This document is a comprehensive pricing tab and contract pricing schedule for RoofConnect National Roofing Services, detailing rates and costs for various roofing, construction, and related services across multiple states. The document appears to be prepared for Region 4 ESC, a cooperative purchasing consortium, and provides detailed pricing coefficients and service rates for numerous roofing and construction activities across almost every U.S. state.
The pricing schedule covers an extensive range of roofing services including water-resistant roofing, insulation installation, roof restoration, masonry work, metal work, woodwork, solar panel installations, and specialized services like asbestos testing and roof inspections. Pricing is structured with unit costs (per square foot, linear foot, or each) for activities ranging from pressure cleaning and coating applications to complex demolition and reconstruction of roof components. The document includes state-specific coefficients for normal and non-normal working hours, a 15% markup on non-prepriced items, and provides granular pricing for specialized services such as skylight replacements, roof ladder installations, and emergency repairs. Additional notable features include warranty options, mileage rates, and detailed pricing for solar panel system components.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Number Unit of Measure
1 SF
2 SF
3 SF
4 SF
5 SF
6 SF
7 SF
8 LF
9 LF
10 LF
11 LF
12 LF
13 LF
14 LF
15 LF
16 LF
17 LF
18 LF
Number Unit of Measure
19 SF
20 SF
21 SF
Backer rod, polyethylene, 1/2” diameter, installed in prepared opening
1.92
Backer rod, polyethylene, 3/4” diameter, installed in prepared opening
1.95
Backer rod, polyethylene, 1” diameter, installed in prepared opening
2.03
Description of Cost Factors Offeror's Bid
Building paper, asphalt felt sheathing paper, 1 ply, 15#, in place
0.26
Building paper, asphalt felt sheathing paper, 1 ply, 40#, in place
36.66
Building paper, red rosin paper, 5 square rolls, 4#, in place
41.93
Non-pigmented synthetic resin, waterproofing, one coat sprayed on
0.47
Caulking: remove existing, clean and prime joint 5.2
Caulking, epoxied urethane compound, 2 component, 1/4” x 1/4”, in place
4.03
Caulking, polyurethane, 1 component, 1/4” x 1/4”, in place
3.09
Caulking, polyurethane, 1 component, 1/2” x 1/2”, in place
3.46
Caulking, silicone rubber, 1 component, 1/4” x 1/4”, in place
5.38
Caulking, epoxied urethane compound, 2 component, 1/4” x 1/4”, in place
4.16
Caulking, silicone rubber, 1 component, 3/4” x 3/8”, in place
7.48
Backer rod, polyethylene, 3/8” diameter, installed in prepared opening
1.9
PRICING TAB
Description of Cost Factors Offeror's Bid
Water Resistant Roofing Pressure cleaning, vertical walls 2.24
Pressure cleaning, horizontal surfaces 2.02
Roof scanning to identify wet or substandard room components to be removed 0.05
Asphalt emulsion coating, waterproofing, brush applied, per coat
0.39
Rubberized coating waterproofing, brush applied, per coat
7.22
Vinyl/acrylic resin, damp proofing, brush applied per coat.
1.53
22 SF
23 SF
24 SF
1 SF
2 SF
3a SF
3b SF
4a SF
4b SF
Number Unit of Measure
5 SF
6 SF
7a SF
7b SF
8a SF
8b SF
8c SF
Hot applications 0.68
Cold applications 0.85
Mechanically attached 1.5
Hot applications 1.03
Cold applications 1.29
Description of Cost Factors Offeror's Bid
Roof deck insulation, Isocyanurate in 4’ x 4’ or 4’ x 8’ sheets, 1” thick, R-6.6, mechanically fastened
1.76
Roof deck insulation, Isocyanurate in 4’ x 4’ or 4’ x 8’ sheets with fiberglass facers, 1 1/2” thick, R-10.0, mechanically fastened
1.95
Roof deck insulation, fiberboard in 4’ x 4’ sheets, 1/2” thick, R-1.39, applied Type IV asphalt
Hot applications 0.72
Cold applications 0.85
Roof deck insulation, fiberboard in 4’ x 8’ sheets, 25/32” thick, R-2.4, installed hot/cold or mechanically attached coated six sides
Vapor retarder; 2-ply inorganic, glass, Type IV, applied in cold adhesive to 4’ x 8’ x 1/4” glass-mat embedded, water resistant gypsum core panel mechanically fastened
3.37
Insulation
Demolition of roof insulation, per inch of depth 0.52
Demolition of lightweight cementitious fills, per inch of depth 1.63
Roof deck insulation, Isocyanurate in 4’ x 4’ or 4’ x 8’ sheets with fiberglass facers, 1” thick, R- 6.6, applied Type IV asphalt
Hot applications 0.87
Cold applications 1
Roof deck insulation, Isocyanurate in 4’ x 4’ or 4’ x 8’ sheets with fiberglass facers, 1 1/2” thick, R-10.0, applied Type IV asphalt
