24-042 DSWWTP Lift Station Rehab WW2103B Project Manual to post.pdf
PDF 17 MB Posted
- Attached to
- DSWWTP Misc Improvements WW2103C
- Solicitation number
- 26-048
- Issued by
- Galveston County, Texas
About this file
This is a comprehensive Specifications and Contract Documents package issued by the City of League City, Texas for the Dallas Salmon Wastewater Treatment Plant Influent Lift Station Rehabilitation project (WW2103B, Bid No. 26-042). The project scope encompasses installation of bypass pumping systems on influent gravity raw sewage collection sewers with SCADA system connections; removal, storage, and reinstallation of existing submersible pumps; blast cleaning and pressure washing of all wet wells; dewatering and drying of existing wet wells with pump base elbow inspection; installation of reinforcing steel and concrete wall buildup with corrosion prevention coatings; installation of new flood-resistant access hatches and raised vent assemblies; installation of new 316L stainless steel piping, guide rails, and engineered pipe supports; installation of new gusset plates and tie rods on pump riser piping couplings and force main headers with blast painting and stencil labeling; and new level instrumentation with waterproofing details and associated electrical and instrumentation work. Sealed bids were due on Wednesday, September 23, 2026 at 2:00 PM at the City of League City Purchasing Department, with public opening at 2:10 PM at the Johnnie Arolfo Civic Center. An optional pre-bid conference was scheduled for September 8, 2026 at 2:00 PM with a site visit to follow. The question cutoff date was 5:00 PM on Monday, September 14, 2026. Bidders were required to submit bids in duplicate (one original marked, one marked copy) with bid documents available online through http://leaguecitytx.gov/bids.aspx and www.CivcastUSA.com at no charge.
A 5% bid bond or cashier's/certified check from a Texas bank is required, payable to the City of League City, with the bid deposit forfeited as liquidated damages if the awarded bidder fails to execute the contract and furnish required bonds within ten calendar days of the award notice. The successful bidder must provide Performance, Payment, and One-Year Maintenance Bonds equal to 100% of the total contract price from a surety company with a minimum Best Key Rating of "B" and authorization to do business in Texas. The bid evaluation incorporates an A+B bidding methodology, with each calendar day valued at $3,000 for award purposes; bidders must specify their calendar days to substantial completion, with 30 additional calendar days allotted for final completion and final payment. Liquidated damages apply at $3,000 per calendar day for project delays beyond the bid timeline. The base bid includes mobilization and demobilization (maximum 4% of contract value), all project work for a complete operating system, and a $100,000 miscellaneous construction contingency. Extra work items include skilled and unskilled labor, well pointing, ductile iron pipe and fittings, pump replacement options for various models, stainless steel wall pipe replacement alternatives, and protective coating system options. The general contractor must perform a minimum of 40% of the overall contract value. Bidders must submit financial statements current within twelve months of the bid date, a statement of qualifications with minimum ten project references, proof of insurance coverage, and compliance documentation including House Bill 89 verification, Texas Ethics Commission Form 1295 (if awarded), conflict of interest questionnaire, and Public Information Act acknowledgment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of League City, Texas
Specifications and
Contract Documents for
Dallas Salmon Wastewater Treatment Plant
Influent Lift Station Rehabilitation
Issued for Bid (IFB)
Project # WW2103B
Bid No. 26-042
August 13, 2026
Prepared By:
3115 Allen Parkway, Suite 300
Houston, Texas 77019
TBPE Firm Registration No. F-10053
713-682-9007
8/13/2026
Technical Specifications for the
City of League City, TX
Contract Docs, DIVISION 1, DIVISION 2, DIVISION 6, DIVISION 7, DIVISION 9, DIVISION 10, DIVISION 11, DIVISION 15
DIVISION 3, DIVISION 5
DIVISION 13
DIVISION 16
8/13/2026 8/13/2026
SPECIFICATIONS AND CONTRACT DOCUMENTS
for
WW2103B
in
CITY OF LEAGUE CITY, TEXAS
Ardurra Group, Inc.
3115 Allen Parkway, Suite 300
Houston, Texas 77019
TBPE Firm Registration No. F-10053
713-682-9007
City of League City
Influent Lift Station Rehabilitation TABLE OF CONTENTS
00003-1
8/6/26
TABLE OF CONTENTS
No. of
Section Pages
DIVISION 00 REQUIREMENTS
00003 Table of Contents
00015 Drawing List
02 Notice to Bidders
03 General Instructions to Bidders
04 Subcontractors and Major Suppliers Form
05 Bid Coversheet
05a Bid Proposal
05b Bidder Certification and Addenda Acknowledgement
05c House Bill 89 Verification
5d Texas Public Information Request Act
06 Bid Bond
07 Performance Bond
7.2 Standard Form of Agreement
08 Payment Bond
09.1 Conflict of Interest Questionnaire
