25087 Detroit Bid Set.pdf

PDF 1 MB Posted

Attached to
591/25087. MNB; DOSC - Electrical Project State and local contract opportunity
Solicitation number
RFQ 171 260000000252 2
Issued by
Wayne County, Detroit City, Michigan

About this file

This is a Bid Set document for the Detroit Department of General Services (DOSC) Electrical Project, a state and local contract opportunity in Michigan. The project involves electrical work at an unspecified Detroit location. The bid set includes the scope of work, technical specifications, and bidding requirements necessary for contractors to submit responsive proposals. Specific details regarding project quantities, timeline milestones, site visit schedules, pre-bid meetings, submission deadlines, and contract award dates are contained within the supporting documentation referenced in this bid package. The contract term and any renewal options would be detailed in the conditions of the bid solicitation.

Pricing requirements, set-aside provisions, incumbent contractor information, and funding sources and amounts are specified within the detailed bid documents and special conditions included in the complete bid set. Contractors responding to this opportunity should review all components of the bid package thoroughly to ensure compliance with all requirements and to accurately estimate project costs. Additional information regarding bonding requirements, insurance provisions, and contractor qualifications is contained in the supporting exhibits and specifications.

View the file

Other files for this state and local contract opportunity

Other files attached to 591/25087. MNB; DOSC - Electrical Project, newest first.
File Type Posted
Service Disabled Veteran Owned Business Info Sheet 2025.pdf PDF
25087 Detroit Bid Specifications .pdf PDF
591_25087 Detroit Project Advertise.pdf PDF
Addendum # 1 591_25087 Detroit .pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

UN

UM

E

PL

UR

IB

U

T U E B O R

I N

E P

SI

R

A U

Q I

S M

A N

E C

M A

M A

L U

S N

C R

S M

P U

C I

C I

E

Created by Robert W. Loftis 1991

Pl ot te d:

By

S H

E E

T

ID

E N

TI

FI

C A

TI

O

N N

O

IS

S

U E

D F

O R

D A

TE

JO

B N

O.

IN

D

E X

N O

Y

FI

LE

N O

1/

7.

M N

B P

R E

LI

M

IN

A

R Y

C O

N S

TR

U

C

TI

O N

FI

N

A L

R E

C O

R D

ES

IG

N

ED

D R

AW

N

C H

EC

KE

D

AP

PR

O

VE

D A

D A

M P

. L A

C H

, R A

, D

IR

EC

TO

R D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

PR

O C

U R

EM

EN

T A

N D

R

EA

L

ES

TA

TE

S

ER

V

IC

ES

A

D M

IN

IS

TR

A

TI

O

N D

EP

A

R

TM

EN

T

O F

TE

C

H N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

TEn gi ne er in g, A rc hi te ct ur e, La nd Su rv ey in g ab on m ar ch e.

co m

T30

S Ka la m az oo

M al l Ka la m az oo

, M I.

.3

.6

0AB

ON

M

AR

CH

E

Be nt on H ar bo r G ra nd

H av en G ra nd

R ap id s

Ka la m az oo /P or ta ge Fo rt W ay ne

G os he n

Ho ba rt La fa ye tte So ut h

Be nd

V al pa ra iso

Au to de sk

D oc s:

//2

5-

A dr ia n G ar ag e/

-0

6_ E_

_D

O

SC

.rv t

4/ 9/

:4

4:

P M

G0

W es t F or t, D et ro it, M

I 4

D et ro it O pe ra tio ns

S er vi ce C en te r

PR

O

JE

C T

C O

VE

R

S H

EE

T

-0

/0

9/

DETROIT OPERATIONS & SERVICE CENTERDETROIT OPERATIONS & SERVICE CENTER

MDOT - ELECTRICAL PROJECT

1060 WEST FORT, DETROIT, MI 48226

LOCATION MAP

OVERALL FACILITY IMAGE

PROJECT INFORMATIONMICHIGAN LOCATION MAP

DRAWING LIST

OWNER:OWNER:

BUILDING SITE ADDRESS:BUILDING SITE ADDRESS:

ELECTRICAL CODE:ELECTRICAL CODE:

DEPARTMENT OF TRANSPORTATION (MDOT)

1060 WEST FORT, DETROIT, MI 48226

2023 MICHIGAN ELECTRICAL CODE

BASED ON 2023 NATIONAL ELECTRIC CODE W/ MICHIGAN PART 8 AMENDMENTS

CONSTRUCTION DOCUMENTS

G001 - PROJECT COVER SHEET

E110 - FIRST FLOOR ELECTRICAL PLAN

E120 - SECOND FLOOR ELECTRICAL PLAN

E400 - LIGHTNING PROTECTION AND GROUNDING PLANS

E600 - ONE-LINE DIAGRAM

E601 - ONE-LINE DIAGRAM

UP

UP

UP

A

B

B.9

C

D

7 8 9 10 11 12 13 14 15 16 17 18

RP-1A

RP-1B

RP-1C

RP-1D

MA

TC

HL

IN

E

SPD

SPD

SPD

SPD

FUEL

STORAGE

TANK

DIESEL

GENERATOR

TRANSFORMER TRANSFORMER

A

B

B.9

C

D

1 2 3 4 5 6 7

MA

TC

HL

IN

E

RP-UPS4A

RP-UPS4B

RP-UPS1

RP-UPS2

DP-UPS DP-AC

RP-UPS7

RP-UPS5A

RP-UPS5B

RP-UPS3A

RP-UPS3B

RP-UPS8

SPD

SPD

SPD

SPDSPD

SPD

SPD

SPD

SPD

SPD

SPD

SPD

RP-UPS6

RP-EM1AA

LP-EMBB

ELEVATOR

DISCONNECT

SPD

SPD

SPD

ELEVATOR CONTROLLER

SPD

S

UN

UM

E

PL

UR

IB

U

T U E B O R

I N

E P

SI

R

A U

Q I

S M

A N

E C

M A

M A

L U

S N

C R

S M

P U

C I

C I

E

Created by Robert W. Loftis 1991

Pl ot te d:

By

S H

E E

T

ID

E N

TI

FI

C A

TI

O

N N

O

IS

S

U E

D F

O R

D A

TE

JO

B N

O.

