D-3 Post Award Certifications.doc

DOC document 32 KB Posted

Attached to
Automatic Door Preventative Maintenance
Solicitation number
28321320Q00000032
Issued by

View the file

Other files

File Type Posted
D-2 Automatic Door Equipment List.xlsx XLSX spreadsheet
D-5 Past Performance Questionnaire.doc DOC document
D-4 WD 2015-4265 Rev 11 2019.07.16.pdf PDF
SF 18.pdf PDF
D-1 SOW - Automatic Door.doc DOC document
Sol_28321320Q00000032.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT D-3

POST AWARD CERTIFICATIONS

The contractor shall complete this checklist and forward it to the COTR within 30 calendar days of award of the contract.

REQUIREMENT
HAS PROVIDED (DATE)
HAS NOT PROVIDED

Contractor has in place a Personal Protective Equipment (PPE) program and all employees have been trained and certified as required by Title 29 CFR 1910.132-138*

Contractor has in place a Hazard Communication Program and all employees have been trained and certified as required by Title 29 CFR 1910.1200

Contractor has in place a Hazardous Energy Source Control (Lockout/Tagout) program and all employees have been trained and certified as required by Title 29 CFR 1910.147

Contractor employees and/or subcontractors have been completed, as required by Title 29 CFR 1926.1101: 1) Asbestos Awareness Training, and 2) if asbestos abatement is required, Operations and Maintenance Training

In accordance with 29 CFR 1910.269(b)(1), personnel shall be trained in CPR/First Aid if they are performing work on, or associated with 50 volts or more

Contractor has in place a hearing conversation program and has trained all employees as required by Title 29 CFR

For any requirement for which the contractor does not immediately comply, the contractor may provide information which would indicate a plan to put the program in place and/or provide the required training. If the Government accepts any such plan, the contractor shall be expected to comply with the requirement within 30 calendar days following submission of the checklist.

CERTIFIED TO BE TRUE AND ACCURATE

Printed Name and Title

Signature/Date

*CFR-Code of Federal Regulations

File details come from the government source that posted it. Updated .