10 One-Year Maintenance Bond
11 General Conditions of the Agreement
11.1 Attachment No.1 to General Conditions – Worker’s Compensation Insurance Coverage 3
11.2 Attachment No. 2 to General Conditions
11.3 Subcontractor/Materialman’s Full and Final Release and Waiver of Claims and Liens ... 1
11.4 Consent of Surety Company to Final Payment
11.6a Attachment 3 Wage Rates Divider
11.6b Wage Rates
11.7 Special Conditions Divider
12 Special Conditions
DIVISION 1 GENERAL CONDITIONS
01046 Control of Work
01100 Summary of Work
01110 Protection of the Environment
01140 Contractor's Use of Premises
01170 Special Provisions
01172 Pipe Penetrations
01200 Measurement and Payment Procedures
01290 Change Order Procedures
01292 Schedule of Values
01310 Coordination and Meetings
01311 Schedule and Sequence of Construction
01350 Submittals
00003-2
DIVISION 1 GENERAL CONDITIONS - CONTINUED
01420 Referenced Standards
01430 Contractor's Quality Control
01440 Observation Services
01445 Pipeline Testing and Cleaning
01450 Testing Laboratory Services
01458 Special Inspections
01465 Equipment Testing and Startup
01480 Water Tightness Test for Hydraulic Structures
01500 Temporary Facilities and Controls
01505 Mobilization
01530 Protection of Existing Facilities
01560 Filter Fabric Fence
01561 Reinforced Filter Fabric Barrier
01562 Waste Material Disposal
01564 Control of Ground Water And Surface Water
01565 TPDES Requirements
01566 Source Controls for Erosion and Sedimentation
01570 Trench Safety System
01610 Basic Product Requirements
01630 Product Options and Substitutions
01640 Manufacturers’ Services
01710 Cleaning
01730 Operation and Maintenance Data
01731 Cutting and Patching
01735 Vendor Training
01740 Warranties and Bonds
01750 Anchorage and Bracing
01755 Starting Systems
01760 Project Record Documents
01770 Project Closeout
DIVISION 2 SITE WORK
02200 Site Preparation
02210 Earthwork
02220 Site Demolition
02221 Trenching, Backfilling and Compaction
02230 Granular Materials
02252 Cement Stabilized Sand
02255 Bedding, Backfill, and Embankment Materials
02311 Excavation Support and Protection
02317 Excavation and Backfill for Structures
02318 Excavation and Backfill For Utilities
02335 Subgrade
02370 Geotextile
02512 Polyethylene Wrap
00003-3
DIVISION 2 SITE WORK - CONTINUED
02530 Gravity Sanitary Sewers
02534 PVC Pipe
02558 Cleaning and Television Inspection
02634 Ductile Iron Pipe and Fittings
02751 Concrete Pavement
02910 Topsoil
02921 Hydromulch Seeding
02980 Pavement Repair
DIVISION 3 CONCRETE
03100 Concrete Formwork
03200 Concrete Reinforcement
03250 Concrete Joints and Joint Accessories
03300 Cast-In-Place Concrete
03350 Concrete Finishes
03600 Grout
03740 Modifications to Existing Concrete
03800 Concrete Electrical Raceway Encasement
DIVISION 4 MASONRY – NOT USED
DIVISION 5 METALS
05500 Miscellaneous Metal
DIVISION 6 WOOD AND PLASTIC (INCLUDING FIBERGLASS)
06100 Rough Carpentry
DIVISION 7 THERMAL AND MOISTURE PROTECTION
07901 Caulking and Joint Sealants
DIVISION 8 DOORS AND WINDOWS – NOT USED
DIVISION 9 PROTECTIVE COATING AND FINISHES
09805 Interior Concrete Corrosion Barrier
09901 Protective Coatings
09915 Surface Preparation and Shop Prime Painting
DIVISION 10 SPECIALTIES
10400 Signage
00003-4
DIVISION 11 EQUIPMENT
11319 Submersible Pumps
11354 Vortex Flow Insert
11500 Temporary Bypass Pumping Systems
DIVISION 12 FURNISHINGS – NOT USED
DIVISION 13 SPECIAL CONSTRUCTION
13300 Process Control Systems General Provisions
13310 Application Engineering Services
13315 Process Control Systems Submittals
13320 Process Control Systems Testing
13450 Temporary Radio Monitoring System
13451 Input/Output List for Temporary Radio Monitoring
13500 Instruments
13500.01 Instrument Device Schedule
13532 Radar Level Meters
13542 Level Switches
DIVISION 14 CONVEYING SYSTEMS – NOT USED
DIVISION 15 MECHANICAL
15050 Piping – General Requirements
15064 PVC & CPVC Pipe and Fittings
15066 Stainless Steel Pipe and Fittings
15072 Ductile Iron Pipe and Fittings
15120 Piping Specialties
15140 Pipe Hangers and Supports
15190 Mechanical Identification Systems
DIVISION 16 ELECTRICAL
16010 Basic Electrical Requirements
16060 Electrical Demolition
16111 Conduit, Fittings and Bodies
16120 600-Volt Insulated Wire6
16126 Instrumentation Cable
16131 Device, Pull, Junction, and Terminal Boxes
16140 Wiring Devices
16165 Disconnect Switches
16170 Grounding and Bonding
16171 Low Voltage Motors
00003-5
DIVISION 16 ELECTRICAL - CONTINUED
16175 Low Voltage Variable Frequency Drives
16195 Electrical Identification
16476 Disconnects and Circuit Breakers
APPENDIX
Verdantas Flow Labs – Dallas Salmon WWTP Influent Lift Station Rehabilitation Project
Wet Well Intake Conceptual Design Review (REV 1.0) Report
END OF SECTION
Influent Lift Station Rehabilitation DRAWING LIST
00015-1
DRAWING LIST
GENERAL
G-1 COVER SHEET
G-2 DRAWING INDEX
G-3 GENERAL LEGENDS, SCHEDULES, AND ABBREVIATIONS SHEET I
G-4 GENERAL LEGENDS, SCHEDULES, AND ABBREVIATIONS SHEET II
G-5 GENERAL, WATER AND SANITARY CONSTRUCTION NOTES
