This is a specification document and invitation to bid issued by Montgomery County, Texas for Project #26-09, the Dobbin-Huffsmith Road Improvement project (CSJ: 0912-37-264) located in Precinct #2. The project involves roadway rehabilitation and widening of Dobbin-Huffsmith Road from Spur 149 Road to FM 2978, spanning 8.25 miles with proposed roadway widenings where right-of-way permits and updated striping. The scope of work includes excavation, flexible base placement, cement treatment, asphalt treatment, prime coat application, dense-graded hot-mix asphalt (D-GR HMA), tack coat, pavement repairs, mobilization, traffic control, work zone pavement markings, reflective pavement markings, and raised pavement markers. Sealed lump sum bids are due by July 29, 2026 at 2:00 p.m. at the Montgomery County Purchasing Agent's office (501 North Thompson, Suite 405, Conroe, Texas 77301). A pre-bid meeting is scheduled for July 14, 2026 at 10:00 a.m., with a deadline for questions on July 20, 2026 by 2:00 p.m. The contractor must achieve substantial completion within 118 calendar days after written notice to proceed. The project specifications reference 2024 Texas Department of Transportation Technical Specifications and Montgomery County General Conditions.
Bid security of not less than 5 percent of the greatest amount of the bid must accompany each proposal in the form of a certified or cashier's check or bidder's bond. A Performance and Payment Bond, each in an amount of 100 percent of the contract sum, is required within twenty days of notification of award. Contractors must submit a Texas Ethics Commission Form 1295 with their bid, along with a completed Contractor's Qualification Statement (AIA Form A305) and initialed copies of Montgomery County Purchasing Department requirements. The county encourages the utilization of local businesses and suppliers wherever possible but not to the extent that the contractor's bid becomes uncompetitive. The owner reserves the right to reject any or all bids, accept any proposal considered advantageous, and waive any informality or irregularity in any bid. Consideration of the lowest price and length of days bid for substantial completion may be major factors in determining the most advantageous proposal. Vendors must download and complete any addenda and submit responses in accordance with the stated requirements. No bid will be considered withdrawn for ninety days after opening without owner consent.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Montgomery County Specification Download Acknowledgement
Invitation to Bid
DOBBIN-HUFFSMITH RD. IMPROVEMENT Project # 26-09
PRECINCT #2 SPECS
CSJ: 0912-37-264
VENDORS MUST IMMEDIATELY RETURN THIS FORM BY EMAIL: purchasing@mctx.org
Vendor Responsibilities o Vendors must download and complete any addenda o Vendors must submit responses in accordance with requirements stated on cover of document o Vendor must submit 1295 form with Bid/Proposal
Detailed information regarding 1295 can be found under item 49 in the attached Terms and Conditions.
Texas Ethics Commission website for 1295:
https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm
For completing the 1295:
Contract ID: 5606 Description: Project #26-09
Montgomery County will not be responsible for inaccurate or incomplete specifications and/or addenda pertaining to any bid/proposal that is received electronically.
Legal Name of Contracting Company
Contact Person
Complete Mailing Address
Telephone Number Email Address
Signature Date
Project #26-09 Dobbin-Huffsmith Rd. Improvement (CSJ: 0912-37-264) – Precinct #2 mailto:purchasing@mctx.org https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm
Sealed lump sum General Contract Bids, addressed to the OWNER:
MONTGOMERY COUNTY PURCHASING
Attn: Kelly Vidal, CPPO, CPPB, NIGP-CPP, County Purchasing Agent Project: Project# 26-09 Dobbin-Huffsmith Rd. Improvement - Precinct #2
CSJ: 0912-37-264
501 North Thompson, Suite 405 Conroe, Texas 77301 will be received until July 29, 2026 in the OFFICE OF THE COUNTY PURCHASING AGENT, for the Dobbin-Huffsmith Rd. Improvement, PROJECT #26-09 (CSJ: 0912-37-264) located in Montgomery County, Texas, and then publicly opened in the office of the Montgomery County Purchasing Agent.
A Cashier's or Certified Check or Bidder's Bond payable to the order of the OWNER, in an amount not less than 5% of the greatest amount of proposal submitted must accompany the Contractors Bid.
A Performance and Payment Bond, each in an amount not less than 100% of the Contract Sum, conditioned upon the faithful performance of the Contract, will be required.
General Documents, Drawings and Specifications (Construction Documents) for the Project are in the office of the Purchasing Agent. Any questions concerning the information contained in the Plans & Specifications shall be directed to the Procurement Construction Project Manager - Construction, Andreea Kovacs via email at andreea.kovacs@mctx.org.
Sets of Construction Documents may be obtained from the office of the Montgomery County Purchasing Agent. General Contract Bidders shall submit a completed Contractor’s Qualification Statement (AIA Form A305) to Purchasing Agent at time of request for documents.
All bids, whether mailed or delivered, must be in the hands of OWNER no later than the above specified time for said Project. All Bids shall be sealed and marked outside of envelope: Dobbin-Huffsmith Rd.
Improvement, PROJECT #26-09 (CSJ: 0912-37-264), with name and address of the Bidder.
No bid shall be withdrawn for ninety (90) days after opening of the bids without consent of Owner. Owner reserves the right to reject any or all bids; to accept or reject any Alternates; to accept any bid considered advantageous; and to waive any informality or irregularity in any bid which, in his judgement, is in his own best interest. It is in the Owner’s best interest to occupy the space as soon as possible, therefore consideration of the lowest price and/or length of days bid for Substantial Completion may be a major factor in determining the most advantageous proposal.
-o0o-
Project #26-09 Dobbin-Huffsmith Rd. Improvement (CSJ: 0912-37-264) – Precinct #2
BIDDING INFORMATION:
a. Lump Sum General Contract Bids, for the Dobbin-Huffsmith Rd. Improvement, PROJECT #26-09 (CSJ: 0912-37-264), located in Montgomery County, Texas, will be received by OWNER and opened at the time, place and date designated in the ADVERTISEMENT FOR BIDS or latest Addendum thereto.
b. Each Bidder shall complete all the blank spaces on the Bid Form.
c. Submit Bids on the form provided by the Owner or on an exact copy thereof. Seal Bid in an enveloped addressed to OWNER and plainly mark outside of the envelope name of the contents, and the name and address of the Bidder.
d. If a Bidder submits his Bid by mail, he shall enclose the above described sealed envelope in a second envelope addressed to OWNER and have the bidder’s return address in the upper left hand corner. The Officer whose duty it is to open the Bids will decide when the bid opening time is at hand and no Bid received thereafter will be considered. Owner and Engineer will not be responsible for the premature opening of any Bid which is not properly addressed and identified.
1. TENTATIVE SCHEDULE OF EVENTS:
• Release of Bid: Wednesday, July 1, 2026
• Pre-Bid Meeting: Tuesday, July 14, 2026 at 10:00 am
• Deadline for Questions: Monday, July 20, 2026 by 2:00 pm
• Submission Due Date: Wednesday, July 29, 2026 by 2:00 pm
2. BID SECURITY: No bid will be considered unless it is accompanied by a certified or cashier’s check or bidder’s bond executed on the standard form acceptable to Owner, in either case, the amount shall be not less than 5% of the greatest amount of the bid (considering Alternates, if any).
The bid security shall ensure the execution of the Contract and the furnishing of an acceptable Performance and Payment bond by the successful bidder within twenty (20) days after notification of award to such bidder, and that his bid will not be withdrawn within twenty (20) days after the date of opening of the bid without the consent of OWNER. The Performance and Payment bond shall be in the amount of 100% of the total Contract Sum, in form prescribed by Owner. A Contract with Owner, in form prescribed by Owner, shall be executed and delivered together with the said Performance and Payment bond of the successful bidder within twenty (20) days after receipt by such successful bidder of Notice of Acceptance of his proposal by Owner or Engineer. The bid security in the form of certified or cashier’s check will be returned to unsuccessful Bidders as soon as a contract award is made.