Vapor retarder adhered, 2 ply inorganic, glass Type 15, applied in Type IV (or appropriate type) asphalt, in place
26.83
Vapor retarder, 2 ply organic, Type 15 pound, applied in Type IV asphalt (or appropriate type), in place
35.69
9a SF
9b SF
10 SF
11 SF
12 SF
Number Unit of Measure
13 SF
14 SF
15 SF
16 SF
17 SF
18 SF
19a SF
19b SF
20a SF
20b SF
21a SF
21b SF
22a SF
22b SFSet into adhesive 1.89
Roof Tiles and Shingles
Set into adhesive 1.82
CDX Gypsum, 1/2" x 4' x 8'
Mechanically attached 1.5
Set into adhesive 1.95
CDX Gypsum with fiberglass, facer: 1/4" x 4' x 8'
Mechanically attached 1.3
Set into adhesive 1.63
CDX Gypsum with fiberglass facer: 1/2” x 4’ x 8’
Mechanically attached 1.5
Description of Cost Factors Offeror's Bid
Roof deck insulation, vermiculite at 1/8:12, R-value depending on thickness, per inch of depth 2.68
Roof deck insulation, vermiculite at 1/4:12, R-value depending on thickness, per inch of depth
3.42
Roof deck insulation, gypsum panels, 3” thick 5.07
Roof deck insulation, Isocyanurate (black facer only), tapered, 1/8” per foot slope, Type IV asphalt, per inch of depth
1.37
Roof deck insulation, Isocyanurate (black facer only), tapered, 1/4” per foot slope, Type IV asphalt, per inch of depth
1.5
Cold insulation adhesive 0.91
CDX Gypsum, 1/4" x 4' x 8'
Mechanically attached 1.37
Roof deck insulation, fiberboard in 4’ x 4’, 1” thick, R-2.78, applied Type IV asphalt (or appropriate asphalt), coated six sides
Hot applications 1.17
Cold applications 1.37
Roof deck insulation, fiberboard in 4' x 4' sheets, 1/2” thick, R-1.39, mechanically fastened, coated six sides
0.98
Roof deck insulation, fiberboard in 4’ x 4’, 1” thick, R-2.78, mechanically fastened, coated six sides
1.55
Roof deck insulation, lightweight cellular wire reinforced concrete fill, R- value depending on thickness, per inch of depth
0.78
1 SF
2 SF
Number Unit of Measure
3 SF
4 SF
5 SF
6 SF
7a Each
7b Each
8 SF
1 SF
2 SF
3 SF
4 SF
5 SF
6 SF
7 SF
8 SF
9 SF
10 SF
Number Unit of Measure
11 SF
2 SF
Remove single-ply roof, membrane mechanically attached
0.72
Remove copper sheet roofing 0.49
Base sheet, 3-ply fiberglass, Type IV (or appropriate type) asphalt (17 year roof)
3.12
Base sheet, 4-ply fiberglass, mechanically attached (17-year roof)
3.97
Fiberglass cap finishing membrane 1.11
Base sheet with 2 ply, fiberglass felts, Type IV asphalt (or appropriate type)
3.12
Base sheet with 3 ply, fiberglass felts, Type IV asphalt (or appropriate type)
3.97
Description of Cost Factors Offeror's Bid
Base sheet mechanically attached with 4 ply, Type VI fiberglass felts, Type IV (or appropriate type) asphalt
3.89
3.89Nail base sheet, 3 ply Type VI fiberglass felts, fiberglass cap, Type IV (or appropriate type) asphalt.
Shingles, fiberglass, Class A, 30-year, premium laminated multilayered 2.8
Replace clay or concrete roof tiles 18.2
Replace/repair other shingles 10.4
Self-adhering ice and water shield membrane for shingles, tiles, metal waterways, penetrations, valleys, ridges, edges, etc.
1.5
Roofing and Roof Restoration Remove built-up roof, multi-ply aggregate, non-asbestos, 1" thick or less
1.37
Remove single-ply roof: ballast, and membrane only
0.85
Remove single-ply roof, membrane partially or fully adhered
0.98
Remove composition shingles and felts to decking
0.98
Test for asbestos prior to removal 0.2
Description of Cost Factors Offeror's Bid
Remove clay, concrete, or slate roof tiles to decking
1.89
Remove wood shingles and felts to decking 0.98
Shingles, fiberglass, Class A, 25-year strip shingles, slopes 3:12 or greater 2.41
13 SF
14 SF
15 SF
16 SF
17 SF
18 SF
19 SF
20 SF
21 SF
22 SF
23 SF
24 SF
Number Unit of Measure
25 SF
26 SF
27 SF
28 SF
29 SF
30 SF
31 SF
32 SF
33 SF
Built-up roofing repairs; pitch-based mastic, with fiberglass mesh
2.67
Built-up roofing repairs; elastomeric mastic, with fiberglass mesh
3.56
Built-up roofing restoration, coal tar pitch roofs 1.37
Built-up roofing restoration, odorless, coal tar pitch or asphalt roofs
1.11
Built-up roof, modified bitumen adhesive, added cost per ply per square foot
0.59
Built-up roof, surface with cold asphaltic surfacing adhesive and gravel
1.5
Built-up roof, surface with emulsion and granules
1.29
Description of Cost Factors Offeror's Bid
Built-up roof, surface with emulsion and aluminum coating
1.39
Built-up roof, surface with emulsion and white elastomeric coating
1.46
Built-up roof, surface with aluminum coating or paint
1.5
Built-up roofing, surface with high solids white elastomeric coating
3.64
Built-up roofing repairs; fibered asphalt mastic, brush grade, with fiberglass mesh.
