Yakima Greenway Active Transportation and Park Improvements

This is a construction specifications and bid documents package for the Yakima Greenway Foundation in Yakima County, Washington, for State Aid No. HLP-1485(029) and ARPA Contract No. ARPA-38170, HLA Project No. 24206 & 24207. The project encompasses resurfacing approximately 2 miles of existing asphalt pathway, ADA accessibility improvements, replacement of vault toilets, signage and wayfinding improvements, and illumination enhancements across six separate schedules. Sealed bids were due July 30, 2026, at 10:00 a.m. at the Yakima Greenway Visitor Center, with public opening and reading of bids to follow immediately thereafter. Contract time for project completion is seventy (70) working days from the Notice to Proceed date, with contract performance anticipated to begin by September 7, 2026, though suspension for long-lead material procurement may be considered at the Engineer's discretion. The Engineer of record is HLA Engineering and Land Surveying, Inc., represented by Stephen S. Hazzard, PE. Contract documents, including plans and specifications, were available on the Engineer's website at https://www.hlacivil.com/bid/, where planholders could register for automatic addenda notification.

Bids were submitted on a unit price basis across six schedules with estimated quantities and fixed allowances for minor changes and landscape restoration in each schedule. A bid deposit or bond equal to not less than five percent (5%) of the total bid amount was required, with the successful bidder required to obtain a contract bond of 100 percent of the contract price. The project is subject to prevailing wage requirements under RCW 39.12 and Washington State Department of Labor and Industries wage rate determinations for Yakima County effective July 30, 2026. All bids must include a non-collusion affidavit, subcontractor list per RCW 39.30.060, and certification of compliance with wage payment statutes. Supplemental bidder responsibility criteria statements were due by 12:00 p.m. on the second business day following bid submission. The Yakima Greenway Foundation reserved the right to reject any and all bids and to waive technicalities, making award to the lowest responsive, responsible bidder or rejecting all bids. Funding for this project is through ARPA (American Rescue Plan Act) resources and state aid.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YAKIMA GREENWAY ACTIVE TRANSPORTATION

AND PARK IMPROVEMENTS

STATE AID NO. HLP-1485(029)

ARPA CONTRACT NO. ARPA-38170

HLA PROJECT NO. 24206 & 24207

Construction Specifications & Bid Documents

JULY 2026

YAKIMA GREENWAY FOUNDATION

YAKIMA COUNTY, WASHINGTON

CONTRACT DOCUMENTS

FOR

YAKIMA GREENWAY ACTIVE TRANSPORTATION AND PARK IMPROVEMENTS

STATE AID NO. HLP-1485(029)

TABLE OF CONTENTS PAGE NO.

SECTION 1 - ADVERTISEMENT FOR BIDS ............................................................................................ 1-1

ADVERTISEMENT FOR BIDS .............................................................................................................. 1-2 SECTION 2 - INFORMATION FOR BIDDERS .......................................................................................... 2-1

INFORMATION FOR BIDDERS ............................................................................................................ 2-2 SECTION 3 - BID PACKAGE..................................................................................................................... 3-1

BIDDER'S CHECKLIST ......................................................................................................................... 3-2 BID PROPOSAL .................................................................................................................................... 3-3 UNIT PRICE BID PROPOSAL .............................................................................................................. 3-4 BID PROPOSAL SIGNATURE PAGE ................................................................................................... 3-8 AUTHORIZED SIGNATURES (DOT FORM 420-007) .......................................................................... 3-9 BID DEPOSIT ...................................................................................................................................... 3-10 BID BOND ........................................................................................................................................... 3-10 NON-COLLUSION AFFIDAVIT ........................................................................................................... 3-11 SURETY .............................................................................................................................................. 3-12 LOCAL AGENCY SUBCONTRACTOR LIST (DOT FORM 271-015LP) ............................................. 3-13 CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES ..................................... 3-14 SUPPLEMENTAL BIDDER RESPONSIBILITY CRITERIA STATEMENT .......................................... 3-15

SECTION 4 - CONTRACT AND RELATED MATERIALS ......................................................................... 4-1 CONTRACT ........................................................................................................................................... 4-2 CERTIFICATIONS ................................................................................................................................. 4-4 CONTRACT BOND ............................................................................................................................... 4-5 SCHEDULE OF WORKING HOURS .................................................................................................... 4-7

SECTION 5 - LABOR STANDARDS AND WAGE RATE CONDITIONS .................................................. 5-1 PREVAILING WAGE RATES ................................................................................................................ 5-2 DLI (YAKIMA COUNTY) EFFECTIVE 07/30/2026 ................................................................................ 5-3 BENEFIT CODE KEY EFFECTIVE 03/04/2026 .................................................................................... 5-3 DLI SUPPLEMENTAL TO WAGE RATES EFFECTIVE 01/30/2026 .................................................... 5-3

SECTION 6 - SPECIAL PROVISIONS AND TECHNICAL SPECIFICATIONS ......................................... 6-1 TABLE OF CONTENTS ......................................................................................................................... 6-2 SPECIAL PROVISIONS ........................................................................................................................ 6-3

APPENDIX A – WSDOT STANDARD PLANS

APPENDIX B – CONSTRUCTION STAKING REQUEST FORM

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 1-1

SECTION 1 - ADVERTISEMENT FOR BIDS

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 1-2

ADVERTISEMENT FOR BIDS

Yakima Greenway Foundation 111 S. 18th Street Yakima, WA 98901

The Yakima Greenway Foundation invites separate sealed BIDS for the construction of the Yakima Greenway Active Transportation and Park Improvements, State Aid No. HLP-1485(029), ARPA Contract No. ARPA-38170, HLA Project No. 24206 & 24207 including the following approximate major quantities of work:

The Yakima Greenway project will include resurfacing of approximately 2 miles of existing asphalt pathway, ADA accessibility improvements, replacement of vault toilets, signage and wayfinding, and illumination improvements.