3. BID FORM: Provided by Engineer for Contractor’s convenience. Bid shall be in duplicate and signed by a duly authorized official of the contracting firm. This Form must be tendered along with initialed copies of Montgomery County Purchasing Department Requirements.
4. EXAMINATION OF SITE AND CONSTRUCTION DOCUMENTS: Prior to submitting a Bid for this Project, each proposer shall have examined the site, compared it with the Drawings and Specifications, and satisfied himself as to the existing conditions under which he and his subcontractors will be required to work or that will affect the work under this Contract. No allowances will be made in behalf of Contractor or any Subcontractor, after the Contract has been signed, for any omission, error or negligence in determining these conditions.
5. TIME OF COMPLETION: Contractor shall achieve Date of Substantial Completion within 118 calendar days after written Notice to Proceed. This is subject to adjustments of Contract Time as provided in the Contract.
6. INTERPRETATION OF BID PRICES: In case of a difference in written words and figures on Bid Form, the amount stated in written words shall govern.
7. DELIVERY OF BIDS: Bidder shall be responsible for mailing or delivering his Bid at the proper time and to the proper place. The mere fact that a Bid was mailed or dispatched will not be considered.
Bidder is held responsible for determining that the Bid is actually received by Owner. Submitting a Bid or modification thereof by telephone or telegraph is not allowed.
8. PERFORMANCE AND PAYMENT BONDS: Required. Refer to Item 1 above, and Montgomery County Purchasing Department Requirements.
9. TAX EXEMPTION: TEXAS SALES AND USE TAXES: Owner is exempt from State and local sales and use taxes under Section 151.309 of the Texas Tax Code. This Contract is deemed to be a separated Contract for Texas tax purposes, and as such, Owner hereby issues its Texas Exemption for the purchase of any items qualifying for exemption under this Agreement. Contractor is to issue its Texas Resale Certificate to vendors and subcontractors for such items qualifying for this exemption and further, Contractor should state these items at cost.
10. ADDENDA AND INTERPRETATIONS:
a. No interpretation of the meaning of the Construction Documents (General Documents, Specifications and Drawings) will be made to any bidder orally. Requests for such interpretations shall be made in writing and addressed to Engineer, and to be given consideration must be received at least (5) working days prior to date set for receiving bids.
Any and all such interpretations or supplemental instructions will be issued in the form of written Addenda to the Construction Documents, which, if issued, will be furnished to all prospective bidders at the respective addresses furnished for such purposes, prior to date set for opening of bids. Failure of any bidder to receive any such Addendum or interpretation shall not relieve any bidder from any obligation under his bid as submitted. All Addenda so issued shall become part of the Contract Documents upon signing of the Agreement Between Owner and Contractor.
b. Contractors, subcontractors and materialmen bidding on this work are requested to direct their requests for clarification or amplification to the Drawings and Specifications covering all phases of the work, including architectural, mechanical, plumbing and electrical items, to the Assistant County Purchasing Agent, Andreea Kovacs via email at andreea.kovacs@mctx.org.
Oral interpretation will not constitute authority to change the scope of work, workmanship or materials required for this project.
c. Request for approval to substitute materials, methods, or processes shall be made to Engineer no later than (5) working days prior to date for submission of subcontract bids to general contractors, and if found acceptable, will be confirmed by an Addendum to the Construction Documents. Where proposed substitutions are NOT incorporated into the Construction Documents by Addendum PRIOR TO the Contract Bid Opening, all bids shall be held to have been made on the basis of materials, methods and processes required by the Construction Documents. CONTRACTOR NOTE: The terms “substitution”, “equal” and similar wording as used herein shall be held to mean “a proposal to use any material, method, or process other than the materials, methods or processes as specified, as well as related work as noted on the Drawings”.
11. CASH ALLOWANCES: Not Applicable
12. USE OF LOCAL SUBCONTRACTORS AND SUPPLIERS: It is the intention of the County for local businesses to be given every consideration and opportunity to provide services and materials for this project. Contractors submitting bids for this project are encouraged to utilize local businesses wherever possible, but not to the extent where their participation will result in the Contractor’s bid not being competitive.
13. TRASH REMOVAL: Contractor shall not allow trash to accumulate on the building site. Contractor shall be required to coordinate the location of his trash dumpster with the Owner’s Representative.
PROJECT: Dobbin-Huffsmith Rd. Improvement, PROJECT #26-09 (CSJ: 0912-37-264) BID DATE: July 1, 2026
BID TIME: 2:00 P.M.
PLACE: OFFICE OF THE COUNTY PURCHASING AGENT
501 North Thompson, Suite 405 - Conroe, Texas, 77301
CONTRACTOR:______________________________________________________
TYPED/PRINTED NAME OF FIRM SUBMITTING BID
TO: MONTGOMERY COUNTY PURCHASING AGENT
Project #26-09 Dobbin-Huffsmith Rd. Improvement – Precinct #2
CSJ: 0912-37-264
501 North Thompson, Suite 405 Conroe, Texas 77301
Having carefully examined the Construction Documents and having visited the site and examined all conditions affecting the Work, the undersigned and subcontractors employed for this project agree to provide all labor and material required by the Construction Documents and do all work necessary for the complete construction of the Dobbin-Huffsmith Rd. Improvement, PROJECT #26-09 (CSJ: 0912-37-264) -located in Montgomery County, Texas, for the lump sum of:
TOTAL AMOUNT BID:
______________________________________________________________________________DOLLARS (amount written in words governs)
(amount in figures)
TIME FOR COMPLETION. Contractor shall achieve Date of Substantial Completion within 118 calendar days after written Notice to Proceed. This is subject to adjustments of Contract Time as provided in the Contract.
ADDENDA. The undersigned acknowledges receipt of Addendum Number(s)_____________issued during the time for bidding and has included the several changes therein in this Proposal.
BID SECURITY. Bid Security in the sum of ___________________________________________DOLLARS ($_________) in the form of _______________________________________________________________ is submitted herewith as a guarantee that the undersigned will, if this Bid is accepted and the undersigned be notified of such acceptance, enter into a Contract and furnish acceptable Performance and Payment Bonds within twenty (20) days after the prescribed forms of Agreement and bond are presented to the undersigned for execution and that no bid made hereby will be withdrawn within twenty (20) days after the date set for opening of the bid for this Work without your consent.
CHANGES IN THE WORK. When changes in the Work are ordered involving extra cost over and above the Contract Sum, the cost of such extra work shall be stated as a lump sum to be added to the Contract Sum before the extra work is begun, in which event the lump sum shall represent the actual cost of labor and material.
COMPLIANCE ACKNOWLEDGMENT. The undersigned acknowledges this Bid is based on STRICT COMPLIANCE with the Drawings and Specifications, as to items, materials, methods, etc., or PRIOR
APPROVED EQUALS ISSUED BY ADDENDA BEFORE PROPOSAL OPENING DATE.
GENERAL.
It is understood that if accepted by Owner, this Bid becomes a part of the Contract Documents upon the signing of the Agreement, and failing to comply with any part of this Bid will be taken as failure of the Bidder to comply with the Contract Agreement and will be just cause for rejection of the Work.
If awarded the Contract for this Project, the undersigned shall submit to the Engineer a list of subcontractors he proposes to employ prior to executing the subcontracts. It is also understood that OWNER reserves the right to reject any or all proposals; to accept any proposal considered advantageous; and to waive any informality or irregularity in any proposal which, in his judgement, is in his own best interest. It is in the Owner's best interest to occupy the building as quickly as possible, therefore, consideration of either lowest price and/or length of days proposed for substantial completion may be a major factor in determining the most advantageous proposal.
The undersigned certifies that the amounts contained in this Bid have been carefully checked and are submitted as correct and final.
The undersigned agrees that he will not withdraw this Bid for a period of ninety (90) days from the date hereof: .
BID TO BE SUBMITTED IN DUPLICATE (one original and one copy).
NAME OF CONTRACTING FIRM
BY:________________________________________
AUTHORIZED SIGNATURE
PRINTED/TYPED NAME & TITLE OF ABOVE
ADDRESS:__________________________________
CITY STATE ZIP
TELEPHONE: (_____)__________________
FAX: (_____)_________________________
STATE WHETHER CORPORATION
PARTNERSHIP or INDIVIDUAL
SEAL, IF CORPORATION
MONTGOMERY COUNTY, TEXAS
PRECINCT 2
CHARLIE RILEY, COMMISSIONER
PROJECT NO. 26-09
DOBBIN-HUFFSMITH RD. IMPROVEMENT
CSJ: 0912-37-264
PROJECT MANUAL
BIDDER IS REQUIRED TO FILL IN INFORMATION BELOW:
BIDDER
(COMPANY NAME)
TOTAL AMOUNT OF BID $
11700 Katy Freeway Suite 300 Houston, Texas 77079 Phone:
713.988.0145 www.wsbeng.com
Project #26-09 Dobbin-Huffsmith Rd. Improvement (CSJ: 0912-37-264) – Precinct #2 http://www.wsbeng.com/ http://www.wsbeng.com/
SCOPE OF WORK
FOR
DOBBIN-HUFFSMITH RD CONSTRUCTION
This project is a roadway rehabilitation and widening project for Dobbin-Huffsmith Rd from Spur
149 Rd to FM 2978. Project is 8.25 miles long with proposed roadway widenings where ROW allows and updated striping.
The above description of the scope of work is general in nature and is only intended to provide an overview of the project. The complete detailed scope of work and bid items are contained in the plans and specifications. The contractor will have 118 calendar days to complete the project.
This project shall be constructed under the Montgomery County General Conditions and the
2024 Texas Department of Transportation Technical Specifications.
Initial
DOBBIN-HUFFSMITH RD PAVEMENT
REHABILITATION CONSTRUCTION
MONTGOMERY COUNTY, TEXAS
BID FORM
ITEM DESC SPEC
NO. NO. NO. DESCRIPTION UNIT QTY PRICE AMOUNT
110 7001 0 EXCAV (ROADWAY) CY 6,000
247 7113 0 FL BS (CMP IN PLC)(TY A GR 1-2) (12") SY 32,404
275 7001 0 CEMENT TON 940
275 7017 0 CEMENT TREAT (SUBGRADE) (8") SY 52,180
292 7014 000 ASPHALT TRT BASE (GR 4)(PG 64) TON 574
310 7001 000 PRIME COAT (AE-P) GAL 18,263
341 7048 000 D-GR HMA TY-D PG70-22 TON 14,621
341 7082 000 TACK COAT GAL 19,938
351 7010
FLEXIBLE PAVEMENT STRUCTURE
REPAIR(11") SY 42,592
500 7001 MOBILIZATION LS 1
502 7001
BARRICADES, SIGNS AND TRAFFIC
HANDLING MO 5
503 7001
PORTABLE CHANGEABLE MESSAGE
SIGN DAY 100
505 7001 0 TMA (STATIONARY) DAY 100
505 7002 0 TMA (MOBILE OPERATION) HR 40
662 7008 0
WK ZN PAV MRK NON-REMOV
(W)6"(SLD) LF 87,045
662 7012 0
WK ZN PAV MRK NON-REMOV
(W)8"(SLD) LF 13,045
662 7017
WK ZN PAV MRK NON-REMOV
(W)24"(SLD) LF 48
662 7018 0
WK ZN PAV MRK NON-REMOV
(W)(ARROW) EA 7
662 7030 0
WK ZN PAV MRK NON-
REMOV(W)(WORD) EA 7
662 7038 0
WK ZN PAV MRK NON-REMOV
(Y)6"(SLD) LF 63,250
662 7040
WK ZN PAV MRK NON-REMOV
(Y)12"(SLD) LF 85
662 7049 000 WK ZN PAV MRK REMOV (REFL) TY I-C EA 655
662 7051
WK ZN PAV MRK REMOV (REFL) TY II-A-
A EA 711
666 7024 0 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 13,045
666 7036 0
REFL PAV MRK TY I
(W)24"(SLD)(100MIL) LF 48
666 7042 0
REFL PAV MRK TY I
(W)(ARROW)(100MIL) EA 7
DOBBIN-HUFFSMITH RD PAVEMENT
REHABILITATION CONSTRUCTION
MONTGOMERY COUNTY, TEXAS
BID FORM
ITE
M DESC SPEC
NO. NO. NO. DESCRIPTION UNIT QTY PRICE AMOUNT
666 7066 0
REFL PAV MRK TY I
(W)(WORD)(100MIL) EA 7
666 7117 0
REFL PAV MRK TY I
(Y)12"(SLD)(100MIL) LF 85
666 7411 0 REFL PAV MRK TY I (W)6"(SLD)(100MIL) LF 87,045
666 7423 0 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) LF 63,250
672 7002 0 REFL PAV MRKR TY I-C EA 655
672 7004 0 REFL PAV MRKR TY II-A-A EA 711
677 7002 0 ELIM EXT PM & MRKS (6") LF 360
677 7004 0 ELIM EXT PM & MRKS (8") LF 90
677 7009 0 ELIM EXT PM & MRKS (ARROW) EA 2
678 7002 0 PAV SURF PREP FOR MRK (6") LF 360
678 7004 0 PAV SURF PREP FOR MRK (8") LF 90
678 7009 0 PAV SURF PREP FOR MRK (ARROW) EA 2
PROJECT TOTAL
MONTGOMERY COUNTY
DOBBIN-HUFFSMITH RD
CONSTRUCTION GENERAL NOTES
1. BIDDERS ARE REQUESTED TO VISIT THE VICINITY OF THE PROJECT SITE AND EVALUATE THE
EXISTING SITE CONDITIONS.
2. THE ATTENTION OF PROSPECTIVE BIDDERS IS DIRECTED TO ORDINANCES AND REGULATIONS OF
LOCAL MUNICIPAL AND COUNTY GOVERNMENTS AND THE TEXAS COMMISSION ON ENVIRONMENTAL
QUALITY WHICH MAY BE APPLICABLE ON THIS PROJECT.
3. THE CONTRACTOR SHALL PROCURE ALL PERMITS AND LICENSES, WHICH ARE TO BE ISSUED TO
THE CONTRACTOR BY THE CITY AND/OR COUNTY.
4. IN THOSE INSTANCES WHERE FIXED FEATURES REQUIRE, THE GOVERNING SLOPES INDICATED
HEREIN MAY BE VARIED BETWEEN THE LIMITS SHOWN AND TO THE EXTENT DETERMINED BY THE
ENGINEER.
5. GRADE STREET INTERSECTIONS AND MEDIAN OPENINGS FOR SURFACE DRAINAGE.
6. NOTIFY THE COUNTY ENGINEER IMMEDIATELY IF DISCREPANCIES ARE DISCOVERED IN THE
HORIZONTAL CONTROL OR BENCHMARK DATA.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MARKING STATIONS EVERY 100 FEET AND SHALL
MAINTAIN THE MARKINGS FOR THE DURATION OF THE PROJECT.
8. PRIOR TO BEGINNING ANY EXCAVATION WORK IN THE AREA OF EXISTING UTILITIES, THE
CONTRACTOR SHALL CONTACT THE UTILITY COMPANIES OR THE UTILITY COORDINATING
COMMITTEE FOR EXACT LOCATIONS TO PREVENT ANY DAMAGE OR INTERFERENCE WITH PRESENT
FACILITIES. THE UTILITY COORDINATING COMMITTEE AND THE TEXAS ONE CALL SYSTEM SHALL BE
NOTIFIED AT THE FOLLOWING NUMBER: OUTSIDE HMA, TOLL FREE 1-800-245-4545
THIS ACTION, HOWEVER, SHALL IN NO WAY BE INTERPRETED AS RELIEVING THE CONTRACTOR OF
HIS/HER RESPONSIBILITIES UNDER THE TERMS OF THE CONTRACT AS SET OUT IN THE PLANS AND
SPECIFICATIONS. THE CONTRACTOR SHALL REPAIR ANY DAMAGE CAUSED BY HIS/HER
OPERATIONS AT THE CONTRACTOR'S EXPENSE AND SHALL RESTORE FACILITIES TO SERVICE IN A
TIMELY MANNER.
9. IF ANY OVERHEAD OR UNDERGROUND POWER LINES NEED TO BE DE-ENERGIZED, THE
CONTRACTOR SHALL CALL THE POWER COMPANY TO DO THIS WORK. ANY COST ASSOCIATED WITH
DE-ENERGIZING THE POWER LINE AND/OR ANY OTHER PROTECTIVE MEASURES REQUIRED SHALL
BE AT THE CONTRACTOR'S EXPENSE.
10. WHEN THE CONTRACTOR IS WORKING NEAR ANY POWER LINES, IT IS HIS/HER RESPONSIBILITY TO
COMPLY WITH THE APPROPRIATE SECTIONS OF TEXAS STATE LAW AND FEDERAL REGULATIONS
RELATING TO THE TYPE OF WORK INVOLVED.
Project #26-09 Dobbin-Huffsmith Rd. Improvement (CSJ: 0912-37-264) – Precinct #2
DNash Snapshot
11. THE CONTRACTOR WILL BE REQUIRED TO MAKE EVERY EFFORT TO CONTROL DUST CAUSED BY
HIS/HER CONSTRUCTION OPERATIONS. IN SWEEPING THE FINISHED ASPHALT PAVEMENT, THE
CONTRACTOR WILL BE REQUIRED TO USE ONE OF THE FOLLOWING TYPES OF SWEEPERS (OR
EQUAL):
TRICYCLE TYPE TRUCK TYPE - 4 WHEEL
WAYNE SERIES 900 M-B CRUISER II
ELGIN WHITE WING WAYNE MODEL 945
ELGIN PELICAN MOBIL TE-3
MOBIL TE-4
MURPHY 4042
12. DO NOT MIX OR STORE MATERIALS, OR STORE OR REPAIR EQUIPMENT, ON TOP OF ASPHALT
PAVEMENT OR BRIDGE DECKS UNLESS AUTHORIZED BY THE COUNTY ENGINEER. PERMISSION WILL
BE GRANTED TO STORE MATERIALS ON SURFACES IF NO DAMAGES OR DISCOLORATION WILL
RESULT.
13. PERSONAL VEHICLES OF EMPLOYEES ARE NOT PERMITTED TO PARK WITHIN THE RIGHT OF WAY.
EMPLOYEES MAY PARK AT THE CONTRACTOR’S OFFICE, EQUIPMENT, AND MATERIALS STORAGE
YARD SITES.
14. ASSUME OWNERSHIP OF DEBRIS AND DISPOSE OF AT APPROVED LOCATION. DO NOT DISPOSE OF
DEBRIS ON PRIVATE PROPERTY UNLESS APPROVED IN WRITING BY COUNTY ENGINEER.
15. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ELEVATIONS AT LOCATIONS WHERE A
PROPOSED TO EXISTING TIE-IN IS LOCATED. LIMITS OF WORK MAY BE ADJUSTED AS DIRECTED BY THE
ENGINEER IN ORDER TO MATCH EXISTING ROADWAY ELEVATIONS, EXISTING CHANNEL BANKS AND
OUTFALLS.
16. ENSURE THE ROAD IS ALWAYS OPEN TO TRAFFIC. MAINTAIN ACCESS TO PUBLIC AND PRIVATE DRIVES
AND SIDE ROADS AT ALL TIMES.
17. THE COST FOR MATERIALS, LABOR, AND INCIDENTALS TO PROVIDE FOR TRAFFIC ACROSS THE
ROADWAY AND FOR INGRESS AND EGRESS TO PRIVATE PROPERTY IN ACCORDANCE WITH TXDOT
GENERAL CONDITION ARTICLE 7.7 OF THE STANDARD SPECIFICATIONS IS SUBSIDIARY TO THE
VARIOUS BID ITEMS. RESTORE ACCESS ROADWAYS TO THEIR ORIGINAL CONDITION UPON
COMPLETING CONSTRUCTION.
18. SCHEDULE CONSTRUCTION OPERATIONS SUCH THAT PREPARING INDIVIDUAL ITEMS OF WORK
FOLLOWS IN CLOSE SEQUENCE TO CONSTRUCTING STORM DRAINS IN ORDER TO PROVIDE AS LITTLE
INCONVENIENCE AS PRACTICAL TO THE BUSINESSES AND RESIDENTS ALONG THE PROJECT.
19. SCHEDULE WORK SO THAT THE BASE PLACEMENT OPERATIONS FOLLOW THE SUBGRADE WORK AS
CLOSELY AS PRACTICAL TO REDUCE THE HAZARD TO THE TRAVELING PUBLIC AND TO PREVENT UNDUE
DELAY CAUSED BY WET WEATHER.
20. WHEN DESIGN DETAILS ARE NOT SHOWN ON THE PLANS, PROVIDE SIGNS AND ARROWS CONFORMING
TO THE LATEST “STANDARD HIGHWAY SIGN DESIGNS FOR TEXAS” MANUAL.
21. CONSIDER THE LOCATIONS OF UNDERGROUND UTILITIES DEPICTED IN THE PLANS AS APPROXIMATE
AND EMPLOY RESPONSIBLE CARE TO AVOID DAMAGING UTILITY FACILITIES. DEPENDING UPON SCOPE
AND MAGNITUDE OF PLANNED CONSTRUCTION ACTIVITIES, ADVANCED FIELD CONFIRMATION BY THE
UTILITY OWNER OR OPERATOR MAY BE PRUDENT. WHERE POSSIBLE, PROTECT AND PRESERVE
Project #26-09 Dobbin-Huffsmith Rd. Improvement (CSJ: 0912-37-264) – Precinct #2
PERMANENT SIGNS, MARKERS, AND DESIGNATIONS OF UNDERGROUND FACILITIES.
IF THE CONTRACTOR DAMAGES OR CAUSE DAMAGE (BREAKS, LEAKS, NICKS, DENTS, GOUGES, ETC.) TO
THE UTILITY, CONTACT THE UTILITY FACILITY OWNER OR OPERATOR IMMEDIATELY.
IF OVERHEAD OR UNDERGROUND POWER LINES NEED TO BE DE-ENERGIZED, CONTACT THE
ELECTRICAL SERVICE PROVIDER TO PERFORM THIS WORK. COSTS ASSOCIATED WITH DE-ENERGIZING
THE POWER LINES OR OTHER PROTECTIVE MEASURES REQUIRED ARE AT NO EXPENSE TO THE
COUNTY.
IF WORKING NEAR POWER LINES, COMPLY WITH THE APPROPRIATE SECTIONS OF TEXAS STATE LAW
AND FEDERAL REGULATIONS RELATING TO THE TYPE OF WORK INVOLVED.
22. MAINTAIN THE ROADWAY SLOPE STABILITY. MAINTAINING SLOPE STABILITY IS SUBSIDIARY TO THE
VARIOUS BID ITEMS.
23. BEFORE STARTING WORK ON A CONSTRUCTION CONTRACT, PREPARE AND SUBMIT A PROGRESS
SCHEDULE BASED ON THE SEQUENCE OF WORK AND TRAFFIC CONTROL PLAN SHOWN IN THE
CONTRACT. AT A MINIMUM, PREPARE THE PROGRESS SCHEDULE AS A BAR CHART. INCLUDE ALL
PLANNED WORK ACTIVITIES AND SEQUENCES AND SHOW COMPLETION WITHIN THE NUMBER OF
CALENDAR DAYS SPECIFIED. INCORPORATE MAJOR MATERIAL PROCUREMENTS, KNOWN UTILITY
RELOCATIONS, AND OTHER ACTIVITIES THAT MAY AFFECT THE COMPLETION OF THE CONTRACT IN
THE PROGRESS SCHEDULE. SHOW A BEGINNING DATE, ENDING DATE, AND DURATION IN NUMBER
OF CALENDAR DAYS FOR EACH ACTIVITY. DO NOT USE ACTIVITIES EXCEEDING 30 CALENDAR DAYS, EXCEPT FOR AGREED UPON ACTIVITIES. SHOW AN ESTIMATED PRODUCTION RATE PER
CALENDAR DAY FOR EACH WORK ACTIVITY.
SUBMIT AN UPDATED PROGRESS SCHEDULE MONTHLY, UNLESS OTHERWISE SHOWN IN THE
CONTRACT OR AS DIRECTED. UPDATE THE PROGRESS SCHEDULE BY ADDING ACTUAL PROGRESS
MADE DURING THE PREVIOUS UPDATE PERIOD, INCLUDING APPROVED CHANGES TO THE
SEQUENCE OF WORK AND THE TRAFFIC CONTROL PLAN. IF AN UPDATED PROGRESS SCHEDULE
INDICATES THE CONTRACT WILL NOT BE COMPLETED WITHIN THE NUMBER OF CALENDAR DAYS
SPECIFIED, NOTIFY THE ENGINEER IN WRITING WHETHER THE CONTRACTOR WILL REVISE THE
PROGRESS SCHEDULE TO MEET THE NUMBER OF CALENDAR DAYS SPECIFIED OR EXCEED THE
NUMBER OF CALENDAR DAYS SPECIFIED.
NO DIRECT COMPENSATION WILL BE MADE FOR FULFILLING THESE REQUIREMENTS, AS THIS WORK
IS CONSIDERED SUBSIDIARY TO THE ITEMS OF THE CONTRACT.
24. CALENDAR DAYS WILL BE CHARGED SUNDAY THROUGH SATURDAY, INCLUDING ALL
HOLIDAYS, REGARDLESS OF WEATHER CONDITIONS, MATERIAL AVAILABILITY, OR OTHER
CONDITIONS NOT UNDER THE CONTROL OF THE CONTRACTOR.
25. ITEM 100: PREPARING RIGHT OF WAY
CLEAN EXISTING DITCHES UNDER FILL SECTIONS OF UNDESIRABLE MATERIALS INCLUDING GRASS, MUCK, AND TRASH. PERFORM THIS WORK IN ACCORDANCE WITH THE CONSTRUCTION SECTION OF
THE ITEM, “PREPARING RIGHT OF WAY.” THIS WORK IS SUBSIDIARY TO THIS BID ITEM.
THE ITEM, “PREPARING RIGHT OF WAY” WILL BE MEASURED FOR PAYMENT ONLY WITHIN THE LIMITS
SHOWN ON THE PLANS. PREPARING RIGHT OF WAY NECESSARY TO PERFORM CONSTRUCTION
THAT IS OUTSIDE LIMITS SHOWN ON THE PLANS IS SUBSIDIARY TO THE BID ITEM.
REMOVE ABANDONED UTILITIES THAT ARE IN CONFLICT WITH THE NEW UTILITIES, AT NO EXPENSE
TO MONTGOMERY COUNTY.
REESTABLISH AND MAINTAIN RIGHT OF WAY STAKES AFTER COMPLETING THE RIGHT OF WAY
PREPARATION ACTIVITIES AND UNTIL UTILITIES ARE IN PLACE.
REMOVE AND ASSUME OWNERSHIP OF THE EXISTING GROUND MOUNTED SIGNS WITHIN THE LIMITS
OF ROADWAY CONSTRUCTION UNLESS OTHERWISE NOTED OR DIRECTED. THIS WORK IS
SUBSIDIARY TO THE ITEM, “PREPARING RIGHT OF WAY”.
26. ITEM 110: EXCAVATION
IF MANIPULATING THE EXCAVATED MATERIAL REQUIRES MOVING THE SAME MATERIAL MORE THAN
ONCE TO ACCOMPLISH THE DESIRED RESULTS, THE EXCAVATION IS MEASURED AND PAID FOR
ONLY ONCE REGARDLESS OF THE MANIPULATION REQUIRED.
TRANSITION THE DITCH GRADES AND CHANNEL BOTTOM WIDTHS AT STRUCTURE LOCATIONS. USE ONLY
APPROVED CHANNEL EXCAVATION IN THE EMBANKMENT.
27. ITEM 112: SUBGRADE WIDENING
REMOVING OBSTRUCTIONS WITHIN THE RIGHT OF WAY, SUCH AS TREES, BRUSH,
OVERHANGING LIMBS, FENCES, FOUNDATIONS, AND OTHER MISCELLANEOUS DEBRIS THAT
MAY INTERFERE WITH GRADING (SUBGRADE WIDENING) IS SUBSIDIARY TO THE ITEM,
“SUBGRADE WIDENING.”
28. ITEM 132: EMBANKMENT
IF SALVAGED BASE IS USED FOR THE EMBANKMENT MATERIAL, BREAK IT INTO SMALL PIECES TO
ACHIEVE THE REQUIRED DENSITY AND TO FACILITATE PLACING IN THE EMBANKMENT. OBTAIN
APPROVAL OF THE MATERIAL BEFORE PLACING IN THE EMBANKMENT.
FURNISH TYPE C MATERIAL WITH A MAXIMUM LIQUID LIMIT (LL) OF 65, A MINIMUM PLASTICITY INDEX
(PI) OF 5, AND COMPOSED OF SUITABLE EARTH MATERIAL SUCH AS LOAM, CLAY, OR OTHER
MATERIALS THAT FORM A SUITABLE EMBANKMENT.
THE EMBANKMENT MATERIAL USED ON THE PROJECT WHICH HAS A LIQUID LIMIT EXCEEDING 45
WILL BE TESTED FOR LIQUID LIMITS AT THE RATE OF ONE TEST PER 20,000 CU. YD. OR PER TOTAL
QUANTITY LESS THAN 20,000 CU. YD., UNLESS OTHERWISE DIRECTED. ONLY USE MATERIAL THAT
PASSES THE ABOVE TESTS.
PROVIDE A FINISHED GRADE WITH THE TOP 4 IN. CAPABLE OF SUSTAINING VEGETATION. USE
FERTILE SOIL THAT IS EASILY CULTIVATED, FREE FROM OBJECTIONABLE MATERIAL AND HIGHLY
RESISTANT TO EROSION.
THE EMBANKMENT SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR.
29. ITEM 247: FLEXIBLE BASE
PLACE THE FLEXIBLE BASE IN COURSES A MAXIMUM OF 8 IN. THICK (LOOSE MEASUREMENT). MIX
FLEXIBLE BASE THAT REQUIRES 2 OR MORE MIXTURES OF MATERIAL, IN AN APPROVED
STATIONARY PUGMILL TYPE MIXER. MATERIAL PASSING THE NO. 40 SIEVE IS KNOWN AS SOIL
BINDER.
TOLERANCES RELATING TO A SPECIFIED GRADATION AND TO A PLASTICITY INDEX UNDER THIS
SPECIFICATION ARE PERMITTED.
Project #26-09 Dobbin-Huffsmith Rd. Improvement (CSJ: 0912-37-264) – Precinct #2
FURNISH ONE TYPE OF THE BASE MATERIAL UNLESS OTHERWISE AUTHORIZED.
COMPACT THE COURSES TO A MINIMUM DENSITY OF 95 PERCENT OF THE MAXIMUM DENSITY AS
DETERMINED USING TEST METHOD TEX-113-E.
SANDSTONE AGGREGATE IS NOT PERMITTED.
30. ITEM 341: DENSE-GRADED HOT-MIX ASPHALT
UNLESS OTHERWISE SHOWN ON THE PLANS, RECLAIMED ASPHALT PAVEMENT (RAP) GENERATED BY
THIS PROJECT WILL BECOME THE PROPERTY OF THE CONTRACTOR FOR USE IN THE CURRENT
CONSTRUCTION PROJECT OR IN FUTURE PROJECTS.
TAPER THE ASPHALT CONCRETE PAVEMENT AT THE BEGINNING AND ENDING POINTS.
USE A MAXIMUM 6H:1V SLOPE FOR THE ASPHALT CONCRETE PAVEMENT EDGE.