2.67
Base sheet with 4 ply; 2 polyester and 2 fiberglass felts, Type IV (or appropriate type) asphalt (20 year roof)
2.39
Built-up roof, base sheet with 3 ply polyester roofing sheet, Type IV (or appropriate type) asphalt (20 year roof)
2.08
Built-up roof, base sheet with 3 ply Type GS fiberglass, cold process adhesive (20 year roof)
3.61
Built-up roof base sheet plus 4 ply Type G2 fiberglass, cold process adhesive (30 year roof) 3.61
Built-up roof, base sheet, 1 ply Type VI fiberglass, 1 ply modified bitumen sheet, fire rated, Type IV asphalt (15 year roof)
4.88
Built-up roof, base sheet, 2 ply polyester roofing sheet, 1 ply modified bitumen sheet, fire rated, Type IV asphalt (or appropriate type) (20 year roof)
4.88
Built-up roof, base sheet, G-2, 33 lb., mechanically attached
0.72
Built-up roof, base sheet, G-2, 33 lb., Type IV asphalt
0.78
Built-up roof, premium asphalt, added cost per ply per square foot
0.33
34 SF
35 SF
36a SF
36b SF
36c SF
37 SF
38 SF
39 SF
40 SF
41 SF
Number Unit of Measure
42 SF
43 SF
44 SF
45 SF
46 SF
47 SF
48 SF
49 SF
50 SF
51 SF
52 SF
53 SF
54 SF
55 SF
56 SF
57 SF
Single ply roof, TPA Fleece Back, 45 mils fully adhered with hot asphalt
5.07
Single ply roof, 45 mils mechanically attached 3.25
Base sheet mechanically attached with 3 ply fiberglass felts, Type 1 - Coal Tar Pitch 2.28
Base sheet mechanically attached with 3 ply Organic felts, Type 1 - Coal Tar Pitch
2.34
Built-up roof, 4 ply Fiberglass felts, Type 1 Coal Tar Pitch
2.41
Build-up roof, 4 ply Organic felts, Type 1 Coal Tar Pitch
2.41
Additional Polyurethane foam coating 1.37
Single-ply roof, EDPM, 45 mils reinforced, mechanically fastened
2.41
Single-ply roof, EDPM, 60 mils fully adhered 2.54
Built-up roof, base sheet with 3 ply trilaminate ply, cold process adhesive (25 year roof)
3.45
Built-up roof, surface with premium asphalt, and gravel.
0.96
Built-up roof, surface with Fire Retardant Aluminum coating or paint, single coat
1.11
Modified Bitumen roof, base sheet, cap sheet, cold Modified Bitumen Adhesive
4.75
Built-up roof, 3 ply fiberglass felts, Type IV asphalt
3.51
Single ply Roof, 45 mils fully adhered with bonding adhesive
4.23
PVC 2.28
EPDM 2.15
Flashing membrane, 2 ply, Type IV or Type VI fiberglass
1.5
Flashing membrane, 1 ply polyester and 1 ply modified bitumen
2.93
Flashing membrane, 2 ply, polyester 1.63
Flashing membrane, CSPE 1.82
Flashing membrane, CSPE with aluminum coating
2.15
Description of Cost Factors Offeror's Bid
Polyurethane foam roofing 3.97
Single-ply roof, CSPE, 45 mils reinforced, asbestos free, mechanically fastened 2.28
Single-ply roof, CSPE, 60 mils reinforced, asbestos free, mechanically fastened 2.54
Single-ply roofing repairs (CSPE, PVC, and
EPDM)
CSPE 2.28
58 SF
59 SF
Number Unit of Measure
60 SF
61 SF
62 SF
63 SF
1 SF
2 SF
3 SF
4 Each
5 Each
6a
6b Each
6c SF
6d SF
7a SF
7b SF
Number Unit of Measure
7c SF
7d SF
Description of Cost Factors Offeror's Bid
Removal of existing mortar (½” wide by 1½” depth)
5.81
Removal of existing mortar (¾” wide by 1½” depth)
7.4
Coping stones, remove and reset 39.33
Brick, block or coping removal 17.23
Brick, block and brick exterior wall maintenance, repair and application of protective coatings.
Selective Demolition of Concrete Block Masonry Units (CMU) with perimeter saw cutting- swingstage 4”, 6” and 8” block (high-rise)
9.09
Selective Demolition of Brick Masonry Units with perimeter saw cutting - swingstage one, two, and three wythe (high-rise)
24.58
Selective Demolition of Brick Masonry Units with perimeter saw cutting - scaffolding one, two and three wythe (low-rise)
17.45
Selective Demolition of Mortar Joint with Perimeter Sawcutting – Swingstage (high-rise)
Removal of existing mortar ( ½” wide by ¾” depth)
3.17
Removal of existing mortar (¾” wide by ¾” depth)
5.28
Single ply repairs at laps or defects using 2 coats elastomeric coating system with reinforcement 4.23
Single ply roof, TPA fleece back, 60 mils fully adhered with hot asphalt
5.4
Single ply roof 60 mils fully adhered with bonding adhesive
3.97
Built-up roof, 1 ply Trilaminate, 1 ply Modified Bitumen Sheet, fire rated
4.23
Masonry Brick, remove and reset, 1 to 50 sq ft 19.85
Brick, remove and reset, over 50 sq ft 15.26
Block, remove and reset 16.52
Built-up roof, surface with hot Coal Tar Pitch and gravel
2.02
Single ply repairs using 2 coat polyurethane, elastomeric coating system 4.23
Description of Cost Factors Offeror's Bid
8a SF
8b SF
8c SF
8d SF
9a SF
9b SF
9c SF
9d SF
Number Unit of Measure
10a SF
10b SF
10c SF
Furnish and install new mortar (½” wide by ¾” depth)
6.33
Furnish and install new mortar (¾” wide by ¾” depth)
7.19
Furnish and install new mortar (½” wide by 1 ½” depth)
6.97
Furnish and install new mortar (¾” wide by 1 ½” depth)
8.24
Description of Cost Factors Offeror's Bid
New Pointing Work – Scaffolding (low- rise)
Furnish and install new mortar (½” wide by ¾” depth)
5.07
Furnish and install new mortar (¾” wide by ¾” depth)
5.71
Furnish and install new mortar (½” wide by 1 ½” depth)
5.92
Selective Demolition of Mortar Joint with Perimeter Sawcutting – Scaffolding (low-rise)
Removal of existing mortar ( ½” wide by ¾” depth)
5.53
Removal of existing mortar (¾” wide by ¾” depth)
5.59
Removal of existing mortar (½” wide by 1½” depth)
6.05
Removal of existing mortar (¾” wide by 1½” depth)
6.33
New Pointing Work – Swingstage (high- rise)
10d SF
11a SF
11b SF
11c SF
11d SF
Number Unit of Measure
12a SF
12b SF
12c SF
12d SF
13a SF
13b SF
13c SF
13d SF
Removal of 3 wythe brick parapet wall (42” high)
118.73
Removal of 2 wythe brick parapet wall (24” high)
55.47
Removal of 3 wythe brick parapet wall (42” high) 110.93
Reconstruction of Brick Masonry Roof Parapets
– Swingstage (high-rise)
New brick masonry parapet w/stone coping and flashings (3 wythe - 24” high) 288.6
New brick masonry parapet w/stone coping and flashings (3 wythe - 42” high) 364.87
New brick masonry parapet w/stone coping and flashings (2 wythe - 24” high) 214.07
New brick masonry parapet w/stone coping and flashings (2 wythe - 42” high) 266.93
Reconstruction of Brick Masonry Roof Parapets
– Scaffolding (low-rise)
Furnish and install new mortar (¾” wide by 1 ½” depth)
6.77
Removal of Roof Parapets – Swingstage (high-rise)
Removal of 3 wythe brick parapet wall (24” high)
97.07
Removal of 3 wythe brick parapet wall (42” high)
171.6
Removal of 2 wythe brick parapet wall (24” high)
81.47
Removal of 3 wythe brick parapet wall (42” high)
149.93
Description of Cost Factors Offeror's Bid
Removal of Roof Parapets – Scaffolding (low-rise)
Removal of 3 wythe brick parapet wall (24” high)
65.87
14a SF
14b SF
14c SF
14d SF
15a SF
15b SF
15c SF
15d SF
15e SF
16a SF
16b SF
16c SF
16d SF
16e SF
Number Unit of Measure
17a SF
17b SF
18a SF
18b SF
18c SF
18d SF
Description of Cost Factors Offeror's Bid
Drilling and installation of new friction pins with mortar cap
18.2
Drilling and installation of new friction pins for lime stone with mortar cap
28.6
Limestone Removal and Replacement.
