249_Pennsylvania_-_DB_Trade_Partner_MEP_RFP_Final_REV.pdf
PDF 24 MB Posted
- Attached to
- EXT MOH | DB Trade Partner - FP/Plumb/Mech/Elect
- Solicitation number
- SFGOV-0000011933
- Issued by
- California
About this file
This Request for Proposals (RFP) is issued by Suffolk Construction/LMSa, Tenderloin Neighborhood Development Corporation (TNDC), and Young Community Developers (YCD) for design-build trade partner onboarding in the electrical, mechanical, plumbing, and fire protection trades for a 100% affordable housing project at 249 Pennsylvania Avenue in San Francisco, California. The project is an 8-story, Type I structure containing at least 120 residential units with amenities including community rooms, bike parking, and green space, located at the corner of Pennsylvania Avenue and Mariposa Street backing up to I-280. The RFP is soliciting proposals for preconstruction services (design coordination, cost planning, estimating, BIM coordination, constructability reviews, scheduling, and commissioning planning) and construction services (furnish and installation of complete systems) to be performed in Phase II. The proposal submission deadline is August 14, 2026, at 5:00 PM PST via email to kbrady@suffolk.com and nbaca@suffolk.com. Questions regarding the RFP must be submitted by July 31, 2026, with responses provided by August 7, 2026. Short-listed applicants will be notified by August 21, 2026, for interviews targeting the week of August 24, 2026, with final selection anticipated for mid-September 2026. The tentative project schedule includes Phase II Design Development and Construction Documents beginning September 2026, with construction completion targeted for June 2029. The project is subject to external funding and building permit approval, and TNDC and YCD reserve the right to terminate or place the project on indefinite hold.
Proposals will be evaluated on a 100-point scale based on trade-specific experience and capacity (20 points), design-build experience (25 points), key staff resumes (20 points), SBE participation (15 points), proof of insurance (pass/fail), opinion of cost estimate/schedule (20 points), and interview performance (50 points). The project is administered by the San Francisco Mayor's Office of Housing and Community Development (MOHCD) and is subject to a 25% SBE subcontracting goal for design services and a 25% subcontracting goal for construction services, with successful bidders required to make good faith efforts to utilize certified SBEs. The project is also subject to Federal Davis-Bacon and/or State Prevailing Wage requirements, the City's First Source Hiring Program with a 50% San Francisco resident participation goal by work hours, and HUD Section 3 requirements. Insurance requirements include General Liability on an occurrence form, Professional Liability of not less than $5,000,000 per claim (with five-year tail coverage post-completion if claims-made basis), and Pollution Liability of not less than $2,000,000 aggregate. The construction contract will be structured as cost-plus-fee with a guaranteed maximum price using modified DBIA documents. Subcontractors must comply with all specified insurance requirements and are responsible for obtaining pre-qualification approval from the Contractor prior to work commencement. The developers reserve the right to postpone, withdraw, or reject any and all proposals, and firms may contest selection results within five business days of the notice to submit complaints to the Contract Monitoring Division.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EXT_MOH___DB_Trade_Partner_-_FP_Plumb_Mech_Elect.xml | XML file | |
| EXT_MOH___DB_Trade_Partner_-_FP_Plumb_Mech_Elect.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS (“RFP”)
DESIGN BUILD TRADE PARTNER ONBOARDING
Electrical
Mechanical
Plumbing
Fire Protection
FOR
100% Affordable Housing Design-Build Project
249 Pennsylvania Avenue
San Francisco, CA 94102
Issued by:
Suffolk Construction/LMSa
Tenderloin Neighborhood Development Corporation (TNDC)
Young Community Developers (YCD)
Issuance of RFP:
July 15, 2026
Submittal Deadline:
August 14, 2025 by 5:00 PM PST
To be sent via email to: kbrady@suffolk.com;
nbaca@suffolk.com
TABLE OF CONTENTS
PROJECT OVERVIEW
SELECTION PROCESS AND SCHEDULE
INSURANCE REQUIREMENTS
DESIGN BUILD SERVICES REQUESTED
SUBMITTAL RESPONSE REQUIREMENTS
TERMS AND CONDITIONS
DESIGN-BUILD TRADE PARTNER PROCUREMENT ATTACHMENTS
ADDENDA (TO BE ISSUED BY FRIDAY, AUGUST 7, 2026)
PROJECT OVERVIEW
About the Project
249 Pennsylvania is the site of a proposed affordable family project of at least 120 units, at the corner of Pennsylvania Ave and Mariposa Street and backing up onto I-280. Though the adjacent street is significantly sloped, this is an already excavated site, which is currently sitting vacant.
Introduction
The Mayor’s Office of Housing and Community Development (MOHCD), together with Tenderloin
Neighborhood Development Corporation (TNDC) and Young Community Developers (YCD) (collectively, the
"Owner"), is seeking proposals from qualified design-build teams to provide design, preconstruction, and construction services for the affordable housing development at 249 Pennsylvania Avenue (the "Project").
The Project will deliver multifamily affordable rental housing, including units for formerly homeless households. Proposing teams shall consist of an architect and general contractor with demonstrated experience delivering design-build affordable housing projects in San Francisco.
The Project will be delivered using a two-phase Design-Build approach:
• Phase I – Preconstruction Services: The architect, under direct contract with the Owner, will advance the design through 100% Schematic Design and establish the Basis of Design. THIS PHASE IS
COMPLETED
• Phase II – Design & Construction Services: The Owner will contract with a single Design-Builder, who will assume responsibility for the architect, design consultants, subcontractors, and construction. The Design-Builder will complete the design through Design Development and
Construction Documents, administer construction, and deliver the completed Project in accordance with the established Basis of Design.
TENTATIVE PROJECT SCHEDULE
TNDC/YCD & Suffolk/LMSa anticipate the following project schedule:
Schedule Activities Schedule
PHASE 2: DD, CD and Construction Start September 2026
50% DD Submission Targeting November 1, 2026
100% DD Submission Targeting February 8, 2027
50% CD Submission Targeting March 29, 2027
90% CD Submission Targeting May 24, 2027
100% CD/ Conformed Set Submission Targeting June 14, 2027
Final GMP Submission Targeting August 9, 2027
Construction Start* September 2027
*Construction start date subject to external funding (Notice of Funding Availability - NOFA) dates & building permit approval
Construction Completion June 2029
SELECTION PROCESS AND SCHEDULE
The RFP process and schedule includes the following key milestones:
SUBMITTAL REQUIREMENTS
Please submit one searchable, non-password protected, PDF copy of your proposal (including attachments, as appropriate) to the email address below. Only electronic submittals will be accepted.
TNDC and YCD are not responsible for any expenses related to the preparation or presentation of responses to this RFP.
If you are a trade that plans to cover multiple scopes, please submit separate packages.
SUBMIT PROPOSALS TO: Suffolk Construction
Kevin Brady: kbrady@suffolk.com
Nicole Baca: nbaca@suffolk.com
SUBMITTAL DUE DATE
Proposals due 5 PM PST on Friday August 14,2026. Submittals received after the due date and time will not be accepted. Incomplete submittals will not be accepted.
DESIGN-BUILDER SELECTION PROCESS
Clarifications and Questions Regarding this RFP
All questions regarding this RFP must be submitted to kbrady@suffolk.com & nbaca@suffolk.comby
July 31, 2026. The developer will provide responses to all applicants via email.
Review of Qualifications and Fee Proposal
A selection committee comprised of at least four members will review and score the Applicants’ proposals per the Scoring Criteria. Based upon the results of this evaluation, a “short-list” of selected potential Design Build Trade Partners will be invited for interviews.
Reference Calls and Interviews
Short-listed applicants will be notified and asked to participate in interviews with the selection panel.
Both Subcontractor and Engineer must attend the interview. Following interviews, the highest scoring/ranking design-build trade partner teams (one per trade specific) will be conditionally selected based on reference calls, interview results, and other requested submitted documentation.
