, by a qualified testing agency.

D. Field quality-control reports.

1.4 QUALITY ASSURANCE

A. Manufacturer Qualifications: A paving-mix manufacturer registered with and approved by PennDOT in accordance to Bulletin 41 - Produces of Bituminous Mixtures.

B. Testing Agency Qualifications: Qualified according to ASTM D 3666 for testing indicated.

1.5 FIELD CONDITIONS

A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, if rain is imminent or expected before time required for adequate cure, or if the following conditions are not met:

1. Prime Coat: Minimum surface temperature of 40 deg F.

ASPHALT PAVING 321216 - 2

2. Tack Coat: Minimum surface temperature of 40 deg F.

3. Asphalt Base Course: Minimum surface temperature of 35 deg F and rising at time of placement.

4. Asphalt Surface Course: Minimum surface temperature of 40 deg F at time of placement.

PART 2 - PRODUCTS

2.1 AGGREGATES

A. General: Provide aggregate from sources listed in PennDOT Bulletin 14. Aggregates and RAM shall conform to the quality requirements for Superpave Asphalt Mixture Design as specified in PennDOT Bulletin 27.

B. Coarse Aggregate: ASTM D 692/D 692M, sound; angular crushed stone, crushed gravel, or cured, crushed blast-furnace slag.

C. Fine Aggregate: ASTM D 1073, sharp-edged natural sand or sand prepared from stone, gravel, cured blast-furnace slag, or combinations thereof.

1. For hot-mix asphalt, limit natural sand to a maximum of 20 percent by weight of the total aggregate mass.

D. Mineral Filler: ASTM D 242/D 242M rock or slag dust, hydraulic cement, or other inert material.

2.2 ASPHALT MATERIALS

A. Asphalt Binder: As indicated on drawings.

B. Emulsified Asphalt Prime Coat: ASTM D 977 or AASHTO M 140 emulsified asphalt.

C. Tack Coat: ASTM D 977 or AASHTO M 140 emulsified asphalt.

D. Water: Potable.

2.3 AUXILIARY MATERIALS

A. Joint Sealant: ASTM D 6690 or AASHTO M 324, Type I, hot-applied, single-component, polymer-modified bituminous sealant.

2.4 MIXES

A. Hot-Mix Asphalt: Dense, hot-laid, hot-mix asphalt plant mixes approved by PennDOT. Provide mixes complying with composition, grading, and tolerance requirements as follows:

1. Base Course: As indicated on drawings.

ASPHALT PAVING 321216 - 3

2. Wearing Course: As indicated on drawings.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that subgrade is dry and in suitable condition to begin paving.

B. Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.

1. Completely proof-roll subgrade in one direction, limit vehicle speed to 3 mph.

2. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by Engineer, and replace with compacted backfill or fill as directed.

C. Proceed with paving only after unsatisfactory conditions have been corrected.

3.2 REPAIRS

A. Leveling Course: Install and compact leveling course consisting of hot-mix asphalt surface course to level sags and fill depressions deeper than 1 inch in existing pavements.

1. Install leveling wedges in compacted lifts not exceeding 3 inches thick.

B. Crack and Joint Filling: Remove existing joint filler material from cracks or joints to a depth of 1/4 inch.

1. Clean cracks and joints in existing hot-mix asphalt pavement.

2. Use emulsified-asphalt slurry to seal cracks and joints less than 1/4 inch wide. Fill flush with surface of existing pavement and remove excess.

3. Use hot-applied joint sealant to seal…