Snap_Hank_SOW_(2).doc
DOC document 41 KB Posted
- Attached to
- Jib Hanks for USCGC EAGLE (WIX 327)
- Solicitation number
- 2315855XQE460
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_Jib_Hanks_Page_2.pdf | ||
| RFQ_Jib_Hanks_Page_3.pdf | ||
| RFQ_Jib_Hanks_Page_1.pdf | ||
| Snap_Hank_pic.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
USCGC EAGLE (WIX 327)
General Specifications This statement of work solicits the competitive quotes for the making of Jib Hanks.
1.0
General
1.1 This statement of work solicits competitive quotes for the making of Jib Hanks.
1.2 The bidding closing date is 20 August 2015.
1.3 Bids must be received at: Chelsea.S.Kariam@uscg.mil by the quote closing date.
1.4 The Contracting Officer (KO) for this contract is SK2 Chelsea S. Kariam who can be reached via email at Chelsea.S.Kariam@uscg.mil The Contracting Officer’s Technical Representative (COTR), BMC John Elsbree, can be reached via email at John.T.Elsbree@uscg.mil. The alternate Contracting Officer’s Technical Representative is Mr. Erin Stapleton who can be reached via email at Erin.M.Stapleton@uscg.mil.
2.0 Construction Specification
2.1 Selected contractor will construct the Jib Hank with the following dimensions.
2.1.1 Jib Hanks will be constructed from bronze with an inner diameter of 2.25”, a jaw opening of 1.125”, with a .5” pin diameter. Refer to enclosure 1 for further details.
2.2 The contractor may deviate for the attached specifications to take advantage of new technologies or enhanced construction processes, however, any deviation from these specifications must be recommended by the COTR and approved by the KO before implementation.
2.3 Request 70 small jib hanks matching the characteristics in 2.1.1 and enclosure 1.
3.0 Site Visitation and Inspection 3.1 In order to evaluate materials, workmanship and progress, the contractor will allow reasonable access by the COTR or other USCGC EAGLE personnel to the construction facilities.
4.0 Delivery and Acceptance
4.1 The final acceptance/delivery date for the Jib Hanks is 05 October 2015. Delivery may be coordinated with the COTR to the ships location at the US Coast Guard Yards at 2401 Hawkins Point Road, Baltimore, MD 21226.
4.2 Transportation expenses for delivery of the completed Jib Hanks will be paid by CGC Eagle but return of unsatisfactory Jib Hanks shall be borne by the contractor.
Enclosures
1. Jib Hank Photograph
File details come from the government source that posted it. Updated .