This contract has seventy (70) working days to complete the work.

Bids will be received by the Executive Director at the Yakima Greenway Visitor Center, 111 S. 18th Street, Yakima, WA 98901, until 10:00 a.m., July 30, 2026, and then shortly thereafter will be publicly opened and read aloud at the Yakima Greenway Visitor Center located at 111 S. 18th Street.

CONTRACT DOCUMENTS may be obtained at the following website: https://www.hlacivil.com/bid/.

Planholder list and addenda will be available on the website. Bidders are encouraged to register as planholders on the website, whom will be added to the Planholder list and will receive automatic addenda notification. All questions should be directed to Stephen S. Hazzard, PE, at (509) 966-7000 or shazzard@hlacivil.com.

Each bid or proposal must be accompanied by bond or a certified check, payable to the order of the Treasurer of the Yakima Greenway Foundation for the sum of not less than 5% of said bid or proposal and none will be considered unless accompanied by such deposit, to be forfeited to the Yakima Greenway Foundation in the event the successful bidder shall fail or refuse to enter into a Contract with the Yakima Greenway Foundation for the making and construction of the aforesaid improvement. All bids or proposals must be in writing on the form bound in the Specifications, sealed and filed with the Executive Director on or before the day and hour above mentioned.

The Yakima Greenway Foundation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin.

The Yakima Greenway Foundation reserves the right to reject any and all bids and to waive technicalities or irregularities, and after careful consideration of all bids and factors involved, make the award to best serve the interests of the Yakima Greenway Foundation.

Konner Hopkins

Executive Director

Publish: July 9, 2026 July 16, 2026 https://www.hlacivil.com/bid/ mailto:shazzard@hlacivil.com

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 2-1

SECTION 2 - INFORMATION FOR BIDDERS

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 2-2

INFORMATION FOR BIDDERS

BIDS will be received by the Yakima Greenway Foundation (herein called the “CONTRACTING AGENCY”), at the Yakima Greenway Visitor Center, 111 S. 18th Street, Yakima, WA 98901, until 10:00 a.m., July 30, 2026, and then at the Yakima Greenway Visitor Center publicly opened and read aloud.

Each BID must be submitted in a sealed envelope, addressed to the Executive Director at 111 S. 18th Street, Yakima, WA 98901. Each sealed envelope containing a BID must be plainly marked on the outside as BID for Yakima Greenway Active Transportation and Park Improvements, and the envelope should bear on the outside the BIDDER'S NAME, address, and license number if applicable, and the name of the project for which the BID is submitted. If forwarded by mail, the sealed envelope containing the BID must be enclosed in another envelope addressed to the CONTRACTING AGENCY at the Yakima Greenway Visitor Center, 111 S. 18th Street, Yakima, WA 98901.

All BIDS must be made on the required BID form. All blank spaces for BID prices must be filled in, in ink or typewritten, and the original BID form must be fully completed and executed when submitted. Only one copy of the BID form is required.

The CONTRACTING AGENCY may waive any informalities or minor defects or reject any and all BIDS.

Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Any BID received after the time and date specified shall not be considered. Should there be reasons why the Contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the CONTRACTING AGENCY and the BIDDER.

BIDDERS must satisfy themselves of the accuracy of the estimated quantities in the BID SCHEDULE by examination of the site and a review of the Drawings and Specifications including ADDENDA. After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding concerning the quantities of WORK or of the nature of the WORK to be done.

The CONTRACT DOCUMENTS contain the provisions required for the construction of the PROJECT.

Information obtained from an officer, agent, or employee of the CONTRACTING AGENCY or any other person shall not affect the risks or obligations assumed by the CONTRACTOR nor relieve the CONTRACTOR from fulfilling any of the conditions of the Contract.

Each BID must be accompanied by an original BID BOND payable to the CONTRACTING AGENCY for five percent of the total amount of the BID. When the Agreement is executed, the bonds of the unsuc-cessful BIDDERS will be returned. The BID BOND of the successful BIDDER will be retained until the CONTRACT BOND has been executed and approved, after which it will be returned. A certified check may be used in lieu of a BID BOND.

A CONTRACT BOND in the amount of 100 percent of the CONTRACT PRICE, with a corporate Surety approved by the CONTRACTING AGENCY, will be required for the faithful performance of the Contract.

Attorneys-in-fact who sign BID BONDS or CONTRACT BONDS must file with each BOND a certified and effective dated copy of their Power of Attorney.

The party to whom the Contract is awarded will be required to execute the Agreement and obtain the CONTRACT BOND within ten (10) working days from the date when NOTICE OF AWARD is delivered to the BIDDER. The NOTICE OF AWARD shall be accompanied by the necessary Agreement and BOND forms. In case of failure of the BIDDER to execute the Agreement, the CONTRACTING AGENCY may consider the BIDDER in default, in which case the BID BOND accompanying the proposal shall become the property of the CONTRACTING AGENCY.

The CONTRACTING AGENCY may make such investigations as deemed necessary to determine the ability of the BIDDER to perform the WORK, and the BIDDER shall furnish to the CONTRACTING AGENCY all such information and data for this purpose as the CONTRACTING AGENCY may request.