Removal of existing deteriorated architectural limestone
65.87
Furnish and install new limestone replacement.
189.8
Replacement of stone with lightweight polymer resin to match
76.27
Minor patching of existing stone to match
121.33
Furnish and install new flashings (Lead coated copper)
23.4
Parging and waterproofing of back-up wall 18.2
New Throughwall Flashings – Scaffolding (low-rise) Removal of 4 courses 1 wythe brick wall w/Temporary Shoring
66.73
Removal and replacement of steel lintel 39
Furnish and install new flashings (Bituthane) 10.4
Furnish and install new flashings (Lead coated copper)
20.8
Parging and waterproofing of back-up wall 14.73
Brick Masonry/Stone Stabilization
Description of Cost Factors Offeror's Bid
New brick masonry parapet w/stone coping and flashings (3 wythe - 24” high)
184.6
b) New brick masonry parapet w/stone coping and flashings (3 wythe - 42” high)
250.47
c) New brick masonry parapet w/stone coping and flashings (2 wythe - 24” high)
131.73
d) New brick masonry parapet w/stone coping and flashings (2 wythe - 42” high)
193.27
New Throughwall Flashings – Swingstage (high-rise) Removal of 4 courses 1 wythe brick wall w/Temporary Shoring
83.2
Removal and replacement of steel lintel 41.6
Furnish and install new flashings (Bituthane) 13
19a SF
19b SF
19c SF
19d SF
20a SF
20b SF
20c SF
20d SF
20e SF
20f SF
20g SF
20h SF
Number Unit of Measure
21a SF
21b SF
21c SF
22a SF
22b SF
22c SF
23a Each
23b SF
23c SF
24a SF
24b SF
24c SF
25a SF
25b SF
25c SF
25d SF
25e SF
Perimeter sawcutting 1.3
Removal of existing concrete (2” depth). 18.2
Removal of existing concrete (3.5” depth). 23.4
New Concrete and Coating
Placement of new high strength patching mortar (2” depth)
65.87
Placement of new high strength patching mortar (3.5” depth).
73.67
Cleaning and coating of concrete surface. 6.07
Sidewalk Bridging. 206.27
Temporary Roof Protection 1.31
Brick Masonry Piers
Isolated repair of existing masonry piers (removal and replacement)
118.73
Reconstruction of isolated areas of pier 106.6
Construction of new masonry piers. 85.8
Crack Repair
Drill and install new stainless steel pins. 19.07
Grouting of open cracks 13
Replacement of cracked bricks 26
Concrete Removal
Reinstallation of existing stones with cleaning 38.13
Furnish and install new coping stones 86.67
Furnish and install new sealants between coping stones.
6.67
Cleaning and coating of existing stones. 6.93
CMU Backup Wall Repair and Waterproofing.
Description of Cost Factors Offeror's Bid
Replacement of Deteriorated CMU Back-up 44.2
Parging of CMU back-up wall 11.27
Waterproofing of back-up wall 6.07
Removal of existing deteriorated architectural Terra Cotta
65.87
Furnish and install new Terra Cotta replacement.
210.6
Replacement of stone with lightweight polymer resin to match
76.27
Minor patching of existing stone to match 121.33
Roof Coping Stones.
Removal of existing roof coping stones (16 inches)
65.87
Removal and parging of existing substrate 14.73
Furnish and install new lead coated copper flashings
20.8
Drilling and epoxy grouting stainless steel pins 19.07
Terra Cotta Removal and Replacement.