IN

D

E X

N O

Y

FI

LE

N O

1/

7.

M N

B P

R E

LI

M

IN

A

R Y

C O

N S

TR

U

C

TI

O N

FI

N

A L

R E

C O

IG

N

ED

D R

AW

N

C H

EC

KE

D

AP

PR

O

VE

D A

D A

M P

. L A

C H

, R A

, D

IR

EC

TO

R D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

PR

O C

U R

EM

EN

T A

N D

R

EA

L

ES

TA

TE

S

ER

V

IC

ES

A

D M

IN

IS

TR

A

TI

O

N D

EP

A

R

TM

EN

T

O F

TE

C

H N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

TEn gi ne er in g, A rc hi te ct ur e, La nd Su rv ey in g ab on m ar ch e.

co m

T30

S Ka la m az oo

M al l Ka la m az oo

, M I.

.3

.6

0AB

ON

M

AR

CH

E

Be nt on H ar bo r G ra nd

H av en G ra nd

R ap id s

Ka la m az oo /P or ta ge Fo rt W ay ne

G os he n

Ho ba rt La fa ye tte So ut h

Be nd

V al pa ra iso

Au to de sk

D oc s:

//2

5-

A dr ia n G ar ag e/

-0

6_ E_

_D

O

SC

.rv t

4/ 9/

:4

4:

P M

E1

W es t F or t, D et ro it, M

I 4

D et ro it O pe ra tio ns

S er vi ce C en te r

FI

R

ST

F

LO

O R

E

LE

C

TR

IC

AL

P

LA

N

-0

/0

9/

SCALE: 1/8" = 1'-0"

EAST FIRST FLOOR ELECTRICAL PLAN

SCALE: 1/8" = 1'-0"

WEST FIRST FLOOR ELECTRICAL PLAN

1.

2.

3.

4.

5.

6.

7.

8.

GENERAL SURGE PROTECTION NOTES:

ALL SURGE PROTECTION DEVICES (SPDs) SHALL BE INSTALLED IN ACCORDANCE

WITH NEC 2023, MANUFACTURER REQUIREMENTS, AND PROJECT DOCUMENTS.

CONTRACTOR SHALL VERIFY VOLTAGE, CONFIGURATION, AND SHORT-CIRCUIT

RATINGS OF ALL SPDs PRIOR TO INSTALLATION.

ALL CONNECTION LEAD LENGTHS SHALL BE KEPT AS SHORT AND STRAIGHT AS

POSSIBLE. TOTAL LEAD LENGTH (LINE, NEUTRAL, GROUND) SHALL NOT EXCEED 24"

OR MANUFACTURER RECOMMENDATIONS.

CONTRACTOR SHALL PROVIDE ALL REQUIRED HARDWARE, CONDUIT, WIRING, AND

ACCESSORIES NECESSARY FOR A COMPLETE INSTALLATION.

COORDINATE ALL ELECTRICAL SHUTDOWNS, PANEL ACCESS, AND INSTALLATION

SEQUENCES WITH OWNER 2 WEEKS PRIOR TO WORK.

WHERE EXISTING SPDs ARE REMOVED, CONTRACTOR SHALL PROVIDE AND INSTALL

NEW PANEL ENCLOSURE COVER SECTION TO MAINTAIN PANEL UL LISTING AND NEMA

RATING.

FOR PANELS WITH EXISTING EXTERNAL MOUNTED SPDs, REPLACE SPDs AT THE

SAME LOCATION USING EXISTING CONDUIT PATHS PROVIDING NEW WIRING.

TEST AND VERIFY SPD OPERATION UPON INSTALLATION PER MANUFACTURER'S

RECOMMENDATIONS. NOTIFY ENGINEER OF ANY DEFICIENCIES.

SURGE PROTECTION DEVICE SCHEDULE

PANEL NAME VOLTAGE AMPACITY PANEL MOUNTING

TYPE EXISTING SPD EXISTING SPD MOUNTING

TYPE NEW DEVICE RATING RECOMMENDED SPD

BREAKER

DIAGNOSTIC

CAPABILITIES NOTES

SWBD-A 480/277V 1600A FLOOR STANDING REMOVE INTEGRAL 200KA PER MODE 100A,3P ADVANCED SWBD-B 480/277V 1600A FLOOR STANDING REMOVE INTEGRAL 200KA PER MODE 100A,3P ADVANCED

DP-A 480/277V 800A SURFACE REMOVE EXTERNAL 140KA PER MODE 60A,3P BASIC

DP-AC 480/277V 800A SURFACE NONE EXTERNAL 140KA PER MODE 60A,3P BASIC

DP-B 480/277V 1000A SURFACE REMOVE EXTERNAL 140KA PER MODE 60A,3P BASIC

DP-RP 480/277V 800A SURFACE NONE - 140KA PER MODE 60A,3P BASIC

DP-UPS 480/277V 800A SURFACE REMOVE INTEGRAL 140KA PER MODE 60A,3P BASIC

ELEVATOR DISCONNECT 480/277V 50A SURFACE NONE - 100KA PER MODE N/A BASIC INSTALL SPD ON THE LOAD SIDE OF FUSIBLE DISCONNECT SWITCH FOR THE ELEVATOR CONTROLLER.