WHERE THE 6H:1V ACP EDGE TAPER EXTENDS OVER ONTO THE UNSURFACED SHOULDERS, BLADE OFF THE LOOSE EXISTING SHOULDER MATERIAL TO PROVIDE A SOLID BASE FOR THE OUTSIDE TAPER EDGE.
AFTER PLACING THE ACP OVERLAY, BLADE THIS MATERIAL BACK AGAINST THE EDGE TAPER.
THIS WORK IS SUBSIDIARY TO THE VARIOUS BID ITEMS.
THE STOCKPILE WILL BE THE POINT OF SAMPLING OF COARSE AGGREGATE FOR TEST METHOD TEX-217-F
(PART II, DECANTATION).
PLACE THE ASPHALT CONCRETE PAVEMENT IN COURSES AS SHOWN ON THE TYPICAL SECTIONS.
DO NOT USE PETROLEUM-BASED SOLVENTS IN THE BEDS OF HOT MIX ASPHALT DELIVERY VEHICLES.
DILUTION OF TACK COAT IS NOT ALLOWED.
DO NOT USE SURFACE AGGREGATE CLASSIFICATION (SAC) C FOR THIS PROJECT.
FOR DETERMINING THE ASPHALT CONTENT, ONLY IGNITION OVENS WILL BE ALLOWED.
THE TACK COAT RATE SHOWN ON THE “BASIS OF ESTIMATE” IS AN AVERAGE RATE FOR CALCULATING TACK COAT QUANTITIES. VARY THE RATE BASED ON THE PAVEMENT CONDITIONS AND OTHER FACTORS
SUCH AS MANUFACTURER’S RECOMMENDATIONS AND WEATHER.
31. ITEM 502: BARRICADES, SIGNS AND TRAFFIC HANDLING
USE A TRAFFIC CONTROL PLAN FOR HANDLING TRAFFIC THROUGH THE VARIOUS PHASES OF
CONSTRUCTION. FOLLOW THE PHASING SEQUENCE UNLESS OTHERWISE AGREED UPON BY THE
COUNTY ENGINEER, PROJECT ENGINEER AND THE PROJECT MANAGER. ENSURE THIS PLAN
CONFORMS TO THE LATEST “TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES” AND THE
LATEST BARRICADE AND CONSTRUCTION (BC) STANDARD SHEETS. THE LATEST VERSIONS OF
WORK ZONE STANDARD SHEETS WZ (BTS-1) AND WZ (BTS-2) ARE THE TRAFFIC CONTROL PLAN FOR
THE SIGNAL INSTALLATIONS.
SUBMIT CHANGES TO THE TRAFFIC CONTROL PLAN TO THE PROJECT MANAGER, PROJECT
ENGINEER, COUNTY ENGINEER. PROVIDE A LAYOUT SHOWING THE CONSTRUCTION PHASING,
SIGNS, STRIPING, AND SIGNALIZATIONS FOR CHANGES TO THE ORIGINAL TRAFFIC CONTROL PLAN.
Project #26-09 Dobbin-Huffsmith Rd. Improvement (CSJ: 0912-37-264) – Precinct #2
FURNISH AND MAINTAIN THE BARRICADES AND WARNING SIGNS, INCLUDING THE NECESSARY
TEMPORARY AND PORTABLE TRAFFIC CONTROL DEVICES, DURING THE VARIOUS PHASES OF
CONSTRUCTION. PLACE AND CONSTRUCT THESE BARRICADES AND WARNING SIGNS IN
ACCORDANCE WITH THE LATEST “TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES” FOR
TYPICAL CONSTRUCTION LAYOUTS.
COVER WORK ZONE SIGNS WHEN WORK RELATED TO THE SIGNS IS NOT IN PROGRESS, OR WHEN
ANY HAZARD RELATED TO THE SIGNS NO LONGER EXISTS.
KEEP THE DELINEATION DEVICES, SIGNS, AND PAVEMENT MARKINGS CLEAN. THIS WORK IS
SUBSIDIARY TO THE ITEM, “BARRICADES, SIGNS, AND TRAFFIC HANDLING.”
IF A SECTION IS NOT COMPLETE BEFORE THE END OF THE WORKDAY, PULL BACK THE BASE
MATERIAL TO THE EXISTING PAVEMENT EDGE ON A 6H: 1V SLOPE. EDGE DROP-OFFS DURING THE
HOURS OF DARKNESS ARE NOT PERMITTED.
BEFORE DETOURING TRAFFIC ONTO THE SHOULDERS, REMOVE DIRT, DEBRIS, VEGETATION, AND
OTHER DELETERIOUS MATERIAL FROM THE SURFACE OF THE SHOULDERS. APPROPRIATELY SIGN
THE DETOUR IN AN APPROVED MANNER. THIS WORK IS SUBSIDIARY TO THE VARIOUS BID ITEMS.
COVER OR REMOVE THE PERMANENT SIGNS AND CONSTRUCTION SIGNS THAT ARE INCORRECT OR
THAT DO NOT APPLY TO THE CURRENT SITUATION FOR A PARTICULAR PHASE.
DO NOT MOUNT SIGNS ON DRUMS OR BARRICADES, EXCEPT THOSE LISTED IN THE LATEST
BARRICADES AND CONSTRUCTION STANDARD SHEETS.
USE TRAFFIC CONES FOR DAYTIME WORK ONLY. REPLACE THE CONES WITH PLASTIC DRUMS
DURING NIGHTTIME HOURS.
PLACE POSITIVE BARRIERS TO PROTECT DROP-OFF CONDITIONS GREATER THAN 2 FT. WITHIN THE
CLEAR ZONE THAT REMAIN OVERNIGHT. THE CLEAR ZONE IS 10’ FROM THE EDGE OF TRAVEL WAY
FOR THIS ROADWAY.
USE SHADOW VEHICLES WITH TRUCK MOUNTED ATTENUATORS (TMA) FOR LANE CLOSURES
DURING CONSTRUCTION.
32. ITEM 506: TEMPORARY EROSION, SEDIMENTATION AND ENVIRONMENTAL CONTROL
USE APPROPRIATE MEASURES TO PREVENT, MINIMIZE, AND CONTROL THE SPILL OF HAZARDOUS
MATERIALS IN THE CONSTRUCTION STAGING AREA. REMOVE AND DISPOSE OF MATERIALS IN
COMPLIANCE WITH STATE AND FEDERAL LAWS.
BEFORE STARTING CONSTRUCTION, REVIEW WITH THE ENGINEER THE SW3P USED FOR
TEMPORARY EROSION CONTROL AS OUTLINED ON THE PLANS. BEFORE CONSTRUCTION, PLACE
THE TEMPORARY EROSION AND SEDIMENTATION CONTROL FEATURES AS SHOWN ON THE SW3P.
SCHEDULE THE SEEDING OR SODDING WORK AS SOON AS POSSIBLE. THE PROJECT SCHEDULE
PROVIDES FOR A VEGETATION MANAGEMENT PLAN.
AFTER COMPLETING EARTHWORK OPERATIONS, RESTORE AND RESEED THE DISTURBED AREAS IN
ACCORDANCE WITH THE DEPARTMENT’S SPECIFICATIONS FOR PERMANENT OR TEMPORARY
EROSION CONTROL.
IMPLEMENT TEMPORARY AND PERMANENT EROSION CONTROL MEASURES TO COMPLY WITH THE
NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT UNDER THE
CLEAN WATER ACT.
Project #26-09 Dobbin-Huffsmith Rd. Improvement (CSJ: 0912-37-264) – Precinct #2
BEFORE STARTING GRADING OPERATIONS AND DURING THE PROJECT DURATION, PLACE THE
TEMPORARY OR PERMANENT EROSION CONTROL MEASURES TO PREVENT SEDIMENT FROM
LEAVING THE RIGHT OF WAY.
33. ITEM 662: WORK ZONE PAVEMENT MARKINGS
AT THE END OF EACH DAY’S WORK, MARK ROADWAYS THAT REMAIN OPEN TO TRAFFIC DURING
CONSTRUCTION OPERATIONS WITH STANDARD PAVEMENT MARKINGS, IN ACCORDANCE WITH THE
LATEST “TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.”
USING RAISED MARKERS FOR REMOVABLE WORK ZONE PAVEMENT MARKINGS ON FINAL
CONCRETE SURFACES IS OPTIONAL.
DO NOT USE RAISED PAVEMENT MARKERS AS OPTIONAL WORK ZONE PAVEMENT MARKINGS ON
FINAL ASPHALT SURFACES.
FOR TRANSITION LANE LINES AND DETOUR LANE LINES, USE RAISED PAVEMENT MARKERS AS
SHOWN FOR SOLID LINES ON THE LATEST BARRICADE AND CONSTRUCTION STANDARD SHEET FOR
“WORK ZONE PAVEMENT MARKING DETAILS.”
34. ITEM 666: REFLECTIVE PAVEMENT MARKINGS
USE TYPE III GLASS BEADS FOR THERMOPLASTIC AND MULTIPOLYMER PAVEMENT MARKINGS.
USE A 0.100 IN. (100 MIL) THICKNESS FOR THERMOPLASTIC PAVEMENT MARKINGS, MEASURED TO
THE TOP OF THE THERMOPLASTIC, NOT INCLUDING THE EXPOSED GLASS BEADS.
USE A 0.022 IN. (22 MIL) THICKNESS FOR MULTIPOLYMER PAVEMENT MARKINGS, MEASURED TO THE
TOP OF THE MULTIPOLYMER, NOT INCLUDING THE EXPOSED GLASS BEADS.
PURCHASE THE TRAFFIC PAINT FROM THE OPEN MARKET.
IF THE TYPE II MARKINGS BECOME DIRTY AND REQUIRE CLEANING BY WASHING, BRUSHING,
COMPRESSED AIR, OR OTHER APPROVED METHODS BEFORE APPLYING THE TYPE I
THERMOPLASTIC MARKINGS, THIS ADDITIONAL CLEANING IS SUBSIDIARY TO THE ITEM,
“REFLECTORIZED PAVEMENT MARKINGS.”
ESTABLISH THE ALIGNMENT AND LAYOUT FOR WORK ZONE STRIPING AND PERMANENT STRIPING.
STRIPE ALL ROADWAYS BEFORE OPENING THEM TO TRAFFIC.
PLACE PAVEMENT MARKINGS UNDER THESE ITEMS IN ACCORDANCE WITH DETAILS SHOWN ON THE
PLANS, THE LATEST “TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES,” OR AS DIRECTED.
WHEN DESIGN DETAILS ARE NOT SHOWN ON THE PLANS, PROVIDE PAVEMENT MARKINGS FOR
ARROWS, WORDS, AND SYMBOLS CONFORMING TO THE LATEST “STANDARD HIGHWAY SIGN
DESIGNS FOR TEXAS” MANUAL.
35. ITEM 672: RAISED PAVEMENT MARKERS
IF OTHER OPERATIONS ARE COMPLETE ON THE PROJECT AND IF THE CURING TIME PERIOD IS NOT
YET ELAPSED, THE CONTRACT TIME WILL BE SUSPENDED UNTIL THE CURING IS DONE.
BEFORE PLACING THE RAISED PAVEMENT MARKERS ON CONCRETE PAVEMENT, BLAST CLEAN THE
SURFACE USING AN ABRASIVE-BLASTING MEDIUM. THIS WORK IS SUBSIDIARY TO THE ITEM,
“RAISED PAVEMENT MARKERS.”
PROVIDE EPOXY ADHESIVE THAT IS MACHINE-MIXED OR NOZZLE-MIXED AND DISPENSED. EQUIP THE
Project #26-09 Dobbin-Huffsmith Rd. Improvement (CSJ: 0912-37-264) – Precinct #2
MACHINE OR NOZZLE WITH A MECHANISM TO ENSURE POSITIVE MIX MEASUREMENT CONTROL.
36. ITEM 678: PAVEMENT SURFACE PREPARATION FOR MARKINGS
DO NOT BLAST CLEAN ASPHALT CONCRETE PAVEMENT. CLEAN ASPHALT CONCRETE PAVEMENT AS
REQUIRED UNDER THE APPLICABLE SPECIFICATIONS OR AS DIRECTED.
ON EXISTING CONCRETE PAVEMENT WHEN PLACING A NEW STRIPE ON AN EXISTING LOCATION,
AFTER REMOVING THE EXISTING STRIPE UNDER THE ITEM, “ELIMINATING EXISTING PAVEMENT
MARKINGS AND MARKERS,” AIR-BLAST THE SURFACE WITH COMPRESSED AIR JUST BEFORE
PLACING THE NEW STRIPE.
DO NOT CLEAN CONCRETE PAVEMENT BY GRINDING.
B A S I S O F E S T I M A T E
Item Description Limit and Rate Unit
247 Flexible Base
• Crushed Stone 138 Lb. / Cu. Ft.
TON
260 Lime Treatment (Road-Mixed) For materials used as subgrade *
• Lime(HYD, COM, or QK)(SLRY) or QK(DRY)
6 % by weight based on 100 Lb. / Cu. Ft. subgrade
SY
TON
275 Cement Treatment (Road-Mixed) For materials used as subgrade *
• Cement 6 % by weight based on 100 Lb. / Cu. Ft. subgrade
SY
TON
292 Asphalt Treatment (Plant-Mixed)
• Asphalt
• Aggregate
110 Lb. / Sq. Yd.-In.
5 % by weight 95 % by weight
TON
310 Prime Coat 0.25 Gal. / Sq. Yd. GAL
341 Dense-Graded Hot Mix Asphalt Tack Coat
• Applied on new HMA
• Applied on Existing HMA
• Applied on Milled HMA
110 Lb. / Sq. Yd.-In.
0.06 Gal. / Sq. Yd.
0.09 Gal. / Sq. Yd.
0.11 Gal. / Sq. Yd.
TON
GAL
Project #26-09 Dobbin-Huffsmith Rd. Improvement (CSJ: 0912-37-264) – Precinct #2
2024 Specifications 3007
1 - 3 06-24 Statewide
Special Specification 3007
Bonding Course
1. DESCRIPTION
Construct a bonding course using a Tracking-Resistant Asphalt Interlayer (TRAIL) or a Spray Applied Underseal Membrane before the placement of a new hot-mix asphalt concrete pavement.
2. MATERIALS
Furnish asphalt materials in accordance with Article 300.2., “Materials” for one of the following two options:
2.1. TRAIL. Furnish asphalt material described as “tack” for typical use in the TRAIL Material Producer List. Do not dilute emulsified asphalts at the terminal, in the field, or at any other location before use, unless required in conformance with the manufacturer’s recommendation for approved TRAIL products on the MPL.
2.2. Underseal Membrane. Furnish asphalt material meeting the requirements of Special Specification 3005, “Spray Applied Underseal Membrane.” Do not dilute emulsified asphalts at the terminal, in the field, or at any other location before use.
Furnish asphalt material for applying tack coat to all miscellaneous contact surfaces when approved by the Engineer:
2.3. Miscellaneous Tack. Furnish CSS-1H, SS-1H, EBL, or a PG binder with a minimum high-temperature grade of PG 58 for tack coat binder in accordance with Item 300, Asphalts, Oils, and Emulsions. Specialized tack coat materials on the MPL for Tracking Resistant Asphalt Interlayer (TRAIL) will be allowed or required when shown on the plans. Do not dilute emulsified asphalts at the terminal, in the field, or at any other location before use, unless required in conformance with the manufacturer’s recommendation for approved TRAIL products on the MPL.
2.4. Sampling. The Engineer will obtain at least one sample of the tack coat binder per project per source in accordance with Tex-500-C, Part III, and test it to verify compliance with Item 300. The Engineer will notify the Contractor when the sampling will occur and will witness the collection of the sample from the asphalt distributor immediately before use. Label the can with the corresponding lot and sublot numbers, producer, producer facility location, grade, district, date sampled, all applicable bills of lading (if available), and project information, including highway and control-section-job (CSJ) number. For emulsions, the Engineer may test as often as necessary to ensure the residual of the emulsion is greater than or equal to the specification requirement in Item 300.
3. EQUIPMENT
3.1. TRAIL. Provide the equipment recommended by the producer.
3.2. Underseal Membrane. Provide in accordance with Special Specification 3005, “Spray Applied Underseal Membrane.”
4. CONSTRUCTION
4.1. Preparation. Clean the surface before placing the bonding course. Apply bonding course uniformly at the approved rate, unless otherwise directed. The Engineer will set the rate between 0.04 – 0.14 gal. of residual asphalt per square yard of surface area. The Engineer may adjust the application rate, taking into
2 - 3 06-24 Statewide consideration the existing pavement surface conditions. Prevent splattering of the bonding course when placed adjacent to curb, gutter, and structures, Apply a thin, uniform tack coat to all miscellaneous contact surfaces of curbs, structures, and joints. Prevent splattering of the tack coat when placed adjacent to curb, gutter, and structures.
4.2. TRAIL. Perform the following construction methods when applying a TRAIL for a bonding course:
4.2.2. Test Strips. When required by the Engineer, perform a test strip of TRAIL at a location on or near the project as directed. Allow the strip to cure for a maximum of 30 min. Drive over the test strip with equipment used during laid-down construction to simulate the effect of paving equipment. There should be no evidence of tracking or picking up of the TRAIL material on the wheels of the equipment.
4.2.3. Placement. Uniformly apply the TRAIL material to all areas where mix will be placed, including joints, at the rate shown on the plans or as directed, within 15°F of the approved temperature, and not above the maximum allowable temperature. Unless otherwise directed, uniformly apply the TRAIL material at a minimum rate specified on the plans. The Engineer will set the application rate between 0.06 – 0.14 gal. per square yard for emulsion TRAIL and the application rate between 0.08 – 0.12 gal. per square yard for hot-applied TRAIL.
4.3. Underseal Membrane. Place in accordance with Special Specification 3005, “Spray Applied Underseal Membrane.”
4.3.2. Placement. Do not allow any loose mixture onto the prepared surface before application of the membrane.
Unless otherwise directed, uniformly apply the membrane to all areas where mix will be placed, including joints, at the rate shown on the plans. Unless otherwise directed, uniformly apply the membrane at the minimum rate specified on the plans. The Engineer may adjust the application rate, taking into consideration the existing pavement surface conditions. The Engineer will set the application rate between 0.10 – 0.22 gal.
per square yard for underseal membrane.
4.4. Quality Control. Stop application if it is not uniform due to streaking, ridging, pooling, or flowing off the roadway surface. Verify equipment condition, operating procedures, application temperature, and material properties. Determine and correct the cause of non-uniform application.
The Engineer may perform independent tests to confirm contractor compliance and may require testing differences or failing results to be resolved before resuming production.
The Engineer may stop the application and require construction of test strips at the Contractor’s expense if any of the following occurs:
non-uniformity of application continues after corrective action;
evidence of tracking or picking up of the TRAIL;
in three consecutive shots, application rate differs by more than 0.02 gal. per square yard from the rate directed; or any shot differs by more than 0.04 gal. per square yard from the rate directed.
The Engineer will approve the test strip location. The Engineer may require additional test strips until surface treatment application meets specification requirements.
5. MEASUREMENT
5.1. Volume. Asphalt material, including all components, will be measured at the applied temperature by strapping the tank before and after road application. The distributor calibrated strap stick will be used for measuring the asphalt level in the distributor asphalt tank. The certified tank chart will be used to determine the beginning gallons and the final gallons in the distributor tank. The quantity to be measured for payment will be the difference between the beginning gallons and the final gallons.
3 - 3 06-24 Statewide
5. PAYMENT
The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid for “Bonding Course.” These prices are full compensation for surface preparation; furnishing, preparing, hauling, Miscellaneous Tack used for all miscellaneous contact surfaces, and placing materials; removing existing pavement markers and excess aggregate; rolling;
cleaning up stockpiles; and equipment, labor, tools, and incidentals.
2024 Specifications 8011
1 - 13 06-24 Statewide
Special Specification 8011
Dense-Graded Hot-Mix Asphalt (Materials Only)
1. DESCRIPTION
Provide a hot-mix asphalt (HMA) material composed of a dense-graded mixture of aggregate and asphalt binder mixed hot in a mixing plant. This Specification is intended for small quantity (SQ) HMA projects, typically under 5,000 tons per work order.
2. MATERIALS
Furnish uncontaminated materials of uniform quality that meet the requirements of the plans and specifications.
Notify the Engineer of all material sources and before changing any material source or formulation. The Engineer will verify that the specification requirements are met when the Contractor makes a source or formulation change, and may require a new laboratory mixture design, trial batch, or both. Any subsequent mention of testing in this Specification will not be required by either the Engineer or Contractor unless the Engineer determines a need for the testing.
2.1. Aggregate. Furnish aggregates from sources in accordance with the requirements shown in Table 1 and this Section. Aggregate requirements in this Section, including those shown in Table 1, may be modified or eliminated when shown on the plans. Additional aggregate requirements may be specified when shown on the plans. Provide aggregate stockpiles that meet the definitions in this Section for coarse, intermediate, or fine aggregate. Aggregate from reclaimed asphalt pavement (RAP) is not required to meet Table 1 requirements unless otherwise shown on the plans. Supply aggregates that meet the definitions in Tex-100-E for crushed gravel or crushed stone. The Engineer will designate the plant or the quarry as the sampling location. Provide samples from materials produced for the project. The Engineer will establish the surface aggregate classification (SAC) and perform Los Angeles abrasion, magnesium sulfate soundness, and Micro-Deval tests. Perform all other aggregate quality tests listed in Table 1. Document all test results on the mixture design report. The Engineer may perform tests on independent or split samples to verify Contractor test results. Stockpile aggregates for each source and type separately. Determine aggregate gradations for mixture design and production testing based on the washed sieve analysis given in Tex-200-F, Part II.
2.1.1. Coarse Aggregate. Coarse aggregate stockpiles must have no more than 20% material passing the No. 8 sieve. Aggregates from sources listed in the Department’s Bituminous Rated Source Quality Catalog (BRSQC) are preapproved for use. Use only the rated values for hot-mix listed in the BRSQC. Rated values for surface treatment (ST) do not apply to coarse aggregate sources used in hot-mix asphalt.
For sources not listed on the Department’s BRSQC:
build an individual stockpile for each material;
request the Department test the stockpile for specification compliance;
allow 30 calendar days for the Engineer to sample, test, and report results;
use only when tested and approved; and once approved, do not add material to the stockpile unless otherwise allowed.
Provide coarse aggregate with at least the minimum SAC shown on the plans. SAC requirements apply only to aggregates used on the surface of travel lanes, unless otherwise shown on the plans. The SAC for sources on the Department’s Aggregate Quality Monitoring Program (AQMP) (Tex-499-A) is listed in the
BRSQC.
2 - 13 06-24 Statewide
2.1.1.1. Blending Class A and Class B Aggregates. Class B aggregate meeting all other requirements shown in Table 1 may be blended with a Class A aggregate to meet requirements for Class A materials, unless otherwise shown on the plans. When blending Class A and Class B aggregates to meet a Class A requirement, ensure that at least 50% by weight, or volume if required, of the material retained on the No. 4 sieve comes from the Class A aggregate source, unless otherwise shown on the plans. Blend by volume if the bulk specific gravities of the Class A and Class B aggregates differ by more than 0.300. Coarse aggregate from RAP will be considered as Class B aggregate for blending purposes.
The Engineer may perform tests at any time during production when the Contractor blends Class A and B aggregates to meet a Class A requirement. The Engineer will use the Department’s mix design template, when electing to verify conformance, to calculate the percent of Class A aggregate retained on the No.