This is a Request for Bids specification document issued by the City of Tacoma, Department of Public Utilities, Water Division for a water main replacement project. The project involves the installation of 653 linear feet of 8-inch ductile iron water main and associated fittings at 67th Avenue W, Phase 1 (Project No. FRP 2024-0063). The bid specification includes 32 line items covering mobilization, traffic control, pavement removal and restoration, trench excavation and shoring, pipe installation, valves, fittings, and testing requirements. Sealed bids must be submitted electronically to sendbid@cityoftacoma.org or in person at the Tacoma Public Utilities Administration Building North by 11:00 a.m. Pacific Time on Tuesday, September 15, 2026. Bids will be publicly opened and read aloud at 11:15 a.m. on the same date. No pre-proposal meeting will be held, but questions may be submitted to Brandon Snow (bsnow@tacoma.gov) by 3:00 p.m. PST on August 27, 2026.
The project has an estimated value of $329,643.00. All bid proposals must include a 5 percent bid bond or certified check, and the successful bidder must provide 100 percent payment and performance bonds. Prevailing wage rates apply to this project in accordance with Washington State law and federal Davis-Bacon Act requirements. The contract will be awarded to a single respondent and is subject to standard City of Tacoma contract terms including a one-year guarantee period for construction work. Final payment will be made upon completion and acceptance of work, with retention of 5 percent until all required documentation, including prevailing wage affidavits and tax certificates, are submitted. Liquidated damages of $300 per calendar day apply for delays beyond the completion date. The City reserves the right to reject any and all bids and waive minor deviations or informalities.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form No. SPEC-010D Revised: 01/2006
TACOMA WATER
REQUEST FOR BIDS
SPECIFICATION NO. TW26-0154F
WATER DIVISION PROJECT NO. FRP 2024-0063
67th Avenue W, Phase 1
CITY OF TACOMA
DEPARTMENT OF PUBLIC UTILITIES
TACOMA WATER
SPECIFICATION NO.: TW26-0154F
CONSTRUCTING WATER MAINS
in accordance with approved plans for
WATER MAIN REPLACEMENT PROJECT NO. FRP 2024-0063
67th Avenue W, Phase 1
Troy Saghafi, P.E.
Tacoma Water
Tacoma Public Utilities
FRP 2024-0063
07/14/2026
Form No. SPEC-040C Revised: 06/03/2024
City of Tacoma Public Utilities-Water Division
REQUEST FOR BIDS TW26-0154F
FRP 2024-0063, 67th Avenue W, Phase 1
Submittal Deadline: 11:00 a.m., Pacific Time, Tuesday, September 15, 2026 Submittals must be received by the City’s Procurement and Payables Division by 11:00 a.m. Pacific Time.
For electronic submittals, the City of Tacoma will designate the time of receipt recorded by our email server, as the official time of receipt. This clock will be used as the official time of receipt of all parts of electronic bid submittals. Include the specification number in the subject line of your email. Your submittal must be sent as an attachment, links to your electronic submittal will not be accepted.
For in person submittals, the City of Tacoma will designate the time of receipt recorded by the timestamp located at the lobby security desk, as the official time of receipt. Include the specification number on the outside of the sealed envelope. Late submittals will be returned unopened and rejected as non-responsive.
Submittal Delivery: Sealed submittals will be received as follows:
By Email:
sendbid@cityoftacoma.org Maximum email size, including attachments: 35 MB.
Multiple emails may be sent for each submittal.
Note: Email may pass through multiple servers before arriving at its destination. Please allow sufficient time for email delivery of submittals. Timely electronic delivery is at the risk of the supplier.
In Person:
Tacoma Public Utilities Administration Building North, Main Floor, Lobby Security Desk 3628 South 35th Street Tacoma, WA 98409 Monday – Friday 8:00 am to 4:30 pm
Bid Opening: Submittals must be received by the City’s Procurement and Payables Division prior to 11:00 a.m. Pacific Time. Sealed submittals in response to a RFB will be opened Tuesday’s at 11:15 AM by a purchasing representative and read aloud during a public bid opening held at the Tacoma Public Utilities Administrative Building North, 3628 S. 35th Street, Tacoma, WA 98409, conference room M-1, located on the main floor. They will also be held virtually Tuesday’s at 11:15 AM. Attend a Zoom meeting via this link or call 1
(253) 215 8782 using meeting ID # 884 0268 0573, passcode # 070737.
Submittals in response to an RFP, RFQ or RFI will be recorded as received, but not read at bid opening. As soon as possible, after 1:00 PM, on the day of submittal deadline, preliminary results will be posted to www.TacomaPurchasing.org.
If you believe your submittal was sent timely and was not read at bid opening, please contact sendbid@cityoftacoma.org immediately.
Solicitation Documents: An electronic copy of the complete solicitation documents may be viewed and obtained at the City’s plan distribution service provider, ARC, 632 Broadway, Tacoma, WA, or by going to http://www.e-arc.com/location/tacoma. Prospective bidders will be required to pay reproduction costs. A list of vendors registered for this solicitation is also available at their website.
Pre-Proposal Meeting: A pre-proposal meeting will not be held. Questions may be submitted to Brandon Snow by email to bsnow@tacoma.gov no later than by 3:00pm, PST, August 27th, 2026.
Project Scope: Install 653 LF of 8” Ductile Iron Water Main and Fittings.