The CONTRACTING AGENCY reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the CONTRACTING AGENCY that such BIDDER is properly qualified to carry out the obligations of the Agreement and to complete the WORK contemplated therein.

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 2-3

A conditional or qualified BID will not be accepted.

Award will be made to the lowest responsive, responsible BIDDER or all bids will be rejected.

All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the PROJECT shall apply to the Contract throughout.

Each BIDDER is responsible for inspecting the site and for reading and being thoroughly familiar with the CONTRACT DOCUMENTS. The failure or omission of any BIDDER to do any of the foregoing shall in no way relieve any BIDDER from any obligation in respect to its BID.

The low BIDDER shall supply the names and addresses of major material SUPPLIERS and SUBCONTRACTORS when required to do so by the CONTRACTING AGENCY.

Contract time for this project is anticipated to begin by September 7, 2026. However, a contract suspension for long-lead material procurement may be considered at the Engineer’s discretion.

The ENGINEER is HLA Engineering and Land Surveying, Inc. (HLA), represented by Stephen S.

Hazzard, PE. The ENGINEER'S address is 2803 River Road, Yakima, Washington 98902, PHONE: (509) 966-7000, EMAIL: shazzard@hlacivil.com.

mailto:shazzard@hlacivil.com

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-1

SECTION 3 - BID PACKAGE

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-2

BIDDER'S CHECKLIST

All forms listed below must be fully executed and submitted with the Bid:

1) BID PROPOSAL

2) UNIT PRICE BID PROPOSAL

3) BID PROPOSAL SIGNATURE PAGE - Executed by authorized signatory in accordance with 1-02.6.

4) AUTHORIZED SIGNATURES (DOT FORM 420-007)

5) BID DEPOSIT or BID BOND

BID DEPOSIT - Sign the Bid Deposit in the space provided if the bid is accompanied by a certified check or cashier’s check in the amount of not less than 5% of the total amount bid.

OR

BID BOND - This form is to be executed by the bidder and Surety Company. The amount of this bond shall be not less than 5% of the total amount bid and may be shown in dollars or on a percentage basis. Provide Power of Attorney for Surety's agent.

6) NON-COLLUSION AFFIDAVIT - Must be subscribed and sworn to before a Notary Public.

7) SURETY

8) LOCAL AGENCY SUBCONTRACTOR LIST (DOT FORM 271-015LP)

9) CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES

The following form must be fully executed and submitted by 12:00 P.M. (noon) of the second business day following the bid submittal deadline.

1) SUPPLEMENTAL BIDDER RESPONSIBILITY CRITERIA STATEMENT - Provide supporting documentation as required.

The following forms are to be executed and/or submitted for approval to the Engineer after the Contract is awarded:

1) CONTRACT - To be executed by the successful bidder and the Yakima Greenway Foundation.

2) CERTIFICATIONS

3) CONTRACT BOND - To be executed by the successful bidder and his Surety Company. Provide

Power of Attorney.

4) SCHEDULE OF WORKING HOURS

5) CERTIFICATE OF PUBLIC LIABILITY AND PROPERTY DAMAGE INSURANCE and contractually required endorsements must be provided by the successful bidder in accordance with the provisions of the Standard Specifications and Technical Specifications.

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-3

BID PROPOSAL

A Proposal of ______________________________________________ (hereinafter called “BIDDER”), organized and existing under the laws of the State of Washington doing business as ______________________1. To the Yakima Greenway Foundation, Washington, (hereinafter called

“CONTRACTING AGENCY”).

In compliance with your Advertisement for Bids, BIDDER hereby proposes to perform all work for the construction of the YAKIMA GREENWAY ACTIVE TRANSPORTATION AND PARK IMPROVEMENTS, State Aid No. HLP-1485(029), ARPA Contract No. ARPA-38170, HLA Project No. 24206 & 24207, in strict accordance with the CONTRACT DOCUMENTS, within the time set forth therein, and at the prices stated below.

By submission of this BID, each BIDDER certifies, in the case of a joint BID each party thereto certifies as to its own organization, that this BID has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor.

BIDDER hereby agrees to commence work under this Contract within ten (10) calendar days after NOTICE TO PROCEED and to fully complete the PROJECT within seventy (70) working days of such

NOTICE TO PROCEED.

BIDDER further agrees to pay as liquidated damages the sum specified for each working day thereafter as provided in Section 1-08.9 of the Standard Specifications.

BIDDER acknowledges receipt of the following ADDENDA:

Addenda will be posted on the Engineer’s website: https://www.hlacivil.com/bid/. Bidders are encouraged to register as planholders on the website, whom will be added to the Planholder list and will receive automatic addenda notification.

BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the following unit prices or lump sum amounts:

1 Insert "a corporation," "a partnership," or "an individual" as applicable.

https://www.hlacivil.com/bid/

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-4

UNIT PRICE BID PROPOSAL

STATE AID NO. HLP-1485(029)

ITEM

NO.

