Attachment_A_-Statement_of_Work.pdf
PDF 51 KB Posted
- Attached to
- Electronic Discharge Machining (EDM) Supplies
- Solicitation number
- 2031ZA18Q00234
About this file
Attachment A -Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined_Solicitation_2031ZA18Q00234.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A
1 2031ZA18Q00234 Bureau of Engraving and Printing
STATEMENT OF WORK
Supplies for Electrical Discharge Machining (EDM) Equipment:
Van-TG Non-Paraffin and Bronco Cut X Wire
C.1 PURPOSE AND BACKGROUND
The Office of Engraving’s Plate Manufacturing Division makes Surface Pieces for Over- Printing of the Seals on all of the United States Currency. These Surface Pieces have a critical thickness and surface finish requirement.
The Bureau of Engraving and Printing (“BEP”) has a requirement for two (2) types of Electronic Discharge Machining (EDM) supplies which are critical in producing these surface pieces.
C.2 TECHNICAL REQUIREMENTS
C.2.1 Contractor shall supply the following items or an approved equivalent:
A. Van-TG Non-Paraffin (VAN TG NP) (Hard Brass Wire non-paraffin coating),
0.01 inch diameter 22.0 pound spools
B. Bronco Cut X, 0.01 inch diameter 17.5 pound spools of wire
C.2.2 The wires shall meet the following specifications:
A. Van-TG Premium Brass NP Wire (0.01 in. diameter wire, 22 pound spool)
• Consistent straightness to ensure threading
• Cuts up to 10 degrees
Item Core Material
Coating Material
Tensile Strength
Elongation Color
Van-TG Premium NP
CuZn35 Paraffin-free 900 N/mm2
148,000 PSI
1% Gold
2 2031ZA18Q00234 Bureau of Engraving and Printing
B. Bronco Cut Type X (0.01 inc. diameter wire, 17.5 pound spool)
• High-performance, multipurpose spark erosion wire with CuZn coating
• Suited for precision cutting as well as high-speed cutting
Item Core Material Coating Material Tensile Strength Elongation Color
Bronco Cut Type X
Cu CuZn50 520 mPa
75,500 PSI
1% Brown
C.2.3 Any wires supplied other than the items listed above must first be tested by the BEP.
Vendor must provide a spool of each equivalent item for test cutting. The wire must perform with current programmed paths with no change to existing parameters. No compensation will be provided for wire that meets different performance needs or could possibly affect the quality of current production.
C.2.4 Contractor shall provide the supplies within eight (8) weeks after receipt of award.
C.2.5 Spools shall be delivered in cases, two (2) spools per case. For example, 18 spools = 9 cases.
C.2.6 Contractor shall be responsible for contacting the Loading Dock 24 hours in advance of the scheduled delivery to arrange access to the facility.
C.3 PLACE OF PERFORMANCE
The contractor shall deliver all equipment to:
The Bureau of Engraving and Printing, 14th and C Streets, SW Room 602-13 Annex Washington D.C.20228 Attention: COR (TO BE DETERMINED UPON AWARD)
C.4 SPECIAL DELIVERY INSTRUCTIONS
C.4.1 Delivery must take place between the hours of 9:00am and 2:00pm Monday through
Friday.
C.4.2 Contractor shall notify the COR prior scheduling delivery.
3 2031ZA18Q00234 Bureau of Engraving and Printing
C.4.3 BEP Delivery Instruction: The Contractor shall contact the BEP Receiving Section on 202-874-2333 at least forty-eight (48) hours in advance to schedule all deliveries.
Receiving hours for deliveries to the BEP are 7:30 a.m. to 2:30 p.m., local time, Monday through Friday, excluding U.S. Federal Holidays and the BEP Year-End-Shutdown Period. The following Delivery information shall be provided when scheduling delivery appointments to the BEP:
Name of Sender (e.g. Contractor) Name of Carrier Contract/Purchase Order # Total number of cartons and/or pallets Total weight Date and time of delivery Mode of Transportation (e.g., van, truck, automobile) Point of Contact Information
C.4.4 Shipping shall be F.O.B. Destination within Consignee's Premises.
C.5 PERIOD OF PERFORMANCE
The period of performance is a base period of twelve months plus four (4) 12-month option years. The anticipated award period is 15 May 2018 – 14 May 2023.
C.6 GOVERNMENT RESPONSIBILITIES
C.6.1 Site Access: Subject to the security requirements and regulations of the BEP, the
Government will permit contractor personnel access to the equipment covered under this SOW; however, the Government may restrict the access of contractor personnel if deemed in the best interest of the Government. In such cases, the Government will notify the contractor concerning such access restriction.
C.6.2 Security Requirements: No special requirements are identified. Personnel performing under this contract will be escorted by BEP personnel. Personnel performing under this contract shall not have any pending criminal charges nor have been a convicted felon.
C.7 PERFORMANCE REQUIRED
C.7.1 Responsibility for Inspection and Testing: The BEP reserves the right to perform any inspections and tests set forth for this equipment, to include inventory of parts list and supplies listed in contract.
C.7.2 BEP Testing: The BEP will evaluate the Bronco X and VAN TG NP Supplies for compliance with the requirements as stated in Section C.2 above. If any item is deemed insufficient or damaged, the Contracting Officer Representative (COR) will notify the contractor and all part found insufficient or damaged must be replace at the Contractor’s expense.
| C.6.1 Site Access: Subject to the security requirements and regulations of the BEP, the Government will permit contractor personnel access to the equipment covered under this SOW; however, the Government may restrict the access of contractor personn... |
| C.6.2 Security Requirements: No special requirements are identified. Personnel performing under this contract will be escorted by BEP personnel. Personnel performing under this contract shall not have any pending criminal charges nor have been a con... |
File details come from the government source that posted it.