Estimate: $329,643.00 Paid Sick Leave: The City of Tacoma requires all employers to provide paid sick leave in accordance with Washington State law.
mailto:sendbid@cityoftacoma.org https://us06web.zoom.us/j/88402680573?pwd=eThSaXZxNER0TWRhUGx6U0F2cURMZz09 https://www.cityoftacoma.org/cms/One.aspx?portalId=169&pageId=22848 mailto:sendbid@cityoftacoma.org http://www.e-arc.com/location/tacoma mailto:bsnow@cityoftacoma.orgs
Form No. SPEC-040C Revised: 06/03/2024
Americans with Disabilities Act (ADA Information: The City of Tacoma, in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. Specification materials can be made available in an alternate format by emailing the contact listed below in the Additional Information section.
Title VI Information: “The City of Tacoma” in accordance with provisions of Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.S.C. sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin in consideration of award.
Additional Information: Requests for information regarding the specifications may be obtained by contacting Brandon Snow by email to bsnow@cityoftacoma.org.
Protest Policy: City of Tacoma protest policy, located at www.tacomapurchasing.org, specifies procedures for protests submitted prior to and after submittal deadline.
Meeting sites are accessible to persons with disabilities. Reasonable accommodations for persons with disabilities can be arranged with 48 hours advance notice by calling 253-502-8468.
http://cms.cityoftacoma.org/Purchasing/CandA/ProtestPolicy052711.pdf http://www.tacomapurchasing.org/
TW26-0154F
SPECIFICATION CONTENTS
This Specification contains the following:
1. Cover Sheet
2. Engineer Cover Sheet
3. Request for Bids
4. Specification Contents
5. General Provisions
6. Submittal Checklist
7. Signature Page
8. Bid Proposal
9. Contract Forms Information Tab
10. Bid Bond
11. Performance Bond to the City of Tacoma
12. Payment Bond to the City of Tacoma
13. Insurance Certificate Requirements
14. List of Subcontractor Categories of Work
15. Prevailing Wage Rates
16. Final Contract Verification
17. Record of Prior Contracts (Construction Contracts)
18. Subcontractor Verification Form
19. General Release (Construction Contracts)
20. Sample Contract
21. Certification of Compliance with Wage Payment Statutes
22. State Responsibility Information Form
23. Special Notice to Bidders – Responsible Bidder Criteria
24. LEAP Information Tab
24.1 Local Employment and Apprenticeship Training Program (LEAP) Documents
25. Equity in Contracting Tab
25.1 Equity in Contracting Utilization Form
25.2 Equity in Contracting RequirementsMemo
26. Special Provisions Tab
26.1 Special Provisions for Installation of Water Main
27. Attachments Tab
28. FRP-2024-0063 Signed Drawings
29. Pierce County ROW Permit
29.1 Pierce County Std plans PC A7-1 and A7- 2
29.2 PC. K4.2, PC. K4.3, PC. K4.4
30. City of Tacoma 17-56-1 Standard Plans
General
Provisions
General Provisions 2009, revised 10/06/2018, 10/27/2020, 12/15/2020, 10/08/2024 Page 1 of 20
GENERAL PROVISIONS
(Revised October 8, 2024)
SECTION I - BIDDING REQUIREMENTS
SECTION I REQUIREMENTS ARE BINDING ON ALL RESPONDENTS.
1.01 USE AND COMPLETION OF CITY PROPOSAL SHEETS
A. Respondent's Proposal
Each Respondent must bid exactly as specified on the Proposal sheets. All proposals must remain open for acceptance by the City for a period of at least 60 calendar days from the date of opening of the bids.
B. Alterations of Proposals Not Allowed
Proposals that are incomplete or conditioned in any way contain alternatives or items not called for in the General Provisions and Specifications, or not in conformity with law may be rejected as being nonresponsive. The City cannot legally accept any proposal containing a substantial deviation from these Specifications.
C. Filling Out City Proposal Sheets
All proposals must be completed using the proposal sheets and forms included with this specification, and the prices must be stated in figures either written in ink or typewritten. No proposal having erasures or interlineations will be accepted unless initialed by the Respondent in ink.
1.02 CLARIFICATION OF PROPOSAL FOR RESPONDENT
If a prospective Respondent has any questions concerning any part of the Proposal, he/she may submit a written request for answer of his/her questions. Any interpretation of the Proposal will be made by an Addendum duly issued and mailed or delivered to each prospective Respondent. Such addendum must be acknowledged in the proposal. The City of Tacoma will not be responsible for any other explanation or interpretation of the bid documents.
1.03 RESPONDENT'S BOND OR CERTIFIED CHECK
Each bid for construction must be accompanied either by a certified or cashier’s check for 5 percent of the total amount bid, including tax, payable to the City Treasurer, or an approved bid bond, by a surety company authorized to do business in the State of Washington, for 5 percent of the total amount bid. The person legally authorized to sign the bid must sign all bid bonds. The approved bid bond form attached to these Specifications should be used: no substantial variations from the language thereof will be accepted.
If a bid bond is used, the 5 percent may be shown either in dollars and cents, or the bid bond may be filled in as follows, "5 percent of the total amount of the accompanying proposal."
The check of the successful Respondent will be returned after award of the Contract, acceptance of the Payment and Performance Bond and City's receipt of the signed Contract. The checks of all other Respondents will be returned immediately upon the award of the Contract. Bid bonds will not be returned.