ITEM DESCRIPTION

PAYMT

SPEC UNIT QUANTITY

UNIT PRICE

DOLLARS-

CTS

AMOUNT

CTS

SCHEDULE A – Sarg Hubbard Lighting Improvements

1 Minor Change 1-04.4(1) FA Est. X $5,000.00 = $5,000.00

2 SPCC Plan 1-07.15(1) LS --- X --- =

3 Mobilization 2-01.5 LS --- X --- =

4 Project Temporary Traffic Control 2-04.5(1) LS --- X --- =

5 Landscape Restoration 8-02.5 FA Est. X $5,000.00 = $5,000.00

6 Illumination System, Complete 8-20.5 LS --- X --- =

SCHEDULE A SUBTOTAL

8.5% STATE SALES TAX

SCHEDULE A TOTAL

NO. ITEM DESCRIPTION

PAYMT

SPEC UNIT QUANTITY

UNIT PRICE

CTS

SCHEDULE B – Lighting Improvements

7 Minor Change 1-04.4(1) FA Est. X $2,500.00 = $2,500.00

8 Mobilization 2-01.5 LS --- X --- =

9 Project Temporary Traffic Control 2-04.5(1) LS --- X --- =

10 Landscape Restoration 8-02.5 FA Est. X $1,500.00 = $1,500.00

11 Solar Enabled Light and Luminaire 8-20.5 EA 6 X =

SCHEDULE B SUBTOTAL

SCHEDULE B TOTAL

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-5

NO.

ITEM DESCRIPTION

PAYMT

SPEC UNIT QUANTITY

UNIT PRICE

CTS

SCHEDULE C – Signage and Wayfinding Improvements

12 Minor Change 1-04.4(1) FA Est. X $15,000.00 = $15,000.00

13 Mobilization 2-01.5 LS --- X --- =

14 Project Temporary Traffic Control 2-04.5(1) LS --- X --- =

15 Removal of Structures and Obstructions 3-02.5 LS --- X --- =

16 Unclassified Excavation Incl. Haul 3-03.5 CY 15 X =

17 Crushed Surfacing Base Course 4-05.5 TON 10 X =

18 Landscape Restoration 8-02.5 FA Est. X $2,500.00 = $2,500.00

19 Gateway Sign 8-05.5 EA 3 X =

20 Gateway Sign (Material Only) 8-05.5 EA 1 X =

21 Kiosk Sign 8-05.5 EA 8 X =

SCHEDULE C SUBTOTAL

SCHEDULE C TOTAL

NO. ITEM DESCRIPTION

PAYMT

SPEC UNIT QUANTITY

UNIT PRICE

CTS

SCHEDULE D – Pathway Resurfacing Improvements

22 Minor Change 1-04.4(1) FA Est. X $25,000.00 = $25,000.00

23 Mobilization 2-01.5 LS --- X --- =

24 Project Temporary Traffic Control 2-04.5(1) LS --- X --- =

25 Clearing and Grubbing 3-01.5 LS --- X --- =

26 Unclassified Excavation Incl. Haul 3-03.5 CY 20 X =

27 Crushed Surfacing Top Course 4-04.5 TON 350 X =

28 Crack Sealing 5-04.5 LF 4,800 X =

29 Soil Residual Herbicide 5-04.5 LF 4,800 X =

30 HMA Cl. 3/8-Inch PG 64S-28 5-04.5 TON 1,900 X =

31 Job Mix Compliance Price Adjustment 5-04.5 CALC Est. X $0.00 = $0.00

32 Compaction Price Adjustment 5-04.5 CALC Est. X $0.00 = $0.00

33 Cyclic Density Price Adjustment 5-04.5 CALC Est. X $0.00 = $0.00

34 Erosion Control and Water Pollution Prevention 8-01.5 LS --- X --- =

SCHEDULE D TOTAL

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-6

NO.

ITEM DESCRIPTION

PAYMT

SPEC UNIT QUANTITY

UNIT PRICE

CTS

SCHEDULE E – ADA Accessibility Improvements

35 Minor Change 1-04.4(1) FA Est. X $2,500.00 = $2,500.00

36 Mobilization 2-01.5 LS --- X --- =

37 Unclassified Excavation Incl. Haul 3-03.5 CY 8 X =

38 Crushed Surfacing Top Course 4-05.5 TON 5 X =

39 HMA Cl. 3/8-Inch PG 64H-28 5-04.5 TON 4 X =

40 Job Mix Compliance Price Adjustment 5-04.5 CALC Est. X $0.00 = $0.00

41 Compaction Price Adjustment 5-04.5 CALC Est. X $0.00 = $0.00

42 Cyclic Density Price Adjustment 5-04.5 CALC Est. X $0.00 = $0.00

43 Cement Conc. Curb Ramp 8-14.5 EA 3 X =

44 Permanent Signing 8-21.5 LS --- X --- =

45 Pavement Markings 8-22.5 LS --- X --- =

SCHEDULE E TOTAL

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-7

NO.

ITEM DESCRIPTION

PAYMT

SPEC UNIT QUANTITY

UNIT PRICE

CTS

SCHEDULE F – Vault Toilets Improvements

46 Minor Change 1-04.4(1) FA Est. X $15,000.00 = $15,000.00

47 Mobilization 2-01.5 LS --- X --- =

48 Project Temporary Traffic Control 2-04.5(1) LS --- X --- =

49 Clearing and Grubbing 3-01.5 LS --- X --- =

50 Removal of Structures and Obstructions 3-02.5 LS --- X --- =

51 Unclassified Excavation Incl. Haul 3-03.5 CY 15 X =

52 Crushed Surfacing Top Course 4-05.5 TON 20 X =

53 HMA Cl. 3/8-Inch PG 64H-28 5-04.5 TON 10 X =

54 Job Mix Compliance Price Adjustment 5-04.5 CALC Est. X $0.00 = $0.00

55 Compaction Price Adjustment 5-04.5 CALC Est. X $0.00 = $0.00

56 Cyclic Density Price Adjustment 5-04.5 CALC Est. X $0.00 = $0.00

57 Erosion/Water Pollution Control 8-01.5 LS --- X --- =

58 Landscape Restoration 8-02.5 FA Est. X $5,000.00 = $5,000.00

59 Furnish and Install New Vault Toilet 8-19.5 EA 3 X =

60 Remove Existing Vault Toilet 8-19.5 EA 2 X =

61 Pavement Markings 8-22.5 LS --- X --- =

SCHEDULE F SUBTOTAL

SCHEDULE F TOTAL

SCHEDULES A, B, C, D, E, AND F TOTAL

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-8

BID PROPOSAL SIGNATURE PAGE

STATE AID NO. HLP-1485(029)

, 2026

BIDDER (CONTRACTOR) DATE

BY

AUTHORIZED OFFICIAL'S SIGNATURE TITLE

(Please print or type name)

Mailing Address:

Phone:

E-mail address:

CONTRACTOR LICENSE NUMBER

CONTRACTOR UEI NUMBER

CONTRACTOR UBI NUMBER

CONTRACTOR FEDERAL TAX I.D. NUMBER

CONTRACTOR EMPLOYMENT SECURITY DEPARTMENT NUMBER

CONTRACTOR INDUSTRIAL INSURANCE ACCOUNT NUMBER

The names of the principal officers of the corporation submitting this Proposal, or of the partnership, or of all persons interested in this Proposal as principals are as follows:

PROJECT MANAGER CELL PHONE:

NOTES:

1) If the bidder is a co-partnership, so state, giving firm name under which business transacted. If the bidder is a corporation, this proposal must be executed by its duly authorized officials.

2) Bidders shall acknowledge receipt of all addenda, if any, in the space provided on the first page of this proposal.

Authorized Signatures List the name and title of those individuals in your organization who are authorized to execute proposals, contracts, bonds and other documents and/or instruments on behalf of the organization. Specify if more than one signature is required.

NOTE: Signature must appear next to name Name (Typed) Signature Title

Name (Typed) Signature Title

Name (Typed) Signature Title

Name (Typed) Signature Title

Name (Typed) Signature Title

Name (Typed) Signature Title

Name (Typed) Signature Title

Name (Typed) Signature Title

Name (Typed) Signature Title

Name (Typed) Signature Title

Name (Typed) Signature Title

The undersigned, being duly sworn, deposes and says that the foregoing is a true statement of facts concerning the individual, corpration, co-partnership or joint venture herein named, as of the date indicated:

Name of Firm - Be Exact

Sworn to before me this day of , Notary Public

Notary Seal

Authorized Signature(s)

Corporate Seal(s) DOT Form 420-007 EF

Revised 10/02

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-10

BID DEPOSIT

STATE AID NO. HLP-1485(029)

ARPA CONTRACT NO. ARPA-38170

HLA PROJECT NO. 24206 & 24207

Herewith find deposit in the form of a certified check or cashier's check in the amount of $__________________________________________, which amount is not less than five percent (5%) of our total bid for this project.

Sign Here

OR

BID BOND

KNOW ALL PERSONS BY THESE PRESENTS:

That we _________________________________________________________________, as Principal, and ___________________________________________________________________________, as Surety, are held and firmly bound unto the YAKIMA GREENWAY FOUNDATION, as Obligee, in the penal sum of _______________________________________________________________ Dollars, for the payment of which the Principal and the Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents.

The condition of this obligation is such that if the Obligee shall make any award to the Principal for YAKIMA GREENWAY ACTIVE TRANSPORTATION AND PARK IMPROVEMENTS, State Aid No. HLP- 1485(029), HLA Project No. 24206 & 24207, according to the terms of the proposal or bid made by the Principal therefor, and the Principal shall duly make and enter into a Contract with the Obligee in accor-dance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure so to do, pay and forfeit to the Obligee the penal amount of the deposit specified in the call for bids, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damages, the amount of this bond.

SIGNED, SEALED, AND DATED THIS __________ DAY OF __________________, 2026.

Principal

Surety

, 2026

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-11

NON-COLLUSION AFFIDAVIT

STATE AID NO. HLP-1485(029)

STATE OF WASHINGTON )

) ss. NON-COLLUSION AFFIDAVIT

COUNTY OF ____________ )

_________________________________________________________________________, being first duly sworn, on oath says that the bid above submitted is a genuine and not a sham or collusive bid, or made in the interest or on behalf of any person not therein named; and the said bidder further says that the said bidder has not directly or indirectly induced or solicited any bidder on the above work or supplies to put in a sham bid, or any other person or corporation to refrain from bidding; and that said bidder has not in any manner sought by collusion to secure to themselves an advantage over any other bidder or bidders.

(Contractor's Signature)

Signed and sworn to (or affirmed) before me on _________________________, 2026, by

Notary Public Name

Notary Public Signature

My Appointment Expires

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-12

SURETY

STATE AID NO. HLP-1485(029)

If the Bidder is awarded a construction Contract on this bid, the Surety who provides the Contract Bond will be whose address is:

Street City State ZIP

Local Agency Subcontractor List Prepared in compliance with RCW 39.30.060 as amended

To Be Submitted with the Bid Proposal Project Name

Failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform the same work will result in your bid being non-responsive and therefore void.

Subcontractor(s) with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical as described in Chapter 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name.

To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no subcontractor is listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bidder itself, or (ii) be performed by a lower tier subcontractor who will not contract directly with the bidder.

Subcontractor Name

Work to be performed

Subcontractor Name

Work to be performed

Subcontractor Name

Work to be performed

Subcontractor Name

Work to be performed

Subcontractor Name

Work to be performed

* Bidder’s are notified that it is the opinion of the enforcement agency that PVC or metal conduit, junction boxes, etc, are considered electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical current is connected during the project.

DOT Form 271-015LP Revised 06/2020

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-14

CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES

STATE AID NO. HLP-1485(029)

Failure to return this certification as part of the Bid Proposal package will make this Bid nonresponsive and ineligible for Award.

I hereby certify, under penalty of perjury under the laws of the State of Washington, on behalf of the firm identified below that, to the best of my knowledge and belief, this firm has NOT been determined by a final and binding citation and notice of assessment issued by the Washington State Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of RCW chapters 49.46, 49.48, or 49.52 within three (3) years prior to the date of the Call for Bids.

OFFICIAL AUTHORIZED TO SIGN FOR BIDDER:

Bidder Name:

Name of Contractor/Bidder – Print full legal entity name of firm

Signature of Authorized Person

Date

Print Name and Title

Location or Place Executed (City, State)

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-15

SUPPLEMENTAL BIDDER RESPONSIBILITY CRITERIA STATEMENT

STATE AID NO. HLP-1485(029)

ARPA CONTRACT NO. ARPA-38170

HLA PROJECT NO. 24206 & 24207

This form shall be completed in its entirety and submitted by the apparent low Bidder to the Contracting Agency by 12:00 P.M. (noon) of the second business day following the bid submittal deadline.

Bidder will be deemed not responsible if Bidder does not meet the mandatory bidder responsibility criteria in RCW 39.04.350(1), as amended, or supplemental bidder responsibility criteria listed in Section 1-02.14 of the Special Provisions, including submission of further documentation as may be requested by the Contracting Agency.

Contractor:

Name:

Address:

Contact Person:

1. Delinquent State Taxes:

Instruction to Bidders: Check the appropriate box

□ The undersigned certifies that the Bidder does not owe delinquent taxes to the Washington State Department of Revenue without a payment plan approved by the Department of Revenue.

□ Alternatively, the undersigned certifies that the Bidder does owe delinquent taxes to the Washington State Department of Revenue with a payment plan approved by the Department of Revenue.

If the Bidder does owe delinquent taxes to the Washington State Department of Revenue, the Bidder must submit a written payment plan approved by the Department of Revenue, to the Contracting Agency by the deadline listed above.

2. Federal Debarment: The Bidder shall not currently be debarred or suspended by the Federal government. The Bidder shall not be listed as having an “active exclusion” on the U.S.

government’s “System for Award Management” database (www.sam.gov).

3. Subcontractor Responsibility: The undersigned certifies that the Bidder’s standard subcontract form includes the subcontractor responsibility language required by RCW 39.06.020, and the Bidder has an established procedure it utilizes to validate the responsibility of each of its subcontractors.

4. Apprenticeship: Apprentice utilization is required for all project bids having an engineer’s estimate of more than $1,500,000.00. For public works project subject to the apprenticeship utilization requirements in RCW 39.04.320, the Bidder shall not have been found out of compliance by the Washington state apprenticeship and training council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under chapter 49.04 RCW for the one-year period immediately preceding the date of the bid solicitation.

http://www.sam.gov/

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-16

5. Claims Against Retainage and Bonds:

Instruction to Bidders: Check the appropriate box

□ The undersigned certifies that the Bidder has not had claims against retainage or payment bonds for public works projects in the three (3) years prior to the bid submittal date.

□ Alternatively, the undersigned certifies that the Bidder has had claims against retainage or payment bonds for public works projects in the three (3) years prior to the bid submittal date.

If the Bidder has had claims against retainage and payment bonds for public works projects in the three (3) years prior to the bid submittal date, submit a list of public works projects completed during this period that have had claims against retainage and payment bonds and include name of Project, Owner and contact information for the Owner, a list of claims filed against retainage and/or payment bond for any of the projects listed; and a written explanation of circumstances surrounding each claim and the ultimate resolution of the claim.

6. Public Bidding Crime:

Instructions to Bidders: Check the appropriate box

□ The undersigned certifies that the Bidder and/or its Owners have not been convicted of a crime involving bidding on a public works contract in the five (5) years prior to the bid submittal date.

□ Alternatively, the undersigned confirms that the Bidder and/or its Owners have been convicted of a crime involving bidding on a public works contract in the five (5) years prior to the bid submittal date.

If the Bidder and/or its Owners have been convicted of a crime involving bidding on a public works contract, provide a written explanation identifying the date of the conviction and a description of the circumstances surrounding the conviction.

7. Termination for Cause/Termination for Default:

□ The undersigned certifies that the Bidder has not had any public works contracts terminated for cause or terminated for default by a government agency in the five (5) years prior to the bid submittal date.

□ Alternatively, the undersigned confirms that the Bidder has had public works contracts terminated for cause or terminated for default by a government agency in the five (5) years prior to the bid submittal date.

If the Bidder has had any public works contracts terminated for cause or terminated for default in the five (5) years prior to the bid submittal date, provide a written explanation for all contracts terminated for cause or terminated for default by identifying the Project contract that was terminated, the government agency which terminated the contract, the date of the termination, and a description of the circumstances surrounding the termination.

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 3-17

8. Lawsuits:

□ The undersigned certifies that the Bidder has not had any lawsuits with judgments entered against the Bidder in the five (5) years prior to the bid submittal date that demonstrate a pattern of failing to meet the terms of contracts.

□ Alternatively, the undersigned confirms that the Bidder has had lawsuits with judgments entered against the Bidder in the five (5) years prior to the bid submittal date that demonstrate a pattern of failing to meet the terms of contracts.

