Contract 220000001407 is an indefinite delivery vehicle (IDV) between the State of Michigan Department of Transportation (MDOT) and Greenscape General Contracting LLC, a Michigan-based contractor. The contract was executed on September 7, 2022, with an initial five-year term expiring September 6, 2027, and includes three optional one-year renewal periods exercisable at the State's sole discretion. The contract has been modified three times through change notices, with the most recent modification effective October 25, 2024. The estimated aggregate contract value is $7,742,250.00, representing an increase of $5,000,000 from the initial contract value of $2,742,250, approved by the State Administrative Board on January 4, 2024. MDOT's Program Manager is Justin Droste (MDOT TSMO), and the Contract Administrator is Ruth Thole (MDOT CSD).
The contract provides for the design, manufacture, delivery, and installation of precast concrete vault restroom buildings manufactured by CXT, Inc. at Michigan roadside parks across six MDOT regions (Bay, Grand, North, Southwest, Superior, and University). Pricing is regional and firm for 365-day periods, ranging from $74,000 to $86,300 per building installation in the current pricing schedule, with separate line items for the building ($69,000-$81,300) and excavation, installation, and finishing ($5,000). Contract activities must be completed within 165 calendar days from receipt of delivery order. The contractor must provide performance and lien bonds each equal to 25 percent of the total contract price, maintain comprehensive insurance coverage, provide a twenty-year warranty on concrete components and one-year warranty on non-concrete components, and is subject to liquidated damages of $5,000 plus $100 per day for late or improper completion. Delivery is F.O.B. destination with all shipping costs included in pricing. Payment terms are Net 45 days via electronic funds transfer.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT CHANGE NOTICE
Change Notice Number 3 .
to
Contract Number 220000001407.
C O
N T
R A
C T
R
In fo rm a ti o n
Brian Cataldo dba Greenscape General Contracting
S T
A
E
P ro g ra m
M a n a g e r Justin Droste MDOT TSMO
8360 W. Ludington Dr. 517-636-0518
Lake, MI 48632 DrosteJ@michigan.gov
CV0035958
C o n tr ct
A d m in is tr a to r Ruth Thole MDOT CSD
C o n tr m in is tr a to r Brian Cataldo 517-335-4972
989-544-2489 TholeR@michigan.gov brian@greenscapegc.com
CONTRACT SUMMARY
Precast Vault Restroom Buildings with Installation at Roadside Parks
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE
INITIAL AVAILABLE
OPTIONS
EXPIRATION DATE BEFORE
CHANGE(S) NOTED BELOW
September 7, 2022 September 6, 2027 3; 1-year September 6, 2027
PAYMENT TERMS DELIVERY TIMEFRAME
Net 45 165 Days
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
☐ P-card ☐ Direct Voucher (DV) ☐ Other ☐ Yes ☒ No
MINIMUM DELIVERY REQUIREMENTS
DESCRIPTION OF CHANGE NOTICE
OPTION LENGTH OF OPTION EXTENSION
LENGTH OF
EXTENSION
REVISED EXP. DATE
☐ ☐ No change
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
$7,742,250.00 $0.00 $7,742,250.00
Effective October 25, 2024, Schedule A, Section 1.5. Non-Standard Site Work is amended to add contingencies and miscellaneous expenses related to Contract Activities. The amended section is as follows:
1.5. Non-Standard Site Work. Occasionally a site location may require work, contingencies, and/or miscellaneous expenses that are beyond the standard excavation, installation, and finishing as defined in Section 1.4. Non-standard work, contingencies, or miscellaneous expenses may include, but are not limited to, installation or replacement of concrete approaches, crane matting, crane rental, unusual excavation, and removal of existing restroom building. The Contractor must provide a price quote for any non-standard site work which must be approved by MDOT. All agreed upon non-standard work will require an individual delivery order and invoice per site, separate from the Building and standard Excavation, Installation, and Finishing work items.
All other terms, conditions, and specifications remain the same. Per contractor and agency agreement.
STATE OF MICHIGAN PROCUREMENT
Department of Transportation 425 West Ottawa Street., Lansing, MI 48933 P.O. Box 30050, Lansing, MI 48909
Change Notice Number 2 .
N T
R A
C T
In fo rm a ti o n
A g n a g e r Justin Droste MDOT TSMO
8360 W. Ludington Dr. 517-636-0518
Lake, MI 48632 DrosteJ@michigan.gov
CV0035958
C o n tr a c t
A d m in is tr a to r Ruth Thole MDOT CSD
C o n tr a c t
A d m in is tr a to r Brian Cataldo 517-335-4972
989-544-2489 TholeR@michigan.gov brian@greenscapegc.com
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE
INITIAL AVAILABLE
OPTIONS
EXPIRATION DATE BEFORE
CHANGE(S) NOTED BELOW
September 7, 2022 September 6, 2027 3; 1-year September 6, 2027
PAYMENT TERMS DELIVERY TIMEFRAME
Net 45 165 Days
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
LENGTH OF
EXTENSION
REVISED EXP. DATE
☐ ☐ No change
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
$2,742,250.00 $5,000,000.00 $7,742,250.00
Effective January 8, 2024, the following changes are made to this Contract:
1. Prices are increased per the attached Revised Schedule B.
2. The Contract Value is increased to cover the increased price and anticipated purchases during the remainder of the contract term. The estimated number of buildings to be purchased has significantly increased from the estimated number used for the RFP process.