1.04 DELIVERY OF PROPOSALS TO THE CITY’S PURCHASING OFFICE
A. Proposal packages must be received by the City’s Procurement and Payables Division in SAP Ariba (unless another form of delivery is stated), prior to the scheduled time and date stated in the Solicitation.
B. Supplier is solely responsible for timely delivery of its Submittal.
C. Submittals received after the time stated in the solicitation will not be accepted.
D. For purposes of determining whether a Submittal has been timely received in SAP Ariba, the City's Procurement and Payables Division will rely on the submittal clock in SAP Ariba.
General Provisions 2009, revised 10/06/2018, 10/27/2020, 12/15/2020, 10/08/2024 Page 2 of 20
1.05 LICENSES/PERMITS
A. Suppliers, if applicable, must have a Washington state business license at the time of Submittal and throughout the term of the Contract. Failure to include a Washington state business license may be grounds for rejection of the Submittal or cancellation of contract award. Information regarding Washington state business licenses may be obtained at http://bls.dor.wa.gov.
B. Upon award, it is the responsibility of the Supplier to register with the City of Tacoma's Tax and License Division, 733 South Market Street, Room 21, Tacoma, WA 98402-3768, 253-591-5252, https://www.cityoftacoma.org/government/city_departments/finance/tax_and_license/. Supplier shall obtain a business license as is required by Tacoma Municipal Code Subtitle 6C.20.
C. During the term of the Contract, Supplier, at its expense, shall obtain and keep in force any and all necessary licenses and permits.
1.06 CONTRACTOR'S STATE REGISTRATION NUMBER
Contractors for construction or public works construction are required to be licensed by the state. If the provisions of Chapter 18.27 of the Revised Code of Washington apply to the Respondent, then the Respondent's Washington State Contractor's Registration No. must accompany the bid.
1.07 BID IS NONCOLLUSIVE
The Respondent represents by the submission of the Proposal that the prices in this Bid are neither directly nor indirectly the result of any formal or informal agreement with another Respondent.
1.08 EVALUATION OF BID
A. Price, Experience, Delivery Time and Responsibility
In the evaluation of bids, the Respondent's experience, delivery time, quality of performance or product, conformance to the specifications and responsibility in performing other contracts (including satisfying all safety requirements) may be considered in addition to price. In addition, the bid evaluation factors set forth in City Code Section 1.06.262 may be considered by the City. Respondents who are inexperienced or who fail to properly perform other contracts may have their bids rejected for such cause.
B. Prequalified Electrical Contractor
Certain types of electrical construction require special expertise, experience, and prequalification of the Contractor (or subcontractor) by the City. In such cases, the Respondent must be prequalified or the Respondent must subcontract with a City prequalified electrical contractor for the specialty work.
C. Insertions of Material Conflicting with Specifications
Only material inserted by the Respondent to meet requirements of the Specifications will be considered. Any other material inserted by the Respondent will be disregarded as being nonresponsive and may be grounds for rejection of the Respondent's Proposal.
D. Correction of Ambiguities and Obvious Errors
The City reserves the right to correct obvious errors in the Respondent's proposal. In this regard, if the unit price does not compute to the extended total price, the unit price shall govern.
1.09 WITHDRAWAL OF BID
A. Prior to Bid Opening
Any Respondent may withdraw his/her Proposal prior to the scheduled bid opening time by delivering a written notice to the City’s Procurement and Payables Office. The notice may be submitted in person or by mail; however, it must be received by the City’s Procurement and Payables Office prior to the time of bid opening.
B. After Bid Opening
No Respondent will be permitted to withdraw his/her Proposal after the time of bid opening, as set forth in the Call for Bids, and before the actual award of the Contract, unless the award of Contract is delayed more than sixty (60) calendar days after the date set for bid opening. If a delay of more than 60 calendar days does occur, then the Respondent must submit written notice withdrawing his/her Proposal to the Purchasing Manager.
http://bls.dor.wa.gov/ https://www.cityoftacoma.org/government/city_departments/finance/tax_and_license/ https://www.cityoftacoma.org/government/city_departments/finance/tax_and_license/
General Provisions 2009, revised 10/06/2018, 10/27/2020, 12/15/2020, 10/08/2024 Page 3 of 20
1.10 OPENING OF BIDS
At the time and place set for the opening of bids, all Proposals, unless previously withdrawn, will be publicly opened and read aloud, irrespective of any irregularities or informalities in such Proposal.
1.11 CITY COUNCIL/PUBLIC UTILITY BOARD FINAL DETERMINATION
The City Council or Public Utility Board of the City of Tacoma shall be the final judge as to which is the lowest and best bid in the interest of the City of Tacoma. The City reserves the right to reject any and all bids, waive minor deviations or informalities, and if necessary, call for new bids.
1.12 RESPONDENT'S REFUSAL TO ENTER INTO CONTRACT
Any Respondent who refuses to enter into a Contract after it has been awarded to the Respondent will be in breach of the agreement to enter the Contract and the Respondent's certified or cashier’s check or bid bond shall be forfeited.
1.13 TAXES
A. Include In Proposal All Taxes
Respondent shall include in his/her Proposal all applicable local, city, state, and federal taxes. It is the Respondent's obligation to state on his/her Proposal sheet the correct percentage and total applicable Washington State and local sales tax. The total cost to the City including all applicable taxes may be the basis for determining the low Respondent.
B. Federal Excise Tax
The City of Tacoma is exempt from federal excise tax. Where applicable, the City shall furnish a Federal Excise Tax Exemption certificate.
C. City of Tacoma Business and Occupation Tax
Sub-Title 6A of the City of Tacoma Municipal Code (TMC) provides that transactions with the City of Tacoma, may be subject to the City of Tacoma's Business and Occupation Tax. It is the responsibility of the Respondent awarded the Contract to register with the City of Tacoma's Department of Tax and License, 733 South Market Street, Room 21, Tacoma, WA 98402-3768, telephone 253-591-5252. The City's Business and Occupation Tax amount shall not be shown separately but shall be included in the unit and/or lump sum prices bid.
1.14 FIRM PRICES/ESCALATION
Except as specifically allowed by the Special Provisions, only firm prices will be accepted.
1.15 AWARD
A. Construction and/or Labor Contracts
Unless specifically noted in the Special Provisions or Proposal sheets, all construction and/or labor contracts will be awarded to only one Respondent.
B. Supply/Equipment Contracts
The City reserves the right to award an equipment or supply contract for any or all items to one or more Respondents as the interests of the City will be best satisfied.
1.16 INCREASE OR DECREASE IN QUANTITIES
The City of Tacoma reserves the right to increase or decrease the quantities of any items under this Contract and pay according to the unit prices quoted in the Proposal (with no adjustments for anticipated profit).
1.17 EXTENSION OF CONTRACT
Contracts resulting from this specification shall be subject to extension by mutual agreement per the same prices, terms and conditions.
General Provisions 2009, revised 10/06/2018, 10/27/2020, 12/15/2020, 10/08/2024 Page 4 of 20
1.18 PAYMENT TERMS
A. Prices will be considered as net 30 calendar days if no cash discount is shown. Payment discount periods of twenty (20) calendar days or more if offered in the submittal, will be considered in determining the apparent lowest responsible submittal. Discounts will be analyzed in context of their overall cumulative effect. Invoices will not be processed for payment nor will the period of cash discount commence until receipt of a properly completed invoice and until all invoiced items are received and satisfactory performance of the Contractor has been attained. If an adjustment in payment is necessary due to damage or dispute, the cash discount period shall commence on the date final approval for payment is authorized.
B. ePayable/Credit Card Acceptance. Submittals offering ePayable/Credit card acceptance may be compared against submittals offering a prompt payment discount to evaluate the overall cumulative effect of the discount against the advantage to the City of the ePayable/Credit card acceptance, and may be considered in determining the apparent lowest responsible submittal.
1.19 PAYMENT METHOD – EPAYABLES – CREDIT CARD ACCEPTANCE – EFT/ACH ACCEPTANCE
A. Payment methods include:
• EPayables (Payment Plus). This is payment made via a virtual, single use VISA card number provided by the City’s commercial card provider. Suppliers accepting this option will receive “due immediately” payment terms. Two options for acceptance are available to suppliers. Both are accompanied by an emailed advice containing complete payment details:
• Straight-through processing (buyer initiated). Immediate, exact payments directly deposited to supplier accounts by the City’s provider bank; the supplier does not need to know card account details.
• Supplier retrieves card account through the secure, on-line portal provided via email notifications sent by the City’s commercial card provider.
• Credit card. Tacoma’s VISA procurement card program is supported by standard bank credit suppliers and requires that merchants abide by the VISA merchant operating rules. It provides “due immediately” payment terms.
• Suppliers must be PCI-DSS compliant (secure credit card data management) and federal FACTA (sensitive card data display) compliant.
• Suppliers must be set up by their card processing equipment provider (merchant acquirer) as a minimum of a Level II merchant with the ability to pass along tax, shipping and merchant references information.
• Electronic Funds Transfer (EFT) by Automated Clearing House (ACH). Standard terms are net 30 for this payment method.
• Check or other cash equivalent. Standard terms are net 30 for this payment method.
B. The City’s preferred method of payment is by ePayables (Payment Plus) followed by credit card (aka procurement card). Suppliers may be required to have the capability of accepting the City’s ePayables or credit card methods of payment. The City of Tacoma will not accept price changes or pay additional fees when ePayables (Payment Plus) or credit card is used.
C. The City, in its sole discretion, will determine the method of payment for goods and/or services as part of the Contract.
1.20 COOPERATIVE PURCHASING
The Washington State Interlocal Cooperative Act RCW 39.34 provides that other governmental agencies may purchase goods and services on this solicitation or contract in accordance with the terms and prices indicated therein if all parties are agreeable.
1.21 PUBLIC DISCLOSURE: PROPRIETARY OR CONFIDENTIAL INFORMATION
A. Respondent’s Submittals, all documents and records comprising any Contract awarded to Respondent, and all other documents and records provided to the City by Respondent are deemed public records subject to disclosure under the Washington State Public Records Act, Chapter 42.56 RCW (Public Records Act). Thus, City may be required, upon request, to disclose the Contract and documents or records related to it unless an exemption under the Public Records Act or other laws applies. In the event CITY receives a request for such disclosure, determines in its legal judgment that no applicable exemption to disclosure applies; and Respondent has complied with the requirements to Respondent has complied with the requirements to mark records considered confidential or proprietary
General Provisions 2009, revised 10/06/2018, 10/27/2020, 12/15/2020, 10/08/2024 Page 5 of 20 as such requirements are stated below, City agrees to provide Respondent 10 days written notice of impending release. Should legal action thereafter be initiated by Respondent to enjoin or otherwise prevent such release, all expense of any such litigation shall be borne by Respondent, including any damages, attorneys’ fees or costs awarded by reason of having opposed disclosure. City shall not be liable for any release where notice was provided and Respondent took no action to oppose the release of information.
B. If Respondent provides City with records or information that Respondent considers confidential or proprietary, Respondent must mark all applicable pages or sections of said record(s) as “Confidential” or “Proprietary.” Further, in the case of records or information submitted in response to a Request for Proposals, an index must be provided indicating the affected pages or sections and locations of all such material identified Confidential or Proprietary. Information not included in the required index will not be reviewed for confidentiality or as proprietary before release. If Supplier fails to so mark or index Submittals and related records, then the City, upon request, may release said record(s) without the need to satisfy the requirements of subsection A above; and Respondent expressly waives its right to allege any kind of civil action or claim against the City pertaining to the release of said record(s). Submission of materials in response to City’s Solicitation shall constitute assent by Respondent to the foregoing procedure and Respondent shall have no claim against the City on account of actions taken pursuant to such procedure.
1.22 FEDERAL AID PROJECTS
The City of Tacoma in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, part 21, nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR, part 26, will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award.
SECTION II - CONTRACT REQUIREMENTS
2.01 CONTRACTOR'S RESPONSIBILITY
A. Contract Documents
The Respondent to whom the Contract is awarded, hereinafter called the Contractor, shall enter into a Contract with the City of Tacoma, , within 10 days after receipt from the City of Tacoma of a properly prepared Contract. In addition, the Contractor will do all things required to promptly perform this Contract pursuant to the terms of this Contract. Certain contracts for supplies, goods or equipment may use the City Purchase Order in place of a formal contract document.
B. Surety Bonds
Except as modified by the Special Provisions, the Respondent to whom the Contract is awarded shall provide a payment and performance bond, including power of attorney, for 100 percent of the amount of his/her bid (including sales taxes), to insure complete performance of the Contract including the guarantee.
The bonds must be executed by a surety company licensed to do business in the State of Washington. For a supply-type contract, a cashier’s check or cash may be substituted for the bonds; however, this cash or cashier’s check must remain with the City through the guarantee period and any interest on said amount shall accrue to the City.
C. Independent Contractor
Contractor is an independent contractor; no personnel furnished by the Contractor shall be deemed under any circumstances to be the agent or servant of the City. Contractor shall be fully responsible for all acts or omissions of Subcontractors and its and their suppliers and of persons employed by them, and shall be specifically responsible for sufficient and competent supervision and inspection to assure compliance in every respect with the Contract. There shall be no contractual relationship between any Subcontractors or supplier and the City arising out of or by virtue of this agreement. No provision of the Contract is intended or is to be construed to be for the benefit of any third party.
General Provisions 2009, revised 10/06/2018, 10/27/2020, 12/15/2020, 10/08/2024 Page 6 of 20
2.02 CONFLICTS IN SPECIFICATIONS
Anything mentioned in the Specifications and not shown on the Drawings and anything on the Drawings and not mentioned in the Specifications shall be of like effect and shall be understood to be shown and/or mentioned in both. In case of differences between Drawings and Specifications, the Specifications shall govern. In addition, in the event of any conflict between these General Provisions, the Special Provisions, the Technical Provisions and/or the Proposal pages, the following order of precedence shall control:
1. Proposal pages prevail if they conflict with the General, Special or Technical Provisions.
2. Special Provisions prevail if they conflict with the General Provisions and/or Technical Provisions.
3. Technical Provisions prevail if they are in conflict with the General Provisions.
In case of discrepancy of figures between Drawings, Specifications or both, the matter shall immediately be submitted to the Engineer for determination. Failure to submit the discrepancy issue to the Engineer shall result in the Contractor's actions being at his/her own risk and expense. The Engineer shall furnish from time to time such detailed drawings and other information as he/she may consider necessary.
2.03 INSPECTION
A. Of the Work
All materials furnished and work done shall be subject to inspection.
The Inspector administering the Contract shall at all times have access to the work wherever it is in progress or being performed, and the Contractor shall provide proper facilities for such access and inspection. Such inspection shall not relieve the Contractor of the responsibility of performing the work correctly, utilizing the best labor and materials in strict accordance with the Specifications of this Contract. All material or work approved and later found to be defective shall be replaced without cost to the City of Tacoma.
B. Inspector's Authority
The inspector shall have power to reject materials or workmanship which do not fulfill the requirements of these Specifications, but in case of dispute the Contractor may appeal to the Director or Superintendent, whose decision shall be final. The word “Director” means the Director of the City of Tacoma General Government department that is administering the contract. The word "Superintendent" means the Superintendent of the City of Tacoma, Department of Public Utilities Division that is administering the contract.
The Contract shall be carried out under the general control of the representative of the particular City Department or Division administering the Contract, who may exercise such control over the conduct of the work as may be necessary, in his or her opinion, to safeguard the interest of the City of Tacoma. The Contractor shall comply with all orders and instructions given by the representative of the particular Department or Division administering the Contract in accordance with the terms of the Contract.
Provided, that for the purposes of construction contracts, such control shall only apply (a) to the extent necessary to ensure compliance with the provisions of this contract, and (b) to the extent necessary to fulfill any nondelegable duty of the City for the benefit of third parties not engaged in promoting the activity of this contract.
Nothing herein contained, however, shall be taken to relieve the Contractor of his/her obligations or responsibilities under the Contract.
2.04 FEDERAL, STATE AND MUNICIPAL REGULATIONS
All federal, state, municipal and/or local regulations shall be satisfied in the performance of all portions of this Contract. The Contractor shall be solely responsible for all violations of the law from any cause in connection with work performed under this Contract.
General Provisions 2009, revised 10/06/2018, 10/27/2020, 12/15/2020, 10/08/2024 Page 7 of 20
2.05 INDEMNIFICATION
A. Indemnification
Contractor acknowledges that pursuant to the terms of this agreement, Contractor is solely and totally responsible for the safety of all persons and property in the performance of this Contract. To the greatest extent allowed by law, Contractor assumes the risk of all damages, loss, cost, penalties and expense and agrees to indemnity, defend and hold harmless the City of Tacoma, from and against any and all liability which may accrue to or be sustained by the City of Tacoma on account of any claim, suit or legal action made or brought against the City of Tacoma for the death of or injury to persons (including Contractor's or subcontractor's employees) or damage to property involving Contractor, or subcontractor(s) and their employees or agents, arising out of and in connection with or incident to the performance of the Contract including if the City is found to have a nondelegable duty to see that work is performed with requisite care, except for injuries or damages caused by the sole negligence of the City. In this regard, Contractor recognizes that Contractor is waiving immunity under industrial Insurance Law, Title 51 RCW. This indemnification extends to the officials, officers and employees of the City and also includes attorney's fees and the cost of establishing the right to indemnification hereunder in favor of the City of Tacoma. In addition, within the context of competitive bidding laws, it is agreed that this indemnification has been mutually negotiated. Provided however, this provision is intended to be applicable to the parties to this agreement and it shall not be interpreted to allow a Contractor's employee to have a claim or cause of action against Contractor.
B. Limitation of Liability for Primarily Supply-Type Contracts
In all contracts where the total cost of the supply of materials and/or equipment constitute at least 70 percent of the total contract price (as determined by the City), the City agrees that it will not hold the contractor, supplier or manufacturer liable for consequential damages for that part of the contract related to the manufacture and/or design of the equipment, materials or supplies.
2.06 CONTRACTOR'S INSURANCE
A. During the course and performance of a Contract, Contractor will provide proof and maintain the insurance coverage in the amounts and in the manner specified in the City of Tacoma Insurance Requirements as is applicable to the services, products, and deliverables provided under the Contract. The City of Tacoma Insurance Requirements document, if issued, is fully incorporated into the Contract by reference.
B. Failure by City to identify a deficiency in the insurance documentation provided by Contractor or failure of City to demand verification of coverage or compliance by Contractor with these insurance requirements shall not be construed as a waiver of Contractor’s obligation to maintain such insurance.
2.07 ASSIGNMENT AND SUBLETTING OF CONTRACT
C. Assignment
The Contract shall not be assigned except with the consent of the Superintendent or his/her designee.
Requests for assignment of this contract must be in writing with the written consent of the surety, and the request must show the proposed person or organization to which the contract is assigned is capable, experienced and equipped to perform such work. The proposed substitute person or organization may be required to submit to the City information as to his/her experience, financial ability and give statements covering tools, equipment, organization, plans and methods to fulfill any portion of the Contract prior to approval of assignment.
D. Subletting
The Contract shall not be sublet except with the written consent of the Superintendent or his/her designee.
In the event that a prequalified electrical contractor is necessary to perform certain portions of the work, such work may be subcontracted with a City prequalified electrical contractor for the type of work involved.
Requests for subletting of this Contract must be in writing with the written consent of the Surety, and the request must show the proposed person or organization to which the Contract is sublet is capable, experienced and equipped to perform such work. The proposed substitute person or organization may be required to submit to the City information as to his experience, financial ability and give statements covering tools, equipment, organization, plans and methods to fulfill any portion of the Contract prior to approval of subletting.
General Provisions 2009, revised 10/06/2018, 10/27/2020, 12/15/2020, 10/08/2024 Page 8 of 20
The written consent approving the subletting of the Contract shall not be construed to relieve the Contractor of his/her responsibility for the fulfillment of the Contract. The Subcontractor shall be considered to be the agent of the Contractor and the Contractor agrees to be responsible for all the materials, work and indebtedness incurred by the agent.
A subcontractor shall not sublet any portion of a subcontract for work with the City without the written consent of the City.
2.08 DELAY
E. Extension of Time
With the written approval of the Superintendent or his/her designee, the Contractor may be granted additional time for completion of the work required under this Contract, if, in the Superintendent's opinion the additional time requested arises from unavoidable delay.
F. Unavoidable Delay
Unavoidable delays in the prosecution of the work shall include only delays from causes beyond the control of the Contractor and which he/she could not have avoided by the exercise of due care, prudence, foresight and diligence. Delay caused by persons other than the Contractor, Subcontractors or their employees will be considered unavoidable delays insofar as they necessarily interfere with the Contractor's completion of the work, and such delays are not part of this Contract.
Unavoidable delay will not include delays caused by weather conditions, surveys, measurements, inspections and submitting plans to the Engineer of the particular Division involved in administering this Contract.
2.09 GUARANTEE
A. Guarantee for Construction, Labor or Services Contract
Neither the final certificate of payment or any provision in the Contract Documents, nor partial or entire occupancy of the premises by the City, shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects in the work and pay for any damage to other work resulting therefrom, which shall appear within a period of one year from the date of final acceptance of the work unless a longer period is specified. The City will give notice of observed defects with reasonable promptness.
If it has been discovered, before payment is required under the terms of the Contract, that there is a failure to comply with any of the terms and provisions of this Contract, the City has the right and may withhold payment.
In case of a failure of any part of the work, materials, labor and equipment furnished by the Contract or to fully meet all of the requirements of the Contract, the Contractor shall make such changes as may be necessary to fully meet all of the specifications and requirements of this Contract. Such changes shall be made at the Contractor's sole cost and expense without delay and with the least practicable inconvenience to the City of Tacoma. Rejected material and equipment shall be removed from the City's property by and at the expense of the Contractor.
B. Guarantee for Supply Contracts
Unless a longer period is specified, the supplier and/or manufacturer of the supplies, materials and/or equipment furnished pursuant to this Contract agrees to correct any defect or failure of the supplies, materials and/or equipment which occurs within one year from the date of: (1) test energization if electrical or mechanical equipment; (2) commencement of use if supplies or materials, provided, however, said guarantee period shall not extend beyond eighteen months after date of receipt by the City. All of the costs (including shipping, dismantling and reinstallation) of repairs and/or corrections of defective or failed equipment, supplies and/or material is the responsibility of the supplier and/or manufacturer.
When the supplier is not the manufacturer of the item of equipment, supplier agrees to be responsible for this guarantee and supplier is not relieved by a manufacturer's guarantee.
General Provisions 2009, revised 10/06/2018, 10/27/2020, 12/15/2020, 10/08/2024 Page 9 of 20
C. Guarantee Period Extension
The Contract guarantee period shall be suspended from the time a significant defect is first documented by the City until the work or equipment is repaired or replaced by Contractor and accepted by the City. In addition, in the event less than ninety (90) days remain on the guarantee period (after recalculating), the guarantee period shall be extended to allow for at least ninety (90) days from the date the work or equipment is repaired or replaced and accepted by the City.
2.10 DEDUCTIONS FOR UNCORRECTED WORK
If the City of Tacoma deems it expedient to correct work not done in accordance with the terms of this Contract, an equitable deduction from the Contract price shall be made.
2.11 CITY OF TACOMA'S RIGHT TO TERMINATE CONTRACT
A. Termination for Convenience
1. Supplies. The City may terminate a Contract for supplies at any time upon prior written notice to Contractor. Upon the effective date of termination specified in such notice, and payment by the City, all conforming supplies, materials, or equipment previously furnished hereunder shall become its property.
2. Services. The City may terminate a Contract for services at any time, with or without cause, by giving 10-business day’s written notice to Supplier. In the event of termination, all finished and unfinished work prepared by Supplier pursuant to the Contract shall be provided to the City. In the event City terminates the Contract due to the City’s own reasons and without cause due to Supplier’s actions or omissions, the City shall pay Supplier the amount due for actual work and services necessarily performed under the Contract up to the effective date of termination, not to exceed the total compensation set forth in the Contract.
B. Termination for Cause
1. The City may terminate a Contract for either services or supplies in the event of any material breach of any of the terms and conditions of the Contract if the Contractor’s breach continues in effect after written notice of breach and 30 days to cure such breach and fails to cure such breach
2. Bankruptcy. If the Contractor should be adjudged as bankrupt, or makes a general assignment for the benefit of creditors, or a receiver should be appointed on account of his/her insolvency, or if he/she or any of his/her subcontractors should violate any of the provisions of the Contract, or if the work is not being properly and diligently performed, the City of Tacoma may serve written notice upon the Contractor and Surety, executing the Payment and Performance Bond, of its intention to terminate the Contract; such notice will contain the reasons for termination of the Contract, and unless within 10 days after the serving of such notice, such violation shall cease and an arrangement satisfactory to the City of Tacoma for correction thereof shall be made, the Contract shall, upon the expiration of said I 0 days, cease and terminate and all rights of the Contractor hereunder shall be forfeited. In the event the Contract is terminated for cause, Contractor shall not be entitled to any lost profits resulting therefrom.
3. Notice. In the event of any such termination for cause, the City of Tacoma shall immediately send (by regular mail or other method) written notice thereof to the Surety and the Contractor.
Upon such termination the Surety shall have the right to take over and perform the Contract, provided however, the Surety must provide written notice to the City of its intent to complete the work within 15 calendar days of its receipt of the original written notice (from the City) of the intent to terminate. Upon termination and if the Surety does not perform the work, the City of Tacoma may take over the work and prosecute the same to completion by any method it may deem advisable, for the account of and at the expense of the Contractor, and the Contractor and the Surety shall be liable to the City of Tacoma for all cost occasioned to the City of Tacoma thereby. The City of Tacoma may without liability for doing so, take possession of and utilize in completing the work, such materials, equipment, plant and other property belonging to the Contractor as may be on the site of the work and necessary therefore.
General Provisions 2009, revised 10/06/2018, 10/27/2020, 12/15/2020, 10/08/2024 Page 10 of 20
2.12 LIENS
In the event that there are any liens on file against the City of Tacoma, the City of Tacoma shall be entitled to withhold final or progress payments to the extent deemed necessary by the City of Tacoma to properly protect the outstanding lien claimants until proper releases have been filed with the City Clerk.
2.13 LEGAL DISPUTES
A. General
Washington law shall govern the interpretation of the Contract. The state or federal courts located in Pierce County Washington shall be the sole venue of any mediation, arbitration, or litigation arising out of the Contract.
Respondents providing submittals from outside the legal jurisdiction of the United States of America will be subject to Tacoma’s City Attorney’s Office (CAO) opinion as to the viability of possible litigation pursuant to a contract resulting from this Specification. If it is the opinion of the CAO that any possible litigation would be beyond reasonable cost and/or enforcement, the submittal may be excluded from evaluation.
B. Attorney Fees
For contracts up to $250,000, which become the subject of litigation or arbitration, the substantially prevailing party may be entitled to reasonable attorney fees, as provided in RCW 39.04.240. Provided, however, the attorney fee hourly rate for the City of Tacoma's assistant city attorneys is agreed to be $150 per hour or the same as the hourly rate for Contractor's legal counsel, whichever is greater.
2.14 DELIVERY
Prices must be quoted F.O.B. destination, freight prepaid and allowed with risk of loss during transit remaining with Contractor/Supplier (unless otherwise stated in these Specifications) to the designated address set forth in these Specifications.
Deliveries shall be between 9:00 a.m. and 3:30 p.m.; Monday through Friday only (except legal holidays of the City of Tacoma).
Legal holidays of the City of Tacoma are:
New Year's Day January I Martin Luther King's Birthday 3rd Monday in January Washington's Birthday 3rd Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day 1st Monday in September Veteran's Day November 11 Thanksgiving Day 4th Thursday of November Day after Thanksgiving 4th Friday of November Christmas Day December 25
When any of these holidays occur on Saturday or Sunday, the preceding Friday or the following Monday, respectively, is a legal holiday for the City of Tacoma.
2.15 PACKING SLIPS AND INVOICES
A. Packing slips and shipping notices shall be sent to the specific City Division or Department receiving the item(s) at the address stated in City’s Solicitation or as otherwise stated in the Contract and include complete description of items, contents of items if crated or cased, quantity, shipping point, carrier, bill of lading number and City of Tacoma purchase order.
B. Each invoice shall show City of Tacoma purchase order number, release number if applicable, quantity, unit of measure, item description, unit price and extended price for each line if applicable, services and deliverables provided if applicable. Line totals shall be summed to give a grand total to which sales tax shall be added, if applicable.
1. For transactions conducted in SAP Ariba, invoices shall be submitted through Ariba.
2. For invoices paid by ACH or by check, unless stated otherwise, invoices shall be electronically submitted by email with corresponding PO number listed in the subject line to accountspayable@cityoftacoma.org.
mailto:accountspayable@cityoftacoma.org mailto:accountspayable@cityoftacoma.org
General Provisions 2009, revised 10/06/2018, 10/27/2020, 12/15/2020, 10/08/2024 Page 11 of 20
3. For invoices paid by credit card, invoices shall also display the last name of the cardholder and last four digits (only) of the card number (e.g., Jones/6311). Unless stated otherwise, invoices shall be electronically submitted by email with corresponding PO number listed in the subject line to (do not combine different POs into one invoice or charge) to pcardadmin@cityoftacoma.org.
2.16 APPROVED EQUALS
A. Unless an item is indicated as "No substitute", special brands, when named, are intended to describe the standard of quality, performance or use desired. Equal items will be considered by the City, provided that the respondent specifies the brand and model, and provides all descriptive literature, independent test results, product samples, local servicing and parts availability to enable the City to evaluate the proposed "equal".
B. The decision of the City as to what items are equal shall be final and conclusive. If the City elects to purchase a brand represented by the respondent to be an "equal", the City's acceptance of the item is conditioned on the City's inspection and testing after receipt. If, in the sole judgment of the City, the item is determined not to be an equal, the item shall be returned at the respondent's expense.
C. When a brand name or level of quality is not stated by the respondent, it is understood the offer is exactly as specified. If more than one brand name is specified, respondents must clearly indicate the brand and model/part number being bid.
2.17 ENTIRE AGREEMENT
This written contract represents the entire Agreement between the parties and supersedes any prior oral statements, discussions or understandings between the parties.
2.18 CODE OF ETHICS
The City's Code of Ethics, Chapter 1.46, Tacoma Municipal Code, provides ethical standards for City personnel and prohibits certain unethical conduct by others including respondents and contractors. Violation of the City's Code of Ethics will be grounds for termination of this contract.
2.19 FEDERAL FINANCIAL ASSISTANCE
If federal funds, including FEMA financial assistance to the City of Tacoma, will be used to fund, pay or reimburse all or a portion of the Contract, Contractor will comply with all applicable Federal law, regulations, executive orders, FEMA policies, procedures, and directives and the following clauses will be incorporated into the Contract:
A. EQUAL EMPLOYMENT OPPORTUNITY During the performance of this Contract, Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following:
1. Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .