225 MP YRRP PWS.pdf
PDF 1 MB Posted
- Attached to
- G1, 225 MP Yellow Ribbon
- Solicitation number
- W912LR23R0082
- Issued by
-
Department of the Army National Guard
About this file
This performance work statement outlines requirements for a 225 MP Yellow Ribbon Reintegration Program contract opportunity with the Department of the Army National Guard. The contractor will be required to develop a quality control plan within five calendar days of award to ensure compliance with contract requirements. Key deliverables include providing a contract manager within three days of award and ensuring all contractor personnel identify themselves as such in interactions with government entities. The contractor must safeguard all government property and secure facilities at the close of each work period. The government will evaluate performance in accordance with the quality assurance surveillance plan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912LR23R0082 225MP YRRP.pdf | ||
| W912LR23R0082 Combo - Solicitation 225MP YRRP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ver. October 2022
FY 2008 National Defense Authorization Act, Public Law 110- 181, Section 582);
re how it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary. After acceptance of the QCP, the contractor changes to its QCP.
1.4.4 Quality Assurance (QA). The Government shall eval
performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).
1.4.5 Installation Access and Security Requirements. None
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Key Control: None
1.4.7 Special Qualifications: None
1.4.9 Contract Manager (CM): The shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO within 3 calendar days after contract award. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, (or the KO if a COR is not assigned), to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is displayed in all correspondence types (to include signature blocks on e- mail) and dealings with Government or non-Government entities/ Contractor personnel shall wear
6Ver. October 2022
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference / Deliverable Title
Frequency Number of Copies
Medium/ Format
Submit To
1.4. Quality
Control Plan
Provide within 5 calendar days after Contract Award
1 Electronic Submissio n
KO
. Post Award onference and
Minute
As schedule prior to start contract
1 Electronic Submissio n
KO 1. Contract Manager
Provide within 3 calendar days after Contract Award
1 Electronic Submissio n
CORIdentification of Contractor Personnel
At all times during event
1 Electronic Submissio n
COR.
Identification
Contract1.
Quality1.4.
File details come from the government source that posted it. Updated .