SELECTION SCHEDULE
Request for Proposals available July 15, 2026
Questions on RFP due July 31, 2026 @ 5 PM
Development team responses to questions August 7 , 2026
Qualifications/Proposals due August 14, 2026 @ 5 PM
Notify short-listed candidates August 21, 2026
Interviews Targeting week of August 24th 2026
Final Selection (tentative) Beginning to Mid September 2026
INSURANCE REQUIREMENTS:
i. OCIP __
ii. CCIP __
iii. No OCIP or CCIP (Traditional Insurance) X_
1. Subcontractor understands and acknowledges that there shall be no commencement of any Work until all insurance required by this Subcontract has been provided and Subcontractor has been enrolled in the OCIP or CCIP, if applicable. Subcontractor shall immediately provide all information requested by Contractor to enable OCIP or CCIP enrollment, if applicable.
2. General Liability and Umbrella Liability Policies must be provided on an occurrence form
3. Subcontractors responsible for Design Build Scopes or any professional service shall carry
Professional Liability insurance coverage in an amount not less than $5,000,000 per claim and as required. If such insurance is written on a claim made basis, these Subcontractors shall maintain the insurance for the minimum period of five (5) years after Substantial Completion of the entire Work and have a retroactive date prior to the effective date of the subcontract. Any lower tier subcontractors performing similar work and/or having design responsibility must be required to comply with these same insurance requirements.
4. A copy of any residential exclusion contained in the subcontractor’s policy must be provided to
Suffolk Construction Co. for review and approval.
5. Subcontractors shall carry Pollution Liability insurance with limits of not less than $2,000,000 aggregate for bodily injury, personal injury, and property damage, including the Contractor, the
Owner and all others required by contract as additional insureds. If such subcontractors haul hazardous waste, they must carry Automobile Liability insurance which includes the MCS 90 endorsement.
6. Subcontractor shall be fully responsible to provide all information required by Contractor in its sole discretion to enable pre-qualification prior to award of the Subcontract and similar information for any renewal needs throughout the course of the Project at intervals required by Contractor.
DESIGN-BUILD SERVICES REQUESTED
The Design Build Trade Partners are expected to actively draw upon their experience, skills, and knowledge to add value to the project. During the design process (Phase II), the Trade Partners duties will include the pre-construction services and Construction services outlined below:
1. Preconstruction Services – Design/ Coordination PHASE II The MEP Trade Partner shall provide all professional services necessary to support design development, planning, coordination, estimating, procurement strategy, and construction readiness from Notice to
Proceed through execution of the Construction Services Agreement.
A. Design Services: Provide discipline-specific engineering support and technical expertise, Review design documents for constructability, Recommend system alternatives to improve cost, quality, schedule, maintainability, and lifecycle performance, Participate in Target Value Design (TVD) and value analysis exercises, Evaluate alternate materials and equipment, and Identify opportunities to simplify installation and improve sequencing.
B. Cost Planning & Estimating: Develop conceptual and detailed cost estimates throughout design, Validate design against established target budgets, Identify cost escalation risks, and Evaluate cost impacts of design changes.
C. BIM / VDC Coordination: Develop discipline-specific BIM models, Participate in interdisciplinary model coordination, Attend clash detection meetings, and assist in resolveing clashes within agreed coordination schedule.
D. Constructability Reviews
Provide ongoing constructability reviews for: Equipment access, Installation sequencing, Service clearances, Future maintenance access, Code compliance, and Installation tolerances
E. Scheduling, Planning & Procurement: Participate in pull planning sessions identifying sequence of work, manpower and areas of coordination with all trades to meet the project overall schedule, Identify critical path activities, and Identify procurement durations, supply chain risks and early release items
F. Utility Coordination: Coordinate with utility providers, Support utility applications, Verify service requirements, Participate in utility planning meetings, and Coordinate temporary utility requirements.
G. Commissioning Planning
Support commissioning by: Reviewing Owner Project Requirements, Developing commissioning schedule, Identifying testing requirements, Coordinating TAB activities, Developing startup sequence, and Supporting functional testing planning
2. Construction Services – Construction administration/ Furnish and Installation
PHASE II.2
Following successful completion of Phase 1, the Trade Partner shall furnish all labor, supervision, engineering support, materials, equipment, tools, temporary facilities, testing, and incidentals necessary to complete the Work.
Furnish and install complete system in compliance with all codes and regulations. This includes:
A. Complete system including piping, ducting, wiring sizing, and of all equipment by this subcontractor’s Trade specific Engineer of Record.
B. All miscellaneous required systems including for specific equipment/appliances, car stackers, EV chargers, and amenity needs.
C. Phase 1 has identified a target value budget for the Cost of work to be put in place. Up award, it will be required to the success of the project for this budget to be maintained or enhanced.
SUBMITTAL RESPONSE REQUIREMENTS
Please submit your proposal as a single package of all below sections with the following items. Total PTS is
100 for RFP Response and 50 for Interview.
COVER LETTER
Briefly describe the team members proposed for this project, clearly stating the respective roles of the parties,) and their qualifications to best deliver 249 Pennsylvania under the guiding principles included in this RFP. (max 1 page)
1. MEP TRADE PARTNER - TRADE SPECIFIC EXPERIENCE AND CAPACITY (20 PTS)
A. Subcontractors information (2 pages max)
a. Name of company, number of years in business, number of employees
b. Description of services offered
c. Narrative on Entitlement/Permitting, Cost Containment/Value Engineering, and Construction Administration
i. Describe your experience entitling and permitting projects. Include relevant experience working with MOHCD, DPW/BSM, SFPUC water, DBI, PUC/PG&E, SFMTA, and Planning. Include any experience working with SB-35, Coastal Commission and/or AB-2162.
ii. Describe your philosophy and approach to managing the design, cost containment, and construction administration processes
B. Provide one or two subcontractor examples* of completed projects of similar construction type, size, scope, funding sources, and regulation. Please include the following information:
a. Similarities to Project
b. Current Contacts for Developer/Owner, Architect, Local Jurisdiction
c. Contract type
d. BIM Role (which trades or disciplines)
e. Initial Contract value, final contract value, general explanation for major Change Orders
f. Detailed demonstration meeting the Project’s DBE, LBE and/or SBE subcontracting goals, HUD Section 3, prevailing wage and first source local work force hiring goals.
g. Start of construction contract amount and construction cost at completion
D. Provide one or two examples of projects utilizing the design-build delivery method. Projects staffed with partnerships outside of this proposed design-builder team may be included, however, projects with proposed design-builder will score higher. (As applicable, max 2 pages each):
a. Project name, location, date completed
b. Current Contacts for Developer/Owner, General Contractor, Architect, Local Jurisdiction
c. Contract type
d. Total number of units, square footage
e. BIM Role (which trades or disciplines) & Cost
f. Initial contract value, final Contract value, general explanation for major Change Orders
g. Detailed demonstration meeting the Project’s DBE, LBE and/or SBE subcontracting goals, HUD Section 3, prevailing wage and first source local work force hiring goals.
2. DESIGN BUILD EXPERIENCE (25 PTS)
A. Outline decision-making throughout the design process and team members’ roles and responsibilities. Please indicate project(s) where the Design-Builder team has worked in partnership and how your previous experiences will inform your partnership on 249
Pennsylvania Ave. Please indicate whether the project(s) were completed utilizing a design-build, design-bid-build, or other approach.
B. Stakeholder approach: Working with a client, such as TNDC and YCD, that has an array of stakeholders that have input on decisions, including construction related changes, VE, etc. For example, TNDC and YCD often must inform and receive direction from other departments within the firm for programmatic changes that can lead to longer timeframes for decision-making.
Describe creative and achievable strategies to engage with the project stakeholders to maintain costs and keep project on schedule and facilitate design charrettes, community meetings, that engage the public and keep them informed of project updates.
C. Scheduling: Proposed schedule overview for Phase II (completion of design and construction).
The scheduling narrative should include how the design-build team will phase the design and construction of the project to ensure decision-making is timely and avoids potential for any costly rework.
