Concho_Raw_WL_Phase_2_Quote_Sheet_072219.docx
DOCX document 13 KB Posted
- Attached to
- Raw Waterline Replacement Phase 2 Federal contract opportunity
- Solicitation number
- 246-19-Q-0081
About this file
Concho RAW WL Phase 2 Quote Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Plan_Holders_List_.pdf | ||
| SOW_MOD_03_.pdf | ||
| RFQ_246-19-Q-0081_MOD_02_CONCHO_RAW_WATERLINE__.pdf | ||
| Concho_Raw_WL_Phase_2_Specs_072919.pdf | ||
| Important_Information_Related_to_this_Acquisition_.docx | DOCX document | |
| RFQ_246-19-Q-0081_SF_18_FORM__.doc | DOC document | |
| Concho_Raw_WL_Phase_2_Plan_Set_072219.pdf | ||
| Wage_Rates_OK20190029_07_26_2019_.pdf | ||
| Concho_Raw_WL_Phase_2_SOW_072219.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IHS Project OK 13-T49 Quote Sheet – Concho Raw Waterline Phase 2
CONCHO RAW WL PHASE 2 – QUOTE SHEET
| ITEM |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| AMOUNT |
| 1 |
| 6" PVC C-900 (DR-18) |
| LF |
| 1,163 |
| 2 |
| 6" GATE VALVE & BOX |
| EA |
| 5 |
| 3 |
| 8" PVC C-900 (DR-18) |
| LF |
| 6,185 |
| 4 |
| 8" GATE VALVE & BOX |
| EA |
| 2 |
| 5 |
| CONNECTION TO EXISTING 8” SYSTEM |
| EA |
| 2 |
| 6 |
| CONNECTION TO EXISTING 4” SYSTEM |
| EA |
| 4 |
| 7 |
| CUT & CAP EXISTING 4" WATERLINE |
| EA |
| 2 |
| 8 |
| CUT & CAP EXISTING 6" WATERLINE |
| EA |
| 2 |
| 9 |
| 4” Flushing Valve |
| EA |
| 2 |
| 10 |
| Water Meter Valve Vault & Appurtenances |
| EA |
| 2 |
| 11 |
| Remove Existing Valve Vault |
| LOT |
| 1 |
| 12 |
| Remove/Replace Concrete |
| SF |
| 15 |
| 13 |
| Sodding |
| SF |
| 500 |
| 14 |
| Pressure Testing and Disinfection |
| LOT |
| 1 |
| 15 |
| TERO 3% Construction Cost |
| LOT |
| 1 |
| 16 |
| Bid, Performance & Payment Bonds |
| LOT |
| 1 |