26a SF
26b SF
27 SF
27a SF
27b SF
28 LF
28a LF
Number Unit of Measure
28b LF
29 LF
29a LF
29b LF
30 LF
30a LF
30b LF
30c LF
30d LF
31 LF
31a LF
31b LF
31c LF
31d LF
31e Each
31f LF
31g Each
31h Each
31i SF
31j Each
31k SF
Metal splash pan, 16 oz. 23.73
Metal trim, aluminum, .032" thick, painted
5.53
Metal storm collar 31.85
Metal coping, galvanized steel, 24 gauge, standing seam
16.25
Gutter, copper, 16 oz, half round, 6" wide 29.19
Remove metal downspouts 5.79
Downspouts, aluminum, .024" thick, 3" x 4", painted, installed
15.93
Downspouts, GI, 24 gauge 3" x 4" installed
19.83
Downspouts, GI, 24 gauge, 4" round, installed 18.88
Downspouts, copper, 16 oz., 6" round, installed 20.41
Downspouts, strainer 3.25
Metal flashing, apron flashing, 9" wide 8.78
Metal flashing, step flashing 16.25
Description of Cost Factors Offeror's Bid
Counterflashing, copper, 16 oz., 6" width
11.05
Remove metal edge, gravel stop, eave strip, or coping
1.95
Metal edge raised, galvanized steel fascia/eave drip; 6" face, hemmed, continuous cleat, 3" deck flange
6.5
Gravel stop, galvanized steel, 24 gauge, 6" face 6.83
Remove metal gutter 3.25
Gutter, galvanized steel, ASTM 526, with 12.5oz./square foot galvanized coating, 24 gauge, 5" box or ogee style, joints and end caps shall be soldered
19.5
Gutter, aluminum, .050" thick 5" box or ogee, painted, Kynar finish
24.7
Gutter, copper, 16 oz, half round, 5" wide 18.53
Metal Work Remove standard metal decking 1.37
Install metal decking; 1-1/2" deep, 20 gauge, standard profile
5.07
Install steel plate, two sizes 4.55
10 Gauge, standard application 2.28
Extra heavy-duty 1/4th inch 1.63
Remove metal counterflashing 2.34
Counterflashing, galvanized, 24 gauge, 6" width 4.55
31L SF
31m LF
31n SF
31n SF
31o SF
31p SF
31q SF
31r SF
31s SF
32a SF
32b SF
32c SF
32d SF
33a SF
33b SF
33c SF
34a SF
Number Unit of Measure
34b SF
34c SF
35a SF
35b SF
35c SF
Exterior rated gypsum board sheathing and substrate
3.94
Woodwork Demolition of plywood or standard 1” x 6” decking
1.24
Demolition of standard 2” x 6” tongue and groove decking
1.5
Plywood decking, CDX, 1/2” thick (or 15/32" optional)
2.67
Cladding of roof parapet walls with copings.
27.73
New Exterior Insulation and Finish System
(EIFS)
New Exterior Insulation and Finish System
(EIFS)
42.9
New Exterior Insulation Finish System (EIFS) w/o insulation
27.01
New Metal Copings. 23.39
Surface Preparation
Cleaning of existing steel and surface. 3.03
Description of Cost Factors Offeror's Bid
Coating of existing reinforcement 3.72
Parapet wall metal 12.81
Metal edge, anodized finished aluminum, free floating fascia system 8 inches 48.36
Metal edge, high performance fluorocarbon finished aluminum, free floating fascia system 8 inches
21.91
Metal edge, anodized finished aluminum, free floating fascia system 6 inches
19.47
Metal edge, high performance fluorocarbon finished aluminum, free floating fascia system 6 inches
17.03
New Aluminum Metal Cladding
Furnish and install new uninsulated aluminum wall cladding
19.7
Furnish and install new insulated aluminum wall cladding
30.68
Furnish and install new insulated aluminum wall cladding panels (Architecture 41.6
Description of Cost Factors Offeror's Bid
Metal coping, galvanized steel, 24 gauge, with butt plate
16.25
Resolder joints in sheet metal 4.23
Metal edge, aluminum, 0.50 thick 6" face painted
23.08
Metal edge, aluminum, free floating fascia system
26.65
35d SF
35e SF
35f SF
35g SF
35h LF
35i LF
35j LF
35k LF
36a LF
36b LF
36c LF
37a LF
37b LF
38a LF
38b LF
Number Unit of Measure
39a SF
39b LF
39c SF
39d SF
39e Each
39f SF
39g SF
39h LF
39i SF
39j LF
39k LF
40a LF
40b LF
41a Each
Gutter liners 20.54
Flashing 10.99
Expansion joints 26.65
Finishing touches (no additional cost in contract)
Snow retention assemblies 22.75
Self-adhering ice and water shield membrane for shingles, tiles, metal waterways, penetrations, valleys, ridges, edges, etc.