LP-2AA 480/277V 100A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

LP-EM2AA 480/277V 100A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

LP-EMBB 480/277V 60A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

PP-GEN 208/120V 150A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

RP-1A 208/120V 150A FLUSH NONE - 50KA PER MODE 30A,3P BASIC

RP-1B 208/120V 150A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

RP-1C 208/120V 150A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

RP-1D 208/120V 150A FLUSH NONE - 50KA PER MODE 30A,3P BASIC

RP-2A 208/120V 150A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

RP-2B 208/120V 150A FLUSH NONE - 50KA PER MODE 30A,3P BASIC

RP-2C 208/120V 150A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

RP-2D 208/120V 100A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

RP-BL 208/120V 50A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

RP-EM1AA 208/120V 50A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

RP-EM2A 208/120V 70A SURFACE NONE - 50KA PER MODE 30A,3P BASIC

RP-UPS1 208/120V 150A SURFACE REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

RP-UPS2 208/120V 150A SURFACE REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

RP-UPS3A 208/120V 150A SURFACE REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

RP-UPS3B 208/120V 150A SURFACE REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

RP-UPS4A 208/120V 150A SURFACE REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

RP-UPS4B 208/120V 150A SURFACE REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

RP-UPS5A 208/120V 150A SURFACE REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

RP-UPS5B 208/120V 150A SURFACE REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

RP-UPS6 208/120V 150A SURFACE REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

RP-UPS7 208/120V 150A SURFACE REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

RP-UPS8 208/120V 150A FLUSH REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

RP-UPS9 208/120V 150A FLUSH REMOVE INTEGRAL 50KA PER MODE 30A,3P BASIC

1.

A.

B.

2.

A.

3.

A.

B.

4.

A.

B.

a.

SCHEDULE NOTES:

EXISTING SPD

NONE - THERE IS NO EXISTING SURGE PROTECTION DEVICE INSTALLED IN THE PANEL

REMOVE - REMOVE THE EXISTING SURGE PROTECTION DEVICE. IF EXISTING DEVICE IS MOUNTED IN THE PANEL (INTEGRAL), INSTALL NEW PANEL

SECTION COVER WITHOUT AN OPENING FOR AN SDP.

RECOMMENDED SPD BREAKER

PROVIDE NEW CIRCUIT BREAKER FOR THE NEW SURGE PROTECTION DEVICE SPECIFIED. MOVE EXISTING CIRCUITS TO OTHER CIRCUIT SPACES TO MAKE

ROOM FOR THE 3 POLE BREAKER SPECIFIED, IF NECESSARY.

PANEL MOUNTING TYPE

SURFACE - EXISTING PANEL IS SURFACE MOUNTED. INSTALL NEW SPD SURFACE MOUNTED AS CLOSE AS POSSIBLE TO THE PANEL, WITH A MAX SDP

CONDUCTOR LENGTH OF 24".

FLUSH - EXISTING PANEL IS FLUSH MOUNTED IN WALL. PROVIDE FLUSH MOUNTING KIT FOR NEW SPD AND FLUSH MOUNT SPD AS CLOSE AS POSSIBLE TO THE PANEL, WITH A MAX SPD CONDUCTOR LENGTH OF 24". CONTRACTOR TO CUT DRYWALL FOR INSTALLATION, AND PATCH, REPAIR, AND PAINT THE

SURROUNDING WALL MATERIAL BACK TO ITS EXISTING STATE.

DIAGNOSTIC CAPABILITIES:

BASIC - INDICATOR LIGHTS

ADVANCED - INTEGRAL TOUCH SCREEN COLOR LCD DISPLAY PROVIDING REAL-TIME SYSTEM RMS VOLTAGE, CURRENT, FREQUENCY, POWER FACTOR, KW, KVAR, AND KVA. EVENT COUNT WITH TIME & DATE STAMP SHOWING SURGES, SAGS, SWELLS, OUTAGES, AND OVER/UNDER FREQUENCY. USER SETTABLE ALARMS AND THRESHOLDS. EMBEDDED WEBPAGE FOR REMOTE MONITORING CAPABLE OF CHARTING AND DOWNLOADING REPORTS.

CONTRACTOR TO PROVIDE PROGRAMMING AND INTEGRATION INTO OWNERS EXISTING BUILDING MANAGEMENT SYSTEM.

DN

DN

DN

A

B

B.9

C

D

7 8 9 10 11 12 13 14 15 16 17 18

RP-2A

MA

TC

HL

IN

E

RP-2B

E120

SPD

SPD

A

B

B.9

C

D

1 2 3 4 5 6 7

RP-BL

MA

TC

HL

IN

E

RP-UPS9

SPD

SPD

A

16 17

RP-2C

DP-B

LP-2AA

2-HOUR RATED CHASE FOR INCOMING

COMMERCIAL POWER CONDUITS FROM

PAD MOUNTED TRANSFORMERS.

INTERIOR LOW VOLTAGE RELAY

LIGHTING CONTROL PANEL (R).

EXTERIOR LOW VOLTAGE RELAY

LIGHTING CONTROL PANEL (SR).

BUILDING CENTRAL GROUND BAR

8'-0" AFF TO BOTTOM SEE BUILDING

SYSTEM GROUNDING RISER DIAGRAM

SECONDARY MAIN SWITCHGEAR

480/277V-3Ø-4W.

DRAW-OUT AIR CIRCUIT BREAKERS (TYPICAL).

T1

DP-RP

DP-A

ATS-LS

MA

IN

S W

ITC

H

SO

UR

CE

N

O.

DI

ST

RI

BU

TIO

N

SE

CT

IO

N

"A

TIE

B

RE

AK

ER

MA

IN

S W

ITC

H

SO

UR

CE

N

O.

DI

ST

RI

BU

TIO

N

SE

CT

IO

N

"B

RP-2D

T2

LP-EM2AA

RP-EM2A

ATS-3

ATS-2 ATS-1

GENERATOR

SWITCHGEAR

225 KVA

42"Wx32"Dx44"H

2,200 LB'S

PP-GEN

SPD

SPD

SPD

SPDSPD

SPD

SPD

SPD

SPD SPD

SPD

S

UN

UM

E

PL

UR

IB

U

T U E B O R

I N

E P

SI

R

A U

Q I

S M

A N

E C

M A

M A

L U

S N

C R

S M

P U

C I

C I

E

Created by Robert W. Loftis 1991

Pl ot te d:

By

S H

E E

T

ID

E N

TI

FI

C A

TI

O

N N

O

IS

S

U E

D F

O R

D A

TE

JO

B N

O.

IN

D

E X

N O

Y

FI

LE

N O

1/

7.

M N

B P

R E

LI

M

IN

A

R Y

C O

N S

TR

U

C

TI

O N

FI

N

A L

R E

C O

IG

N

ED

D R

AW

N

C H

EC

KE

D

AP

PR

O

VE

D A

D A

M P

. L A

C H

, R A

, D

IR

EC

TO

R D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

PR

O C

U R

EM

EN

T A

N D

R

EA

L

ES

TA

TE

S

ER

V

IC

ES

A

D M

IN

IS

TR

A

TI

O

N D

EP

A

R

TM

EN

T

O F

TE

C

H N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

TEn gi ne er in g, A rc hi te ct ur e, La nd Su rv ey in g ab on m ar ch e.

co m

T30

S Ka la m az oo

M al l Ka la m az oo

, M I.

.3

.6

0AB

ON

M

AR

CH

E

Be nt on H ar bo r G ra nd

H av en G ra nd

R ap id s

Ka la m az oo /P or ta ge Fo rt W ay ne

G os he n

Ho ba rt La fa ye tte So ut h

Be nd

V al pa ra iso

Au to de sk

D oc s:

//2

5-

A dr ia n G ar ag e/

-0

6_ E_

_D

O

SC

.rv t

4/ 9/

:4

4:

P M

E1

W es t F or t, D et ro it, M

I 4

D et ro it O pe ra tio ns

S er vi ce C en te r

SE

C O

N D

F

LO

O R

E

LE

C

TR

IC

AL

P

LA

N

-0

/0

9/

SCALE: 1/8" = 1'-0"

EAST SECOND FLOOR ELECTRICAL PLAN

SCALE: 1/8" = 1'-0"

WEST SECOND FLOOR ELECTRICAL PLAN

1.

2.

3.

4.

5.

6.

7.

8.

GENERAL SURGE PROTECTION NOTES:

ALL SURGE PROTECTION DEVICES (SPDs) SHALL BE INSTALLED IN ACCORDANCE

WITH NEC 2023, MANUFACTURER REQUIREMENTS, AND PROJECT DOCUMENTS.

CONTRACTOR SHALL VERIFY VOLTAGE, CONFIGURATION, AND SHORT-CIRCUIT

RATINGS OF ALL SPDs PRIOR TO INSTALLATION.

ALL CONNECTION LEAD LENGTHS SHALL BE KEPT AS SHORT AND STRAIGHT AS

POSSIBLE. TOTAL LEAD LENGTH (LINE, NEUTRAL, GROUND) SHALL NOT EXCEED 24"

OR MANUFACTURER RECOMMENDATIONS.

CONTRACTOR SHALL PROVIDE ALL REQUIRED HARDWARE, CONDUIT, WIRING, AND

ACCESSORIES NECESSARY FOR A COMPLETE INSTALLATION.

COORDINATE ALL ELECTRICAL SHUTDOWNS, PANEL ACCESS, AND INSTALLATION

SEQUENCES WITH OWNER 2 WEEKS PRIOR TO WORK.

WHERE EXISTING SPDs ARE REMOVED, CONTRACTOR SHALL PROVIDE AND INSTALL

NEW PANEL ENCLOSURE COVER SECTION TO MAINTAIN PANEL UL LISTING AND NEMA

RATING.

FOR PANELS WITH EXISTING EXTERNAL MOUNTED SPDs, REPLACE SPDs AT THE

SAME LOCATION USING EXISTING CONDUIT PATHS PROVIDING NEW WIRING.

TEST AND VERIFY SPD OPERATION UPON INSTALLATION PER MANUFACTURER'S

RECOMMENDATIONS. NOTIFY ENGINEER OF ANY DEFICIENCIES.

SCALE: 1/4" = 1'-0"E120

1 ENLARGED ELECTRICAL ROOM A204

A

B

B.9

C

D

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

ACC-2 ACC-1

RTU-1B

RTU-1A

RTU-2A

EF-3 EF-4

RTU-2B

EF-1

EF-1

SECURITY CAMERA

MOUNTING POLE.

LIGHTNING PROTECTION AIR TERMINAL.

ALL EXISTING TO REMAIN (TYP)

CONTRACTOR TO REMOVE ALL COPPER WIRING ON

THE ROOF IN CONTACT WITH THE ALUMINUM PARAPIT

OR ANY ALUMINUM METAL AND REPLACE WITH

ALUMINUM WIRE. CONNECT NEW WIRE TO ALL THE

EXISTING AIR TERMINALS.

EXHAUST FAN HOUSING.

EXHAUST FAN

HOUSING.

LIGHTNING PROTECTION WIRING BELOW

ROOF MEMBERANE EXISTING TO REMAIN.

LIGHTNING PROTECTION WIRING BELOW

ROOF MEMBERANE EXISTING TO REMAIN.

LIGHTNING PROTECTION WIRING BELOW

ROOF MEMBERANE EXISTING TO REMAIN.

LIGHTNING PROTECTION WIRING BELOW

ROOF MEMBERANE EXISTING TO REMAIN.

NEW AIR TERMINAL AND BONDING

CABLE TO BE INSTALLED ON

EXISTING ANTENNA.

NEW AIR TERMINAL AND BONDING

CABLE TO BE INSTALLED ON

EXISTING ANTENNA. (TYP OF 2)

NEW AIR TERMINAL AND BONDING

CABLE TO BE INSTALLED ON

EXISTING ANTENNA.(TYP OF 4)

NEW AIR TERMINAL AND BONDING

CABLE TO BE INSTALLED ON

EXISTING VENT PIPE.

EXISTING VENT PIPE.

NEW AIR TERMINAL AND BONDING

CABLE TO BE INSTALLED ON

EXISTING VENT PIPE.

NEW AIR TERMINAL AND BONDING

CABLE TO BE INSTALLED ON

EXISTING VENT PIPE.

EXISTING GROUND

RODS TO REMAIN (TYP)

B

B.9C

D

1 2 3 4 5 6 7 8 9 10 11 12 16 17 18

FUEL

STORAGE

TANK

DIESEL

GENERATOR

TRANSFORMER TRANSFORMER

METAL FENCE

10'-0" LONG x 5/8" DIAMETER COPPER GROUND ROD

AND #4/0 CABLE CONNECTION TO BUILDING STEEL. ALL

CONNECTIONS TO BE CADWELD. COORDINATE WITH

STRUCTURAL TRADES AND ARCHITECTURAL TRADES.

GROUND BAR (EXISTING)

EXISTING UNDERGROUND GROUNDING

CONDUCTOR TO REMAIN

S

UN

UM

E

PL

UR

IB

U

T U E B O R

I N

E P

SI

R

A U

Q I

S M

A N

E C

M A

M A

L U

S N

C R

S M

P U

C I

C I

E

Created by Robert W. Loftis 1991

Pl ot te d:

By

S H

E E

T

ID

E N

TI

FI

C A

TI

O

N N

O

IS

S

U E

D F

O R

D A

TE

JO

B N

O.

IN

D

E X

N O

Y

FI

LE

N O

1/

7.

M N

B P

R E

LI

M

IN

A

R Y

C O

N S

TR

U

C

TI

O N

FI

N

A L

R E

C O

IG

N

ED

D R

AW

N

C H

EC

KE

D

AP

PR

O

VE

D A

D A

M P

. L A

C H

, R A

, D

IR

EC

TO

R D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

PR

O C

U R

EM

EN

T A

N D

R

EA

L

ES

TA

TE

S

ER

V

IC

ES

A

D M

IN

IS

TR

A

TI

O

N D

EP

A

R

TM

EN

T

O F

TE

C

H N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

TEn gi ne er in g, A rc hi te ct ur e, La nd Su rv ey in g ab on m ar ch e.

co m

T30

S Ka la m az oo

M al l Ka la m az oo

, M I.

.3

.6

0AB

ON

M

AR

CH

E

Be nt on H ar bo r G ra nd

H av en G ra nd

R ap id s

Ka la m az oo /P or ta ge Fo rt W ay ne

G os he n

Ho ba rt La fa ye tte So ut h

Be nd

V al pa ra iso

Au to de sk

D oc s:

//2

5-

A dr ia n G ar ag e/

-0

6_ E_

_D

O

SC

.rv t

4/ 9/

:4

4:

P M

E4

W es t F or t, D et ro it, M

I 4

D et ro it O pe ra tio ns

S er vi ce C en te r

LI

G H

TN

IN

G P

R O

TE

C

TI

O

N A

N D

G R

O U

N D

IN

G

P

LA

N S

-0

/0

9/

SCALE: 3/32" = 1'-0"

ROOF LIGHTNING PROTECTION PLAN

SCALE: 3/32" = 1'-0"

EXISTING ELECTRICAL GROUNDING PLAN

1.

2.

3.

4.

GENERAL LIGHTNING PROTECTION NOTES:

MODIFY EXISTING LIGHTNING PROTECTION SYSTEM BY REPLACING EXISTING CONDUCTORS ON PARAPIT WITH ALUMINUM CONDUCTORS; EXISTING AIR TERMINALS SHALL REMAIN. ALL WORK SHALL COMPLY WITH NFPA 780 (LATEST

ADOPTED EDITION) AND APPLICABLE LOCAL CODES.

ALUMINUM CONDUCTORS SHALL BE INSTALLED USING LISTED FITTINGS AND BI-METALLIC CONNECTORS WHERE REQUIRED TO PREVENT GALVANIC CORROSION AND ENSURE COMPATIBILITY WITH EXISTING COPPER COMPONENTS.

MAINTAIN SYSTEM CONTINUITY, BONDING, GROUNDING, AND ORIGINAL AIR TERMINAL LAYOUT.