D. Design approach: Design narrative for the site
E. Cost containment: Please provide two schedule or cost-saving strategies that the trade partner team has successfully utilized in past projects and is replicable and scalable.
F. Sustainability: “Green” building construction approach and complying with and/or exceeding
Green Point Rated (GPR) construction criteria or other like programs (LEED, Passive House, etc.).
Additionally, please provide a brief description of any experience with GPR and assessment of applicability for 249 Pennsylvania Avenue.
3. KEY STAFF RESUMES (20 PTS)
Provide resumes for the key staff proposed for the Project including, at a minimum, Designer / Engineer
Project Manager / Design Builder project manager, and a Superintendent (who may be substituted with someone of equivalent experience upon Owner’s approval).
4. SBE PARTICIPATION (15 PTS)
A. Detail your team’s plan for achieving the separate 25% SBE subcontracting participation goals for both design and construction by utilizing both design subconsultants and construction subcontractors/ suppliers.
Regardless of team composition, all respondents should describe their recommended approach to meeting the requirements. Teams will be scored on the perceived feasibility of those plans, with the highest points going to teams already meeting the minimum participation through their current composition (i.e., inclusion of an SBE designer, or other means).
B. Fill out SBE 2 Form and return within RFP response package. Form can be located at the end of the RFP.
5. PROOF OF INSURANCE (PASS / FAIL)
Contractor(s) shall provide evidence that the companies can comply with the insurance requirements.
If any team member cannot meet the required level of coverage, please include a statement justifying the appropriateness of the proposed limits.
6. OPINION OF COST ESTIMATE/SCHEDULE (20 PTS)
Provide a cost estimate based on the 100% Schematic design documents. This budget will be used in comparison to the target value budget for the project and we will begin working to align scope.
A. Bid summary or bid-tabulation information
B. Initial conceptual design equipment sizing/ routing was included within the Phase 2 budget pricing
C. Project durations and sequence.
D. Confirmation of Suffolk preliminary schedule included as attachment to RFP.
7. INTERVIEW (50 PTS)
A. Bidders will be shortlisted to top (2) and Interviews will be selected to the shortlist only. Interview dates and agenda outline will be provided upon notice of short listing.
TERMS AND CONDITIONS
This section outlines the terms and conditions which will be set forth in the construction contract.
In submitting a response to this RFP, the applicant acknowledges that he/she has read and understands that these terms and conditions apply to the Project, including Attachments to the RFP. Owner and
Design build team reserve the right to revise any terms and/or conditions set forth in this RFP and/or add any terms and/or conditions beyond those set forth in the RFP. The progress of this project is subject to further feasibility analysis. As such, TNDC and YCD reserve the right to terminate this contract or place the project on hold indefinitely.
Small Business Enterprise Contracting: Subcontracting/Professional Services/Suppliers
The project is administered by the San Francisco Mayor’s Office of Housing and Community
Development (MOHCD). The San Francisco Contract Monitoring Division has assigned a 25% SBE sub-consulting goal for design services and a 25% subcontracting goal for construction services. The selected design-builder will be responsible for assisting the developer in meeting or exceeding these goals.
By applying for this contract award, proposers are responsible for making a good faith effort to use
SBEs for subcontractors/subconsultants. "Small Business Enterprise (SBE)" for this contract means a business that is certified as an SBE under (1) one of the following programs and (2) the firm’s five-year average gross revenues do not exceed the maximum economic thresholds listed on SBE Form 2.
Website links for finding Certified LBEs, SBs, and DBEs:
• For Local Business Enterprises (“City Program”):
https://sfgov.org/cmd/lbe-certification
• Certified Small Businesses Enterprises (“State Program”):
https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx
• Certified Disadvantaged Businesses Enterprises (“Federal DBE Program”):
https://caltrans.dbesystem.com/
The San Francisco Contract Monitoring Division (“CMD”) will confirm that a firm is certified as an SBE under the San Francisco SBE program.
The following form must be executed in full and submitted with the proposal package, or as otherwise specified; if not, the proposal may be rejected.
SBE Form 2 – SBE Eligibility and Subcontracting Declaration: All SBE contractors/joint venture partners and listed SBE subcontractors or suppliers, including all lower tier SBE firms, must complete this form AND submit the listed firm’s current SBE certification. All SBE subcontractors or suppliers will need to submit this form declaring, under penalty of perjury, that their total average gross revenues for the past five years are equal to or below the applicable income thresholds for the specific industry.
For additional information regarding the SBE Program, please contact James Chung at james.chung@sfgov.org.
Hiring Program
This project may be subject to the City’s First Source Hiring Program, which sets a 50% San Francisco resident participation goal (calculated by work hours for each construction trade).
Eligible employees and their work hours may be counted toward meeting more than one of these programmatic goals. Assistance will be provided by CityBuild in placing qualified individuals.
Local Hire
This Project is subject to the First Source Hiring Program under Chapter 83 of the Administrative Code of
San Francisco. Bidders are hereby advised that the requirements of the First Source policies will be incorporated as a material term of any contract awarded for the Project.
Information on San Francisco Local Hiring Policy for Construction:
https://oewd.org/sites/default/files/Documents/localhire_faq.pdf
Prevailing Wage Requirements
The Project shall be subject to Federal (Davis Bacon) or State Prevailing Wage. The appropriate Federal and State wage determination shall be provided by the Office of Labor Standards Enforcement (OLSE) and incorporated in the Project Manual to become a part of the Contract Documents. Certified payroll reports will be required and must be turned in weekly to OLSE.
Information on State Prevailing Wage: https://www.dir.ca.gov/OPRL/2020-1/PWD/index.htm
Construction Contract (Phase II)
The form of the construction contract will be a cost plus fee with a guaranteed maximum price (See
Attachment D for templates of the modified DBIA documents).
DESIGN BUILD TEAMS RIGHTS AND OPTIONS
The developer reserves the right to postpone the Project for its convenience, to withdraw this request for design-build trade partner proposals at any time, to waive irregularities in the selection process, to reject any and all submissions as indicated below in Grounds for Rejection, and to negotiate with any or none of the applicants. This request for design-builder proposals does not commit the developer to enter into a contract for constructing the Project.
Grounds for Rejection
The developers or its representative(s) may reject any and all design-build trade partners proposals for the following reasons:
• The applicant does not demonstrate the minimum project experience required
• The submission of qualifications does not contain all the information requested in the section titled “Design-Builder Qualifications Submissions”
• The applicant is not qualified to perform the services required, as determined by the scored ranking of the proposal
• The Design Build team decides to withdraw this Request for Qualifications
• The applicant proposal is received after the designated deadline
• Acceptance of applicant proposal would entail a violation of law or City codes
• The applicant is suspended or disqualified from projects funded by HUD, MOHCD, the State of
California, or OCII
• The applicant’s cost, schedule, or other key components of its proposal are considered unrealistic or unreasonable in the judgment of the Owner
CLAIMS PROCEDURES
Firms wishing to contest the Design Builder selection process or results will have five (5) business days from the date of notice of the conditionally selected contractor to submit written complaints to the
Contractor Monitoring Division, in accordance with its prevailing guidelines.
DESIGN-BUILD TRADE PARTNER PROCUREMENT ATTACHMENTS
A. 100% Schematic Design drawings
B. Preliminary Site Logistics
C. SBE Form 2
ADDENDA (TO BE ISSUED BY FRIDAY, AUGUST 7, 2026, VIA EMAIL)
Contact Kevin Brady – Kbrady@suffolk.com if you have not received addenda.
A. GC AIA Draft Agreement
B. Exhibit B – SPECIFIC SCOPE OUTLINE for all bidding Trades & Unit Pricing breakdowns
C. Preiminary Construction Schedule
D. Rider S – Safety Requirement
90%
249 Pennsylvania - 100% Schematic Design Documents249 Pennsylvania - 90% Schematic Design Documents
PNPS
PW
PE
PENNSYLVANIA AVE
M
AR
IP
O
SA
S
T
I-280 FREEWAY
FR
EE
W
AY
O
FF
R
AM
P
1001 MARIPOSA ST208 PENNSYLVANIA AVE
254 PENN.
AVE
PENNSYLVANIA
GARDEN
@ L2
@ L1
LEVEL 1LEVEL 2
(E)
UNEXCAVATED
AREA
260-262
PENN. AVE
268-270
PENN. AVE
280 PENN.
AVE
290 PENN.
AVE
184 PENNSYLVANIA
AVE
I-280 FREEWAY OVERPASS
COMMUNITY
ROOM
KITCHEN
S .S
S T
O R
. SITE
SUPERVISOR
OFFICE
SOCIAL
WORKER
OFFICE
PARCEL
STOR.
STAFF
BREAK /
MEETING
FILE
STOR.
COPY
ASST.
MGR.
OFFICE
FIRE
PUMP
LAUNDRY
ROOM
EL
ENTRY
LOBBY /
WAITING
EL
TRASH
TERMINATION
ROOM
DOMESTIC
WATER
ANC.
COMMUNITY
ROOM
STAIR 1MAIL
NORTH
COURTYARD
SOCIAL
WORKER
OFFICE
SOUTH
COURTYARD
OPEN TO BLDG.
STORAGE BELOW
ELEV.
CONTROL
ROOM
COMMUNITY
ROOM
STORAGE
STROLLER
CLOSET
LEVEL 1LEVEL 2
250' - 0"
0"
0"
25' - 0"
9'
- 0
0"
5'
- 0
41' - 4 1/2" 51' - 0" 3' - 11"45' - 6" 27' - 10" 51' - 0"28' - 6 1/2"
RECEPTION
26.02 32.03
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
N
A R C H I T E C T S
1/16" = 1'-0"
/2
4/
:1 1:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A1.01
SITE PLAN
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/16" = 1'-0"A1.01 SCALE: 1/16" = 1'-0"
SITE PLAN1
KEYNOTES
26.02 UNDERGROUND VAULT, S.J.T.D.
32.03 CLASS II BIKE PARKING, S.L.D.
A3.01
A3.02
J.2
H ABDF E
PENNSYLVANIA AVE.
M
AR
IP
O
SA
S
T.
I-280 OVER PASS
1084 SF
COMMUNITY
ROOM
110110
UNEXCAVATED AREA
53 SF
ELEV.
CONTROL
ROOM
118118
72 SF
EL
442442
69 SF
EL
469469
526 SF
TRASH
TERMINATION
ROOM
149 SF
STAIR 1
1S11S1
474 SF
106106
1851 SF
NORTH
COURTYARD
128128
A3.02
A3.01
B.5C.2G.5 B.2 A.5CC.5
1.4
E.2 D.8
F.5G
J H.5 G.8H.1 D.2
UNEXCAVATED AREA
264 SF
ASST.
MGR.
OFFICE
104104
163 SF
FIRE
PUMP
127127
163 SF
DOMESTIC
WATER
126126
414 SF
STAFF
BREAK /
MEETING
105105
99 SF
COPY
105A105A
101 SF
FILE
STOR.
105B105B
287 SF
LOBBY /
WAITING
102102
226 SF
SOCIAL
WORKER
OFFICE
109109
276 SF
SOCIAL
WORKER
OFFICE
108108284 SF
SITE
SUPERVISOR
OFFICE
111111115 SF
S.S.
STOR.
112112
167 SF
KITCHEN
110A110A
854 SF
BIKE
ROOM
113113
402 SF
BUILDING
STORAGE
121121
99 SF
MPOE
120120
248 SF
JAN. /
OFFICE
SUPPLY
122122
572 SF
MAINT.
SHOP /
OFFICE /
STORAGE
123123
70 SF
EXIT
VESTIBULE
114114
308 SF
COMMUNITY
ROOM
STORAGE
115115
95 SF
STROLLER
CLOSET
116116
53 SF
PARCEL
STOR.
106A106A
1'
- 4
8'
- 9
1" 4'
- 4
/4
1'
- 1
1/
4"
9'
- 8
7'
- 1 0"
8'
- 5
/4
8'
- 7
/4
5' - 8" 12' - 5" 14' - 3" 6' - 4" 8' - 1" 17' - 8" 15' - 0" 15' - 11 1/2" 24' - 3" 3' - 9" 3' - 9" 24' - 3" 15' - 11 1/2" 8' - 5" 6' - 7" 17' - 8" 8' - 1" 6' - 4" 14' - 0" 11' - 9" 2' - 0"
PNPS
PW
PE
A3.11
A3.11
PE
N
N
SY
LV
AN
IA
G
AR
D
EN
213 SF
COMMON
AREA
RESTROOM
117117
2332 SF
CORRIDOR
107107
107 SF
RECEPTION
101101
EL. 41' - 0"
EL. 42' - 0"
EL. 42' - 0"
EL. 42' - 0"
72 SF
ERRCS
124124
BLDG OVERHANG ABOVE
FILLED AREA
94 SF
ENTRY
235 SF
GEN.
MGR.
OFFICE
244 SF
BOH
CORR.
6.04
6.05
5.01
5.01
14.01
11.05
5.02
10.10
14.02
22.07
22.08
10.01
10.11 22.09
10.12
10.13
5.02
12.10
12.11
3.01 8.01
8.02
8.02
6.03
11.01
6.01
6.066.08
22.01
6.02
11.04
11.03
6.06
6.02
6.08
22.01
11.01
6.01
6.06
6.01
A3.03 1
36" WIDE ACCESSIBLE PATH
EXISTING RETAINING WALL TO REMAIN
NEW RETAINING WALL
LEGEND
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
N
A R C H I T E C T S
As indicated
/2
4/
:1 1:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A2.11
FLOOR
PLAN -
LEVEL 1
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/8" = 1'-0"A2.11 SCALE: 1/8" = 1'-0"
FLOOR PLAN - LEVEL 11
KEYNOTES
3.01 CAST-IN-PLACE CONC. STAIR, S.L.D., S.S.D.
5.01 CUSTOM METAL FENCE & GATE, PTD.
5.02 PREFABRICATED MTL. STAIRS & RAILINGS
6.01 WOOD VENEER UPPER CABINET
6.02 WOOD VENEER LOWER CABINET W/ REMOVABLE BASE
6.03 WOOD VENEER FULL HEIGHT CABINET
6.04 CUSTOM RECEPTION DESK
6.05 BUILT IN BENCHES
6.06 QUARTZ COUNTER WITH INTEGRAL BACK AND SIDE SPLASHES
6.08 WOOD VENEER LOWER CABINET W/ 4 DRAWERS
KEYNOTES
8.01 EXTERIOR STOREFRONT & DOOR
8.02 EXTERIOR SLIDING GLASS DOOR
10.01 GRAB BAR & BACKING
10.10 MAILBOXES
10.11 BABY CHANGING TABLE
10.12 HAND DRYER
10.13 WASTE RECEPTACLE
11.01 REFRIGERATOR
11.03 RANGE
11.04 COMBINATION RANGE HOOD MICROWAVE
11.05 DUMPSTERS, N.I.C.
12.10 E-BIKE CHARGING STATION
12.11 TWO-TIER BICYCLE PARKING
14.01 TRASH CHUTES
14.02 ELEVATOR
22.01 SINK
22.07 DRINKING FOUNTAIN WITH BOTTLE FILLER
22.08 WALL HUNG TOILET
22.09 TROUGH SINK
A3.02
J.2
H ABDF E
FREEWAY / CALTRAIN
OPEN TO BELOW
OPEN TO BELOW
UNEXCAVATED AREA
72 SF
EL
200B200B
69 SF
EL
200A200A
814 SF
ANC.
COMMUNITY
ROOM
224224
A3.02
A3.01
B.5C.2G.5 B.2 A.5CC.5
1.4
E.2 D.8
F.5G
J H.5 G.8H.1 D.2
520 SF
1BR
368 SF
ST-A
376 SF
ST-A
374 SF
ST-A
1'
- 4
8'
- 9
1" 4'
- 4
/4
1'
- 1
1/
4"
9'
- 8
7'
- 1 0"
8'
- 5
/4
8'
- 7
/4
5' - 8" 12' - 5" 14' - 3" 6' - 4" 8' - 1" 17' - 8" 15' - 0" 15' - 11 1/2" 24' - 3" 3' - 9" 3' - 9" 24' - 3" 15' - 11 1/2" 8' - 5" 6' - 7" 17' - 8" 8' - 1" 6' - 4" 14' - 0" 11' - 9" 2' - 0"
OPEN TO BUILDING
STORAGE BELOW
444 SF
LAUNDRY
ROOM
223223
367 SF
ST-A
136 SF
TEL./ELEC.
ALT.
FLRS
222222
1334 SF
SOUTH
COURTYARD
225225
711 SF
2BR-B
149 SF
STAIR 1
2S12S1
86 SF
TR.
220220
970 SF
3BR
PNPS
PW
PE
EL. 51' - 0"
EL. 52' - 0"
EL. 51' - 0"
A3.11
A3.11
72 SF
JAN.
224A224A
149 SF
STAIR 2
2S22S2
BLDG OVERHANG ABOVE
BLDG OVERHANG ABOVE
915 SF
CORRIDOR
253 SF
CORRIDOR
11.06
11.07
8.03 14.01
8.01
8.02
5.01
3.01
A3.03 4
A3.03 1
36" WIDE ACCESSIBLE PATH
EXISTING RETAINING WALL TO REMAIN
NEW RETAINING WALL
LEGEND
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
N
A R C H I T E C T S
As indicated
/2
4/
:1 8:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A2.12
FLOOR
PLAN -
LEVEL 2
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/8" = 1'-0"A2.12 SCALE: 1/8" = 1'-0"
FLOOR PLAN - LEVEL 21
KEYNOTES
3.01 CAST-IN-PLACE CONC. STAIR, S.L.D., S.S.D.
5.01 CUSTOM METAL FENCE & GATE, PTD.
8.01 EXTERIOR STOREFRONT & DOOR
8.02 EXTERIOR SLIDING GLASS DOOR
8.03 ELEVATOR SMOKE CURTAIN
11.06 STACKED WASHER DRYERS, EQUIPMENT N.I.C.
11.07 ACCESSIBLE DYERS, EQUIPMENT N.I.C.
14.01 TRASH CHUTES
A3.02
J.2
H ABDF E
69 SF
EL
300A
72 SF
EL
300B
A3.02
A3.01
B.5C.2G.5 B.2 A.5CC.5
1.4
E.2 D.8
F.5G
J H.5 G.8H.1 D.2
1013 SF
3BR
993 SF
3BR
972 SF
3BR
368 SF
ST-A
374 SF
ST-A
374 SF
ST-A
367 SF
ST-A
525 SF
1BR
993 SF
3BR
FAMILY
DAY
CARE
759 SF
2BR-A
759 SF
2BR-A
1'
- 4
8'
- 9
1" 4'
- 4
/4
1'
- 1
1/
4"
9'
- 8
7'
- 1 0"
8'
- 5
/4
8'
- 7
/4
5' - 8" 12' - 5" 14' - 3" 6' - 4" 8' - 1" 17' - 8" 15' - 0" 15' - 11 1/2" 24' - 3" 3' - 9" 3' - 9" 24' - 3" 15' - 11 1/2" 8' - 5" 6' - 7" 17' - 8" 8' - 1" 6' - 4" 14' - 0" 11' - 9" 2' - 0"
137 SF
TEL./ELEC.
ALT.
FLRS
322 520 SF
1BR
86 SF
TR.
149 SF
STAIR 1
3S1
730 SF
2BR-B
566 SF
ELECTRICAL
820 SF
2BR-C
MGR
595 SF
STRMWTR
PLANTING
423 SF
FAMILY
DAY
CARE
DAY
AREA
317A
128 SF
STRMWTR
PLANTING
OPEN SPACE BELOW
PNPS
PW
PE
EL. 59' - 0"
EL. 61' - 0"
A3.11
A3.11
86 SF
JAN.
730 SF
2BR-B
149 SF
STAIR 2
3S2
BLDG OVERHANG ABOVE
1034 SF
CORRIDOR
635 SF
CORRIDOR
8.04
5.01
32.01
A3.03 4
A3.03 1
36" WIDE ACCESSIBLE PATH
EXISTING RETAINING WALL TO REMAIN
NEW RETAINING WALL
LEGEND
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
N
A R C H I T E C T S
As indicated
/2
4/
:1 8:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A2.13
FLOOR
PLAN -
LEVEL 3
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/8" = 1'-0"A2.13 SCALE: 1/8" = 1'-0"
FLOOR PLAN - LEVEL 31
KEYNOTES
5.01 CUSTOM METAL FENCE & GATE, PTD.
8.04 1-HR. FIRE RATED DOORS
32.01 STORMWATER PLANTING, S.L.D., S.C.D.
A3.02
J.2
H ABDF E
1'
- 4
8'
- 9
1" 4'
- 4
/4
1'
- 1
1/
4"
9'
- 8
7'
- 1 0"
8'
- 5
/4
8'
- 7
/4
401 SF
ST-B
1016 SF
3BR
991 SF
3BR
71 SF
EL
400A
71 SF
EL
400B
759 SF
2BR-A
374 SF
ST-A
759 SF
2BR-A
1013 SF
3BR
993 SF
3BR
972 SF
3BR
374 SF
ST-A
137 SF
TEL./ELEC.
ALT.
FLRS
367 SF
ST-A
667 SF
CORRIDOR
A3.02
A3.01
B.5C.2G.5 B.2 A.5CC.5
1.4
E.2 D.8
F.5G
J H.5 G.8
5' - 8" 12' - 5" 14' - 3" 6' - 4" 8' - 1" 17' - 8" 15' - 0" 15' - 11 1/2" 24' - 3" 3' - 9" 3' - 9" 24' - 3" 15' - 11 1/2" 8' - 5" 6' - 7" 17' - 8" 8' - 1" 6' - 4" 14' - 0" 11' - 9" 2' - 0"
751 SF
2BR-C
730 SF
2BR-B
520 SF
1BR
520 SF
1BR
86 SF
TR.
149 SF
STAIR 1
4S1
730 SF
2BR-B
H.1 D.2
PNPS
PW
PE
A3.11
A3.11
149 SF
STAIR 2
4S2
86 SF
JAN.
368 SF
ST-A
1034 SF
CORRIDOR
A3.03 4
A3.03 1
36" WIDE ACCESSIBLE PATH
EXISTING RETAINING WALL TO REMAIN
NEW RETAINING WALL
LEGEND
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
N
A R C H I T E C T S
As indicated
/2
4/
:1 8:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A2.14
FLOOR
PLAN -
LEVEL 4
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/8" = 1'-0"A2.14 SCALE: 1/8" = 1'-0"
FLOOR PLAN - LEVELS 4-91
KEYNOTES
A3.02
J.2
H ABDF E
ELEV. OVERRUN
A3.02
A3.01
B.5C.2G.5 B.2 A.5CC.5
1.4
E.2 D.8
F.5G
J H.5 G.8H.1 D.2
PNPS
PW
PE
5' - 8" 12' - 5" 14' - 3" 6' - 4" 8' - 1" 17' - 8" 15' - 0" 15' - 11 1/2" 24' - 3" 3' - 9" 3' - 9" 24' - 3" 15' - 11 1/2" 8' - 5" 6' - 7" 17' - 8" 8' - 1" 6' - 4" 14' - 0" 11' - 9" 2' - 0"
1'
- 4
8'
- 9
1" 4'
- 4
/4
1'
- 1
1/
4"
9'
- 8
7'
- 1 0"
8'
- 5
/4
8'
- 7
/4
A3.11
A3.11
VRF CONDENSING UNITS
1214 SF
MECH.
PENTHOUSE
566566
149 SF
STR
108 SF
ELEC.
METERS
AND PV
BATTERY
570570
STORMWATER PLANTING
DHW TANKS
DHW TANKS
23.02
10.16
22.10
7.01
5.03
11.08
8.05
5.03
7.02
7.03
7.03
7.03
5.03
7.01
7.04
22.11
5.04
5.05
22.12
23.03
14.03
23.04
7.05
7.04
7.01
48 SF
ELEV.
CONTROL
7.06
7.07
7.01
48.02
48.01
32.02
A3.03 4
A3.03 1
5' WIDE CLEAR EXTERIOR BUILDING MAINTENANCE WALKWAY
LEGEND
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
N
A R C H I T E C T S
As indicated
/2
4/
:1 1:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A2.15
ROOF
PLAN
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/8" = 1'-0"A2.15 SCALE: 1/8" = 1'-0"
ROOF PLAN1
KEYNOTES
5.03 PTD. GALV. MAINT. ROOF GUARDRAIL, 48" TALL
5.04 ACOUSTICAL & VISUAL SCREEN, MATCH PENTHOUSE HEIGHT
5.05 COLD-FORMED STL. FRAMED ENCLOSED MECH PENTHOUSE,
S.S.D.
7.01 48" TALL PARAPET & COPING, EIFS FINISH AT BACKSIDE
7.02 VALLEY, SLOPE >2% TO DRAIN, TYP.
KEYNOTES
7.03 COLD FLUID APPLIED W.P. O/ CONC. SLAB EDGE
7.04 RIDGE
7.05 DOWNSPOUT & SCUPPER FROM PENTHOUSE ROOF ABOVE
7.06 ROOF WALK PADS
7.07 MODIFIED BITUMEN ROOF O/ L.W. TOPPING O/ STEPPED RIGID
FOAM INSULATION, AVG. R 38, TYP.
8.05 ROOF HATCH & ALTERNATING TREAD DEVICE BELOW
10.16 EMBED PLATE & DAVIT BASE, TYP.
11.08 TRASH CHUTES BELOW
14.03 ELEVATOR OVERRUN
22.10 ROOF DRAIN & OVERFLOW, S.P.D.
22.11 DHW HEAT PUMP WATER HEATERS, S.P.D., O/ CONC. CURB
22.12 DHW TANKS, S.P.D. O/ CONC. CURB
23.02 T.O. SHAFT & EXHAUST FAN, S.M.D., TYP.
23.03 DOAS, S.M.D. O/ CONC. CURB
23.04 VRF CONDENSING UNIT, S.M.D., O/ CONC. CURB
32.02 LIGHTWEIGHT VEGETATED ROOF O/ ROOF MEMBRANE
48.01 PV PANEL & RACK SUPPORT, TYP.
48.02 PV BATTERY
LEVEL 1
41' - 0"
LEVEL 2
52' - 0"
J.2
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
HA B D FEB.5 C.2 G.5B.2A.5 C C.5 E.2D.8 F.5 G JH.5G.8 H.1D.2
PN PS
A3.11
I-280 FREEWAY
5.01
(DASHED BEHIND)
SLOPE OF SIDEWALK
DASHED BEHIND
32.01
LEVEL 1
41' - 0"
LEVEL 2
52' - 0"
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
4579 3 1.468 2
PWPE
A3.11
3.01
5.01
SMOOTH EIFS, FIELD COLOR
LEGEND
TEXTURED EIFS, ACCENT COLOR
SMOOTH EIFS, CUSTOM PATTERN, ALLOW 5 COLORS
THINSET CERAMIC TILE O/ SCRATCH & BROWN CEMENT PLASTER
WD. VENEER PANEL SOFFIT
SEALED CONC. SLAB EDGE
ALUMINUM NAIL FIN. WINDOW, SEE ACOUST. REPORT
INSULATED STOREFRONT GLAZING, SEE ACOUST. REPORT
PTD. STL. PIPE MAINT. GUARDRAIL
SEALED CONC. WALL, SMOOTH FINSIH W/ CAST REVEALS
SMOOTH EIFS, COLOR TO MATCH WINDOW FRAME
SEALED BOARD FORMED CONC. COLUMN OR WALL
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
A R C H I T E C T S
As indicated
/2
4/
:1 9:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A3.01
EXTERIOR
ELEVATIONS
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/8" = 1'-0"A3.01 SCALE: 1/8" = 1'-0"
WEST1
SCALE: 1/8" = 1'-0"A3.01 SCALE: 1/8" = 1'-0"
NORTH2
KEYNOTES
3.01 CAST-IN-PLACE CONC. STAIR, S.L.D., S.S.D.
5.01 CUSTOM METAL FENCE & GATE, PTD.
32.01 STORMWATER PLANTING, S.L.D., S.C.D.
LEVEL 2
52' - 0"
J.2
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
H ABDF E B.5C.2G.5 B.2 A.5CC.5E.2 D.8F.5GJ H.5 G.8H.1 D.2
PNPS
A3.11
5.01
(DASHED BEHIND)
LEVEL 1
41' - 0"
LEVEL 2
52' - 0"
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
4 5 7 931.4 6 82
PW PE
A3.11
I-280 FREEWAY
SMOOTH EIFS, FIELD COLOR
LEGEND
TEXTURED EIFS, ACCENT COLOR
SMOOTH EIFS, CUSTOM PATTERN, ALLOW 5 COLORS
THINSET CERAMIC TILE O/ SCRATCH & BROWN CEMENT PLASTER
WD. VENEER PANEL SOFFIT
SEALED CONC. SLAB EDGE
ALUMINUM NAIL FIN. WINDOW, SEE ACOUST. REPORT
INSULATED STOREFRONT GLAZING, SEE ACOUST. REPORT
PTD. STL. PIPE MAINT. GUARDRAIL
SEALED CONC. WALL, SMOOTH FINSIH W/ CAST REVEALS
SMOOTH EIFS, COLOR TO MATCH WINDOW FRAME
SEALED BOARD FORMED CONC. COLUMN OR WALL
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
A R C H I T E C T S
As indicated
/2
4/
:1 9:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A3.02
EXTERIOR
ELEVATIONS
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/8" = 1'-0"A3.02 SCALE: 1/8" = 1'-0"
EAST ELEVATION1
SCALE: 1/8" = 1'-0"A3.02 SCALE: 1/8" = 1'-0"
SOUTH ELEVATION2
KEYNOTES
5.01 CUSTOM METAL FENCE & GATE, PTD.
LEVEL 2
52' - 0"
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
45 3 1.46 2
PW
A3.11
SMOOTH EIFS, FIELD COLOR
LEGEND
TEXTURED EIFS, ACCENT COLOR
SMOOTH EIFS, CUSTOM PATTERN, ALLOW 5 COLORS
THINSET CERAMIC TILE O/ SCRATCH & BROWN CEMENT PLASTER
WD. VENEER PANEL SOFFIT
SEALED CONC. SLAB EDGE
ALUMINUM NAIL FIN. WINDOW, SEE ACOUST. REPORT
INSULATED STOREFRONT GLAZING, SEE ACOUST. REPORT
PTD. STL. PIPE MAINT. GUARDRAIL
SEALED CONC. WALL, SMOOTH FINSIH W/ CAST REVEALS
SMOOTH EIFS, COLOR TO MATCH WINDOW FRAME
SEALED BOARD FORMED CONC. COLUMN OR WALL
LEVEL 1
41' - 0"
LEVEL 2
52' - 0"
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
4 5 731.4 62
PW
A3.11
LEVEL 1
41' - 0"
LEVEL 2
52' - 0"
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
C.2 C.5
LEVEL 1
41' - 0"
LEVEL 2
52' - 0"
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
4 531.4 62
PW
A3.11
LEVEL 1
41' - 0"
LEVEL 2
52' - 0"
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
45 3 1.46 2
PW
A3.11
LEVEL 1
41' - 0"
LEVEL 2
52' - 0"
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
F F.5 G
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
A R C H I T E C T S
As indicated
/2
4/
:1 9:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A3.03
EXTERIOR
ELEVATIONS
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/8" = 1'-0"A3.03 SCALE: 1/8" = 1'-0"
NORTH COURTYARD - SOUTH3
SCALE: 1/8" = 1'-0"A3.03 SCALE: 1/8" = 1'-0"
NORTH COURTYARD - NORTH1
SCALE: 1/8" = 1'-0"A3.03 SCALE: 1/8" = 1'-0"
SOUTH COURTYARD - SOUTH6
SCALE: 1/8" = 1'-0"A3.03 SCALE: 1/8" = 1'-0"
SOUTH COURTYARD - NORTH4
SCALE: 1/8" = 1'-0"A3.03 SCALE: 1/8" = 1'-0"
NORTH COURTYARD - EAST2
SCALE: 1/8" = 1'-0"A3.03 SCALE: 1/8" = 1'-0"
SOUTH COURTYARD - EAST5
LEVEL 2
52' - 0"
J.2
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
HA B D FEB.5 C.2 G.5B.2A.5 C C.5 E.2D.8 F.5 G JH.5G.8 H.1D.2
PN PS
2BR
2BR
2BR
2BR
2BR
2BR
2BR
2BR
2BR
2BR
2BR
2BR
2BR
2BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
3BR
GEN. MGR.
OFFICE
LOBBY /
WAITING
COMMUNITY
ROOM BIKE ROOM
BLDG
STOR.
MPOE
MNGR UNIT
ELEC. ROOM
ENTRY
LEVEL 1
41' - 0"
LEVEL 2
52' - 0"
LEVEL 3
61' - 0"
LEVEL 4
70' - 0"
LEVEL 5
79' - 0"
LEVEL 6
88' - 0"
LEVEL 7
97' - 0"
LEVEL 8
106' - 0"
LEVEL 9
115' - 0"
ROOF
125' - 0"
UPPER ROOF
136' - 0"
4579 3 1.468 2
PWPE
2BR
2BR
2BR
2BR
2BR
2BR
2BR
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
COMMUNITY
ROOM
OFFICEOFFICEELEV.
ELEV.
ELEV.
ELEV.
ELEV.
ELEV.
ELEV.
ELEV.
ELEV.
CIRC.
CIRC.
CIRC.
CIRC.
CIRC.
CIRC.
CIRC.
CIRC.
CIRC.
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
A R C H I T E C T S
1/8" = 1'-0"
/2
4/
:1 9:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A3.11
BUILDING
SECTIONS
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/8" = 1'-0"A3.11 SCALE: 1/8" = 1'-0"
SECTION NORTH/SOUTH1
SCALE: 1/8" = 1'-0"A3.11 SCALE: 1/8" = 1'-0"
SECTION EAST/WEST2
KITCHEN
BATHROOM
25' - 3 1/4"
/2
A5.04
23.05
A5.04
12.03
12.06
12.09
12.05
KITCHEN
13' - 3 3/4"
28' - 2"
14' - 6" 5' - 3 1/4" 4' - 0" 7' - 6"
9'
- 8
A5.04
BATHROOM
A5.04
23.05
12.05
12.03
12.08
12.07
12.06
12.09
BATHROOM
KITCHEN
2' - 0"11' - 5 5/8"11' - 0 5/8"2' - 0"
9'
- 8
/4
1/ 2"
14' - 6" 4' - 3" 5' - 6 1/4"
7' - 6"
9'
- 5
3/
4"
28' - 0 1/4"
A5.04
A5.04
23.05
12.06
12.07
12.08
12.05
12.03 12.04
12.05
12.09
BATHROOM KITCHEN
9' - 3"9' - 5"
0"
9' - 5" 14' - 6 3/4" 6' - 2 1/2" 2' - 0"
1/
4"
A5.04
A5.04
23.05
12.08
12.07
12.06
12.09
12.04
12.05
12.03
KITCHEN
BATHROOM HALF BATHROOM
13' - 8 3/4"9' - 8"2' - 0"2' - 0"9' - 2"
7'
- 1
1/
4"
1/
4" 1'
- 1 1"
1"
1/
4"
38' - 6 3/4"
9' - 1 1/2" 9' - 5" 7' - 6" 11' - 2 1/4"
5'
- 1
1/
4" 5'
- 0
6"
A5.04
A5.04
A5.04
23.05
23.05
12.04
12.05
12.04
12.03 12.08
12.07
12.06
12.09
KITCHEN
9' - 5"2' - 0"11' - 11 1/4"
4' - 0" 14' - 6" 12' - 0 1/4"
6'
- 1
1/
2" 7'
- 6
24' - 4 1/4"
A5.04
BATHROOM
A5.04
23.05
12.03
12.05
12.06
12.09
KITCHEN
19' - 7 3/4"9' - 8 1/2"
32' - 4 1/4"
1/
4"
2' - 0"
5'
- 1
1/
4"
11' - 11 1/4" 2' - 6" 9' - 5"
4"
7'
- 6
6"
A5.04
BATHROOM
A5.04
23.05
12.03
12.05
12.04
12.05 12.08
12.07
12.09
12.06
36" WIDE ACCESSIBLE PATH
EXISTING RETAINING WALL TO REMAIN
NEW RETAINING WALL
LEGEND
A5.04
A5.04
KITCHEN
BATHROOM
11' - 0 5/8"2' - 0"
9'
- 8
/4
1/ 2"
11' - 3 5/8" 2' - 0"
2'
- 0
7' - 6"
4' - 3"
2'
- 0
12.05
12.04
12.03
12.05
12.08
12.07
12.06
12.09
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
A R C H I T E C T S
1/4" = 1'-0"
/2
4/
:3 2:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A4.11
ENLARGED
PLANS -
UNITS
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/4" = 1'-0"A4.11 SCALE: 1/4" = 1'-0"
STUDIO-A1
SCALE: 1/4" = 1'-0"A4.11 SCALE: 1/4" = 1'-0"
1BR3
SCALE: 1/4" = 1'-0"A4.11 SCALE: 1/4" = 1'-0"
2BR-A4
SCALE: 1/4" = 1'-0"A4.11 SCALE: 1/4" = 1'-0"
2BR-B5
SCALE: 1/4" = 1'-0"A4.11 SCALE: 1/4" = 1'-0"
3BR7
SCALE: 1/4" = 1'-0"A4.11 SCALE: 1/4" = 1'-0"
STUDIO-B2
SCALE: 1/4" = 1'-0"A4.11 SCALE: 1/4" = 1'-0"
2BR-C6
KEYNOTES
12.03 QUEEN BED & 2 NIGHT STANDS, N.I.C.
12.04 FULL BED & 2 NIGHT STANDS, N.I.C.
12.05 5FT LONG DRESSER, N.I.C.
12.06 SOFA, N.I.C.
12.07 COFFEE TABLE, N.I.C.
12.08 TV STAND MEDIA UNIT, N.I.C.
12.09 DINING TABLE & CHAIRS, N.I.C.
23.05 PACKAGED TERMINAL HEAT PUMP, S.M.D.
SCALE: 1/4" = 1'-0"A4.11 SCALE: 1/4" = 1'-0"
2BR-MANAGER8
A5.04
1A
22.01
11.01
6.03 11.03
14' - 6"
5'
- 7
2'
- 1
0" 1'
- 8
3'
- 0
11.03
11.01
11.02
6.02
6.01
A5.04
2A
2B
2C
2D
7' - 0"
2'
- 0
1'
- 6
2'
- 2
"2'
- 1
1" C
LR
9'
- 5
5' - 0"2'
- 6
A5.04
4C
4D
4A
4B
1' - 6"
5'
- 0
7'
- 0
" 1' - 0"
3' - 0" 10.01
10.05
2'
- 6
" 3'
- 3
10.07
2'
- 1
0"
22.13
10.06
7"
1'
- 7
3' - 6" 1' - 0"
4'
- 0
2' - 0"
22.03
10.04
10.02
10.02
1'
- 7
7"
4'
- 0
1' - 0"3' - 6"
10.04
10.01
22.03
10.02
2'
- 1
0"
2'
- 1
1"
1' - 0"
3'
- 3
22.06
1' - 0"
3' - 0"
6.07
10.07
22.02
2'
- 6
1' - 7" 2' - 6" 11"
1' - 9"
10.05
10.01
4'
