26-2521-Exhibit A- Garage Lighting Replacement 3-4, Manual.pdf

PDF 5 MB Posted

Attached to
IFB 26-2521, Garage Lighting Replacement 3-4
Solicitation number
IFB-123750
Issued by
Roanoke City, Virginia

About this file

Summary

This is an Exhibit A specification document for IFB 26-2521, a garage lighting replacement project for the Commonwealth of Virginia. The project involves the installation of new lighting systems in parking decks 3 and 4, with specifications detailing the required lighting fixtures, electrical components, and installation requirements. The scope includes the replacement of existing lighting infrastructure with energy-efficient LED fixtures and associated control systems to improve visibility and safety in the parking facilities.

The document provides detailed technical specifications for lighting equipment, including fixture types, lumen output requirements, color temperature standards, and installation methodology. Bidders are required to comply with all outlined specifications for materials, workmanship, and performance standards. The exhibit establishes the baseline requirements that all responsive bids must meet, ensuring consistency in quality and functionality of the completed lighting system across both parking decks.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GARAGE LIGHTING REPLACEMENT 3-4

PROJECT

RICHMOND INTERNATIONAL AIRPORT

Project Manual

CRAC IFB #26-2521

Gresham Smith Project Number: 45533.63

RIC - GARAGE LIGHTING REPLACEMENT PROJECT

RICHMOND, VA

Gresham Smith Project No.: 45533.63 CRAC IFB No. 26-2521

Table of Contents 00 0110 - 1 of 2

TABLE OF CONTENTS

00 0110 - Table of Contents

General Conditions

SPECIFICATIONS

DIVISION 01 -- GENERAL REQUIREMENTS

01 1000 - Summary of Work

01 2500 - Substitution Procedures

01 2500.01 - Substitution Request Form

01 2600 - Contract Modification Procedures

01 2900 - Payment Procedures

01 3100 - Project Management and Coordination

01 3200 - Construction Progress Documentation

01 3300 - Submittal Procedures

01 4000 - Quality Requirements

01 4216 - Definitions & References

01 4519 - Uncovering and Correction of Work

01 5000 - Temporary Facilities and Controls

01 6000 - Product Requirements

01 7300 - Execution

01 7419 - Construction Waste Management and Disposal

01 7700 - Closeout Procedures

01 7823 - Operation and Maintenance Data

01 7839 - Project Record Documents

01 7900 - Demonstration and Training

DIVISION 02 - EXISTING CONDITIONS

02 4119 - Selective Demolition

RIC - GARAGE LIGHTING REPLACEMENT PROJECT

RICHMOND, VA

Gresham Smith Project No.: 45533.63 CRAC IFB No. 26-2521

Table of Contents 00 0110 - 2 of 2

DIVISION 26 – ELECTRICAL

26 0500 – Electrical General Provisions

26 0519 – Low-Voltage Electrical Power Conductors and Cables

26 0533 – Raceways and Boxed for Electrical Systems

26 0553 – Identification for Electrical Systems

26 5100 – Interior Lighting 26 5600 – Exterior Lighting

ISSUED: DATE:

ISSUE FOR BID 05/08/2026

© 2025 GRESHAM SMITH. ALL RIGHTS RESERVED. USE SUBJECT TO ANY WRITTEN AGREEMENT WITH

GRESHAM SMITH.

END OF SECTION

CAPITAL REGION AIRPORT COMMISSION

GENERAL CONDITIONS

TABLE OF CONTENTS

ARTICLE 1 CONTRACT DOCUMENTS

ARTICLE 2 ADMINISTRATION OF THE CONTRACT

ARTICLE 3 OWNER

ARTICLE 4 CONTRACTOR

ARTICLE 5 SUBCONTRACTORS

ARTICLE 6 WORK BY OWNER OR BY SEPARATE CONTRACTORS

ARTICLE 7 MISCELLANEOUS PROVISIONS

ARTICLE 8 TIME

ARTICLE 9 PAYMENTS AND COMPLETION

ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY

ARTICLE 11 INSURANCE

ARTICLE 12 CHANGES IN THE WORK

ARTICLE 13 UNCOVERING AND CORRECTION OF WORK

ARTICLE 14 TERMINATION OF THE CONTRACT

Capital Region Airport Commission General Conditions Page 2 of 34 CRAC IFB No. 26-2521 - RIC - GARAGE LIGHTING REPLACEMENT 3-4 PROJECT

GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION,

INSTALLATION AND IMPLEMENTATION

ARTICLE 1 CONTRACT DOCUMENTS

1.1 DEFINITIONS

1.1.1 THE CONTRACT DOCUMENTS

The Contract Documents consist of the Owner-Contractor Agreement, the Conditions of the Contract (General, Supplementary, and other Conditions), the Drawings, the Specifications, the Contractor's Bid as accepted by the Owner, and all Addenda issued before, and all Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change Order or Change Directive, or (3) a written interpretation issued by Architect/Engineer in response to a request for information from Contractor forwarded to Architect/Engineer by Contractor pursuant to Subparagraph 2.2.8. The Contract Documents will include all Bid Documents, including Addenda, Instructions to Bidders, Invitation for Bid, and the bid response with associated required submissions. Unit prices submitted with the bid will form the basis for evaluating payment resulting from the addition or deletion of work issued as a Contract Modification under the contract.

1.1.2 THE CONTRACT

The Contract Documents form the Contract for Construction, Installation, and Implementation. This Contract represents the entire and integrated agreement between the parties hereto and supersedes all prior negotiations, representations, or agreements, either written or oral. The Contract may be amended or modified only by a Modification as defined in Subparagraph 1.1.1.

The Contract Documents shall not be construed to create any contractual relationship of any kind between Architect/Engineer and Contractor, but Architect/Engineer shall be entitled to the performance of obligations intended for their benefit, and to the enforcement thereof. Nothing contained in the Contract Documents shall create any contractual relationship between the Owner or Architect/Engineer and any Subcontractor or Sub-subcontractor.

1.1.3 THE WORK

The Work comprises the completed construction required by the Contract Documents, including all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.

1.1.4 THE PROJECT

The Project is the total construction of which the Work performed under the Contract Documents may be a whole or part.

1.1.5 ARCHITECT/ENGINEER

GRESHAM SMITH

1.2 EXECUTION, CORRELATION, AND INTENT

1.2.1 The signing by the Owner and Contractor of the Owner-Contractor Agreement and the Conditions of the Contract (General, Supplementary, and Other Conditions) shall have the same force for all the Contract Documents as if each of the Contract Documents were individually signed by both parties to the Construction Contract. If either the Owner or Contractor or both do not sign such documents, the Architect/Engineer shall identify such Documents in writing and distribute them to

Capital Region Airport Commission General Conditions Page 3 of 34 both Owner and Contractor.

1.2.2 By executing the Contract, Contractor warrants that it has closely inspected the site as well as the conditions of adjacent properties and has recorded to its satisfaction the physical conditions of existing properties and familiarized itself with the local conditions under which the Work is to be performed and correlated its observations with the requirements of the Contract Documents.

1.2.3 The Contract Documents intend to include all items necessary for the proper execution and completion of the Work. The Contract Documents are complementary, and what is required by anyone shall be as binding as if required by all. Work not covered in the Contract Documents will not be required unless it is consistent and reasonably inferable as necessary to produce the intended results. Words and abbreviations that have well-known technical or trade meanings are used in the Contract Documents in accordance with such recognized meanings.

1.2.4 The organization of the Specifications into divisions, sections, and articles, and the arrangement of Drawings, should not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade.

1.2.5 The order of precedence of the Contract Documents is as follows with the highest authority listed as "a": (a) Owner-Contractor Agreement; (b) Conditions of the Contract (FAA Mandatory Contract Provisions, FAA General Contract Provisions, Capital Region Airport Commission General Conditions, in descending order); (c) Specifications and Drawings; (d) Contractor's Proposal as accepted by Owner and incorporated into the Contract Documents.

1.2.6 The Specifications and Drawings shall be equal in authority and priority. However, in the event of a conflict between the Specifications and the Drawings, the Contractor shall at once report such conflict to the Architect/Engineer, and the provision requiring the greater level of service or quality or quantity of work shall prevail in accordance with this Paragraph. A duplication of work is not intended by the Contract Documents, and any duplication specified shall not become a basis for extra cost to the Owner. In the event of duplications, inconsistencies, or conflicts, the appropriate method of performing the Work shall be reviewed and recommended by the Architect/Engineer and approved by the Owner.

1.2.7 When included in the Contract Documents, FAA Sections 10 through 90 and the General Conditions govern performance under all sections of the project manual.

1.3 OWNERSHIP AND USE OF DOCUMENTS

1.3.1 All Drawings, Specifications, computations, sketches, test data, survey results, photographs, renderings, and other material related to the Work prepared by the Contractor or furnished to the Contractor by the Owner or Architect/Engineer are the property of the Owner. The Contractor shall submit to the Owner the original of all such materials upon the Owner's request, or upon Final Completion. The Contractor shall not use any such materials or copies on any other project, nor shall the information be divulged without the Owner's prior written approval. Except for one contract set for each party to the Contract Documents, such documents are to be returned or suitably accounted for to the Owner at the completion of the Work. Submission or distribution to meet official regulatory requirements or for other purposes in connection with the Work is not to be construed as publication in derogation of the Architect/Engineer's or Owner's common-law copyright or other reserved rights.

1.3.2 Reproduction of any portion of the Contract Documents for the Contractor’s use as submittals for Shop Drawings is not acceptable.

1.3.3 The Contractor will be furnished free of charge with 2 (two) copies of Drawings and Project Manuals. Additional sets will be furnished as an expense to the Contractor at the cost of reproduction, postage, and handling.

Capital Region Airport Commission General Conditions Page 4 of 34

ARTICLE 2 ADMINISTRATION OF THE CONTRACT

2.1 DEFINITION

2.1.1 Architect/Engineer is the person lawfully licensed to practice architecture or engineering, as applicable, or an entity lawfully practicing architecture or engineering, identified as such in the Owner-Contractor Agreement. The term Architect/Engineer means the Architect/Engineer or the Architect/Engineer's authorized representative.

2.2 ADMINISTRATION OF THE CONTRACT

2.2.1 Architect/Engineer shall provide administration of the Contract as hereinafter described. However, the Architect/Engineer shall not have authority, without first consulting with and obtaining the approval of the Owner, to (a) order a material change in the Plans, Drawings, or Specifications, or

(b) take any action or approve any change which increases the cost of the Project or the time of performance of the Work.

2.2.2 Architect/Engineer shall be the representative of the Owner during the Work and shall advise and consult with the Owner. Architect/Engineer shall have authority to act on behalf of Owner only to the extent provided in the Contract Documents and the Owner/Architect/Engineer Agreements, respectively, unless otherwise modified by written instrument in accordance with Subparagraph

2.2.20. In the performance of any services by the Architect/Engineer, including any services as a representative of the Owner, the Architect/Engineer acts as an independent contractor and not as an agent of the Owner, and the Owner's participation in the design and construction of the Project in no way relieves Architect/Engineer or Contractor of its professional duties and responsibilities under applicable law and the Contract Documents.

2.2.3 Architect/Engineer shall visit the site at intervals appropriate to the stage of the Work, or as otherwise agreed by the Architect/Engineer and Owner in writing, to familiarize itself with the progress and quality of the Work and to determine if the Work is proceeding in accordance with the Contract Documents. Architect/Engineer shall conduct meetings with the Contractor weekly during installation and monthly at all other times or as necessary and as requested by the Owner. The Architect/Engineer shall attend meetings regularly to review work done, planning, and resolution of any questions or issues that may arise concerning the work. At such meetings, the Architect/Engineer shall be responsible for preparing detailed minutes of the meeting and distributing the minutes to the Owner, Contractor, Architect/Engineer, and any other parties attending such meeting. The Architect/Engineer shall observe the Work of the Contractor to ensure that the Project is constructed in accordance with the Contract Documents and to determine the adequacy of personnel and equipment and the availability of materials and supplies to meet the approved construction schedule. Based on its observations, the Architect/Engineer shall keep the Owner informed of the progress and quality of the Work. The Architect/Engineer shall consult with the Owner when the requirements of the Contract Documents are not met and shall recommend a course of action to the Owner when the requirements of the Contract Documents are not met. The performance of such observations by the Architect/Engineer, however, shall not relieve the Contractor of its responsibility to perform all work in accordance with the Contract Documents.

2.2.4 Architect/Engineer shall not be responsible for or have control or charge of (a) construction, installation, or implementation means, methods, techniques, sequences, or procedures, (b) safety precautions and programs in connection with the Work, or (c) the acts or omissions of Contractor, Subcontractors, Sub-subcontractors or any of their agents or employees, or any other persons performing any of the Work.

Capital Region Airport Commission General Conditions Page 5 of 34

2.2.5 Architect/Engineer shall always have access to the Work wherever it is in preparation and progress, except where prohibited by law. The Contractor shall provide facilities for such access so the Architect/Engineer may perform its function under the Contract Documents.

2.2.6 Except as otherwise provided in the Contract Documents or when direct communications have been specially authorized, the Contractor shall always communicate with the Owner through the Architect/Engineer. Communications by and with the Architect/Engineer's consultants shall be forwarded from the Architect/Engineer to the Owner. Communications by and with Subcontractors and material suppliers shall be forwarded by the Contractor to the Architect/Engineer for the Owner.

Notwithstanding anything to the contrary herein, the Owner shall always have the right, at its sole discretion, to communicate directly with the Contractor, Architect/Engineer, and any other Contractor.

2.2.7 Contractor's Application for Payment shall be forwarded to the Architect/Engineer. The Architect/Engineer shall promptly certify the amounts due on such Applications and forward them to the Owner. After receipt of Contractor's Application for Payment from the Contractor, Architect/Engineer shall either (i) issue a Recommendation for Payment with a copy to the Contractor, for such amount as Architect/Engineer determines is properly due and recommends that the Owner pay; or (ii) notify Contractor in writing its reasons for withholding a Certificate as provided in Subparagraph 9.4.1. The certification of an Application for Payment and Recommendation for Payment by Architect/Engineer shall constitute representation by Architect/Engineer to Owner, based on observations at the site and on the data comprising the Contractor's Application for Payment, that the Work has progressed to the point indicated; that, to the best of its knowledge, information, and belief, the quality of the Work is in accordance with the Contract Documents (subject to an evaluation of the Work for conformance with the Contract Documents upon Substantial Completion, and the results of any specific qualifications stated in the Certificate for Payment); and that Contractor is entitled to payment in the amount certified.

However, the certification of an Application for Payment and Recommendation for Payment by the Architect/Engineer shall not be a representation that the Architect/Engineer has made any examination to ascertain how and for what purpose the Contractor has used the money paid on account of the Contract Sum.

2.2.8 Architect/Engineer shall render interpretations necessary for the proper execution or progress of the Work within the agreed time limits upon written request from Owner. Upon receipt of a Request for Information Form from Contractor, Architect/Engineer shall promptly pursue a response to the same and shall deliver the same to Contractor. In the event the Request for Information is critical, the Architect/Engineer shall immediately pursue a response to the same by telephone or e-mail with written confirmation by e-mail.

2.2.9 Interpretations of the Architect/Engineer shall be consistent with the intent of and reasonably inferable from the Contract Documents and shall be in written or graphic form.

2.2.10 Architect/Engineer's interpretations on matters relating to the artistic effect shall be final if consistent with the intent of the Contract Documents, subject to approval by the Owner.

2.2.11 Claims, disputes, and other matters in question between Contractor and Owner relating to the execution or progress of the Work or the interpretation of the Contract Documents shall be referred initially to Architect/Engineer for a decision which it shall render in writing within a reasonable time.

The Architect/Engineer shall immediately notify the Owner of any claim, dispute, or other matter in question that may affect the Contractor’s performance, Contract Time, or Contract Sum.

2.2.12 Architect/Engineer shall have the authority to reject Work that does not conform to the Contract Documents and to require special inspection or testing, but shall take such action only after consultation with the Owner. Architect/Engineer shall have the authority to require additional inspection or testing of the Work in accordance with Subparagraph 7.7.2, whether such Work is fabricated, installed, or completed, when it determines that such is necessary or advisable for

Capital Region Airport Commission General Conditions Page 6 of 34 implementation of the Contract Documents. Architect/Engineer's authority under this Subparagraph or a good faith decision made by Architect/Engineer to exercise such authority shall not give rise to duty or responsibility of the Architect/Engineer to Contractor, Subcontractor, material and equipment suppliers, their agents or employees, or other persons performing the Work.

2.2.13 Contractor shall review and approve all the Contractor's and Subcontractor's submittals, such as Shop Drawings, Product Data, and samples, before submittal to the Architect/Engineer. The Contractor shall forward all such submittals to the Architect/Engineer for review and approval. The Architect/Engineer's actions shall be taken with such reasonable promptness as to cause no delay in the Work of the Contractor or activities of the Owner.

2.2.14 Upon receipt of submittal data from Contractor, Architect/Engineer shall review and approve, or take other appropriate action upon, Contractor's submittals such as Shop Drawings, Product Data, and Samples, and shall return the same to Contractor. Architect/Engineer's action shall be taken with reasonable promptness to cause no delay and, in any event, within seventeen (17) calendar days. Architect/Engineer's approval of a specific item in Contractor's submittals, such as Shop Drawings, Product Data, and Samples, shall not indicate approval of an assembly of which the item is a component.

2.2.15 Architect/Engineer shall prepare Change Orders for Owner's approval and execution in accordance with the Contract Documents. The Architect/Engineer shall indicate approval on Change Orders and Change Directives after consultation with the Owner.

2.2.16 Architect/Engineer shall assist the Owner in conducting observations to determine the dates of Substantial Completion and Final Completion. Architect/Engineer shall receive and forward to Owner for Owner's review written warranties and related documents required by the Contract Documents and assembled by Contractor, and shall issue a final Recommendation for Payment.

2.2.17 Architect/Engineer shall maintain, and shall give Owner access to, such records and correspondence with respect to the completion of the Project as is reasonably required by Owner and shall maintain schedules of the percentage of construction work done as an appropriate check for verification of requisitions for payment submitted by Contractor. The Architect/Engineer shall also review and make recommendations to the Owner with respect to any request for extensions of time to complete all or any part of the Project when the Contractor submits such requests.

2.2.18 At the request of the Owner, the Architect/Engineer shall review all cost-saving proposals submitted by the Contractor for their cost-saving value and consistency with the Contract Documents and shall forward the results of its review to the Owner for approval. Following the Owner's approval, the Architect/Engineer shall prepare a Change Order, and the Architect/Engineer shall make such revisions to the Drawings and Specifications as necessary to incorporate cost savings proposals of the Contractor, which are acceptable to the Owner and Architect/Engineer. Architect/Engineer shall approve all cost-saving proposals that are acceptable to the Owner and consistent with the intent of the Contract Documents. Architect/Engineer shall make all additions and revisions to the record drawings as required by the Owner, the Federal Aviation Administration ("FAA"), and the Virginia Department of Aviation ("DOAV") and shall provide to each Owner, and where applicable, FAA and DOAV, one reproducible record set of Contract Documents on paper and one reproducible record set of Contract Documents in a computer-aided format acceptable to Owner.

2.2.19 Contractor shall prepare a progress schedule for the Work for review by the Architect/Engineer and approval by the Owner ("Project Schedule"). Architect/Engineer shall work closely with the Contractor to confirm that the Contractor's CPM Construction Schedule conforms to the Work Schedule throughout the Work.

2.2.20 The extent of the duties, responsibilities, and limitations of authority of the Architect/Engineer during construction, as set forth above and elsewhere in the Contract Documents, shall not be modified or extended without the written consent of the Owner and Architect/Engineer, respectively.

Capital Region Airport Commission General Conditions Page 7 of 34

2.2.21 In case of the termination of the employment of the Architect/Engineer, the Owner shall appoint another Architect/Engineer whose status under the Contract Documents shall be that of the former Architect/Engineer.

2.2.22 Inspectors employed by the Owner or Architect/Engineer shall be authorized to inspect all work done and all material furnished. Such inspection may extend to all or any part of the work and to the preparation, fabrication, or manufacture of the materials to be used. Inspectors are not authorized to revoke, alter, or waive any provision of the contract. Inspectors are not authorized to issue instructions contrary to the plans and specifications or to act as a foreman for the Contractor.

2.2.23 Inspectors employed by the Owner or Architect/Engineer are authorized to notify the Contractor or his/her representatives of any failure of the work or materials to conform to the requirements of the contract, plans, or specifications, and to reject such nonconforming materials in question until such issues can be referred to the Architect/Engineer for his/her decision.

ARTICLE 3 OWNER

3.1 DEFINITION

3.1.1 Owner is the entity identified as such in the Owner-Contractor Agreement. The term "Owner" means Owner or its authorized representative.

3.2 INFORMATION AND SERVICES REQUIRED BY OWNER

3.2.1 Owner shall provide access to any existing drawings and surveys noting physical aspects of the property in its possession, at Contractor's request, without warranty or representation of any kind.

3.2.2 Except as provided in Subparagraph 4.7.1, the Owner shall secure and pay for necessary approvals, easements, assessments, and charges required for the construction, use, or occupancy of permanent structures or permanent changes in existing facilities.

3.2.3 Owner shall forward all instructions to Contractor through Architect/Engineer.

3.3 OWNER'S RIGHT TO STOP THE WORK

3.3.1 If Contractor fails to correct defective Work as required by Paragraph 13.2 or fails to carry out the Work in accordance with the Contract Documents, Owner, by a written order signed personally or by an agent or representative specifically so empowered by Owner in writing, may order Contractor to stop the Work or any portion thereof, effective immediately, until the cause for such order has been eliminated; however, this right of Owner to stop the Work shall not give rise to any duty on the part of Owner to exercise this right for the benefit of Contractor or any other person or entity.

3.4 OWNER'S RIGHT TO CARRY OUT THE WORK

3.4.1 If Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within seven (7) days after receipt of written notice from Owner to commence and continue correction of such default or neglect with diligence and promptness, Owner may, after seven (7) days following receipt by Contractor of such notice and without prejudice to any other remedy it may have, make good such deficiencies. In such a case, an appropriate Change Order or Change Directive shall be issued deducting from the payments then or thereafter due to the Contractor the cost of correcting such deficiencies, including compensation for the Architect/Engineer's additional services made necessary by such default, neglect, or failure and Owner's consequential damages.

Capital Region Airport Commission General Conditions Page 8 of 34

If the payments then or thereafter due Contractor are not sufficient to cover such amount, Contractor shall pay the difference to Owner together with interest thereon at the statutory interest rate.

3.5 OWNER’S RIGHT TO SUSPEND THE WORK

3.5.1 The Owner may at any time and without cause suspend the Work or any portion thereof for not more than ninety (90) calendar days by notice in writing to the General Contractor and the Architect/Engineer, which shall fix the date on which Work shall be resumed. The Contractor shall resume the Work on the date so fixed. The Contractor may be allowed an adjustment in the Contract price or an extension of Contract Time, or both, directly attributable to any suspension if he makes a claim therefore as provided by Article 8.3.2.

ARTICLE 4 CONTRACTOR

4.1 DEFINITION

4.1.1 Contractor is the entity identified as such in the Owner-Contractor Agreement. The term "Contractor" means Contractor or its authorized representative.

4.2 REVIEW OF CONTRACT DOCUMENTS

4.2.1 Contractor shall carefully study and compare the Contract Documents and shall at once report to the Architect/Engineer any error, inconsistency, or omission it may discover. The Contractor shall be liable to the Owner and Architect/Engineer for any damage resulting from any errors, inconsistencies, or omissions in the Contract Documents if it knew or, based on generally accepted standards of the industry for this type of Work, should have known of such errors and failed to notify Architect/Engineer; including issues that would be evident during walkthrough observations and assessments made by Contractor before Bid.

4.2.2 Contractor shall perform no portion of the Work at any time without complying with the Contract Documents or, where required, approved Shop Drawings, Product Data, or Samples for such portion of the Work.

4.2.3 Should the Contractor discover any conflict, omission, or error in the Contract Documents or require an interpretation or clarification of the Contract Documents, the Contractor shall immediately submit a completed Request for Information Form to the Architect/Engineer, in the form prescribed by the Architect/Engineer. The Contractor shall be responsible for ascertaining the correct dimensions, and the Contractor is not to ascertain dimensions simply by scaling the drawings. In case of a discrepancy between Drawings and Specifications, the Contractor shall consult the Architect/Engineer promptly for an interpretation before proceeding with the work.

4.3 SUPERVISION AND CONSTRUCTION PROCEDURES

4.3.1 Contractor shall supervise and direct the Work, using its best skill and attention. The Contractor shall be solely responsible for all construction, installation, and implementation means, methods, techniques, sequences, and procedures, and for coordinating all portions of the Work under the Contract. The Contractor shall review any specified construction or installation procedure, including those recommended by manufacturers, and shall advise the Architect/Engineer:

1. If the specified procedure deviates from good construction practice.

2. If following the procedure will affect any warranties, including the Contractor’s general warranty.

Capital Region Airport Commission General Conditions Page 9 of 34

3. Of any objections, the Contractor may have to the procedure.

4. If the Contractor proposes any alternative procedure that the Contractor is willing to warrant.

4.3.2 Contractor shall be responsible to Owner for the acts, errors, and omissions of its employees, Subcontractors, Sub-subcontractors and their agents and employees, and all other persons performing any of the Work under a contract with Contractor and shall fully indemnify, defend and save harmless Owner, its commissioners, agents, employees and assigns from all claims by third parties which may arise on account of services rendered by Contractor's employees, Subcontractors, Sub-subcontractors and their agents and employees and all other persons performing any of the Work under a contract with Contractor.

4.3.3 Contractor shall not be relieved from its obligations to perform the Work in accordance with the Contract Documents by the activities or duties of Architect/Engineer in its administration of the Contract, or by inspections, tests, or approvals required or performed under Paragraph 7.7 by persons other than Contractor.

4.3.4 Contractor shall report to the Owner through the Architect/Engineer.

4.4 LABOR AND MATERIALS

4.4.1 Unless otherwise expressly provided in the Contract Documents, the Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work.

4.4.2 Contractor shall always enforce strict discipline and good order among its employees and shall not employ in the Work any unfit person or anyone not skilled in the task assigned to it. The Contractor shall immediately remove from the Work any of its employees or employees of a Subcontractor when directed to do so by the Owner.

4.4.3 Alternative Products:

1. When a material, equipment, or system is specified by the name of a manufacturer, such material, equipment, or system shall form the basis of the Contract.

2. If the Contractor desires to submit an Alternative Product for evaluation, he shall do so in accordance with FAA Section 60.

4.4.4 General Contractor’s Financial Interests:

The Contractor shall disclose the existence and extent of any financial interest, whether direct or indirect, that he has in the Subcontractor or Material Suppliers which he may propose for this Project.

4.5 WARRANTY

4.5.1 Contractor warrants to Owner and Architect/Engineer that all materials and equipment furnished under this Contract shall be new unless otherwise specified and shall comply strictly with Architect/Engineer's specifications, and that all Work shall be of good quality, free from faults and defects, and in conformance with the Contract Documents. All Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. If required by the Architect/Engineer, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by the provisions of Paragraph 13.2.

Capital Region Airport Commission General Conditions Page 10 of 34

4.6 TAXES

4.6.1 Contractor shall pay all sales, consumer, use, and other similar taxes for the Work or portions thereof provided by Contractor that are legally enacted at the time bids are received, whether yet effective. Before Final Payment, the Contractor shall submit an affidavit to the Architect/Engineer that all sales, consumer, and use taxes have been paid.

4.7 PERMITS, FEES, AND NOTICES

4.7.1 Contractor shall secure and pay for the General Building permit. The Contractor shall secure and pay for all trade permits, including but not limited to governmental fees, licenses, and inspections necessary for the proper execution and completion of the Work. The Contractor shall submit copies of all permits, fees, licenses, and inspections to the Architect/Engineer within twenty-four (24) hours of obtaining the same.

4.7.2 Contractor shall give all notices and comply with all laws, ordinances, rules, regulations, and lawful orders of any public authority bearing on the performance of the Work.

4.7.3 It is not the responsibility of the Contractor to make certain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, building codes, and rules and regulations;

said responsibility being that of the Architect/Engineer. If the Contractor observes that any of the Contract Documents are at variance in any respect, it shall promptly notify the Owner and Architect/Engineer in writing, and any necessary changes shall be accomplished by appropriate Contract Modification.

4.7.4 If Contractor performs any Work knowing it to be contrary to such laws, statutes, ordinances, building codes, and rules and regulations, and without such notice to Owner and Architect/Engineer, it shall assume full responsibility therefore and shall bear all costs attributable thereto.

4.8 SUPERINTENDENT & PROJECT MANAGER

4.8.1 Contractor shall employ a competent superintendent and necessary assistants who shall attend the Worksite during the progress of the Work. The superintendent shall represent the Contractor, and all communications given to the superintendent shall be as binding as if given to the Contractor.

Important communications shall be confirmed in writing. Other communications shall be confirmed on written requests in each case. All communications from or decisions by the superintendent shall be binding as the act of the Contractor.

4.8.2 The Superintendent and Project Manager shall always be acceptable to the Owner and Architect/Engineer. They shall be employed in connection with the work from the commencement to Final Completion unless otherwise specified by the Architect/Engineer or Owner.

4.8.3 Before the execution of the contract, the Contractor shall provide a listing of the Contractor's Key Staff, including the Superintendent, who shall be committed to the Project for the duration. The Contractor represents and warrants that it shall commit such personnel, in terms of expertise and number, to fulfill its obligations and duties under this contract.

4.9 PROGRESS SCHEDULES

4.9.1 Contractor shall submit a preliminary Construction schedule in calendar days for the Work with its bid. The Contractor shall submit a detailed Critical Path Method (CPM) Construction Schedule in calendar days for the work for approval within (20) twenty calendar days from the date of award, or by the date of the Preconstruction Conference, whichever occurs first. The CPM Construction Schedule shall provide for the duration and sequence of each item of work and function to be performed, including a review of Shop Drawings, and shall be updated monthly. Acceptance of the

Capital Region Airport Commission General Conditions Page 11 of 34

CPM Construction Schedule is mandatory for the issuance of the Notice to Proceed. All schedules shall be prepared utilizing the latest Windows-based Primavera P6 software or scheduling software acceptable to the Architect/Engineer. Complete electronic files of schedules and monthly updates prepared for this project shall be furnished to the Architect/Engineer for review.

4.9.2 Contractor's CPM Construction Schedule shall provide for the most expeditious and practicable execution of the Work. In preparing the Contractor's CPM Construction Schedule, the Contractor shall perform a Constructability Study to ensure that the Work shall be constructed most expeditiously and economically.

4.9.3 Contractor shall submit to the Architect/Engineer a monthly status report ("Monthly Status Report") with each monthly application for payment. The Monthly Status Report shall summarize the work performed during the preceding month, and shall set forth the milestones achieved, and shall be submitted in a format acceptable to the Architect/Engineer. Specific CPM Milestones are required and will show the latest deadline for the following:

1. Submission of shop drawings for each trade.

2. Approval of shop drawings for each trade.

3. Starting and completion dates of shop fabrication.

4. Ordering and delivery of major critical, all long lead items or equipment, or time-sensitive components, or custom finish items to the Project Site.

4.9.4 If Contractor fails to submit a detailed CPM Construction schedule before the Notice to Proceed as outlined in Subparagraph 4.9.1, the Architect/Engineer, with the Owner’s approval, may withhold the Contractor’s first monthly progress payment or any portion thereof. If the Contractor fails to submit updated schedules or reports as required, the Architect/Engineer, with the Owner's approval, may at any time withhold the Contractor's progress payment or any portion thereof. Upon submission of the updated schedule or report, amounts withheld shall be released and paid to the Contractor. The Contractor shall submit at the beginning of each week a detailed CPM progress update schedule that includes a two (2) week look-ahead calendar day timeline to the Architect/Engineer. The weekly progress update shall identify certain items such as historical timelines, schedule slippage, delayed or deferred work, the status of critical items noted in 4.9.3, and all currently planned work activities, including relevant Owner’s activities interfacing with the Project.

4.9.5 Contractor represents and warrants that it is familiar with the Project, including the present improvements at the Project site, and that the Contractor shall phase the Work to avoid any interruption to airline services or airport operations except as specifically set forth below. If the Work may require the Contractor to interfere with or interrupt airline services or airport operations in any manner whatsoever, the Contractor shall make a written request to the Architect/Engineer for the Owner's approval of such interference or interruption no less than seventy-two (72) hours before such proposed interruption or interference or, in the case of any proposed closure of a runway, with no less than forty (40) calendar days written notice. In no event whatsoever shall the Contractor take any action that would prevent or impede the timely delivery of airline services or the conduct of airport operations except as expressly authorized by the Owner. If as a result of any act, error, or omission by the Contractor, airline services are impeded, prevented, or delayed, or the Owner's operations are materially impeded in any other way, then the Contractor shall be liable for all damages of every kind or nature suffered or incurred by Owner as a result of such act, error, or omission.

4.10 DOCUMENTS AND SAMPLES AT THE SITE

4.10.1 Contractor shall maintain at the site for the Architect/Engineer and the Owner one (1) record set of all Drawings, Specifications, Addenda, Change Orders, Change Directives, and other Modifications, in good order and marked currently to record all changes made during construction, Capital Region Airport Commission General Conditions Page 12 of 34 and approved Shop Drawings, Product Data, and Samples. These shall be available to the Owner and Architect/Engineer and shall be delivered to the Architect/Engineer for the Owner upon completion of the Work.

4.11 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

4.11.1 Shop Drawings are drawings, diagrams, schedules, and other data specially prepared for the Work by the Contractor or any Subcontractor, Sub-subcontractor, manufacturer, supplier, or distributor to illustrate some portion of the Work.

4.11.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams, and other information furnished by the Contractor to illustrate material, product, or system for some portion of the Work.

4.11.3 Samples are physical examples, which illustrate materials, equipment, or workmanship and establish standards by which the Work shall be judged.

4.11.4 Contractor shall prepare, review, approve, and submit to Architect/Engineer with reasonable promptness and in such sequence as to cause no delay in the Work or the work of Owner, Architect/Engineer, or any separate contractor, all Shop Drawings, Product Data, and Samples required by the Contract Documents. The Contractor shall submit all Shop Drawings, Product Data, and Samples in a format approved by the Architect/Engineer.

4.11.5 By preparing, reviewing, approving, and submitting Shop Drawings, Product Data, and Samples, the Contractor represents that it has determined and verified all materials, field measurements, and field construction criteria related thereto or shall do so with reasonable promptness and that it has checked and coordinated the information contained within such submittals with the requirements of the Work, the Project, and the Contract Documents.

4.11.6 Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by Architect/Engineer's approval of Shop Drawings, Product Data, or Samples unless Contractor has specifically informed Architect/Engineer in writing of such deviation at the time of submission and Architect/Engineer has recommended to Owner and approved in writing the specific deviation and Owner has agreed to such deviation in writing. The Contractor shall not be relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples, or similar submittals by the Architect/Engineer's approval thereof.

4.11.7 Contractor shall direct specific attention, in writing or by noting on resubmitted Shop Drawings, Product Data, or Samples, to revisions other than those requested by Architect/Engineer on previous submittals.

4.11.8 No portion of the Work requiring submission of Shop Drawing, Product Data, or Sample shall be commenced until the submittal has been approved by the Architect/Engineer as provided in Subparagraphs 2.2.13 and 2.2.14. All such portions of the Work shall be in accordance with approved submittals.

4.12 USE OF SITE

4.12.1 Contractor shall confine operations at the site to areas permitted by law, ordinances, permits, the Contract Documents, and the Owner, and shall not unreasonably encumber the site with any materials or equipment.

4.12.2 Contractor shall obtain the approval of the Owner before using any portion of the site.

Capital Region Airport Commission General Conditions Page 13 of 34

4.13 CUTTING AND PATCHING OF WORK

4.13.1 Contractor shall be responsible for all cutting, fitting, or patching that may be required to complete the Work or to make its several parts fit together properly.

4.13.2 Contractor shall not damage or endanger any portion of the Work or the work of the Owner or any separate contractors by cutting, patching, or otherwise altering any work, or by excavation. The Contractor shall not cut or otherwise alter the work of the Owner or any separate Contractor except with the written consent of the Owner and such separate Contractor. The Contractor shall not unreasonably withhold from the Owner or any separate Contractor its consent to cutting or otherwise altering the Work.

4.14 CLEANING UP

4.14.1 Contractor shall always keep the premises free from accumulation of waste materials or rubbish caused by its operations. In the event the Contractor's waste materials interfere with the Owner's or Owner's operations at any time, the Contractor shall remove such waste materials and rubbish daily. At the completion of the Work, it shall remove all waste materials and rubbish from and about the Project as well as all its tools, construction equipment, machinery, and surplus materials.

4.14.2 If Contractor fails to clean up at the completion of the Work, Owner may do so as provided in Paragraph 3.4, and the cost thereof shall be charged to Contractor.

4.15 COMMUNICATIONS

4.15.1 Contractor shall forward all communications to the Owner through the Architect/Engineer.

4.16 ROYALTIES AND PATENTS

4.16.1 Contractor shall pay all royalties and license fees. The Contractor shall defend all suits or claims for infringement of any patent rights and shall indemnify, defend and save Owner harmless from loss or expense on account thereof, except that the Contractor shall not be responsible for such loss or expense when a particular design, process, or the product of a particular manufacturer or manufacturers is specified, but if the Contractor has reason to believe that the design, process or product specified is an infringement of a patent, it shall be responsible for such loss unless it promptly gives such information to Architect/Engineer.

4.17 INDEMNIFICATION

4.17.1 Contractor shall hold harmless, indemnify, and defend Owner and Architect/Engineer, their commissioners, officers, agents, and employees from all liability, claims, losses, or damages including legal fees, costs of litigation, and any judgment arising out of or alleged to arise from Contractor's errors, omissions, negligence, or breach of this Agreement in the performance of the Work. This indemnification obligation shall apply to all liabilities, claims, losses, and damages including legal fees, costs of litigation, and any judgments that are caused in whole or in part by the errors, omissions, negligence, or breach of Contractor, its Subcontractors, Sub-subcontractors, anyone directly or indirectly employed by either or anyone for whose acts either may be liable, regardless of whether or not they are caused in part by a party indemnified hereunder. The indemnification obligation in this Paragraph shall not be limited by a limitation on the amount or type of damage, compensation, or benefits payable by or for the Contractor, Contractor's Subcontractors or Sub-subcontractors, or anyone directly or indirectly employed by any of them under workers' or workmen's compensation acts, disability benefit acts, or other employee benefit acts.

Capital Region Airport Commission General Conditions Page 14 of 34

4.18 THIRD-PARTY BENEFICIARY

4.18.1 No person or entity shall be deemed to be a third-party beneficiary of any provisions of the Contract, nor shall any provisions thereof be interpreted to create a right of action or otherwise permit anyone not a signatory party to the Contract to maintain an action for personal injury or property damage.

ARTICLE 5 SUBCONTRACTORS

5.1 DEFINITION

5.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform any of the Work at the site. Add material and equipment suppliers whenever a reference to Subcontractors is intended to also apply to suppliers. Wherever relevant, the term “Subcontractor” shall also include a person or entity who supplies material or equipment for the Project.

5.1.2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform any of the Work at the site.

5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK

5.2.1 Contractor shall furnish with the bid submission, the names of the people or entities (including those who are to furnish materials or equipment fabricated to a special design) and the services to be provided by such people or entities proposed for each of the principal portions of the Work and the value thereof. Architect/Engineer shall promptly consult with Owner and promptly reply to Contractor in writing stating whether Owner, after due investigation, has a reasonable objection to any such proposed person or entity.

5.2.2 Contractor shall not contract with any proposed person or entity to whom Owner has made a reasonable objection under the provisions of Subparagraph 5.2.1. The Contractor shall not be required to contract with anyone to whom it has a reasonable objection.

5.2.3 If the Owner has a reasonable objection to any such proposed person or entity, the Contractor shall submit a substitute to whom the Owner has no reasonable objection.

5.2.4 Contractor shall make no substitution for any Subcontractor, person, or entity previously selected if Owner makes a reasonable objection to such substitution.

5.3 SUB-CONTRACTUAL RELATIONS

5.3.1 By an appropriate agreement written where legally required for validity, Contractor shall require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to Contractor by the terms of the Contract Documents, and to assume toward Contractor all the obligations and responsibilities which Contractor, by the Contract Documents, assumes toward Owner and Architect/Engineer. Said agreement shall preserve and protect the rights of Owner and Architect/Engineer under the Contract Documents with respect to the Work to be performed by the Subcontractor so that the subcontracting thereof shall not prejudice such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the Contractor-Subcontractor agreement, the benefits of all rights, remedies, and redress against Contractor that Contractor, by these Documents, has against Owner. Where appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with its Sub-subcontractors.