Concho_Raw_WL_Phase_2_SOW_072219.docx

DOCX document 14 KB Posted

Attached to
Raw Waterline Replacement Phase 2 Federal contract opportunity
Solicitation number
246-19-Q-0081
Issued by
Department of Health and Human Services Indian Health Service

About this file

Concho RAW WL Phase 2 SOW

View the file

Other files for this federal contract opportunity

Other files attached to Raw Waterline Replacement Phase 2, newest first.
File Type Posted
Plan_Holders_List_.pdf PDF
SOW_MOD_03_.pdf PDF
RFQ_246-19-Q-0081_MOD_02_CONCHO_RAW_WATERLINE__.pdf PDF
Concho_Raw_WL_Phase_2_Specs_072919.pdf PDF
Important_Information_Related_to_this_Acquisition_.docx DOCX document
RFQ_246-19-Q-0081_SF_18_FORM__.doc DOC document
Concho_Raw_WL_Phase_2_Plan_Set_072219.pdf PDF
Wage_Rates_OK20190029_07_26_2019_.pdf PDF
Concho_Raw_WL_Phase_2_Quote_Sheet_072219.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

RAW WATERLINE REPLACEMENT PHASE 2

TO SERVE THE

CHEYENNE AND ARAPAHO TRIBES

IHS PROJECT OK 13-T49

SCOPE OF WORK

This project is to replace the existing 6-inch waterline, which extends west for approximately 6,185 feet from the water supply wells with 8-inch PVC C-900. The project will also replace the existing 4-inch waterline, which extends south from each water well with approximately 1,163 feet of 6-inch PVC C-900 along with new meter vaults and meters located near the water supply wells. The Contractor agrees to perform all work described in the contract documents for the unit prices or lump sums stated in the completed Quote Sheet to be submitted for this project. Any item required for completion of the project that is not listed in the Quote Sheet shall be included by the Contractor in any of the line items currently listed on the Quote Sheet. Tasks to be completed by the selected contractor include:

1. Install approximately 1,163 feet of 6-inch PVC C-900 pipe

2. Install five (5) 6-inch gate valves and boxes

3. Install approximately 6,185feet of 8-inch PVC C-900 pipe

4. Install two (2) 8-inch gate valves and boxes

5. Connect to existing 8” system in two (2) locations

6. Connect to existing 4” system in two (2) locations

7. Cut and cap existing 4-inch system in two (2) locations

8. Cut and cap existing 6-inch system in two (2) locations

9. Install two (2 ) flushing valves

10. Install two (2) water meter valve vaults and appurtenances

11. Remove one (1) existing valve vault

12. Remove and replace 15 SY of concrete for repair

13. Install 500 SF of sodding

14. Pressure test and disinfect installed waterline

All work shall be done in accordance with Oklahoma Department of Environmental Quality (ODEQ) rules and regulations found in, but not limited to, OAC 252:626 - Public Water Supply Construction Standards. Contractor shall include the price of tracer wire, gravel repair, signage and markers in the pipe installation line items. Contractor to field verify existing utilities. All work shall also conform to the contract plans & specifications.