If the Bidder has had any lawsuits with judgments entered against the Bidder in the five (5) years prior to the bid submittal date that demonstrate a pattern of failing to meet the terms of contracts, submit a list of lawsuits along with a written explanation of the circumstances surrounding each lawsuit. The Contracting Agency shall evaluate these explanations to determine whether the lawsuits demonstrate a pattern of failing to meet the terms of contracts.

(Date) (Signature)

(Print Name)

(Title)

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 4-1

SECTION 4 - CONTRACT AND RELATED MATERIALS

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 4-2

CONTRACT

THIS AGREEMENT, made and entered into in triplicate, this ___________ day of _____________, 2026, by and between the Yakima Greenway Foundation, hereinafter called the CONTRACTING AGENCY, and ________________________________________________________________, hereinafter called the

CONTRACTOR,

WITNESSETH:

That in consideration of the terms and conditions contained herein and attached and made a part of this Agreement, the parties hereto covenant and agree as follows:

I. The CONTRACTOR shall do all work and furnish all tools, materials, and equipment for the bid amount of $___________________, for YAKIMA GREENWAY ACTIVE TRANSPORTATION AND PARK IMPROVEMENTS, State Aid No. HLP-1485(029), ARPA Contract No. ARPA-38170, HLA Project No. 24206 & 24207, in accordance with and as described in the attached Plans and Specifications, and the Standard Specifications for Road, Bridge, and Municipal Construction, which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this Contract and every part thereof.

Contract time shall begin on the first working day following the Notice to Proceed Date and shall be completed within seventy (70) working days of the date of such Notice to Proceed (see SPECIAL PROVISIONS - Section 1-08.5).

If said work is not completed within the time specified, the CONTRACTOR agrees to pay to the CONTRACTING AGENCY for each and every working day said work remains uncompleted after expiration of the specified time, liquidated damages as determined in Section 1-08.9.

The CONTRACTOR shall provide and bear the expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this Contract and every part thereof, except such as are mentioned in the Specifications to be furnished by the CONTRACTING AGENCY.

II. The CONTRACTING AGENCY hereby promises and agrees with the CONTRACTOR to employ, and does employ the CONTRACTOR to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the attached Plans and Specifications and the terms and conditions herein contained; and hereby contracts to pay for the same according to the attached Specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner and upon the conditions provided for in this Contract.

III. The CONTRACTOR for himself, and for his/her heirs, executors, administrators, successors, and assigns does hereby agree to the full performance of all the covenants herein upon the part of the

CONTRACTOR.

IV. It is further provided that no liability shall attach to the CONTRACTING AGENCY by reason of entering into this Contract, except as expressly provided herein.

V. CONTRACTOR is an independent contractor and not an employee of the CONTRACTING AGENCY. The CONTRACTING AGENCY has designated the Contract performance and the CONTRACTOR shall be responsible for the details of that work. The parties recognize the CONTRACTOR has unique skills not otherwise available to the CONTRACTING AGENCY to accomplish the purpose of the Contract. The CONTRACTOR shall supply all equipment and supplies necessary to accomplish the Contract. The parties recognize that the purpose of the Contract is not within the regular course of business of the CONTRACTING AGENCY. The parties state that the right of control over the activities necessary to perform the Contract are with the CONTRACTOR.

IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed the day and year first herein above written.

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 4-3

CONTRACTING AGENCY:

Yakima Greenway Foundation

By: ATTEST:

Name: Konner Hopkins

Title: Executive Director

CONTRACTOR:

(CONTRACTOR NAME)

By: (SEAL)

AUTHORIZED OFFICIAL’S SIGNATURE

Name: ATTEST:

(Please Print or Type)

Address:

Email:

Name:

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 4-4

CERTIFICATIONS

STATE AID NO. HLP-1485(029)

ARPA CONTRACT NO. ARPA-38170

Provide the following:

Name of Traffic Control Manager (TCM) (Must be an employee of the Contractor)

Name of Certified Traffic Control Supervisor (TCS) (Provide copy of certificate)

Name of Mandatory Alternate Certified Traffic Control Supervisor (TCS) (Provide copy of certificate)

Name of Certified Testing Laboratory for Material Testing

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 4-5

CONTRACT BOND

STATE AID NO. HLP-1485(029)

BOND TO YAKIMA GREENWAY FOUNDATION

KNOW ALL PERSONS BY THESE PRESENTS:

That we, the undersigned, , as principal, and , a corporation organized and existing under the laws of the State of _______________________, as a Surety corporation, and qualified under the laws of the State of Washington to become Surety upon bonds of contractors with municipal corporations, as Surety, are jointly and severally held and firmly bound to the Yakima Greenway Foundation in the penal sum of $ for the payment of which sum we bind ourselves and our successors, heirs, administrators, or personal representatives, as the case may be.

This obligation is entered into in pursuance of the statutes of the State of Washington and the Ordinances of the Yakima Greenway Foundation.

Dated at __________________, Washington, this ______ day of _____________, 2026.