1.5
Roof Specialties and Accessories Remove roof hatch 325
Description of Cost Factors Offeror's Bid
Pre-Engineered SSMRS, products (20- year roof)
45.44
Subpurlins 7.02
Roof panel installation 5.85
Field forming of panels 4.88
Concealed anchor clips 1.63
Vapor retarder installation 1.6
Insulation installation 4.88
Gutters (SSMRS only) 18.19
Curbing, SBX treated wood, 2” x 12” 9.5
Joist, fir
2” x 6” 4.49
2" x 8" optional 4.97
Joist, fir
2" x 10" 5.14
2" x 12" optional 6.11
Standing Seam Metal Roof System (SSMRS) Price Each Specification Using Line Items
Standard 2” x 6” tongue and groove decking 6.31
Cants, wood fiber, trapezoidal, 1 1/2” x 5 5/8” 1.63
Cants, SBX treated wood, 4” x 4” diagonal
5.33
Nailer, SBX treated wood, 1” x 4” 2.93
Nailer, SBX treated wood, 2” x 4” 4.23
Nailer, SBX treated wood
2" x 6" 5.28
2" x 8" optional 6.34
Plywood decking, CDX, 5/8” thick 2.99
Plywood decking, CDX, 3/4” thick 4.62
Standard 1” x 6” decking, tongue and groove 5.66
41b Each
41c SF
41d Each
41e Each
41f Each
41g Each
41h Each
41i Each
41j SF
Number Unit of Measure
41k LF
41L LF
42a LF
42b LF
42c LF
42d Each
42e LF
42f LF
42g Each
42h LF
42i Each
42j Each
43a Each
43b Each
43c LF
43d LF
43e Each
43f Each
44a SF
Expansion joint, butyl or neoprene bellows, galvanized flange
23.39
Expansion joint, CSPE reinforced 20.79
Repair kit for dry repairs 62.39
Repair kit for wet repairs 62.39
Skylights (price each size and lens combination)
Standard 3' x 5', 4' x 4', 4' x 8' with single clear lenses
38.32
Roof ladder, steel, bolted to concrete, up to 20 feet, without cage
97.5
Roof ladder, steel, bolted to concrete, 20 feet and up, with cage; with intermediate landings as required by Code
162.5
Roof ladder, security ladder guard 780
Termination bar, aluminum, 1/4” x 1” 1.95
Pitch pocket, 24 gauge, GI, 6” x 6”, with storm collar hemmed to outside, soldered corners and seams
Pitch pocket, 24 gauge, GI, 8” x 8”, with storm collar, hemmed to oytside, soldered corners and seams
Pitch pocket, resurface top only
8" x 8" 6.23
12" x 12" 7.53
Remove existing walkway, built-up roofs 0.98
Description of Cost Factors Offeror's Bid
Walkway, built-up roofs, desert tan fiberglass 4.75
Walkway, built up roofs, non skid 9.75
Walkway, single ply roof
30" wide roll goods, tape attached 3.58
30" wide roll, hot asphalt attached 3.45
30" wide roll, adhesive attached 3.76
Roof ventilators 195
Roof hatch, aluminum, 2’6” x 3’0” 853.13
Roof hatch, aluminum, larger sizes 120.25
Remove existing roof drain, except plumbing
Install new roof 4" drain, except plumbing 1508
Install new roof 6" drain, except plumbing 1664
Reflash existing roof drain 214.5
Plumbing stack, 4# lead flashing 97.5
Scupper, sheet steel, 24 gauge ASTM A 526, match existing configuration
44b SF
Measure
44c SF
44d SF
45a Each
45b Each
45c Each
45d SF
46a Each
46b Each
46c Each
46d SF
46e Each
46f Each
46g Day
46h SF
46i SF
46j SF
46k Per Project
46L Per Project
Number Unit of Measure
46m Per Project
46n Per Project
46o Per Project
Prime contractor’s warranty, restoration, less than 10,000 sq ft, minimum charge
Prime contractor’s warranty, restoration, over 10,000 sq ft, minimum charge
0.1
Description of Cost Factors Offeror's Bid
Prime contractor’s warranty, re-roof, total system, 15 year, less than 10,000 sq ft, minimum charge (Standard)
Prime contractor’s warranty, re-roof, total system, 15 year, less than 10,000 sq ft, minimum charge (includes 2, 5, 7, 10, 15 year inspections)
0.1
Prime contractor’s warranty, re-roof, total system, 15 year, more than 10,000 sq ft, minimum charge (Standard)
Core analysis, 14” x 14” and patch of existing roof surface
Non destructive roof scan, up to 50,000 sq ft, full service each
Additional foot over 50,000 sq ft
0.04
Non destructive roof scan, up to 50,000 sq ft, limited service
Additional foot over 50,000 sq ft
0.04
Roof inspection services (visual inspection of roofing service/membrane, flashings, counterflashings, copings, parapets, trims, hatches, penetrations, curbs, roof-mounted equipment, etc. with a written report of findings and recommendations
Field/shop drawings, up to 10,000 sq ft 0.07
Field/shop drawings, 10,000-50,000 sq ft 0.07
Field/shop drawings, over 50,000 sq ft 0.07
Skylight lense replacement only, double clear 54.28
Security/fall bars for skylights
3' x 5' 455
4' x 4' 455
4' x 8' 650
Special sizes 37.17
Roof Services Asbestos core testing and patch of existing roof surface
149.5
Standard 3' x 5', 4' x 4', 4' x 8' with clear double lenses
56.85
Description of Cost Factors Offeror's Bid
Skylight lense replacement only, clear 34.62
46p Per Project
46q Per Day
46r Day
46s SF
46t SF
46u Day
47a SF
47b SF
47c SF
47d SF
47e Day
47f Day
47g Each
Number Unit of Measure
47h Each
47i Each
48a % of Discount
48b % of O/P
48c % of discount
48d % to be applied
51 Day
Multiplier/factor to be applied to the R.S. Means costs.
Deducts and add-ons for in lieu products (Place behind Tab 6) Special Rental Equipment (Priced based on
9.11.2 above) Cold and bad weather storage identify extra cost if any
$200
Hourly Services Rates
Minor roof repair calls 650
Difficult access or fall restriction;
surcharge
15%
Description of Cost Factors Offeror's Bid
Excessive hauling 130
Work in secured areas or compounds; surcharge 10%
Additional and occasional supplies, materials, equipment and services Additional and occasional services Roofing supplies Discount off Retail Price List 5%
Alternative Methods of Costing - percent of overhead/markup and profit added to cost 25%
Discounts Offered Off Alternative Costing Methods (cost plus profit and overhead) Less Rate of Discount
5%
Asbestos abatement activities, BUR removal and disposal of waste
27.94
Project site is located 65 or more miles from the contractor's/subcontractor's yard/home location.
1.89
Asbestos site monitoring 650
Annual or semi-annual roof housekeeping-per location Cost once a year per location if less than 20,000
sq. ft.
0.16
Cost per Sq.ft. per year per location if greater than 20,000 sq.ft.
0.1
Cost semi-annual per location if less than 20,000 sq. ft
0.18
Cost per Sq.ft. semi annual per location if greater than 20,000 sq.ft.
0.16
Roof leak investigation 650
Prime contractor’s warranty, re-roof, total system, 15 year, more than 10,000 sq ft, minimum charge (includes 2, 5, 7, 10, 15 year inspections)
0.1
Per diem rate per worker per 24 hour period of time
71.5
Prime contractors per diem/costs for asbestos abatement planning
188.5
53 Per Hour
54 Per Hour
55 Per Hour
56 Per Hour
57a Per Mile
57b Percent
57c Dollar Amount
Number Unit of Measure
58 Solar Panels 58a Per Watt
58b Per Watt
58c Per Watt
58d Per Watt
58e Per Watt
58f Per Watt
Coefficient Non- Normal
Working Hours
Coefficient Normal
Working Hours
Coefficient Non- Normal
Working Hours
1.5 1 1.5
2.58 1.25 1.88
1.5 1 1.5
1.5 1.2 1.8
1.91 1.17 1.76
1.5 1.24 1.86
Arizona 1 Nebraska Arkansas 1 Nevada California 1.27 New Hampshire Colorado 1 New Jersey
**NOTE: Complete and submit line items for this section.
Proposed Pricing Coefficient (s)
Please provide Coefficients for products and services not listed in the provided line items for states that you are proposing to do work in.
COEFFICIENTS NORMAL WORKING HOURS; the priced coefficients for each region that you are willing to work in shall be listed for both regular hours (7A.M. to 6 P.M.)
COEFFICENT NON-NORMAL WORKING HOURS; the priced coefficient for weekends, holidays and hours outside of regular hours. The coefficient must be rounded to the nearest second decimal place, e.g. .793 would be rounded to .79.
Coefficients:
State Coefficient Normal
Working Hours
State
Alabama 1 Missouri Alaska 1.72 Montana
Inverters 0.57
Ground Racking 0.61
Roof racking 0.61
BOS (Electrical wire, boxes, conduit, disconnect etc.) 0.66
Installation Labor
**NOTE: Complete and submit line items for this section.
Value Add/Balance of Line
1.32
General Cost Factors Mileage rate 0.6
Performance and payment bond - bonding rate (percent of project) varies
Bonding capacity - total amount of capacity available varies
Description of Cost Factors Offeror's Bid
System
Solar Modules (panels) Tier 1 0.75
Structural Analysis/engineering services 240.5
Architect/design professional services 240.5
Roofing Consultant 169
Labor Rate for Roofer 115.7
1.95 1 1.5
1.76 1.42 2.13
1.5 1 1.5
1.5 1.18 1.77
1.5 1 1.5
2.58 1 1.5
1.98 1.12 1.68
1.98 1 1.5
1.71 1.21 1.82
1.65 1 1.5
1.5 1 1.5
1.5 1 1.5
1.5 1 1.5
1.65 1 1.5
1.5 1 1.5
1.98 1 1.5
1.5 1.25 1.88
1.5 1.1 1.65
1.5 1.2 1.8
1 1.5
Michigan 1 Washington Minnesota 1 West Virginia Mississippi 1 Wisconsin
Wyoming
Note: Provide coefficients for the state(s) that you would like to be awarded. Region 4 ESC is looking for proposers that can provide service in multiple states.
Provide markup percentage on non-prepriced items 15% .
Kentucky 1 Tennessee Louisiana 1 Texas
Maine 1.1 Utah Maryland 1 Vermont
Massachusetts 1.32 Virginia
Idaho 1.32 Oregon Illinois 1.32 Pennsylvania Indiana 1.14 Rhode Island
Iowa 1.1 South Carolina Kansas 1 South Dakota
Delaware 1.17 New York District of Columbia 1 North Carolina
Florida 1 North Dakota Georgia 1 Ohio Hawaii 1.72 Oklahoma
Connecticut 1.3 New Mexico