- 0
10.01
22.05
1. PROVIDE MOLD RESISTAN GYP. BD. @ BATHROOMS
2. DIMENSIONS ARE TO FACE OF GYP. BD.
3. ALL COUNTERTOPS TO BE SOLID SURFACE
4. REFER TO ENLARGED UNIT PLANS FOR OVERALL DIMENSIONS
ENLARGED KITCHEN AND BATHS SHEET NOTES
A5.04
3A
3B
3C
3D
2' - 0" 1' - 6"
5'
- 0
7'
- 0
9' - 5"
22.06
22.05
10.01
10.06
4'
- 0
10.01
22.03
10.04
10.02
1'
- 7
"2'
- 1
0"
4'
- 0
7"
3' - 6" 1' - 0"
2' - 0"
2'
- 1
1"
3'
- 3
22.06
10.01
6.07
22.02
10.07
1' - 0"
3' - 0"
1' - 0" 1' - 2"
2'
- 1
0"
10.01
2' - 6" 11"
10.05
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
A R C H I T E C T S
As indicated
/2
4/
:1 9:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A5.04
UNIT KIT.&
BATHS
ENLARGED
PLANS &
ELEV.
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
SCALE: 1/2" = 1'-0"A5.04 SCALE: 1/2" = 1'-0"
ENLARGED PLAN - KITCHEN TYPE 11
SCALE: 1/2" = 1'-0"
1A
SCALE: 1/2" = 1'-0"A5.04 SCALE: 1/2" = 1'-0"
ENLARGED PLAN - BATHROOM TYPE 12
SCALE: 1/2" = 1'-0"A5.04 SCALE: 1/2" = 1'-0"
ENLARGED PLAN - BATHROOM TYPE 34
SCALE: 1/2" = 1'-0"
4C
SCALE: 1/2" = 1'-0"
4A
SCALE: 1/2" = 1'-0"
4D
SCALE: 1/2" = 1'-0"
4B
SCALE: 1/2" = 1'-0"
2A
SCALE: 1/2" = 1'-0"
2B
SCALE: 1/2" = 1'-0"
2C
SCALE: 1/2" = 1'-0"
2D
KEYNOTES
6.01 WOOD VENEER UPPER CABINET
6.02 WOOD VENEER LOWER CABINET W/ REMOVABLE BASE
6.03 WOOD VENEER FULL HEIGHT CABINET
6.07 CAST POLYMER COUNTER W/ INTEGRAL SINK & BACKSPLASH
10.01 GRAB BAR & BACKING
10.02 ROBE HOOK
10.04 TOILET PAPER HOLDER
10.05 TOWEL RING
10.06 TOWEL BAR
10.07 RECESSED MIRRORED MEDICINE CABINET
11.01 REFRIGERATOR
11.02 DISHWASHER
11.03 RANGE
22.01 SINK
22.02 VANITY FAUCET
22.03 FLOOR MOUNTED TOILET
22.05 HAND HELD SHOWER HEAD
22.06 TUB/SHOWER COMBO
22.13 WALL HUNG LAVATORY
SCALE: 1/2" = 1'-0"A5.04 SCALE: 1/2" = 1'-0"
ENLARGED PLAN - BATHROOM TYPE 23
SCALE: 1/2" = 1'-0"
3A
SCALE: 1/2" = 1'-0"
3B
SCALE: 1/2" = 1'-0"
3C
SCALE: 1/2" = 1'-0"
3D
P H A S E :
I S S U E D F O R :
P E R M I T N o :
S C A L E :
D A T E :
J O B N o :
P R O J E C T
No REVISION DATE
S H E E T T I T L E
S H E E T No
C O N S U L T A N T S
S T A M P
LEDDY MAYTUM STACY ARCHITECTS
1940 BRYANT STREET
SAN FRANCISCO, CA 94110
T 415 495 1700 F 415 495 1717 W www.lmsarch.com
A R C H I T E C T S
/2
4/
:1 9:
P
M A ut od es k
D oc s:
//2
P en ns yl va ni a/
_2
P
E N
N _A
R C
H _R
.r vt
A11.01
3D VIEWS
T N
D C
Y
C D
P
E N
N S
Y L V
A N
IA
11/24/25
XXXX
S A
N F
R A
N C
IS
C
O C
A
90% SCHEMATIC
DESIGN
P E
N N
S Y
LV
A
N
IA
XXXX
249 Pennsylvania - Preliminary Site Logistics
TRUCKING ROUTES 249 PENNSYLVANIA
AVENUE
OWENS ST
TH
S T
MISSISSIPPI ST
M
A R
IP
O
SA
S
T
PENNSYLVANIA AVE
N
E
W
S
TH
S T
SITE LOCATION
CONSTRUCTION TRAFFIC
INBOUND FROM I-280 NORTH
LEGEND:
CONSTRUCTION TRAFFIC
OUTBOUND
CONSTRUCTION TRAFFIC
INBOUND FROM I-280 SOUTH
EXCAVATION 249 PENNSYLVANIA
N
E
W
S
PENNSYLVANIA AVE
M A
R
IPO
SA
ST
A
GATE
B
GATE
WALKWAY OVERHEAD
PROTECTION
SITE
FENCING
TRUCKING LOADING
& UNLOADING ZONE
FOUNDATION 249 PENNSYLVANIA
N
E
W
S
PENNSYLVANIA AVE
M A
R
IPO
SA
ST
TW1
B
GATE
SITE
FENCING
TRUCKING LOADING
& UNLOADING ZONE
A
GATE
EXTERIOR WORK 249 PENNSYLVANIA
N
E
W
S
PENNSYLVANIA AVE
M A
R
IPO
SA
ST
MAN LIFT
WALKWAY OVERHEAD
PROTECTION
SITE
FENCING
B
GATE
A
GATE
TRUCKING LOADING
& UNLOADING ZONE
TW1
SECTION VIEW 249 PENNSYLVANIA
20’
PENNSYLVANIA AVE
249 PENNSYLVANIA AVE
PROPOSED BUILDING
SOUTH FREEWAY
ENTRANCE WALKWAY OVERHEAD
PROTECTION
SITE
FENCING
SITE
FENCING
SCAFFOLD SCAFFOLD
RFP Response Requirement Section 4 - SBE PARTICIPATION - Item B
SBE Form - 2 Attachment
This affidavit is to be completed by each SBE consultant/contractor or supplier (including lower tier SBEs) and shall be submitted by the Developer or Prime Consultant/Contractor to validate initial SBE participation. Contractor/ subcontractor may attach additional sheets if more space is needed to provide complete information.
Scope of Work:
Name of Higher Tier Entity Issuing Contract:
License #:
1. verify that bid to Name of SBE Owner/Representative SBE Firm the above referenced Prime/Higher Tier Entity for (sub)contracting work in the amount of $ and have been offered a (sub)contract in the amount of $
2. Please describe service performed:
3. Select if you are entering direct contract with the developer or will be a lower tier subcontractor
We will self-perform 100% of the work and will not further subcontract any portion of the work.
We WILL subcontract out part of our work to:
Firm in the amount of $ , and this firm is: SBE Certified Not SBE Certified
I declare, under penalty of perjury, that the above information is true and correct and that the signatory below is a bona fide, certified SBE as defined under this SBE Program. A copy of my proposal/bid quote shall be submitted upon request.
My firm’s average gross receipts for the past five years are equal to or below the income threshold for the category checked on page 1, and we agree to comply with the provisions of the SBE Program.
SBE Owner/Authorized Representative (Signature) Date
Name and Title (Print) Name of Firm
Phone Number Email
END OF FORM
v.2025.01.10
This is the start of the file's text. The full file is on GovTribe.