CONDUCTORS SHALL BE ROUTED AS STRAIGHT AND DIRECT AS PRACTICABLE, PROTECTED FROM PHYSICAL DAMAGE, AND COORDINATED WITH ADJACENT CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND PROVIDE

INSPECTION AND DOCUMENTATION AS REQUIRED BY THE AHJ.

SYSTEM SHALL BE INSPECED AND RE-CERTIFIED IN COMPLIANCE TO NFPA 780, LPI 175, & UL96A. SYSTEM SHALL MEETING

REQUIREMENTS AND SHALL RECIEVE A UL MASTER LABEL CERTIFICATION UPON COMPLETION.

M

M M

RTU-2A RTU-2B

G

15KV

RATED

600A-3P

15KV

RATED

600A-3P

P1 P2 P/T

4.8KV

DTE ENERGY. 4.8KV

INCOMING PRIMARY

FEEDER.

*EXISTING

LIGHTNING/SURGE

ARRESTORS ON UTILITY

POWER POLE TO

REMAIN.

SECONDARY MAIN

SWITCHGEAR

480/277-3Ø-4W

1600A BUSSING

5-SECTION, MAXIMUM,

10'-0" WIDE X 72" DEEP

MAX.

1600A-3P 100A 3P

800A-3P 800A-3P 800A-3P

TIE BREAKER

ATODISTRIBUTION SECTION 'A' DISTRIBUTION SECTION 'B'

1600A-3P 1600A-3P 800A-3P 1600A-3P

S P D

100A-3P

2-SECTION MAXIMUM,

48" WIDE X 72" DEEP

GENERATOR WITCHGEAR

480/277-3Ø-4W

1600A BUSSING

1600A-3P 1600A-3P 800A-3P 800A-3P 800A-3P

EXISTING DIESEL GENERATOR

480/277-3Ø-4W

GENERATOR

INCOMING FEEDER

SECTION

ATS-1

800A-4P

ATS-2

400A-3P

ATS-3

400A-3P

DP-B 1000A MLO

480/277-3Ø-4W

65K AIC

MAXIMUM 48" WIDE X 18" DEEP

350A 3P 65K

EXISTING

TRANSFORMER

100A 3P 65K

SPARE

15A 3P 65K

60A 3P 65K

HACR

RATED

100A 3P 65K

SPARE

125A 3P 65K

100A 3P 65K

DWH-1

60A 3P 65K

4# 2, 1# 6 G

RD

., 1

.5" C

LP-EM2AA

LP-EMBB

ATS-LS

100A-4P

60A-3P

AUTOMATIC TRANSFER SWITCH SHALL

TRANSFER TO EMERGENCY POWER

SOURCE WITHIN 10 SECONDS PER NFPA

110 TYPE 10 SYSTEM. REFER TO UURS

CONTRACT DOCUMENTS.

LP-2AA

ELEVATOR

(30-HP)

ELEVATOR

CONTROLLER

125A 3P 65K

HACR

RATED

125A 3P 65K

HACR

RATED

100A 3P 65K

SPARE

30A-3P

15A 3P 65K

SPARE

TO DP-A

SEE SHEET E601 FOR

CONTINUATION

TO DP-UPS

SEE SHEET E601

FOR CONTINUATION

TO DP-RP

SEE SHEET E601

FOR CONTINUATION

1200A/3P

S P D

S P D

S P D

30A 3P

S P D 6

30A 3P

S P D

S P D

S P D

PP-GEN

EXISTING

TRANSFORMER

S P D

30A 3P

SPD

XFMR

CABINET

480:208/120

UPS

CABINET

BATTERY

CABINET

*EXISTING LIGHTNING/SURGE ARRESTORS TO REMAIN.

S

UN

UM

E

PL

UR

IB

U

T U E B O R

I N

E P

SI

R

A U

Q I

S M

A N

E C

M A

M A

L U

S N

C R

S M

P U

C I

C I

E

Created by Robert W. Loftis 1991

Pl ot te d:

By

S H

E E

T

ID

E N

TI

FI

C A

TI

O

N N

O

IS

S

U E

D F

O R

D A

TE

JO

B N

O.

IN

D

E X

N O

Y

FI

LE

N O

1/

7.

M N

B P

R E

LI

M

IN

A

R Y

C O

N S

TR

U

C

TI

O N

FI

N

A L

R E

C O

IG

N

ED

D R

AW

N

C H

EC

KE

D

AP

PR

O

VE

D A

D A

M P

. L A

C H

, R A

, D

IR

EC

TO

R D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

PR

O C

U R

EM

EN

T A

N D

R

EA

L

ES

TA

TE

S

ER

V

IC

ES

A

D M

IN

IS

TR

A

TI

O

N D

EP

A

R

TM

EN

T

O F

TE

C

H N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

TEn gi ne er in g, A rc hi te ct ur e, La nd Su rv ey in g ab on m ar ch e.

co m

T30

S Ka la m az oo

M al l Ka la m az oo

, M I.

.3

.6

0AB

ON

M

AR

CH

E

Be nt on H ar bo r G ra nd

H av en G ra nd

R ap id s

Ka la m az oo /P or ta ge Fo rt W ay ne

G os he n

Ho ba rt La fa ye tte So ut h

Be nd

V al pa ra iso

Au to de sk

D oc s:

//2

5-

A dr ia n G ar ag e/

-0

6_ E_

_D

O

SC

.rv t

4/ 9/

:4

4:

P M

E6

W es t F or t, D et ro it, M

I 4

D et ro it O pe ra tio ns

S er vi ce C en te r O

N E-

LI

N

E D

IA

G

R

AM

-0

/0

9/

NONEE600

1 ONE-LINE DIAGRAM E600

1.

GENERAL ELECTRICAL NOTES:

ALL SPDs SHOWN ON ONE-LINE DIAGRAM SHALL REFERENCE THE “PANEL SURGE

PROTECTION DEVICE TABLE” ON SHEET E001 – ELECTRICAL SCHEDULES FOR SPD

RATINGS, CHARACTERISTICS, AND INSTALLATION REQUIREMENTS.

1.

2.

3.

4.

5.

6.

ELECTRICAL KEYED NOTES:

UTILIZE EXISTING 30A,3P BREAKER TO FEED NEW SURGE PROTECTION DEVICE.

PROVIDE NEW 30A,3P BREAKER. (1) 120V CIRCUIT WILL NEED TO BE MOVED TO FROM

LEFT SIDE OF PANEL TO RIGHT SIDE TO ACCOMODATE NEW 3 POLE BREAKER.

UTILIZE EXISTING BREAKER THAT FEEDS INTEGRATED SURGE PROTECTION DEVICE

TO FEED NEW EXTERNAL SURGE PROTECTION DEVICE.

PROVIDE NEW 30A,3P BREAKER. VERIFY THAT CIRCUITS 37,39,41 ARE

SPARES/SPACES. IF CIRCUIT BREAKERS ARE SPARES, REMOVE THE (3) 120V,1P

SPARES AND REPLACE 3 POLE BREAKER IN EXISTING SPOT.

PROVIDE NEW 30A,3P BREAKER. (1) 120V CIRCUIT WILL NEED TO BE MOVED TO FROM

RIGHT SIDE OF PANEL TO LEFT SIDE TO ACCOMODATE NEW 3 POLE BREAKER.

PROVIDE NEW 30A,3P BREAKER. VERIFY THAT CIRCUITS 31,33,35 ARE SPARES. IF

CIRCUIT BREAKERS ARE SPARES, REMOVE THE (3) 120V,1P SPARES AND REPLACE 3

POLE BREAKER IN EXISTING SPOT.

RTU-1A RTU-1B

DP-A 800A MLO

480/277-3Ø-4W

65K AIC

MAXIMUM 48" WIDE X 18" DEEP

60A 3P 65K

50A 3P 65K

T-3

30 KVA

RP-BL

15A 3P 65K

15A 3P 65K

15A 3P 65K

15A 3P 65K

60A 3P 65K

HACR

RATED

60A 3P 65K

HACR

RATED

15A 3P 65K

50A 3P 65K

50A 3P 65K

SPARE

70A 3P 65K

15A 3P 65K

SPARE

500A 3P 65K

W / SHUNT TRIP

T-2

45 KVA

P-1

3 HP

P-2

3 HP

P-3

3/4 HP

P-4

3/4 HP

DWH-2

6.0KW

49.0 FLA 49.0 FLA

T-4

30 KVA

RP-EM1AA

GRD PER NEC (TYP.)

RP-EM2A

DP-UPS 800A

208/120V-3Ø-4W

22KAIC, 200% NEUTRAL

150A 3P 22K

RP-UPS1

150A 3P 22K

SPARE

2-2 1/

2" C

. E

AC

H W

ITH

3#

0K

CM

IL,

1# 2 G

RD

DP-AC 600A BUS

480V, 3Ø, 3W

65K AIC

125A 3P 65K

125A 3P 65K

SPARE

20A 3P 65K

SPARE

20A 3P 65K

125A 3P 65K

SPACE

20A 3P 65K

450A 3P 65K

ACC-1 ACC-2

ON ROOF ON ROOF

20A 3P 65K

SPARE

CRAC-1 CRAC-2

125A 3P 65K

SPARE

DP-RP 800A MCB

120/208-3Ø-4W

42K AIC, 200% NEUTRAL BAR

MAXIMUM 48" WIDE X 18" DEEP

MAIN

800A 3P

150A 3P 42K

RP-1A

100A 3P 42K

SPARE

150A 3P 42K

RP-1B

150A 3P 42K

RP-1C

150A 3P 42K

RP-1D

150A 3P 42K

RP-2A

150A 3P 42K

RP-2B

150A 3P 42K

RP-2C

100A 3P 42K

RP-D2

100A 3P 22K

RP-UPS2 RP-UPS3A RP-UPS3B RP-UPS4A RP-UPS5A RP-UPS5B RP-UPS6 RP-UPS7 RP-UPS8 RP-UPS9

150A 3P 22K

SPARE

150A 3P 22K

150A 3P 22K

150A 3P 22K

150A 3P 22K

150A 3P 22K

150A 3P 22K

150A 3P 22K

150A 3P 22K

150A 3P 22K

150A 3P 22K

150A 3P 22K

2x 4-6

KC

MI

L, 1# 3/0

G

RD

., 4 " C

2x 3-6

KC

MI

L H

OT

, 2

-60 0K

CM

IL

NE

UT

., 1 #1

/0

GR

D.

, 5

" C

2x 3-6

KC

MI

L H

OT

, 2

-60 0K

CM

IL

NE

UT

., 1 #1

/0

GR

D.

, 5

" C

TO ATS-1

SEE SHEET E600 FOR

CONTINUATION

TO UPS CABINET

ON SHEET E600

TO DP-B

ON SHEET E600

1 1

60A 3P 65K

30A 3P

30A 3P

30A 3P

2 4 5

S P D

S P D

S P D

S P D

30A 3P

S P D

30A 3P

S P D

30A 3P

S P D

30A 3P

S P D

30A 3P

S P D

30A 3P

S P D

30A 3P

S P D

30A 3P

S P D

S P D

RP-UPS4B

30A 3P

S P D

30A 3P

S P D

30A 3P

S P D

30A 3P

S P D

30A 3P

S P D

30A 3P

S P D

SPD SPD SPD SPD SPD SPD SPD SPD SPD SPD SPD SPD

S P D

S P D

S P D

60A 3P 65K

SPARE

30A 3P

S P D S

P D

S P D

30A 3P

S P D

30A 3P

S P D

S P D

30A 3P

S P D

15A 3P 65K

SPARE

15A 3P 65K

SPARE

100A 3P 65K

SPARE

30A 3P

S P D

S

UN

UM

E

PL

UR

IB

U

T U E B O R

I N

E P

SI

R

A U

Q I

S M

A N

E C

M A

M A

L U

S N

C R

S M

P U

C I

C I

E

Created by Robert W. Loftis 1991

Pl ot te d:

By

S H

E E

T

ID

E N

TI

FI

C A

TI

O

N N

O

IS

S

U E

D F

O R

D A

TE

JO

B N

O.

IN

D

E X

N O

Y

FI

LE

N O

1/

7.

M N

B P

R E

LI

M

IN

A

R Y

C O

N S

TR

U

C

TI

O N

FI

N

A L

R E

C O

IG

N

ED

D R

AW

N

C H

EC

KE

D

AP

PR

O

VE

D A

D A

M P

. L A

C H

, R A

, D

IR

EC

TO

R D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

PR

O C

U R

EM

EN

T A

N D

R

EA

L

ES

TA

TE

S

ER

V

IC

ES

A

D M

IN

IS

TR

A

TI

O

N D

EP

A

R

TM

EN

T

O F

TE

C

H N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

TEn gi ne er in g, A rc hi te ct ur e, La nd Su rv ey in g ab on m ar ch e.

co m

T30

S Ka la m az oo

M al l Ka la m az oo

, M I.

.3

.6

0AB

ON

M

AR

CH

E

Be nt on H ar bo r G ra nd

H av en G ra nd

R ap id s

Ka la m az oo /P or ta ge Fo rt W ay ne

G os he n

Ho ba rt La fa ye tte So ut h

Be nd

V al pa ra iso

Au to de sk

D oc s:

//2

5-

A dr ia n G ar ag e/

-0

6_ E_

_D

O

SC

.rv t

4/ 9/

:4

4:

P M

E6

W es t F or t, D et ro it, M

I 4

D et ro it O pe ra tio ns

S er vi ce C en te r O

N E-

LI

N

E D

IA

G

R

AM

-0

/0

9/

SCALE: NONE

ONE-LINE DIAGRAM E6011

1.

2.

GENERAL ELECTRICAL NOTES:

ALL SPDs SHOWN ON ONE-LINE DIAGRAM SHALL REFERENCE THE “PANEL SURGE

PROTECTION DEVICE TABLE” ON SHEET E001 – ELECTRICAL SCHEDULES FOR SPD

RATINGS, CHARACTERISTICS, AND INSTALLATION REQUIREMENTS.

ALL SPARE BREAKERS REMOVED TO BE GIVEN BACK TO OWNER TO KEEP FOR ATTIC

STOCK.

1.

2.

3.

4.

5.

6.

7.

8.

9.

ELECTRICAL KEYED NOTES:

UTILIZE EXISTING 30A,3P BREAKER TO FEED NEW SURGE PROTECTION DEVICE.

PROVIDE NEW 30A,3P BREAKER. (1) 120V CIRCUIT WILL NEED TO BE MOVED TO FROM

LEFT SIDE OF PANEL TO RIGHT SIDE TO ACCOMODATE NEW 3 POLE BREAKER.

UTILIZE EXISTING BREAKER THAT FEEDS INTEGRATED SURGE PROTECTION DEVICE

TO FEED NEW EXTERNAL SURGE PROTECTION DEVICE.

PROVIDE NEW 30A,3P BREAKER. VERIFY THAT CIRCUITS 37,39,41 ARE

SPARES/SPACES. IF CIRCUIT BREAKERS ARE SPARES, REMOVE THE (3) 120V,1P

SPARES AND REPLACE 3 POLE BREAKER IN EXISTING SPOT.

PROVIDE NEW 30A,3P BREAKER. (1) 120V CIRCUIT WILL NEED TO BE RELOCATED TO

ACCOMODATE NEW 3 POLE BREAKER.

PROVIDE NEW 30A,3P BREAKER. VERIFY THAT CIRCUITS 31,33,35 ARE SPARES. IF

CIRCUIT BREAKERS ARE SPARES, REMOVE THE (3) 120V,1P SPARES AND REPLACE 3

POLE BREAKER IN EXISTING SPOT.

REPLACE EXISTING SPARE BREAKERS WITH A 60A,3P BREAKER.

PROVIDE NEW 30A,3P BREAKER. VERIFY THAT CIRCUITS 38,40,42 ARE

SPARES/SPACES. IF CIRCUIT BREAKERS ARE SPARES, REMOVE THE (3) 120V,1P

SPARES AND REPLACE 3 POLE BREAKER IN EXISTING SPOT.

PROVIDE NEW 30A,3P BREAKER. VERIFY THAT CIRCUITS 25,27,29 ARE

SPARES/SPACES. IF CIRCUIT BREAKERS ARE SPARES, REMOVE THE (3) 120V,1P

SPARES AND REPLACE 3 POLE BREAKER IN EXISTING SPOT.

File details come from the government source that posted it. Updated .