Nevertheless, the conditions of the above obligation are such that:

WHEREAS, under and pursuant to action of the Yakima Greenway Foundation, on ________________________, 2026, the Executive Director of said Yakima Greenway Foundation, has let or is about to let to the said ____________________________________________________, the above bounden Principal, a certain Contract, the said Contract being numbered State Aid No. HLP- 1485(029), ARPA Contract No. ARPA-38170, HLA Project No. 24206 & 24207, and providing for the construction of YAKIMA GREENWAY ACTIVE TRANSPORTATION AND PARK IMPROVEMENTS which Contract is referred to herein and is made a part hereof as though attached hereto, and

WHEREAS, the said Principal has accepted, or is about to accept, the said Contract, and undertake to perform the work therein provided for in the manner and within the time set forth;

NOW, THEREFORE, if the said ________________________________________________________ shall faithfully perform all the provisions of said Contract in the manner and within the time therein set forth, or within such extensions of time as may be granted under said Contract, and shall pay all laborers, mechanics, subcontractors and material men and all industrial insurance premiums, and all persons who shall supply said principal or subcontractors with provisions and supplies for the carrying on of said work, and shall indemnify and hold the Yakima Greenway Foundation harmless from any damage or expense by reason of failure of performance as specified in said Contract or from defects appearing or developing in the material or workmanship provided or performed under said Contract within a period of one year after its acceptance thereof by the Yakima Greenway Foundation then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect.

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 4-6

YAKIMA GREENWAY ACTIVE TRANSPORTATION AND PARK IMPROVEMENTS

STATE AID NO. HLP-1485(029)

SURETY: CONTRACTOR:

By:

(Attorney-in-fact) CONTRACTOR NAME

Name: By:

(Please Print or Type) AUTHORIZED OFFICIAL’S SIGNATURE

Agent: Name:

Address:

Surety Representative Name:

Surety Representative Phone:

Surety Representative Email:

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 4-7

SCHEDULE OF WORKING HOURS

STATE AID NO. HLP-1485(029)

ARPA CONTRACT NO. ARPA-38170

HLA PROJECT NO. 24206 & 24207

In accordance with Section 1-08.0(2) Hours of Work, the normal straight time working hours for this project will be from ________________ a.m. to _______________ p.m., _____________________ days per week. It is understood that normal straight time working hours shall not exceed 40 hours per week, regardless of the number of days worked per week. All hours worked in excess of 40 hours per week shall be considered as overtime hours subject to the reimbursement provisions of Section 1-08.0(2) Hours of Work and Section 1-08.0(3) Reimbursement for Overtime Work of Contracting Agency Employees.

Overtime hours are defined as any hours in excess of or outside of the above normal straight time working hours when the Contractor and/or his subcontractors are on the project site performing work.

I hereby certify that my subcontractors have been notified of the normal straight time working hours provisions of this project and understand that Engineer/Contracting Agency costs for overtime hours will be deducted from amounts due to me for work performed on the project.

Contractor

Signature

Date

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 5-1

SECTION 5 - LABOR STANDARDS AND

WAGE RATE CONDITIONS

G:\PROJECTS\2024\24206E\11. Specs\24206_24207 Spec.docx 5-2

PREVAILING WAGE RATES

The prevailing rate of wages to be paid to all workmen, laborers, or mechanics employed in the performance of any part of this Contract shall be in accordance with the provisions of Chapter 39.12 RCW, as amended. The rules and regulations of the Department of Labor and Industries and the schedule of prevailing wage rates for the locality or localities where this Contract will be performed as determined by the Industrial Statistician of the Washington State Department of Labor and Industries, are by reference made a part of this Contract. A schedule of prevailing wage rates is included in these Specifications.

Inasmuch as the CONTRACTOR will be held responsible for paying this schedule of wages, it is imperative that all contractors and subcontractors familiarize themselves with the current wage rates before submitting bids based on these Specifications.

Before any payment is made by the local government body of any sums due under this Contract, the local government body must receive from the Contractor and each subcontractor a copy of the “Statement of Intent to Pay Prevailing Wages” approved by the Washington State Department of Labor and Industries.

Prior to acceptance of the project, the Contracting Agency must receive from the Contractor and each subcontractor a copy of “Affidavit of Wages Paid” and, in addition, from the prime contractor a copy of “Release for the Protection of Property Owners and General Contractor,” all approved by the Washington State Department of Labor and Industries. Forms may be obtained from the Department of Labor and Industries. The Contractor and each subcontractor shall pay all fees associated with and make all applications directly to the Department of Labor and Industries. These affidavits will be required before any funds retained, according to the provisions of RCW 60.28.011, are released to the Contractor.

Payment by the Contractor and subcontractor of any fees shall be considered incidental to the construction and all costs shall be included in other pay items of the project.

Pursuant to RCW 39.12.120, a contractor, subcontractor, or employer shall file a copy of its certified payroll records using the Washington State Department of Labor and Industries (L&I) online system at least once per month. If the L&I online system is not used, a contractor, subcontractor, or employer shall file a copy of its certified payroll records directly with L&I in a format approved by L&I at least once per month. A contractor, subcontractor, or employer's noncompliance with this reporting constitutes a violation of RCW 39.12.050.

Submission of certified payrolls to the Engineer is not required during the project, unless specifically requested by the Engineer or Contracting Agency. Certified payrolls submitted to the Engineer or Contracting Agency without a request will not be reviewed and will be returned to the Contractor.

Contractors must keep accurate payroll records for three years following the date of acceptance of the project by the Contracting Agency. Payroll records must show the name, address, Social Security number, trade or occupation, straight time rate, hourly rate of usual benefits and overtime hours worked each day and week, including agreements to work up to 10-hour days, and the actual rate of wages.

Upon receiving a written request by any interested party, the Contractor must, within ten days, submit Certified Payroll records to the Contracting Agency and the Department of Labor.

Benefit Code Key – Effective 3/4/2026 thru 9/1/2026

1 | P a g e

Overtime Codes

Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker.

1. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE

PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.

B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.

C. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.

D. The first two (2) hours before or after a five-eight (8) hour workweek day or a four-ten (10) hour workweek day and the first eight (8) hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate…