This is a project scope document for the Missouri Department of Transportation's 270 @ 180 Pole Relocation Project located at the intersection of Interstate 270 and MO 180 in St. Louis County. The project involves the relocation of electrical infrastructure, including the installation of two 45-foot tenon mount poles with LED-C 480-volt fixtures in a gore grassy area directly across a ramp from existing pole locations. Work includes line boring from an existing pole (A206) to new poles and new pull boxes, with one bore extending under a ramp to intercept wires serving a high mast tower. The project requires removal and disposal of two existing foundations (A209 and A210) and an old pull box. All new number 6 wire with bare ground will be installed from pole A206 to Tower 15. MoDOT will supply the poles and foundations, while the contractor must supply all LED fixtures. The project must be completed and invoiced by June 15, 2026.

No additional pricing terms, set-asides, incumbents, funding sources, or other salient financial information is provided in the project scope document.

View the file

Other files

File Type Posted
MODOT SL 0000000055SL_SUPPLIER.pdf PDF
Affidavits - Exhibit A and B.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line bore from Existing Pole (A206) to New Pole to New Pole to New Pull Box.

Line bore from New Pull Box under ramp to New Pull Box that intercepts wires going to High Mast Tower.

Newly installed poles will be installed directly across ramp from old locations in gore grassy area.

Remove and dispose of A209 and A210 foundation and old pull box next to A209.

Run all new #6 wire with bare ground from A206 to Tower 15.

Install 2- 45’ tenon mount poles & foundation with LED-C 480v fixtures.

Poles and Foundations will be supplied by MoDOT.

Contractor will supply LED fixtures.

Key Legend

New Pole

New Pull Box

Old Foundation

A206 (Existing Pole)

15 (Existing High Mast Tower)