27008-Bradley Lake Expansion 3 Phase Powerline Tree Clearing - Drawing.pdf

PDF 17 MB Posted

Attached to
BRADLEY LAKE EXPANSION - 3-PHASE POWERLINE TREE CLEARING
Solicitation number
27008
Issued by
Alaska

About this file

This is a technical drawing document prepared by the Alaska Energy Authority (AEA) for the Bradley Lake 3-Phase Powerline expansion project. The document, titled "Bradley Lake Expansion 3 Phase Powerline Tree Clearing - Drawing," contains detailed engineering plans and staking sheets for a three-phase power line installation designed to improve electrical service and reliability to Bradley Dam and support tunnel boring machine operations during the Dixon-Bradley tunnel construction. The project includes overhead conductors, underground primary conductors, junction boxes, power poles, padmount transformers, communication cables, and related electrical infrastructure spanning multiple stations and phases. The drawing package references work order EE-10642ER and was prepared by Christopher T. Davis with Peter M. Blake, issued for construction on May 6, 2026, with a revision dated July 3, 2026. The document includes plan views, elevation profiles, detailed specifications for road crossing clearances (ranging from 26 to 41 feet above roads for communication cables at four designated crossing points), and construction details for overhead and underground installations. The powerline route encompasses approximately 1,500 linear feet with numbered stations, conductor specifications including 24-inch, 48-inch, and 60-inch conduit management products, and integration points with existing infrastructure including culverts and transfer switches.

The technical drawing package provides comprehensive staking and construction guidance for contractors performing the tree clearing and powerline installation work. The document specifies conductor types (1O and 3O overhead and underground primary conductors), equipment locations (junction boxes JB08 through JB14), and detailed engineering standards for installation. The plans indicate both existing infrastructure to be preserved and new construction elements, with specific clearance requirements for road crossings and utility compatibility. The drawings reference multiple related design documents and details sheets covering overhead installations, guy anchor specifications, underground cable specifications, and telecommunications infrastructure. This documentation supports the AEA's September 2026 solicitation for tree clearing contractors and establishes the technical baseline for all bidders responding to the contract opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUNEAU

ST. MATTHEW

ISLAND

KODIAK

PRIBILOF

ISLANDS

ISLAND

NUNIVAK

BETHEL

ANCHORAGE

BARROW

NOMEST. LAWRENCE

ISLAND

TANANA

KOTZEBUE

FAIRBANKS

McGRATH

BRADLEY LAKEHOMER

ALASKA

ENERGY AUTHORITY

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

AECC738

05-06-2026

ALASKA

ENERGY AUTHORITY

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

07-03-2026

C

CC

C

C

CC

CC

CC

C C

C

C

C

C

C

C

C C C C C C C C C

CC

C

CCC

T T T

T T

T T

24"CMP

48"CMP

"C

M P

60"CMP

C C

CCCCC

C

C

C C

C C

C

C

C

C C

C

C C

C

C

C C

C C

C

C

C

C C

C

C

C

C

C C

C

C

C C C

C

C

C C

C

C

C

C C C C C

C C C C

JB08

JB09

JB10

C

JB11

JB12

JB13

JB14

C

C C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

ALASKA

ENERGY AUTHORITY

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

AutoCAD SHX Text

WEB: WWW.EPSINC.COM

AutoCAD SHX Text

REF DWG(S):

AutoCAD SHX Text

OF

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DRAWING NO.:

AutoCAD SHX Text

DRAWING NAME:

AutoCAD SHX Text

ENG. STAMP

AutoCAD SHX Text

REVIEWED (MGR/SUPV)/DATE

AutoCAD SHX Text W.O. #:

AutoCAD SHX Text

DWN BY/DATE

AutoCAD SHX Text

APPROVED (DIRECTOR)/DATE

AutoCAD SHX Text

ANCHORAGE, AK 99503

AutoCAD SHX Text

NO.

AutoCAD SHX Text

PROJECT:

AutoCAD SHX Text

DESIGNER/PROJECT ENGINEER:

AutoCAD SHX Text

DESIGN/CONSTRUCTION/ASBUILT REVISION

AutoCAD SHX Text

3305 ARCTIC BLVD, SUITE 201

AutoCAD SHX Text

AECC: 738

AutoCAD SHX Text

TEL: (907) 522-1953

AutoCAD SHX Text

BRADLEY LAKE 3-PHASE POWERLINE

AutoCAD SHX Text

PETER M. BLAKE/CHRISTOPHER T. DAVIS

AutoCAD SHX Text 25-0305

AutoCAD SHX Text

AEA BRADLEY LAKE HYDROELECTRIC PROJECT

AutoCAD SHX Text

BRADLEY LAKE 3-PHASE POWERLINE

AutoCAD SHX Text

STAKING SHEET

AutoCAD SHX Text

BLP-G-06

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

EDS/05-06-2026

AutoCAD SHX Text

CTD/05-06-2026

AutoCAD SHX Text

AutoCAD SHX Text

REVISED TR4/5 SERVICE

AutoCAD SHX Text

EDS/06-22-2026

AutoCAD SHX Text

CTD/07-03-2026

AutoCAD SHX Text

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C C C C C

C C

C C

C C

C C

C C

C C

C C

C C C

C

C

C

C C C C C C

C C

C

C

C

C

C

C C

T T TC

C

C

C C

CC

C

C C

C C

C C

C C

C C

C C

C C

C

CCCCC

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

ALASKA

ENERGY AUTHORITY

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C

C

C

C

C

C

C

C

C

C

C C

C C

C C

C C

C

C

C

C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C

C

C

C

C C

C C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C C C

C C C

C C

C C

C C C

C

C

C

C

C

C

JB08

C C C C

C C

C C

C C

C C

C

C

C

C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C

C

C

C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C

C

C

C

C

C

C

C

C C

C C

C

C

C

C

C

C

C

C

C

C

JB09

JB10

C

C

C

C

C C

C C

C C

C C

C C

C C

C C

C C

C

C

JB

C

C

C

C

C C

C C

C

C

C

C

C

C

C

C

C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C

C

C

C

C

C

C

C C

C C C C C C

C

C C

C C C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C

JB11

JB12

JB13

JB14

C

C

C

C

C

C

C

C C

C C C C C C

C

C C

C C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

12 13

"C

M P

C

C

C

C

C C

C C

C C

C C

C C

C C

C C

C C

C C

C

C C

C

C C

C

C

C C

C

C

C

C

C

C C

C

C

C C

C

C

C C C

C

JB14

C

C

C

C

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1710

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

18 19 20 21 22 23 24 25 26 27 28 29 30 31

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

Road Crossing Clearances

Road Crossing STR-STR Min. Clearance Above Road (ft) Cable Type

1 STR12 - STR13 41 Comm cable

2 STR15 - STR16 36 Comm cable

3 STR26 - STR27 37 Comm cable

4 STR63 - STR64 26 Comm cable

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

14 15 16 17 18 19 20 21 22 23 24 25

C C C C C C

C C

C

C C

C C

C

C

C

C C

C

C

C

C

C C C

C C

C C

C

C

C C

C C

C

C C

C

C C C

C C C C C

C

C

C

C

C

C

C C C

C

C C

C C

C

C

C C

C

C

C

C

C

C

C

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

29 30

C

C C

C

C

C

C

CCCC

C

C C

C

C

C

C

C C

C C

C C

C C

C C C

C

C

C

C

C C

C C

C C

C

C

C C

C

C

C

C

C

C C

C

C

C

C

C

C

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

56 57 58 59 60 61 62 63 64 65 66 67 68

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

T T

C C

C

C

C

C

C C

C

C C C

C

C C

C C

C C

C C

C C

C C

C C

C

C

C

C C C

C C

C C C C

C

C

C

C

C C

C C

C C

C C

C

44A

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

88 89 90 91 92 93 94 95 96 97 98 99 10

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

U.G. TRIPLEX

AutoCAD SHX Text

TR5

AutoCAD SHX Text

TR4

AutoCAD SHX Text

60"CMP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WEB: WWW.EPSINC.COM

AutoCAD SHX Text

REF DWG(S):

AutoCAD SHX Text

OF

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DRAWING NO.:

AutoCAD SHX Text

DRAWING NAME:

AutoCAD SHX Text

ENG. STAMP

AutoCAD SHX Text

REVIEWED (MGR/SUPV)/DATE

AutoCAD SHX Text W.O. #:

AutoCAD SHX Text

DWN BY/DATE

AutoCAD SHX Text

APPROVED (DIRECTOR)/DATE

AutoCAD SHX Text

ANCHORAGE, AK 99503

AutoCAD SHX Text

NO.

AutoCAD SHX Text

PROJECT:

AutoCAD SHX Text

DESIGNER/PROJECT ENGINEER:

AutoCAD SHX Text

DESIGN/CONSTRUCTION/ASBUILT REVISION

AutoCAD SHX Text

3305 ARCTIC BLVD, SUITE 201

AutoCAD SHX Text

AECC: 738

AutoCAD SHX Text

TEL: (907) 522-1953

AutoCAD SHX Text

BRADLEY LAKE 3-PHASE POWERLINE

AutoCAD SHX Text

PETER M. BLAKE/CHRISTOPHER T. DAVIS

AutoCAD SHX Text 25-0305

AutoCAD SHX Text

AEA BRADLEY LAKE HYDROELECTRIC PROJECT

AutoCAD SHX Text

BRADLEY LAKE 3-PHASE POWERLINE

AutoCAD SHX Text

PLAN VIEW

AutoCAD SHX Text

BLP-P-09

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

EDS/05-06-2026

AutoCAD SHX Text

CTD/05-06-2026

AutoCAD SHX Text

AutoCAD SHX Text

REVISED SERVICE TO TR4/5.

AutoCAD SHX Text

EDS/06-22-2026

AutoCAD SHX Text

CTD/07-03-2026

AutoCAD SHX Text

SCALE: 1"=100'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FT.

AutoCAD SHX Text

SHEET BLP-P-08

AutoCAD SHX Text

SHEET BLP-P-10

AutoCAD SHX Text Elevation (ft)

AutoCAD SHX Text Elevation (ft)

AutoCAD SHX Text Station

AutoCAD SHX Text Station

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

CONSTRUCTION LEGEND

AutoCAD SHX Text

NEW

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text

CONNECT FUTURE SECONDARY TO ONE SIDE OF EXISTING TRANSFER SWITCH

AutoCAD SHX Text

PROJECT BOUNDARY

AutoCAD SHX Text

PROJECT BOUNDARY

AutoCAD SHX Text

CCCC

C C

C C

C

C

C C

C C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C C C

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C C

C C

C C

C C

C

CC

C

C

C

C

C

CCCCCCCCCCCCCCC

C C

C

CCC

C C C C C

C C

C C C C C C C C C C C C C C C

C

C

C

C

C C C

C C

C C

C C

C C

C C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C

C

C

C

C

CCCCC

CCCC

C

C C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C

C C

C C

C

CC

C C

C C

CCC

C

C C

C C

T T

C C

C C

C C C C

C C

C C C C

C C

C C

C C

C C

C C

C C C C

C C C C C

C

C

C

C

C

C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C C

C C

C C

C C

C

C

C

C

C C

C C

C

C

C C

C C

C C

C C

C

C

C C

C C

C C

C CC C

C C

C C

C C

C C

C C

C

C

C

C

C

CCC

C C

C C

C C

C C

C C

C

C

C

C

C

CCC

C C

C

C

C

C

CCCCCCCCC

CC

C

C

C C

C C

C C

C

C

C

C

CCCCCCC

CC

CC

C

C C

C C

C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C C C C C C C C

ALASKA

ENERGY AUTHORITY

1Ø O.H. CONDUCTOR

3Ø O.H. CONDUCTOR

JUNCTION BOX

POWER POLE

1Ø U.G. PRI. CONDUCTOR

3Ø U.G. PRI. CONDUCTOR

PADMOUNT TRANSFORMER

ANCHOR

U.G. COMMUNICATIONS C CC C

SPAN GUY

T T

RECLOSER

HANDHOLE

EXISTING CULVERT

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

5'- 0"

"L"

LE

NGTH O

F EXTENSIO

N(S

TA-*E

XT

NOTE 2

8' -0

" M

IN

IM

U

M

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

12"

4" 4"

ALASKA

ENERGY AUTHORITY

12"

A

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

ENERGY AUTHORITYA

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

ENERGY AUTHORITYA

EENIG

K

OE LAF A

Christopher T. Davis

EE-10642ER

RP

SIG

DERET

OISSEFO

NELAN

TH

TS 49

AT

S

R

bradleylake_3-ph_general-G-01
bradleylake_3-ph_general-G-01
bradleylake_3-ph_general-G-03
bradleylake_3-ph_general-G-03
bradleylake_3-ph_general-G-04
bradleylake_3-ph_general-G-04
bradleylake_3-ph_general-G-05
bradleylake_3-ph_general-G-05
bradleylake_3-ph_plans-P-01
bradleylake_3-ph_plans-P-01
bradleylake_3-ph_plans-P-02
bradleylake_3-ph_plans-P-02
bradleylake_3-ph_plans-P-03
bradleylake_3-ph_plans-P-03
bradleylake_3-ph_plans-P-04
bradleylake_3-ph_plans-P-04
bradleylake_3-ph_plans-P-05
bradleylake_3-ph_plans-P-05
bradleylake_3-ph_plans-P-06
bradleylake_3-ph_plans-P-06
bradleylake_3-ph_plans-P-07
bradleylake_3-ph_plans-P-07
bradleylake_3-ph_plans-P-08
bradleylake_3-ph_plans-P-08
bradleylake_3-ph_plans-P-10
bradleylake_3-ph_plans-P-10
bradleylake_3-ph_plans-P-11
bradleylake_3-ph_plans-P-11
bradleylake_3-ph_plans-P-12
bradleylake_3-ph_plans-P-12
bradleylake_3-ph_plans-P-13
bradleylake_3-ph_plans-P-13
bradleylake_3-ph_plans-P-14
bradleylake_3-ph_plans-P-14
bradleylake_3-ph_details-S-01_overhead
bradleylake_3-ph_details-S-01_overhead
bradleylake_3-ph_details-S-02_overhead
bradleylake_3-ph_details-S-02_overhead
bradleylake_3-ph_details-S-03_overhead
bradleylake_3-ph_details-S-03_overhead
bradleylake_3-ph_details-S-04_guy_anchor
bradleylake_3-ph_details-S-04_guy_anchor
bradleylake_3-ph_details-S-05_underground
bradleylake_3-ph_details-S-05_underground
bradleylake_3-ph_details-S-06_underground
bradleylake_3-ph_details-S-06_underground
bradleylake_3-ph_details-S-07_telecomm
bradleylake_3-ph_details-S-07_telecomm
bradleylake_3-ph_G-02_2026-07-03.pdf
Sheets and Views
G-02
bradleylake_3-ph_G-06_2026-07-03.pdf
Sheets and Views
G-06
bradleylake_3-ph_P-09_2026-07-06.pdf
Sheets and Views
P-09

File details come from the government source that posted it. Updated .