3. The MDOT Program Manager is changed to Justin Droste.
All other terms, conditions, and specifications remain the same. Per contractor and agency agreement and State Administrative Board approval on January 4, 2024.
CHANGE NOTICE NO. 2 TO CONTRACT NO. 220000001407
FOR THE CONTRACTOR:
Company Name
Authorized Agent Signature
Authorized Agent (Print or Type)
FOR THE STATE:
Signature
For Director Michigan Department of Transportation Agency
CHANGE NOTICE NO. 2 TO CONTRACT NO. 220000001407
REVISED SCHEDULE B – PRICING
PRICE SCHEDULE
BAY REGION
Total price for building in Bay Region $84,584.50
Excavation, Installation, Finishing $5,000.00
Total Building & Install $89,584.50
GRAND REGION
Total price for building in Grand Region $84,584.50
Excavation, Installation, Finishing $5,000.00
Total Building & Install $89,584.50
NORTH REGION
Total price for building in North Region $89,079.90
Excavation, Installation, Finishing $5,000.00
Total Building & Install $94,079.90
SOUTHWEST REGION
Total price for building in Southwest Region $81,627.00
Excavation, Installation, Finishing $5,000.00
Total Building & Install $86,627.00
SUPERIOR REGION
Total price for building in Superior Region $96,177.90
Excavation, Installation, Finishing $5,000.00
Total Building & Install $101,177.90
UNIVERSITY REGION
Total price for building in University Region $84,584.50
Excavation, Installation, Finishing $5,000.00
Total Building & Install $89,584.50
Revised 2/2019
Change Notice Number 1 .
N T
R A
C T
A g n a g e r James Roath MDOT
8360 W Ludington Dr. 517-230-5361
Lake, MI 48632 RoathJ1@michigan.gov
Brian Cataldo C o n tr m in is tr a to r Ruth Thole MDOT
989-544-2489 517-335-4972 brian@greenscapegc.com TholeR@michigan.gov
CV0035958
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE
INITIAL AVAILABLE
OPTIONS
EXPIRATION DATE BEFORE
CHANGE(S) NOTED BELOW
September 7, 2022 September 6, 2027 3; 1-year September 6, 2027
PAYMENT TERMS DELIVERY TIMEFRAME
Net 45 165 Days
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
LENGTH OF
EXTENSION
REVISED EXP. DATE
☐ ☐ No Change
CURRENT VALUE VALUE OF CHANGE NOTICE ESTIMATED AGGREGATE CONTRACT VALUE
$2,742,250.00 $0.00 $2,742,250.00
The following sections in Schedule A are revised to indicate the standard colors for walls and roofs:
Section 1.1.A. Standard board and batt texture upper walls and horizontal lap texture lower walls;
color must be Buckskin.
Section 1.1.B. Standard cedar shake roof; color must be Java Brown.
All other terms, conditions, specifications, and pricing remain the same. Per contractor and agency agreement.
STATE OF MICHIGAN PROCUREMENT
Department of Transportation
Revised 2/2019
CHANGE NOTICE NO. 1 TO CONTRACT NO. 220000001407
dba Greenscape General Contracting LLC
Date
Carol Rademacher for the Department Director Name & Title
9/26/2022
9/27/2022
NOTICE OF CONTRACT
NOTICE OF CONTRACT NO. 220000001407 .
between
THE STATE OF MICHIGAN
and
N T
R A
C T
A g n a g e r James Roath MDOT
8360 W. Ludington Dr. 517-230-5361
Lake, MI 48632 RoathJ1@michigan.gov
Brian Cataldo C o n tr m in is tr a to r Ruth Thole MDOT
989-544-2489 517-335-4972 brian@greenscapegc.com TholeR@michigan.gov
CV0035958
INITIAL EFFECTIVE DATE INITIAL EXPIRATION DATE
INITIAL AVAILABLE
OPTIONS
EXPIRATION DATE BEFORE
CHANGE(S) NOTED BELOW
September 7, 2022 September 6, 2027 3; 1-year
PAYMENT TERMS DELIVERY TIMEFRAME
Net 45 165 Days
ALTERNATE PAYMENT OPTIONS EXTENDED PURCHASING
☐ P-card ☐ Payment Request (PRC) ☐ Other ☐ Yes ☒ No
MISCELLANEOUS INFORMATION
This Contract Agreement is awarded on the basis of the inquiry bearing the solicitation number 220000002177 and State Administrative Board approval on August 30, 2022.
ESTIMATED CONTRACT VALUE AT TIME OF EXECUTION $2,742,250.00
425 W. Ottawa St., Lansing, MI 48933 PO Box 30050, Lansing, MI 48909
CONTRACT NO. 220000001407
dba Greenscape General Contracting LLC
Adam Feldpausch, for the Department Director Name & Title
9.5.22
9.6.22
Mich igan .gov/MiProcure ment
Contract 220000001407 3
STANDARD CONTRACT TERMS
This STANDARD CONTRACT (“Contract”) is agreed to between the State of Michigan (the “State”) and Greenscape General Contracting (the “Contractor”), a Michigan limited liability company. This Contract is effective September 7, 2022 (“Effective Date”), and unless terminated, expires on September 6, 2027.
This Contract may be renewed for up to three (3) additional one (1) year periods. Renewal is at the sole discretion of the State and will automatically extend the Term of this Contract. The State will document its exercise of renewal options via Contract Change Notice.
The parties agree as follows:
1. Duties of Contractor. Contractor must perform the services and provide the deliverables described in Schedule A – Statement of Work (the “Contract Activities”). An obligation to provide delivery of any commodity is considered a service and is a Contract Activity.
Contractor must furnish all labor, equipment, materials, and supplies necessary for the performance of the Contract Activities, and meet operational standards, unless otherwise specified in Schedule A.
Contractor must: (a) perform the Contract Activities in a timely, professional, safe, and workmanlike manner consistent with standards in the trade, profession, or industry; (b) meet or exceed the performance and operational standards, and specifications of the Contract; (c) provide all Contract Activities in good quality, with no material defects; (d) not interfere with the State’s operations; (e) obtain and maintain all necessary licenses, permits or other authorizations necessary for the performance of the Contract; (f) cooperate with the State, including the State’s quality assurance personnel, and any third party to achieve the objectives of the Contract; (g) return to the State any State-furnished equipment or other resources in the same condition as when provided when no longer required for the Contract; (h) not make any media releases without prior written authorization from the State; (i) assign to the State any claims resulting from state or federal antitrust violations to the extent that those violations concern materials or services supplied by third parties toward fulfillment of the Contract; (j) comply with all State physical and IT security policies and standards which will be made available upon request; and (k) provide the State priority in performance of the Contract except as mandated by federal disaster response requirements. Any breach under this paragraph is considered a material breach.
Contractor must also be clearly identifiable while on State property by wearing identification issued by the State, and clearly identify themselves whenever making contact with the State.
2. Notices. All notices and other communications required or permitted under this Contract must be in writing and will be considered given and received: (a) when verified by written receipt if sent by courier; (b) when actually received if sent by mail without verification of receipt; or (c) when verified by automated receipt or electronic logs if sent by facsimile or email.
Contract 220000001407 4
If to State: If to Contractor:
Ruth Thole MDOT Contract Services Division 425 W. Ottawa St.
Lansing, MI 48933 TholeR@michigan.gov 517-335-4972
Brian Cataldo Greenscape General Contracting LLC 8630 W. Ludington Dr.
Lake, MI 48632 brian@greenscapegc.com 989-544-2489
3. Contract Administrator. The Contract Administrator for each party is the only person authorized to modify any terms of this Contract, and approve and execute any change under this Contract (each a “Contract Administrator”):
State: Contractor:
Ruth Thole MDOT Contract Services Division 425 W. Ottawa St.
Lansing, MI 48933 TholeR@michigan.gov 517-335-4972
Brian Cataldo Greenscape General Contracting LLC 8630 W. Ludington Dr.
Lake, MI 48632 brian@greenscapegc.com 989-544-2489
4. Program Manager. The Program Manager for each party will monitor and coordinate the day-to-day activities of the Contract (each a “Program Manager”):
State: Contractor:
James Roath MDOT Maintenance Field Services 6333 Lansing Road Lansing, MI, 48917 RoathJ1@michigan.gov 517-230-5361
Brian Cataldo Greenscape General Contracting LLC 8630 W. Ludington Dr.
Lake, MI 48632 brian@greenscapegc.com 989-544-2489
5. Performance Guarantee. Contractor must at all times have financial resources sufficient, in the opinion of the State, to ensure performance of the Contract and must provide proof upon request. The State may require a performance bond (as specified in Schedule A – Statement of Work) if, in the opinion of the State, it will ensure performance of the Contract.
6. Insurance Requirements. Contractor, at its sole expense, must maintain the insurance coverage identified below. All required insurance must: (a) protect the State from claims that may arise out of, are alleged to arise out of, or otherwise result from Contractor's or a subcontractor's performance; (b) be primary and non-contributing to any comparable liability insurance (including self-insurance) carried by the State; and (c) be provided by a company with an A.M. Best rating of "A-" or better, and a financial size of VII or better.
mailto:TholeR@michigan.gov mailto:brian@greenscapegc.com mailto:TholeR@michigan.gov
Contract 220000001407 5
Required Limits Additional Requirements
Commercial General Liability Insurance
Minimum Limits:
$1,000,000 Each Occurrence $1,000,000 Personal & Advertising Injury $2,000,000 Products/Completed
Operations $2,000,000 General Aggregate
Contractor must have their policy endorsed to add “the State of Michigan, its departments, divisions, agencies, offices, commissions, officers, employees, and agents” as additional insureds using endorsement CG 20 10 11 85, or both CG 20 10 12 19 and CG 20 37 12 19.
Automobile Liability Insurance
Minimum Limits:
$1,000,000 Per Accident
Contractor must have their policy: (1) endorsed to add “the State of Michigan, its departments, divisions, agencies, offices, commissions, officers, employees, and agents” as additional insureds; and (2) include Hired and Non-Owned Automobile coverage.
Workers' Compensation Insurance
Minimum Limits:
Coverage according to applicable laws governing work activities.
Waiver of subrogation, except where waiver is prohibited by law.
Employers Liability Insurance
Minimum Limits:
$500,000 Each Accident $500,000 Each Employee by Disease $500,000 Aggregate Disease
7. Reserved.
8. Reserved.
9. Relationship of the Parties. The relationship between the parties is that of independent contractors. Contractor, its employees, and agents will not be considered employees of the State. No partnership or joint venture relationship is created by virtue of this Contract.
Contractor, and not the State, is responsible for the payment of wages, benefits and taxes of Contractor’s employees and any subcontractors. Prior performance does not modify Contractor’s status as an independent contractor. Neither party has authority to contract for nor bind the other party in any manner whatsoever.
10. Reserved.
11. Subcontracting. Contractor may not delegate any of its obligations under the Contract without the prior written approval of the State. Contractor must notify the State at least 90 calendar days before the proposed delegation and provide the State any information it requests to determine whether the delegation is in its best interest. If approved, Contractor must: (a) be the sole point of contact regarding all contractual matters, including payment and charges for all Contract Activities; (b) make all payments to the subcontractor; and (c) incorporate the terms and conditions contained in this Contract in any subcontract with a
Contract 220000001407 6 subcontractor. Contractor remains responsible for the completion of the Contract Activities, compliance with the terms of this Contract, and the acts and omissions of the subcontractor. The State, in its sole discretion, may require the replacement of any subcontractor.
12. Staffing. The State’s Contract Administrator may require Contractor to remove or reassign personnel by providing a notice to Contractor.
13. Background Checks. Pursuant to Michigan law, all agencies subject to IRS Pub. 1075 are required to ask the Michigan State Police to perform fingerprint background checks on all employees, including Contractor and Subcontractor employees, who may have access to any database of information maintained by the federal government that contains confidential or personal information, including, but not limited to, federal tax information.
Further, pursuant to Michigan law, any agency described above is prohibited from providing Contractors or Subcontractors with the result of such background check. For more information, please see Michigan Public Act 427 of 2018. Upon request, or as may be specified in Schedule A, Contractor must perform background checks on all employees and subcontractors and its employees prior to their assignment. The scope is at the discretion of the State and documentation must be provided as requested. Contractor is responsible for all costs associated with the requested background checks. The State, in its sole discretion, may also perform background checks.
14. Assignment. Contractor may not assign this Contract to any other party without the prior approval of the State. Upon notice to Contractor, the State, in its sole discretion, may assign in whole or in part, its rights or responsibilities under this Contract to any other party. If the State determines that a novation of the Contract to a third party is necessary, Contractor will agree to the novation and provide all necessary documentation and signatures.
15. Change of Control. Contractor will notify within 30 days of any public announcement or otherwise once legally permitted to do so, the State of a change in Contractor’s organizational structure or ownership. For purposes of this Contract, a change in control means any of the following: (a) a sale of more than 50% of Contractor’s stock; (b) a sale of substantially all of Contractor’s assets; (c) a change in a majority of Contractor’s board members; (d) consummation of a merger or consolidation of Contractor with any other entity; (e) a change in ownership through a transaction or series of transactions; (f) or the board (or the stockholders) approves a plan of complete liquidation. A change of control does not include any consolidation or merger effected exclusively to change the domicile of Contractor, or any transaction or series of transactions principally for bona fide equity financing purposes.
In the event of a change of control, Contractor must require the successor to assume this Contract and all of its obligations under this Contract.
16. Ordering. Contractor is not authorized to begin performance until receipt of authorization as identified in Schedule A.
17. Acceptance. Contract Activities are subject to inspection and testing by the State within 30 calendar days of the State’s receipt of them (“State Review Period”), unless otherwise provided in Schedule A. If the Contract Activities are not fully accepted by the State, the State will notify Contractor by the end of the State Review Period that either: (a) the
Contract 220000001407 7
Contract Activities are accepted but noted deficiencies must be corrected; or (b) the Contract Activities are rejected. If the State finds material deficiencies, it may: (i) reject the Contract Activities without performing any further inspections; (ii) demand performance at no additional cost; or (iii) terminate this Contract in accordance with Section 24, Termination for Cause.
Within 10 business days from the date of Contractor’s receipt of notification of acceptance with deficiencies or rejection of any Contract Activities, Contractor must cure, at no additional cost, the deficiency and deliver unequivocally acceptable Contract Activities to the State. If acceptance with deficiencies or rejection of the Contract Activities impacts the content or delivery of other non-completed Contract Activities, the parties’ respective Program Managers must determine an agreed to number of days for re-submission that minimizes the overall impact to the Contract. However, nothing herein affects, alters, or relieves Contractor of its obligations to correct deficiencies in accordance with the time response standards set forth in this Contract.
If Contractor is unable or refuses to correct the deficiency within the time response standards set forth in this Contract, the State may cancel the order in whole or in part. The State, or a third party identified by the State, may perform the Contract Activities and recover the difference between the cost to cure and the Contract price plus an additional 10% administrative fee.
18. Delivery. Contractor must deliver all Contract Activities F.O.B. destination, within the State premises with transportation and handling charges paid by Contractor, unless otherwise specified in Schedule A. All containers and packaging become the State’s exclusive property upon acceptance.
19. Risk of Loss and Title. Until final acceptance, title and risk of loss or damage to Contract Activities remains with Contractor. Contractor is responsible for filing, processing, and collecting all damage claims. The State will record and report to Contractor any evidence of visible damage. If the State rejects the Contract Activities, Contractor must remove them from the premises within 10 calendar days after notification of rejection. The risk of loss of rejected or non-conforming Contract Activities remains with Contractor. Rejected Contract Activities not removed by Contractor within 10 calendar days will be deemed abandoned by Contractor, and the State will have the right to dispose of it as its own property.
Contractor must reimburse the State for costs and expenses incurred in storing or effecting removal or disposition of rejected Contract Activities
20. Warranty Period. The warranty period, if applicable, for Contract Activities is a fixed period commencing on the date specified in Schedule A. If the Contract Activities do not function as warranted during the warranty period, the State may return such non-conforming Contract Activities to the Contractor for a full refund.
21. Invoices and Payment. Invoices must conform to the requirements communicated from time-to-time by the State. All undisputed amounts are payable within 45 days of the State’s receipt. Contractor may only charge for Contract Activities provided as specified in Schedule A. Invoices must include an itemized statement of all charges. The State is exempt from State sales tax for direct purchases and may be exempt from federal excise tax, if Services purchased under this Agreement are for the State’s exclusive use.
Notwithstanding the foregoing, all fees are exclusive of taxes, and Contractor is responsible for all sales, use and excise taxes, and any other similar taxes, duties and
Contract 220000001407 8 charges of any kind imposed by any federal, state, or local governmental entity on any amounts payable by the State under this Contract.
The State has the right to withhold payment of any disputed amounts until the parties agree as to the validity of the disputed amount. The State will notify Contractor of any dispute within a reasonable time. Payment by the State will not constitute a waiver of any rights as to Contractor’s continuing obligations, including claims for deficiencies or substandard Contract Activities. Contractor’s acceptance of final payment by the State constitutes a waiver of all claims by Contractor against the State for payment under this Contract, other than those claims previously filed in writing on a timely basis and still disputed.
The State will only disburse payments under this Contract through Electronic Funds Transfer (EFT). Contractor must register with the State at http://www.michigan.gov/SIGMAVSS to receive electronic fund transfer payments. If Contractor does not register, the State is not liable for failure to provide payment. Without prejudice to any other right or remedy it may have, the State reserves the right to set off at any time any amount then due and owing to it by Contractor against any amount payable by the State to Contractor under this Contract.
Excluding federal government charges and terms. Contractor warrants and agrees that each of the fees, economic or product terms or warranties granted pursuant to this Contract are comparable to or better than the equivalent fees, economic or product term or warranty being offered to any commercial or government customer (including any public educational institution within the State of Michigan) of Contractor. If Contractor enters into any arrangements with another customer of Contractor to provide the products or services, available under this Contract, under more favorable prices, as the prices may be indicated on Contractor’s current U.S. and International price list or comparable document, then this Contract will be deemed amended as of the date of such other arrangements to incorporate those more favorable prices, and Contractor will immediately notify the State of such fee and formally memorialize the new pricing in a change notice.
22. Liquidated Damages. Liquidated damages, if applicable, will be assessed as described in Schedule A. The parties understand and agree that any liquidated damages (which includes but is not limited to applicable credits) set forth in this Contract are reasonable estimates of the State’s damages in accordance with applicable law. The parties acknowledge and agree that Contractor could incur liquidated damages for more than one event. The assessment of liquidated damages will not constitute a waiver or release of any other remedy the State may have under this Contract for Contractor’s breach of this Contract, including without limitation, the State’s right to terminate this Contract for cause under Section 24 and the State will be entitled in its discretion to recover actual damages caused by Contractor’s failure to perform its obligations under this Contract. However, the State will reduce such actual damages by the amounts of liquidated damages received for the same events causing the actual damages. Amounts due the State as liquidated damages may be set off against any fees payable to Contractor under this Contract, or the State may bill Contractor as a separate item and Contractor will promptly make payments on such bills.
23. Stop Work Order. The State may suspend any or all activities under the Contract at any time. The State will provide Contractor a written stop work order detailing the suspension.
http://www.michigan.gov/SIGMAVSS
Contract 220000001407 9
Contractor must comply with the stop work order upon receipt. Within 90 calendar days, or any longer period agreed to by Contractor, the State will either: (a) issue a notice authorizing Contractor to resume work, or (b) terminate the Contract or delivery order. The State will not pay for Contract Activities, Contractor’s lost profits, or any additional compensation during a stop work period.
24. Termination for Cause. The State may terminate this Contract for cause, in whole or in part, if Contractor, as determined by the State: (a) endangers the value, integrity, or security of any location, data, or personnel; (b) becomes insolvent, petitions for bankruptcy court proceedings, or has an involuntary bankruptcy proceeding filed against it by any creditor; (c) engages in any conduct that may expose the State to liability; (d) breaches any of its material duties or obligations; or (e) fails to cure a breach within the time stated in a notice of breach. Any reference to specific breaches being material breaches within this Contract will not be construed to mean that other breaches are not material.
If the State terminates this Contract under this Section, the State will issue a termination notice specifying whether Contractor must: (a) cease performance immediately, or (b) continue to perform for a specified period. If it is later determined that Contractor was not in breach of the Contract, the termination will be deemed to have been a Termination for Convenience, effective as of the same date, and the rights and obligations of the parties will be limited to those provided in Section 25, Termination for Convenience.
The State will only pay for amounts due to Contractor for Contract Activities accepted by the State on or before the date of termination, subject to the State’s right to set off any amounts owed by the Contractor for the State’s reasonable costs in terminating this Contract. The Contractor must pay all reasonable costs incurred by the State in terminating this Contract for cause, including administrative costs, attorneys’ fees, court costs, transition costs, and any costs the State incurs to procure the Contract Activities from other sources.
25. Termination for Convenience. The State may immediately terminate this Contract in whole or in part without penalty and for any reason, including but not limited to, appropriation or budget shortfalls. The termination notice will specify whether Contractor must: (a) cease performance of the Contract Activities immediately, or (b) continue to perform the Contract Activities in accordance with Section 26, Transition Responsibilities.
If the State terminates this Contract for convenience, the State will pay all reasonable costs, as determined by the State, for State approved Transition Responsibilities.
26. Transition Responsibilities. Upon termination or expiration of this Contract for any reason, Contractor must, for a period of time specified by the State (not to exceed 90 calendar days), provide all reasonable transition assistance requested by the State, to allow for the expired or terminated portion of the Contract Activities to continue without interruption or adverse effect, and to facilitate the orderly transfer of such Contract Activities to the State or its designees. Such transition assistance may include, but is not limited to: (a) continuing to perform the Contract Activities at the established Contract rates; (b) taking all reasonable and necessary measures to transition performance of the work, including all applicable Contract Activities, training, equipment, software, leases, reports and other documentation, to the State or the State’s designee; (c) taking all necessary and appropriate steps, or such other action as the State may direct, to preserve, maintain, protect, or return to the State all materials, data, property, and confidential
Contract 220000001407 10 information provided directly or indirectly to Contractor by any entity, agent, vendor, or employee of the State; (d) transferring title in and delivering to the State, at the State’s discretion, all completed or partially completed deliverables prepared under this Contract as of the Contract termination date; and (e) preparing an accurate accounting from which the State and Contractor may reconcile all outstanding accounts (collectively, “Transition Responsibilities”). This Contract will automatically be extended through the end of the transition period.
27. Indemnification. Contractor must defend, indemnify and hold the State, its departments, divisions, agencies, offices, commissions, officers, and employees harmless, without limitation, from and against any and all actions, claims, losses, liabilities, damages, costs, attorney fees, and expenses (including those required to establish the right to indemnification), arising out of or relating to: (a) any breach by Contractor (or any of Contractor’s employees, agents, subcontractors, or by anyone else for whose acts any of them may be liable) of any of the promises, agreements, representations, warranties, or insurance requirements contained in this Contract; (b) any infringement, misappropriation, or other violation of any intellectual property right or other right of any third party; (c) any bodily injury, death, or damage to real or tangible personal property occurring wholly or in part due to action or inaction by Contractor (or any of Contractor’s employees, agents, subcontractors, or by anyone else for whose acts any of them may be liable); and (d) any acts or omissions of Contractor (or any of Contractor’s employees, agents, subcontractors, or by anyone else for whose acts any of them may be liable).
The State will notify Contractor in writing if indemnification is sought; however, failure to do so will not relieve Contractor, except to the extent that Contractor is materially prejudiced.
Contractor must, to the satisfaction of the State, demonstrate its financial ability to carry out these obligations.
The State is entitled to: (i) regular updates on proceeding status; (ii) participate in the defense of the proceeding; (iii) employ its own counsel; and to (iv) retain control of the defense, at its own cost and expense, if the State deems necessary. Contractor will not, without the State’s prior written consent (not to be unreasonably withheld), settle, compromise, or consent to the entry of any judgment in or otherwise seek to terminate any claim, action, or proceeding.
Any litigation activity on behalf of the State, or any of its subdivisions under this Section, must be coordinated with the Department of Attorney General. An attorney designated to represent the State may not do so until approved by the Michigan Attorney General and appointed as a Special Assistant Attorney General.
The State is constitutionally prohibited from indemnifying Contractor or any third parties.
28. Infringement Remedies. If, in either party’s opinion, any piece of equipment, software, commodity, or service supplied by Contractor or its subcontractors, or its operation, use or reproduction, is likely to become the subject of a copyright, patent, trademark, or trade secret infringement claim, Contractor must, at its expense: (a) procure for the State the right to continue using the equipment, software, commodity, or service, or if this option is not reasonably available to Contractor, (b) replace or modify the same so that it becomes non-infringing; or (c) accept its return by the State with appropriate credits to the State against Contractor’s charges and reimburse the State for any losses or costs incurred as a consequence of the State ceasing its use and returning it.
Contract 220000001407 11
29. Limitation of Liability and Disclaimer of Damages. IN NO EVENT WILL THE STATE’S
AGGREGATE LIABILITY TO CONTRACTOR UNDER THIS CONTRACT,
REGARDLESS OF THE FORM OF ACTION, WHETHER IN CONTRACT, TORT,
NEGLIGENCE, STRICT LIABILITY OR BY STATUTE OR OTHERWISE, FOR ANY
CLAIM RELATED TO OR ARISING UNDER THIS CONTRACT, EXCEED THE
MAXIMUM AMOUNT OF FEES PAYABLE UNDER THIS CONTRACT. The State is not liable for consequential, incidental, indirect, or special damages, regardless of the nature of the action.
30. Disclosure of Litigation, or Other Proceeding. Contractor must notify the State within 14 calendar days of receiving notice of any litigation, investigation, arbitration, or other proceeding (collectively, “Proceeding”) involving Contractor, a subcontractor, or an officer or director of Contractor or subcontractor, that arises during the term of the Contract, including: (a) a criminal Proceeding; (b) a parole or probation Proceeding; (c) a Proceeding under the Sarbanes-Oxley Act; (d) a civil Proceeding involving: (1) a claim that might reasonably be expected to adversely affect Contractor’s viability or financial stability; or (2) a governmental or public entity’s claim or written allegation of fraud; or (3) any complaint filed in a legal or administrative proceeding alleging the Contractor or its subcontractors discriminated against its employees, subcontractors, vendors, or suppliers during the term of this Contract; or (e) a Proceeding involving any license that Contractor is required to possess in order to perform under this Contract.
31. State Data. All data and information provided to Contractor by or on behalf of the State, and all data and information derived therefrom, is the exclusive property of the State (“State Data”); this definition is to be construed as broadly as possible. Upon request, Contractor must provide to the State, or a third party designated by the State, all State Data within 10 calendar days of the request and in the format requested by the State.
Contractor will assume all costs incurred in compiling and supplying State Data. No State Data may be used for any marketing purposes.
32. Reserved.
33. Non-Disclosure of Confidential Information. The parties acknowledge that each party may be exposed to or acquire communication or data of the other party that is confidential, privileged communication not intended to be disclosed to third parties. The provisions of this Section survive the termination of this Contract.
a. Meaning of Confidential Information. For the purposes of this Contract, the term “Confidential Information” means all information and documentation of a party that:
(a) has been marked “confidential” or with words of similar meaning, at the time of disclosure by such party; (b) if disclosed orally or not marked “confidential” or with words of similar meaning, was subsequently summarized in writing by the disclosing party and marked “confidential” or with words of similar meaning; and, (c) should reasonably be recognized as confidential information of the disclosing party. The term “Confidential Information” does not include any information or documentation that was:
(a) subject to disclosure under the Michigan Freedom of Information Act (FOIA); (b) already in the possession of the receiving party without an obligation of confidentiality;
(c) developed independently by the receiving party, as demonstrated by the receiving party, without violating the disclosing party’s proprietary rights; (d) obtained from a source other than the disclosing party without an obligation of confidentiality; or, (e)
Contract 220000001407 12 publicly available when received, or thereafter became publicly available (other than through any unauthorized disclosure by, through, or on behalf of, the receiving party).
For purposes of this Contract, in all cases and for all matters, State Data is deemed to be Confidential Information.
b. Obligation of Confidentiality. The parties agree to hold all Confidential Information in strict confidence and not to copy, reproduce, sell, transfer, or otherwise dispose of, give or disclose such Confidential Information to third parties other than employees, agents, or subcontractors of a party who have a need to know in connection with this Contract or to use such Confidential Information for any purposes whatsoever other than the performance of this Contract. The parties agree to advise and require their respective employees, agents, and subcontractors of their obligations to keep all Confidential Information confidential. Disclosure to a subcontractor is permissible where: (a) use of a subcontractor is authorized under this Contract; (b) the disclosure is necessary or otherwise naturally occurs in connection with work that is within the subcontractor's responsibilities; and (c) Contractor obligates the subcontractor in a written contract to maintain the State's Confidential Information in confidence. At the State's request, any employee of Contractor or any subcontractor may be required to execute a separate agreement to be bound by the provisions of this Section.
c. Cooperation to Prevent Disclosure of Confidential Information. Each party must use its best efforts to assist the other party in identifying and preventing any unauthorized use or disclosure of any Confidential Information. Without limiting the foregoing, each party must advise the other party immediately in the event either party learns or has reason to believe that any person who has had access to Confidential Information has violated or intends to violate the terms of this Contract and each party will cooperate with the other party in seeking injunctive or other equitable relief against any such person.
d. Remedies for Breach of Obligation of Confidentiality. Each party acknowledges that breach of its obligation of confidentiality may give rise to irreparable injury to the other party, which damage may be inadequately compensable in the form of monetary damages. Accordingly, a party may seek and obtain injunctive relief against the breach or threatened breach of the foregoing undertakings, in addition to any other legal remedies which may be available, to include, in the case of the State, at the sole election of the State, the immediate termination, without liability to the State, of this Contract or any Statement of Work corresponding to the breach or threatened breach.
e. Surrender of Confidential Information upon Termination. Upon termination of this Contract or a Statement of Work, in whole or in part, each party must, within 5 calendar days from the date of termination, return to the other party any and all Confidential Information received from the other party, or created or received by a party on behalf of the other party, which are in such party’s possession, custody, or control; provided, however, that Contractor must return State Data to the State following the timeframe and procedure described further in this Contract. Should Contractor or the State determine that the return of any Confidential Information is not feasible, such party must destroy the Confidential Information and must certify the same in writing within 5 calendar days from the date of termination to the other party. However, the State’s legal ability to destroy Contractor data may be restricted by its retention and disposal
Contract 220000001407 13 schedule, in which case Contractor’s Confidential Information will be destroyed after the retention period expires.
34. Reserved
35. Reserved.
36. Reserved.
37. Records Maintenance, Inspection, Examination, and Audit. Pursuant to MCL 18.1470, the State or its designee may audit Contractor to verify compliance with this Contract.
Contractor must retain and provide to the State or its designee and the auditor general upon request, all records related to the Contract through the term of the Contract and for 4 years after the latter of termination, expiration, or final payment under this Contract or any extension (“Audit Period”). If an audit, litigation, or other action involving the records is initiated before the end of the Audit Period, Contractor must retain the records until all issues are resolved.
Within 10 calendar days of providing notice, the State and its authorized representatives or designees have the right to enter and inspect Contractor's premises or any other places where Contract Activities are being performed, and examine, copy, and audit all records related to this Contract. Contractor must cooperate and provide reasonable assistance. If financial errors are revealed, the amount in error must be reflected as a credit or debit on subsequent invoices until the amount is paid or refunded. Any remaining balance at the end of the Contract must be paid or refunded within 45 calendar days.
This Section applies to Contractor, any parent, affiliate, or subsidiary organization of Contractor, and any subcontractor that performs Contract Activities in connection with this Contract.
38. Representations and Warranties. Contractor represents and warrants: (a) Contractor is the owner or licensee of any Contract Activities that it licenses, sells, or develops and Contractor has the rights necessary to convey title, ownership rights, or licensed use; (b) all Contract Activities are delivered free from any security interest, lien, or encumbrance and will continue in that respect; (c) the Contract Activities will not infringe the patent, trademark, copyright, trade secret, or other proprietary rights of any third party; (d) Contractor must assign or otherwise transfer to the State or its designee any manufacturer's warranty for the Contract Activities; (e) the Contract Activities are merchantable and fit for the specific purposes identified in the Contract; (f) the Contract signatory has the authority to enter into this Contract; (g) all information furnished by Contractor in connection with the Contract fairly and accurately represents Contractor's business, properties, finances, and operations as of the dates covered by the information, and Contractor will inform the State of any material adverse changes;(h) all information furnished and representations made in connection with the award of this Contract is true, accurate, and complete, and contains no false statements or omits any fact that would make the information misleading; and that (i) Contractor is neither currently engaged in nor will engage in the boycott of a person based in or doing business with a strategic partner as described in 22 USC 8601 to 8606. A breach of this Section is considered a material breach of this Contract, which entitles the State to terminate this Contract under Section 24, Termination for Cause.
Contract 220000001407 14
39. Conflicts and Ethics. Contractor will uphold high ethical standards and is prohibited from:
(a) holding or acquiring an interest that would conflict with this Contract; (b) doing anything that creates an appearance of impropriety with respect to the award or performance of the Contract; (c) attempting to influence or appearing to influence any State employee by the direct or indirect offer of anything of value; or (d) paying or agreeing to pay any person, other than employees and consultants working for Contractor, any consideration contingent upon the award of the Contract. Contractor must immediately notify the State of any violation or potential violation of these standards. This Section applies to Contractor, any parent, affiliate, or subsidiary organization of Contractor, and any subcontractor that performs Contract Activities in connection with this Contract.
40. Compliance with Laws. Contractor must comply with all federal, state and local laws, rules and regulations.
41. Reserved.
42. Reserved.
43. Nondiscrimination. Under the Elliott-Larsen Civil Rights Act, 1976 PA 453, MCL 37.2101, et seq., the Persons with Disabilities Civil Rights Act, 1976 PA 220, MCL 37.1101, et seq., and Executive Directive 2019-09. Contractor and its subcontractors agree not to discriminate against an employee or applicant for employment with respect to hire, tenure, terms, conditions, or privileges of employment, or a matter directly or indirectly related to employment, because of race, color, religion, national origin, age, sex (as defined in Executive Directive 2019-09), height, weight, marital status, partisan considerations, any mental or physical disability, or genetic information that is unrelated to the person’s ability to perform the duties of a particular job or position. Breach of this covenant is a material breach of this Contract.
44. Unfair Labor Practice. Under MCL 423.324, the State may void any Contract with a Contractor or subcontractor who appears on the Unfair Labor Practice register compiled under MCL 423.322.
45. Governing Law. This Contract is governed, construed, and enforced in accordance with Michigan law, excluding choice-of-law principles, and all claims relating to or arising out of this Contract are governed by Michigan law, excluding choice-of-law principles. Any dispute arising from this Contract must be resolved in Michigan Court of Claims.
Contractor consents to venue in Ingham County, and waives any objections, such as lack of personal jurisdiction or forum non conveniens. Contractor must appoint agents in Michigan to receive service of process.
46. Non-Exclusivity. Nothing contained in this Contract is intended nor will be construed as creating any requirements contract with Contractor. This Contract does not restrict the State or its agencies from acquiring similar, equal, or like Contract Activities from other sources.
47. Force Majeure. Neither party will be in breach of this Contract because of any failure arising from any disaster or acts of god that are beyond their control and without their fault or negligence. Each party will use commercially reasonable efforts to resume performance.
Contractor will not be relieved of a breach or delay caused by its subcontractors. If immediate performance is necessary to ensure public health and safety, the State may immediately contract with a third party.
https://www.michigan.gov/whitmer/0,9309,7-387-90499_90704-486781--,00.html
Contract 220000001407 15
48. Dispute Resolution. The parties will endeavor to resolve any Contract dispute in accordance with this provision. The dispute will be referred to the parties' respective Contract Administrators or Program Managers. Such referral must include a description of the issues and all supporting documentation. The parties must submit the dispute to a senior executive if unable to resolve the dispute within 15 business days. The parties will continue performing while a dispute is being resolved, unless the dispute precludes performance. A dispute involving payment does not preclude performance.
Litigation to resolve the dispute will not be instituted until after the dispute has been elevated to the parties’ senior executive and either concludes that resolution is unlikely or fails to respond within 15 business days. The parties are not prohibited from instituting formal proceedings: (a) to avoid the expiration of statute of limitations period; (b) to preserve a superior position with respect to creditors; or (c) where a party makes a determination that a temporary restraining order or other injunctive relief is the only adequate remedy. This Section does not limit the State’s right to terminate the Contract.
49. Media Releases. News releases (including promotional literature and commercial advertisements) pertaining to the Contract or project to which it relates must not be made without prior written State approval, and then only in accordance with the explicit written instructions of the State.
50. Website Incorporation. The State is not bound by any content on Contractor’s website unless expressly incorporated directly into this Contract.
51. Schedules. All Schedules, Attachments, and Exhibits that are referenced herein and attached hereto are hereby incorporated by reference. The following Schedules are attached hereto and incorporated herein:
Schedule A Statement of Work
Schedule B Pricing
Attachment 1 MDOT Region Map
Attachment 2 Roadside Parks and Locations
52. Entire Agreement and Order of Precedence. This Contract, which includes Schedule A
– Statement of Work, and schedules and exhibits which are hereby expressly incorporated,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .