This is a project description and scope of work document for the Missouri Department of Transportation's 270 @ 180 Pole Relocation Project located at the interchange of I-270 and MO 180 in St. Louis County. The project involves relocating utility poles and associated infrastructure, including removing existing poles A209 and A210 along with their foundations and an old pull box, installing two new 45-foot tenon mount poles with foundations in a gore grassy area directly across the ramp from the old locations, and performing line boring work from the existing pole A206 to a new pole and subsequently to a new pull box, as well as boring under the ramp to a second pull box that intercepts wires serving the existing High Mast Tower 15. The scope requires installation of new #6 wire with bare ground running from pole A206 to Tower 15 and the installation of LED-C 480-volt fixtures on the new poles. The project must be completed and invoiced by June 15, 2026.

The contractor is responsible for supplying and installing the LED fixtures, while the Missouri Department of Transportation will supply the poles and foundations. Qualified contractors are invited to submit bids for this work. No information regarding pricing terms, set-asides, incumbent contractors, site visit requirements, bidders' conferences, or specific funding sources is provided in the available project documentation.

View the file

Other files

File Type Posted
MODOT SL 0000000055SL_1_SUPPLIER.pdf PDF
Affidavits - Exhibit A and B.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line bore from Existing Pole (A206) to New Pole to New Pole to New Pull Box.

Line bore from New Pull Box under ramp to New Pull Box that intercepts wires going to High Mast Tower.

Newly installed poles will be installed directly across ramp from old locations in gore grassy area.

Remove and dispose of A209 and A210 foundation and old pull box next to A209.

Run all new #6 wire with bare ground from A206 to Tower 15.

Install 2- 45’ tenon mount poles & foundation with LED-C 480v fixtures.

Poles and Foundations will be supplied by MoDOT.

Contractor will supply LED fixtures.

Key Legend

New Pole

New Pull Box

Old Foundation

A206 (Existing Pole)

15 (Existing High Mast Tower)