G-6
STORM SEWER CONSTRUCTION, PAVING CONSTRUCTION, STORM
WATER POLLUTION PREVENTION NOTES
G-7 HYDRUALIC PROFILE
CIVIL
C-1
OVERALL SITE PLAN WITH PROPOSED IMPROVEMENTS AND
CONTRUCTION STAGING AREA
C-2 OVERALL SITE CIVIL PLAN WITH SWPPP
C-3 EXISTING YARD PIPING PLAN
C-4 SYSTEM 1, 2, AND 4 BYPASS PUMPING PLAN
C-5 SYSTEM 1 & 2 BYPASS PUMPING SECTIONS
C-6 SYSTEM 3 BYPASS PUMPING PLAN, SECTIONS, AND DETAILS
C-7 EXISTING YARD PIPING PROFILES SHEET I FOR BYPASS PUMPING
C-8 EXISTING YARD PIPING PROFILES SHEET II FOR BYPASS PUMPING
CZ-1 STANDARD CIVIL DETAILS SHEET I
CZ-2 STANDARD CIVIL DETAILS SHEET II
CZ-3 STANDARD CIVIL DETAILS SHEET III
CZ-4 STANDARD CIVIL DETAILS SHEET IV
MECHANICAL
D-1 EXISTING INFLUENT JUNCTION BOX - DEMOLITION PLAN
D-2 EXISTING INFLUENT JUNCTION BOX - DEMOLITION SECTIONS
D-3 EXISTING INFLUENT LIFT STATION - DEMOLITION UPPER PLAN
D-4
EXISTING INFLUENT LIFT STATION - DEMOLITION INTERMEDIATE
PLAN
D-5
EXISTING INFLUENT LIFT STATION - DEMOLITION SECTIONS
SHEET 1
D-6
EXISTING INFLUENT LIFT STATION - DEMOLITION SECTIONS
SHEET 2
D-7
EXISTING INFLUENT LIFT STATION - DEMOLITION SECTIONS
SHEET 3
M-1 JUNCTION BOX - PROPOSED PLAN
M-2 JUNCTION BOX - PROPOSED SECTIONS
M-3 INFLUENT LIFT STATION - PROPOSED UPPER PLAN
M-4
INFLUENT LIFT STATION - PROPOSED INTERMEDIATE AND LOWER
PLANS
M-5 INFLUENT LIFT STATION - PROPOSED SECTION SHEET 1
M-6 INFLUENT LIFT STATION - PROPOSED SECTION SHEET 2
Influent Lift Station Rehabilitation DRAWING LIST
00015-2
M-7 INFLUENT LIFT STATION - PROPOSED SECTION SHEET 3
MZ-1 PROCESS MECHANICAL STANDARD DETAILS I
MZ-2 PROCESS MECHANICAL STANDARD DETAILS II
STRUCTURAL
S-1
STRUCTURAL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND
LEGEND
S-2 SPECIAL INSPECTIONS
S-3 JUNCTION BOX PLANS, SECTION & ELEVATION
S-4 INFLUENT LIFT STATION - PROPOSED PLANS
S-5 INFLUENT LIFT STATION - PROPOSED SECTIONS
S-6
INFLUENT LIFT STATION - NORTH WET WELL ELEVATIONS &
PHOTOGRAPHS
S-7
INFLUENT LIFT STATION - NORTH WET WELL ELEVATIONS &
PHOTOGRAPHS
S-8
INFLUENT LIFT STATION - SOUTH WET WELL ELEVATIONS &
PTOTOGRAPHS
S-9
INFLUENT LIFT STATION - SOUTH WET WELL ELEVATIONS &
PTOTOGRAPHS
S-10 DETAILS I
S-11 STANDARD DETAILS
S-12 VORTEX FLOW INSERT DETAILS
ELECTRICAL
E-1 ELECTRICAL LEGEND AND SYMBOLS
E-2 ELECTRICAL NOTES
E-3
INFLUENT LIFT STATION & HEADWORKS PARTIAL ELECTRICAL SITE
PLAN
E-4 INFLUENT LIFT STATION ELECTRICAL DEMOLITION PLAN
E-5 TEMPORARY FEED FOR BYPASS PUMPING SYSTEMS
E-6 GROUNDING DETAILS
INSTRUMENTATION
I-1 INSTRUMENTATION & CONTROL LEGEND
I-2 PROCESS & INSTRUMENTATION DIAGRAM - INFLUENT JUNCTION BOX
I-3 PROCESS & INSTRUMENTATION DIAGRAM - INFLUENT LIFT STATION
I-4 INSTRUMENTATION INSTALLATION DETAILS
END OF SECTION
NTB-1
NOTICE TO BIDDERS
Sealed bids must be submitted with, one marked original, one marked copy, properly labeled and clearly marked with the Bid number and description, directed to City of League City, Office of the
Purchasing Manager, 300 West Walker Street, League City, Texas 77573 and will be received until 2:00pm, Wednesday, September 23, 2026. Bids received after that time will not be accepted.
The bids will be publicly opened and read aloud at City of League City, Johnnie Arolfo Civic Center, 400 West Walker Street, League City, Texas 77573 starting promptly at 2:10pm to allow staff to transport the submissions. Bids sent via courier must be sealed in a separate envelope inside of the mailer. The Bidder shall furnish all labor, materials, and equipment and perform all work for the construction of the following project:
Dallas Salmon Wastewater Treatment Plant – Influent Lift Station Rehabilitation
WW2103B
Bid#26-042
The project consists of the following scope of work:
1. Installation of bypass pumping systems as required on the influent gravity raw sewage collection sewers. Connection to existing SCADA system for temporary equipment notification.
2. Removal of existing submersible pumps and proper storage. Reinstall submersible pumps and connect electrical cables upon completion of rehabilitation work.
3. Blast cleaning and pressure wash cleaning of all wet wells in preparation for structural repair methods.
4. Dewatering and drying of existing wet wells. Inspect existing pump base elbows.
5. Installation of additional reinforcing steel and buildup of lower concrete walls. Repair of upper concrete walls and roof ceiling surface. Installation of a coating system to prevent future H2S corrosion reactions.
6. Installation of new flood resistant access hatches at the JB and ILS. Also install new vent assemblies raised to be protected from the current 500-year flood plain.
7. Installation of new wet well type 316L stainless steel piping, guide rails, guide rail support brackets, new engineered pipe supports, etc.
8. Installation of new gusset plates and tie rods on all pump riser piping couplings and on the 30-inch force main header; 3 places. Blast and paint all above ground piping and valves and paint with stencil label. Existing monorail structural support and beams to be blasted and repainted.
9. New level instrumentation and water proofing details with all associated electrical and instrumentation work.
Bid documents may be obtained from http://leaguecitytx.gov/bids.aspx as well as www.CivcastUSA.com, search League City, Galveston County. Bidders must register on this website in order to view and/or download specifications, plans, and bid documents for this project. There is NO charge to view or download documents.
All inquiries about this bid or specifications must be made in writing to Mr. Brent Nicholas, P.E. at
Bnicholas@ardurra.com and respectively, as well as the League City Purchasing Department, at purchasing@leaguecitytx.gov. The city shall not be responsible for any verbal communication mailto:Bnicholas@ardurra.com mailto:purchasing@leaguecitytx.gov
NTB-2
between any employee of the City and any potential firm. Only written requirements and qualifications will be addressed.
An optional pre-bid conference will be held September 8, 2026, at 2:00 p.m., at the City of League
City, Johnnie Arolfo Civic Center, 400 West Walker St., League City, Texas 77573. The pre-bid conference will be followed by a site at 703 N. Wisconsin Ave., League City, Texas 77573.
Prospective Bidders are invited to attend. Failure to attend will not bar Bidders. The cutoff for questions will be 5 p.m. on Monday, September 14, 2026.
A cashier’s check or Certified Check from a Texas Bank, or acceptable Bid Bond from a reliable surety company authorized to do business in Texas, payable to the City of League City, in an amount not less than 5% of the maximum Bid price submitted, must accompany each Bid as a guarantee that, if awarded the contract, the bidder will, within 10 calendar days of Award of Contract, enter into a
Contract and execute Bonds on the forms provided in the Contract Documents. The Bidder’s deposit shall be forfeited and become the property of the OWNER in the event the Bidder neglects or refuses to enter into a contract and to furnish bonds acceptable to the OWNER within 10 calendar days after receipt of Notice to Award from the OWNER. The Bid Deposit of all except the three lowest Bidders will be returned within 10 calendar days after the opening of the bids. The Bid Deposit of the three lowest bidders will be returned within 7 working days after the executed contract and required Bonds have been fully approved by the OWNER.
The successful Bidder must furnish PERFORMANCE, PAYMENT and MAINTENANCE BONDS on the forms furnished with the PROPOSAL, in the amount of 100% of the total contract price, from a surety company holding a permit from the State of Texas to act as surety. The surety company must have a minimum Best Key Rating of “B”, or if the surety company does not have such a rating due to the length of time it has existed, the surety company must be eligible to participate in the surety bond guarantee program of the Small Business Administration and must be an approved surety listed in the current U.S. Department of Treasury Circular 570, and must meet all of the related rules and regulations of the Treasury Department. The surety company and the agency or agent issuing the
PAYMENT, PERFORMANCE and MAINTENANCE BONDS must be authorized to issue and sign
PAYMENT, PERFORMANCE and MAINTENANCE BONDS in Texas in an amount equal to, or greater than, the total Contract price.
Upon consideration of the proposals the City Council plans to award a Contract; however, the City reserves the right to reject any and all bids, to waive any and all irregularities and technicalities, and to accept any bid which it deems advantageous to it. Each bidder agrees to waive any claim it has or may have against the Owner, the Engineer, and their respective employees, arising out of or in connection, with the administration, evaluation, or recommendation of any bid.
First Publication: August 21, 2026 Second Publication: August 28, 2026
City of League City, TX
Dallas Salmon WWTP Influent Lift Station Rehabilitation
GIB-1
GENERAL INSTRUCTION TO BIDDERS
1. SCOPE OF WORK
The work to be done under the contract documents is included in the bid proposal.
(CIP PROJECT #WW2103B)
Bid No. 25-039
The Contractor shall furnish all labor, superintendence, machinery, equipment and all materials necessary to complete this project in accordance with the contract documents.
2. COMPLIANCE WITH CONTRACT DOCUMENTS
All work covered by this Contract shall be done in accordance with the contract documents as described in the General Conditions.
All bidders shall be thoroughly familiar with all of the requirements set forth in the contract documents for the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by said contract documents.
3. PLANS FOR USE BY BIDDERS
It is the intent of the Owner that all parties interested in submitting a bid on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid. The contract documents may be examined without charge as noted in the Notice to Bidders. Any party wishing to purchase a hard copy of the contract documents, including all plans and specifications, may do so with a request and payment of printing cost.
4. INTERPRETATION OF TECHNICAL SPECIFICATIONS, PLANS AND OTHER
DOCUMENTS
Bidders desiring additional information or clarification of technical specifications, plans or other documents must make written requests for such information to the Engineer as the
Owner's representative by the cut-off date, and time, as indicated in the Notice to Bidders.
Answers to all such requests will be given in writing, in addendum form, to all bidders, and all addenda will be bound with and become a part of the contract documents. No written or oral explanation or interpretation except that which is provided by the addenda prepared by the Engineer will be considered official or binding. If the bidder should find discrepancies in or omissions from the technical specifications or plans, or should some doubt exist as to their meaning, the bidder shall notify the Engineer in writing so that a written addendum may be sent to all bidders. It is the responsibility of the bidders to know if they have received all
Dallas Salmon Wastewater Treatment Plant
Influent Lift Station Rehabilitation
Bid No.26-042
GIB-2
such addenda. A complete file on all addenda issued will be maintained at the Engineer's office. In the event a bidder shall fail to seek clarification or interpretation of any part or portions of the technical specifications, plans or other documents, such bidder shall be presumed to have full knowledge of the interpretation by the Engineer.
5. CONDITIONS OF WORK
Each bidder shall fully inform himself of the construction and working conditions under which the work will be performed. Bidders shall inspect the site and thoroughly familiarize themselves with the full bid documents including technical specifications and plans. Failure to do so will not relieve a successful bidder of his obligation to perform the work in accordance with contractual requirements. It is understood that the bid prices shall include the furnishing of all superintendence, labor, material, machinery, equipment, tools, transportation, services and other means of construction, including parts, incidentals and appurtenances, as necessary to complete the work in accordance with the contract documents, technical specifications and plans.
Bidder should carefully examine the bidding documents and the site to determine the actual conditions under which work will be done. Data in the bidding documents pertaining to existing conditions is for convenience only and does not supplant obtaining firsthand information at the site. Submission of a bid constitutes acceptance by the bidder of existing site conditions as part of the requirements of this work.
6. SUBSURFACE INFORMATION
Any information provided in regard to subsurface data, test borings, etc., is to be considered approximate. Soil reports, if any, that the Engineer has obtained for this project will be provided to the bidders for their use. The interpretation of soil information, results of soil borings, etc., is in no way guaranteed.
7. OPEN SPECIFICATIONS
Where equipment or materials are specified by a trade or brand name, it is not the intention of the Owner to discriminate against an equal product of another manufacturer but rather to set a definite standard of quality and/or performance and to establish an equal basis for the evaluation of bids. Where the words "equivalent" or "equal to" are used, they shall be understood to mean that the thing referred to shall be, in the opinion or judgment of the
Engineer, the equivalent of or equal to the product or item specified by name. Unless otherwise specified, all materials shall be the best of their respective kinds and shall be, in all cases, fully equivalent to approved samples. Notwithstanding that the words "equivalent", "equal to" or other such expressions may be used in the specifications in connection with a material, manufactured article or process, the material, article or process specifically designated shall be used unless a substitute shall be approved in writing by the Engineer.
The Engineer has the right to require the use of such specifically designated materials, articles or processes.
GIB-3
8. PREPARATION OF BID PROPOSAL
Unless otherwise directed in the Notice to Bidders, bids shall be submitted in duplicate upon forms furnished by the Owner or copies thereof. All bids shall be prepared in compliance with the requirements of the Notice to Bidders, these instructions and any instructions printed on the prescribed forms. All blank spaces in the form shall be correctly filled in, and the bidder shall state the price(s) both in words and in numerals, for which he proposes to do the work contemplated or to furnish the materials required. Such prices shall be written in ink, distinctly and legibly, or typewritten. Amounts shall be extended and totaled, and no change shall be made in the phraseology of the form or of the bid items thereon. In case of discrepancy between the price written in words and the price written in figures, the price written in words shall govern. If optional items are shown on the bid form and the bidder elects not to bid on such optional items, then "No Bid" must be entered in the blank spaces provided. If a space is left blank on the bid form, the Owner will interpret such blank as a
"No Bid".
The bidder must sign the bid proposal in ink in the space provided on the bid form; unsigned bids will not be accepted. If the proposal is submitted by an individual, his name must be signed by him or his duly authorized agent. A bid submitted by a sole proprietorship must be signed by the proprietor and must clearly set out the name under which the proprietor is conducting business. If the proposal is submitted by a firm, association or partnership, then the name and address of the firm, association or partnership must be shown together with the name and address of each member, and the proposal must be signed by a member of the firm, association or partnership or other person duly authorized.
If the proposal is submitted by a company or corporation, the company or corporate name and business address, the name of the registered agent, the address of the registered office, and the names, addresses and offices of each corporate officer, must be given. Bids submitted by a corporation must be signed by an officer of the corporation having the authority to execute such documents for the corporation, which authority is granted either by the corporate charter, the by-laws of the corporation or a resolution of the board of directors of the corporation, and shall specify under what authority the proposal is signed; the proposal shall be attested to by the secretary or an assistant secretary of the corporation, and the corporate seal shall be affixed thereto.
Powers of attorney authorizing agents or others to sign proposals must be properly certified and must be in writing and submitted with the proposal.
Each bid proposal shall be enclosed in a sealed envelope and submitted in duplicate, addressed as specified in the Notice to Bidders and bearing the bidder's name and the notation "Bid Enclosed”
GIB-4
9. BID BOND REQUIRED
Each bidder is required to submit with each bid a cashier’s check or Certified Check from a
Texas Bank, or acceptable Bid Bond from a reliable surety company authorized to do business in Texas, payable to the City of League City, in an amount not less than 5% of the maximum Bid price submitted, as a guarantee that, if awarded the contract, the bidder will, within 10 calendar days of Award of Contract, enter into a Contract and execute Bonds on the forms provided in the Contract Documents. The Bidder’s deposit shall be forfeited and become the property of the OWNER in the event the Bidder neglects or refuses to enter into a contract and to furnish bonds acceptable to the OWNER within 10 calendar days after receipt of Notice to Award from the OWNER. The Bid Deposit of all except the three lowest
Bidders will be returned within 10 calendar days after the opening of the bids. The Bid
Deposit of the three lowest bidders will be returned within 7 working days after the executed contract and required Bonds have been fully approved by the OWNER.
10. FINANCIAL STATEMENT
Each bid must be accompanied by a financial statement of the bidder as reflected by his most recently prepared statement; the financial statement submitted must be current and shall not have been prepared prior to twelve (12) months immediately preceding the date specified for receipt of bids. The financial statement shall be submitted in a sealed envelope, properly identified as to contents and project description. The bidder's financial statement will be examined only if the bid submitted is actively considered for award; otherwise, it will be returned unopened after the execution of the Contract.
11. DELIVERY OF BIDS
It is the bidder's responsibility to deliver his bid in accordance with the instructions contained in the Notice to Bidders. Bids dispatched but not received by the date and time specified will be returned unopened upon receipt.
The City will receive bids electronically through www.publicpurchase.com or hard copies delivered to Purchasing Department. Instructions for Public Purchase can be found on
Attachment B. Hard copies must be submitted with one (1) marked original, one (1) marked copy properly labeled and clearly marked with the Bid Number, CIP Number, and description, directed to:
Purchasing Department
300 W. Walker St.
League City, Texas 77573
Monday – Thursday: 7:30 am to 5:30 pm
Friday: 7:30 am to 12:00 pm
If the bid is submitted electronically through Public Purchase, a hard copy of the bid bond must be received to the Purchasing Department prior to the bid opening.
http://www.publicpurchase.com/
GIB-5
Bids sent via courier must be sealed in a separate envelope inside of the mailer. Mark envelope/package with Bid Number and name. The Bidder shall furnish all labor, materials, and equipment and perform all work for the construction of the following project:
Bid No. 25-039
12. BID MODIFICATIONS
At any time prior to the deadline set for receipt of bids, a bid may be withdrawn and resubmitted by submitting a written request to do so to the person who holds the bid, but no proposal may be altered after the closing time set for receipt of bids. In addition, any bidder may modify his bid by telegraphic communication or by any available means of written or mechanically printed communication at any time prior to the scheduled closing time, provided such communication is received by the Owner at the City of League City’s
Purchasing Office prior to the deadline set for receipt of bids and provided further that if written confirmation of the modification, over the actual signature of the bidder, has not been delivered into the hands of the Owner prior to the closing time, the Owner is satisfied that such written confirmation, over the actual signature of the bidder, was mailed prior to the closing time as determined from an examination of the postmark. If signed written confirmation is not received within two (2) days from the closing time, no consideration shall be given to such modification. Receipt of a bid modification by any other employee, office or division of the Owner shall not constitute receipt by the Owner, and it shall be the sole responsibility of the bidder to verify or confirm that any such modification has in fact been received by the City of League City’s Purchasing Office prior to the deadline.
13. WITHDRAWAL OF BID
At any time prior to the time set for opening of the bids, a bid proposal may be withdrawn by submitting a written request to do so to the person who holds the bid.
14. REJECTION OF IRREGULAR OR IMPROPER BID
Any bid which contains any omission, alteration, erasure, addition or change of any nature, or which does not include prices for each and every bid item (excluding optional items) may, at the option of Owner, be deemed irregular. In order for any such bid to be considered, any alteration, erasure or other change must be initialed by the bidder prior to submission of the bid. In addition, any bid in which the prices are obviously unbalanced or which fails in any manner to conform to the bidding procedures as set forth may be considered irregular. Any bid proposal which is deemed irregular may be rejected and returned to the bidder without being considered.
Bid No.26-042
GIB-6
Further, any proposal containing any conditions which provide for changes in the stated bid price due to increases or decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the bidder without being considered.
Failure to provide the required number of calendar days for project completion will result in disqualification of the bid.
15. OWNER’S RIGHT TO REQUIRE ADDITIONAL INFORMATION
The Owner reserves the right, after the bids have been opened and before the contract has been awarded, to conduct such investigations as the Owner deems necessary to assist in the evaluation of the bids and to establish the responsibility, qualifications and financial ability of bidders, proposed subcontractors, suppliers and other persons and organizations to perform the work in accordance with the Contract Documents; and to require of a bidder additional information to aid in the evaluation of the bid and the bidders qualifications including but not limited to the following information:
(a) The experience record of the bidder and key subcontractors, suppliers and other persons showing completed jobs of similar scope and work requirements to the one covered by the proposed Contract and all work in progress with bond amounts and percentage completed.
(b) A sworn statement of the current financial condition of the bidder, key subcontractors and suppliers,
(c) An equipment schedule.
16. AWARD OF CONTRACT
(a) Unless all bids are rejected, the Owner will award the Contract as promptly as possible, consistent with the time required for a thorough analysis of the bids submitted. However, the Owner reserves the right to delay award for ninety (90) days after receipt of bids. If no award is made within ninety (90) days after receipt of bids, a bidder may withdraw his bid without prejudice to himself by submitting a written request for its withdrawal to the person who holds the bid. The contract will be awarded to the lowest responsible, responsive bidder whose evaluation by Owner indicates to Owner that the award will be in the best interest of the project. The Contract will be awarded on the basis of all factors that are available to be judged by the Owner and deemed by the Owner to be of the greatest advantage to it, considering the type of work involved, the length of duration thereof, the elements of the bid, history and performance of bidders in previous jobs and other factors as shall be determined by the Owner. Each bidder agrees to waive any claim it has or may have against the Owner, the Engineer, and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any bid. The Owner reserves the right to reject any or all bids and to waive bid irregularities as the interest of the Owner may require. Also, the Owner reserves the right to reject the bid of any bidder if the Owner believes that it would not be in the best interest of the Project to make an award to that bidder, whether because the bid is not responsive, or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Discrepancies in the
GIB-7
multiplication of units of Work and unit prices will be resolved in favor of the unit prices.
Discrepancies between the indicated sum of any column of figures and the correct sum there of will be resolved in favor of the correct sums.
The amount of experience on projects similar in type, size and complexity as this project which the bidders and key subcontractors have and the degree of success on such projects may affect the award.
It is the Owner’s desire that the successful bidder and his key subcontractors be qualified and experienced in providing successful projects; that such successful bidder and key subcontractors have recent successful experience on several projects of similar size and nature as this project.
(b) The City may not execute the contract until it has received from the Bidder a completed, signed, TEC Form 1295 complete with a certificate number assigned by the Texas Ethics
Commission (“TEC”), pursuant to Texas Government Code § 2252.908 and the rules promulgated thereunder by the TEC. The Bidder understands that failure to provide said form complete with a certificate number assigned by the TEC will prohibit the City from executing the final contract.
17. CONTRACT SECURITY
When the Successful Bidder delivers the executed Standard Form of Agreement to Owner, it must be accompanied by the PERFORMANCE, PAYMENT, and MAINTENANCE
BONDS required by the Contract Documents. Bonds may be on the forms provided herein or an equal form containing no substantive changes, as determined by Owner. Bonds must be in the amount of 100% of the total contract price, from a surety company holding a permit from the State of Texas to act as surety. The surety company must have a minimum Best Key
Rating of “B”, or if the surety company does not have such a rating due to the length of time it has existed, the surety company must be eligible to participate in the surety bond guarantee program of the Small Business Administration and must be an approved surety listed in the current U.S. Department of Treasury Circular 570, and must meet all of the related rules and regulations of the Treasury Department. The surety company and the agency or agent issuing the PAYMENT, PERFORMANCE, and MAINTENANCE BONDS must be authorized to issue and sign PAYMENT, PERFORMANCE, and MAINTENANCE BONDS in Texas in an amount equal to, or greater than, the total Contract price.
18. BOUND COPIES OF CONTRACT DOCUMENTS
The Agreement, Bonds and all related contract documents will be prepared and signed in not less than five (5) multiple original counterparts. Each set of contract documents shall be bound (with binder bolts) and shall include the following:
(a) Notice to Bidders;
(b) General Instructions to Bidders.
(c) Subcontractors and Major Suppliers Form
GIB-8
(d) Bid Proposal.
(e) House Bill 89 Verification Document
(f) Public Information Act Form
(g) Performance, Payment and One Year Maintenance Bonds.
(h) Standard Form of Agreement.
(i) General Conditions of Agreements.
(j) Special Conditions.
(k) Technical Specifications (including plans and drawings),
(l) Insurance Certificates.
(m) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders.
The Owner will furnish the Contractor with three (3) sets of conforming contract documents, technical specifications and plans free of charge. Additional sets, if needed, can be obtained from the ENGINEER at the amount indicated in the Notice to Bidders. Plans and specifications for use during construction will only be furnished directly to the Contractor.
The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or others as required for proper prosecution of the work contemplated by the
Contractor.
19. TEXAS STATE SALES TAX
This Contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Tex. Tax Code §§ 151.301, 151.307, 151.309 and 151.311.
The Contractor must obtain a limited sales, excise and use tax permit or exemption certificate which shall enable him to buy the materials to be incorporated into the work without paying the tax at the time of purchase.
20. INSURANCE
The Contractor shall not commence work under this Contract until he has obtained all insurance as required in the General Conditions of Agreement, set forth in the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the Owner. Proof of coverage shall be furnished to the Owner and written notice of cancellation or any material change shall be provided to the Owner not less than thirty (30) days in advance of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the right to subrogation.
The insurance certificates furnished shall name the Owner, the Engineer, their agents and employees, as an additional insured and shall further state that all subcontractors are named as additional insured or, in the alternative, shall be accompanied by a statement from the
Contractor to the effect that no work on this particular project shall be subcontracted.
21. CONTRACTOR'S REPRESENTATIVE
GIB-9
The successful bidder shall be required to have a responsible local representative available at all times while the work is in progress under this Contract. The successful bidder shall be required to furnish the name, address and telephone number where such local representative may be reached during the time that the work contemplated by this Contract is in progress.
22. TIME AND ORDER FOR COMPLETION
The CONTRACTOR will determine the number of calendar days to achieve Substantial
Completion of the Work and will indicate this in the Bid Proposal, including application of topsoil and seed mix, after the date when the Contract Time began, and 30 calendar days to achieve Final Completion and meet all requirements for final payment.
For projects with a requirement of CALENDAR DAYS TO COMPLETE PROJECT and/or
TOTAL BID AMOUNT, the City will use the sum of $3,000 as the monetary value of a calendar day.
Bidders should be aware that the evaluation for the award may consider the number of days bid. The difference in the number of calendar days bid will be multiplied by the above stipulated calendar day value and added to each bidder’s base bid. This is also sometimes referred to as ‘A+B’ bidding.
Bidders should be aware that the OWNER expects timely completion of the contract within the timeframe indicated by the bidder in their bid. Consequently, bidders should be aware that the above stipulated value of a calendar day will be applied by the OWNER as liquidated damages for each calendar day the project is delayed in completion.
The CONTRACTOR will be permitted to prosecute the work in the order of his own choosing unless stated otherwise in the Contract Documents, provided, however, the
OWNER reserves the right to require the CONTRACTOR to submit a progress schedule of the work contemplated by the contract documents. In the event the OWNER requires a progress schedule to be submitted and it is determined by the OWNER that the progress of the work is not in accordance with such schedule, the OWNER may direct the
CONTRACTOR to take such action as the OWNER deems necessary to insure completion of the project within the time specified.
23. WORKING HOURS
All construction work under this contract shall be performed between the hours of 7:00 a.m.
and 6:00 p.m., Monday through Friday unless specific authorization is granted by the project representative after obtaining Owner’s concurrence, or unless extension of working hours is necessary either to avoid lengthy interruption of utility service to the Owner’s customers, or due to an emergency situation.
Construction work under this Contract requiring an on-site project representative will not be performed on weekends or holidays unless the following conditions exist:
GIB-10
(a) The project being constructed is essential to the Owner's ability to provide the necessary service to its citizens; or
(b) Delays in construction are due to factors outside the control of the Contractor. The
Contractor is approaching the penalty provisions of the Contract and can show that he has made a diligent effort to complete the Contract within the allotted time.
Before construction work requiring an on-site project representative is to be performed on weekends or holidays, the Contractor must notify the Owner's representative not less than three (3) full working days prior to the weekend or holiday he desires to do work and obtain written permission from the Owner's representative to do such work. The final decision on whether to allow construction work requiring an on-site project representative on weekends or holidays will be made by the Owner's representative in coordination with the Owner.
When such work is permitted, Contractor shall credit the Owner $50.00/hour by change order for site representation services for work on weekends or Legal Holidays.
The Contractor will not be permitted to work on any Holidays observed by the City. The
Contractor may request a list of the official City holidays at the pre-construction conference.
Construction work requiring an on-site project representative will be any work where excavation, installation of pipes, materials, backfill or paving surface material installation is occurring and any work where investigation processes or testing processes are occurring or are required.
In any event, if a condition should occur or arise at the site of this project or from the work being done under this Contract which is hazardous or dangerous to property or life, the
Contractor shall immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life.
24. MATERIALS AND WORKMANSHIP
The intent of these contract documents is that only materials and workmanship of the best quality and grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until completion of the project and acceptance by the Owner. The presence or absence of a representative of the
Owner on the construction site will not relieve the Contractor of full responsibility for complying with this provision. The specifications for materials and methods set forth in the contract documents provide minimum standards of quality which the Owner believes necessary to procure a satisfactory project.
GIB-11
25. GUARANTEES
All equipment and materials incorporated in the project and all construction shall be guaranteed against defective materials and workmanship. Prior to final acceptance, the
Contractor shall furnish the Owner with a Maintenance Bond which shall provide that the
Contractor shall remedy any defects in the work, at no cost to the Owner, and pay for any and all damages of any nature whatsoever resulting from such defects when such defects appear as a result of defective materials or workmanship within one (1) year from the date of final acceptance of the work.
26. PROTECTION OF THE WORK
The Contractor shall be responsible for the care, preservation, conservation and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities and all means of construction, and any and all parts of the work, whether the Contractor has been paid, partially paid or not paid for such work until the date the Owner issues its certificate of completion to the Contractor.
27. PROTECTION OF SUBSURFACE LINES AND STRUCTURES
It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construction of the project contemplated by these contract documents. The Owner will furnish Contractor with the approximate information of
City owned utility lines of which it has knowledge. However, such fact shall not relieve the
Contractor of his responsibilities aforementioned; the location and depth of utilities shown on any drawings must be regarded as approximate, and it shall be the responsibility of the
Contractor to determine for himself the exact location and depth of any utilities which exist in the project site. All such underground lines or structures cut or damaged by Contractor during the prosecution of the work contemplated by this Contract shall be repaired immediately by Contractor, at Contractor's expense, to the satisfaction of the Owner.
28. BARRICADES AND SAFETY MEASURES
The Contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger signals, and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary.
The Contractor will be held responsible for all damage to the work due to failure of barricades, signs and lights to protect it; and when damage is incurred, the damaged portion shall be immediately removed and replaced by Contractor at his own cost and expense. The
Contractor's responsibility for maintenance of barricades, signs and lights shall not cease until the date of issuance to Contractor of the Owner's certificate of acceptance of the project.
GIB-12
The Contractor will be held responsible for all damage to the work which may occur prior to final acceptance by the Owner regardless of the adequacy of protective barricades and lighting, and when damage is incurred, the damaged portion shall be immediately removed and replaced by Contractor at his own cost and expense.
29. EXPLOSIVES
The use of explosives shall not be permitted.
30. PAYMENT OF EMPLOYEES
The Contractor and each of his subcontractors agree to pay all employees engaged in work on the project under this Contract in full (less mandatory legal deductions), and further agree that no such employees shall look to the Owner for payment of wages or compensation earned by reason of such work.
31. PAYMENT TO CONTRACTOR
All payments due to Contractor shall be made in accordance with the provisions of the
General Conditions of Agreement of the contract documents.
32. AFFIDAVITS OF BILLS PAID
The Owner reserves the right, prior to final acceptance of this project or with the project’s pay estimate submitted each month, to require the Contractor to execute an affidavit certifying that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending of which the Contractor has been notified.
33. QUESTIONS
Submit questions about bidding documents to the Engineer. Inquiries are permitted until the cut-off date, and time, as indicated in the Notice to Bidders. Necessary replies will be issued to bidders of record as addenda, which become a part of the bidding documents. Oral instructions do not form a part of the bidding documents. Bidders should contact the
Engineer not less than 48 hours before bid opening to secure any addenda that may affect bidding.
34. LIST OF SUBCONTRACTORS AND MAJOR SUPPLIERS
With the bid, submit a list of subcontractors for major portions of the work and major suppliers. Give the names and addresses of the selected subcontractors and major suppliers listed in the bid proposal. Include on the list all “local” subcontractors and major suppliers.
“Local” shall be defined as those subcontractors and major suppliers whose principal business location is in Galveston County. The “Subcontractors and Major Suppliers Form” is
GIB-13
provided at the conclusion of the “General Instructions to Bidders” section and shall be attached to Bid.
35. STATEMENT OF QUALIFICATIONS
Each bid must be accompanied by a statement of the qualifications of the Bidder to properly execute the work. No bid will be considered unless such a statement is submitted. Include in the statement of qualifications a list of ten (10) references minimum. The references shall consist of projects of similar nature, cost of the project, Owner's name, Engineer or prime contact and telephone number. The statement of qualifications shall also include the following:
• Organization available for the work contemplated on this project:
- Available Manpower Description
- Available Equipment Description
• Equipment Resources
- Provide total list of firm’s equipment
The amount of experience on projects similar in type, size and complexity as this project which the bidders and key subcontractors have and the degree of success on such projects may affect the award.
It is the Owner’s desire that the successful bidder and his key subcontractors be qualified and experienced in providing successful projects; that such successful bidder and key subcontractors have recent successful experience on several projects of similar size and nature as this project.
36. SUPPLEMENTAL PAY ITEMS AND MINIMUM UNIT PRICE BID ITEMS
Approximate quantity and a minimum unit price have been established for certain supplemental items and for certain base bid items shown in the bid proposal section. The
Contractor may not bid a unit price less than the minimum value; however, he may increase the minimum unit price. If no entry is made in the spaces provided, the minimum unit prices shown shall apply. The supplemental pay items are included to facilitate payment for changes and alterations that may be required to complete work. The actual work as provided by the General and Special Conditions of the Agreement and Technical Specifications and as shown on Plans is described in Proposal items other than supplemental pay items. When work covered by supplemental items is requested by the Contractor and approved by Owner, payment will be based on the quantity actually constructed and unit prices bid in Proposal.
GIB-14
37. PRE BID CONFERENCE
The pre-bid conference is not mandatory.
38. All Bidders are required to submit the following with their bid:
a) Completed Bid Cover Sheet
b)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .