2027_Paratransit_Program_Assessment_(10%_SBE_Goal)_(Addendum_#1_Revision).pdf
PDF 323 KB Posted
- Solicitation number
- RFP 126DY004
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a Request for Proposal (RFP) issued by the Regional Transportation District (RTD) in Denver, Colorado for a 2027 Paratransit Program Assessment consultant. The solicitation seeks qualified respondents to conduct a comprehensive paratransit service study and develop an Accessible Transportation Service Plan pursuant to Senate Bill 26-150, enacted in 2026. The Assessment will analyze current paratransit performance, identify service gaps and needs, evaluate service delivery models, review financial resources, and establish performance frameworks and improvement strategies. The pre-proposal briefing is scheduled for October 2, 2026 at 2:00 p.m. via Microsoft Teams (non-mandatory attendance). The inquiry period closes October 12, 2026 at 2:00 p.m., with RTD providing written responses to questions by October 20, 2026. Proposals must be submitted electronically via RTD's OpenGov procurement portal by November 9, 2026 at 2:00 p.m., with optional oral presentations potentially occurring the week of November 17, 2026. RTD anticipates final selection by December 1, 2026. The contract is fixed-price with a period of performance commencing on the Notice to Proceed and continuing through December 31, 2027, with no option periods included.
The pricing structure is fixed-price for defined tasks with a not-to-exceed amount for reimbursable travel costs based on actual expenses in accordance with GSA rates for Denver, Colorado. A 10% Small Business Enterprise (SBE) goal applies; proposers must document adequate good faith efforts to meet this goal or demonstrate compliance with 49 CFR Part 26.53, with SBE certification required prior to proposal submission. Evaluation criteria are weighted as follows: Approach to accomplishing the scope of work (35%), Past Relevant Experience (35%), Staff Qualifications (20%), and Cost (10%). Technical proposals must not exceed 40 pages and remain valid for 90 days from the due date. All proposals must comply with Level AA of the Web Content Accessibility Guidelines 2.1 and must include an Open Records copy per the Colorado Open Records Act. Award is contingent upon execution of the contract and appropriation of necessary funds by RTD's Board of Directors. All deliverables must comply with Section 508 accessibility standards and WCAG 2.1 Level AA guidelines, with documents translated into Spanish at minimum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Regional Transportation District
Contracting and Procurement
1660 Blake St.
Denver, CO 80202
Request for Proposal
RFP 126DY004
2027 PARATRANSIT PROGRAM ASSESSMENT (10% SBE GOAL)
September 25, 2026
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/rtd-denver https://procurement.opengov.com/portal/rtd-denver
Regional Transportation District
REQUEST FOR PROPOSAL
2027 Paratransit Program Assessment (10% SBE Goal)
Sections
1. INTRODUCTION
2. INSTRUCTIONS TO PROPOSERS
3. GENERAL INSTRUCTIONS
4. PROPOSALS
5. AWARD PROCESS
6. LEGAL NOTICE TO PROPOSERS
7. PROPOSAL CONTENTS CHECKLIST (FORMS TO BE SUBMITTED)
8. PRICING FORM
9. SCOPE OF WORK SERVICES
Attachments:
A - SOW 2027 Paratransit Program Assessment_Final 26.09.23
B - 2027 Paratransit Program Assessment_Detailed Cost Form_26.09.24
C - Form of Contract 2027 Paratransit Program Assessment_26.09.24(1)
RFP 126DY004 - 2027 Paratransit Program Assessment (10% SBE Goal)
1. INTRODUCTION
RTD is seeking responses from qualified respondents to provide: 2027 Paratransit
Program Assessment (10% SBE Goal)
1.1. Summary
Pursuant to Senate Bill 25-161, enacted in 2025, a Regional Transportation District
Accountability Committee (Accountability Committee) was created to evaluate and make recommendations related to RTD’s governance, workforce retention, and paratransit services. As a result of the Accountability Committee’s recommendations, Senate Bill 26-
150 (SB26-150), Modernizing the Regional Transportation District Act, was enacted in
2026.
Included in SB26-150 was a directive for RTD to contract with an independent third-party entity to conduct a comprehensive paratransit service study(the “2027 Paratransit
Program Assessment” or the “Assessment”), that will result in the adoption of an
Accessible Transportation Service Plan (the “Plan”).
This solicitation is for a consultant to perform the Assessment, including the delivery of the Plan. Evaluating accessible transit service delivery holistically will allow RTD to better address customer needs and allocate agency resources where they can have the greatest impact and ensures the agency effectively delivers paratransit mobility services in a manner that supports its mission of making lives better through connections.
The Assessment will analyze current paratransit performance, service gaps and needs, service delivery models, financial resources, and performance framework and service improvement strategies. The final Plan will serve as RTD’s paratransit roadmap, ensuring the agency remains efficient and responsive to community needs.
1.2. Background
The overarching goal is to achieve Board adoption of a practical and implementable
Plan in accordance with the requirements of SB26-150. The Assessment will conclude no later than December 31, 2027, , will comply with SB26-150, and will address the following major sub-goals:
• Comprehensive Assessment of RTD Paratransit Services: Identify optimal service standards and performance measures and prepare a comprehensive vision for services.
• An Open and Transparent Process Leading to Board Plan
Adoption: Ensure successful outreach, stakeholder engagement, public involvement, and communication throughout the Assessment process.
1.3. Contact Information
Patrick Naulty
Procurement Specialist II
Email: patrick.naulty@rtd-denver.com
Phone: (303) 299-2257
Department:
Outside Consultants
1.4. Timeline
RFP advertised September 25, 2026
Pre-proposal briefing (Non-
Mandatory)
October 2, 2026, 2:00pm
Microsoft Teams meeting
Join:
https://teams.microsoft.com/meet/239168
869858307?p=ESAEcTsEYOFGdQFAbY
Meeting ID: 239 168 869 858 307
Passcode: hJ2Re2TD
Need help? | System reference
Dial in by phone
+1 720-443-6193,,228664063# United
States, Denver
Find a local number
Phone conference ID: 228 664 063#
Inquiry Period October 12, 2026, 2:00pm
RTD sends responses to written inquiries
October 20, 2026, 2:00pm mailto:patrick.naulty@rtd-denver.com tel:(303)299-2257 https://teams.microsoft.com/meet/239168869858307?p=ESAEcTsEYOFGdQFAbY https://teams.microsoft.com/meet/239168869858307?p=ESAEcTsEYOFGdQFAbY
Proposals due November 9, 2026, 2:00pm
If necessary, oral presentations Week Of November 17, 2026
RTD, 1660 Blake Street, Denver, Colorado
80202
RTD anticipates making final selection.
December 1, 2026
2. INSTRUCTIONS TO PROPOSERS
2.1. Work
RTD will accept proposals from qualified companies until 2:00 pm on Monday, November 9, 2026 via RTD's online procurement portal, OpenGov. This Request for
Proposal (“RFP”) is for 2027 Paratransit Program Assessment (10% SBE Goal), per the enclosed specifications and requirements.
2.2. Cost Type
Payments are anticipated to be made on a Fixed Price basis.
2.3. Award of Contract
Award of a Contract from this RFP will be based upon Best Value competitive proposal procedures.
2.4. Period of Performance
Subject to the Termination provision of the Contract, performance shall commence as of the Effective Date (or in the event that RTD provides a Notice to Proceed to the
Contractor, the Period of Performance shall commence on the date of the Notice to
Proceed) and shall continue Until December 31, 2027 (subject to the exercise of any option periods).
2.5. Options for this Contract
There are no option periods for this contract.
2.6. Small Business Requirement for Contracts with an SBE Goal
RTD has specified a SBE participation goal of 10% for the Work to be performed under the Contract. Proposers must make adequate good faith efforts to meet this goal in order to be deemed as a responsive and responsible proposer. Award of the Contract will be conditioned on meeting the requirements of this section. 49 CFR Part 26.53 and
Appendix A of 49 CFR Part 26 shall serve as the criteria for evaluating compliance with the good faith efforts requirements. Additionally, proposers are required to solicit the support and assistance of RTD’s Small Business Opportunity Office if they are unable to meet the SBE participation goal assigned to this Contract. The proposers can meet this requirement in one of two ways:
First, the proposer can meet this goal by demonstrating and documenting its commitments for participation by SBEs for at least the total percentage identified above or a percentage that exceeds the goal for the project. The SBE Contract Requirements as well as 49 CFR Part 26.53 explain the procedures that recipients/agencies such as
RTD should follow in this situation. For purposes of this section, RTD will accept SBEs that are currently certified with the RTD Small Business Opportunity Office under the
NAICS code that coincides with the Scope of Work that they will execute in this project.
All SBEs must be certified prior to the proposal submission, except in a “design-build” or
“turnkey” contracting situation, multi-year projects, or some on-call or work order projects where RTD will explain its procedure in the SBE Contract Requirements.
Second, if the proposer does not meet the SBE goal identified in this Contract or is able to only meet part of this goal, it must document adequate good faith efforts. Appendix
A to 49 CFR part 26 clearly states, “This means that the proposer must show that it took all necessary and reasonable steps to achieve a SBE goal or other requirement of this part which, by their scope, intensity, and appropriateness to the objective, could reasonably be expected to obtain sufficient SBE participation, even if they were not fully successful.” Additionally, SBE Contract Requirements as well as 49 CFR Part 26.53 explain the good faith efforts procedures that recipients/agencies such as RTD should follow when a proposer does not meet the goal.
The SBE participation goal applies to the total value of the Contract including all pre-award negotiation results and post-award change orders/modifications. Submittals of the proposer’s SBE Plan/Program will be evaluated based on the proposer’s SBE approach, creativity, demonstrated commitment to RTD’s SBE and diversity programs, ability to successfully respond to project SBE participation goals and compliance with overall SBE program requirements as codified in 49 CFR Part 26 and RTD’s SBE
Program.
2.7. Proposals Valid
Proposals shall be valid for a duration of no less than ninety (90) days from proposal due date.
3. GENERAL INSTRUCTIONS
3.1. General
A. Each proposer is solely responsible for submitting any necessary forms and certifications that may be required by the RFP. Enclosed is a copy of the Contract contemplated for award substantially in the form to be executed.
B. A list of all holders (“followers”) of the RFP is available for view and/or print on the online procurement portal. The list is obtainable from the RFP advertisement date through the RFP close date.
3.2. Option(s)
If RTD has included the potential for options on this Contract, proposals should be adjusted to cover such option(s). The option quantities or periods contained in the proposal shall be evaluated in order to determine Contract award. When options have not been evaluated as part of the award, the exercise of such options will be considered
“sole source” procurements. RTD will evaluate proposals for award purposes by adding the total proposed price for all options to the total proposed price for the initial term of the Contract. Award of a Contract containing options shall not obligate RTD to exercise such option(s).
3.3. Addenda to RFP
In the event that it becomes necessary to revise any part of this RFP, or if additional information is necessary to enable potential proposers to make an adequate interpretation of the provisions of this RFP, an addendum to the RFP will be provided to each recipient of this RFP through RTD's online procurement portal.
3.4. Inquiries
Questions about RTD and this RFP shall be directed to Patrick Naulty, Procurement
Specialist II, through RTD’s online procurement portal.
A. From the issuance date of this RFP until RTD selects a proposal for award, Patrick Naulty, Procurement Specialist II, is the sole point of contact for RTD and
RTD’s project team members concerning this RFP. (In this RFP and the Contract
Documents, this point of contact may be referred to as the Contract
Administrator, Contracting Officer, Purchasing Agent, Buyer, or the like.) Any violation of this condition may be cause for RTD to reject the offending proposer’s proposal. If RTD later discovers that the proposer has engaged in any violations of this condition, RTD may reject the offending proposer’s proposal or rescind its Contract award. Proposers must agree not to distribute any part of their proposals beyond RTD. A proposer that shares information contained in its proposal with other RTD personnel, RTD project team members, RTD board members, and/or competing proposer personnel may be disqualified.
B. Proposers’ questions must be submitted through RTD’s online procurement portal. All questions or requests for clarifications regarding this solicitation, including the form of the Contract, must be made during the Inquiry Period. RTD has no obligation to respond to questions or requests for clarifications that are not submitted through RTD’s online procurement portal, nor to those submitted outside of the Inquiry Period. Except as provided below, RTD’s responses to all inquiries properly submitted will be answered in the form of an addendum that will be provided to all recipients of this RFP through RTD’s online procurement portal. To the extent that Proposers request changes to the form of the
Contract, including additional terms, conditions, and agreements (such as license agreements, master services agreements, and user agreements), such requested changes must be submitted with proposals. See “Legal Notice to Proposers - Rights Reserved to RTD.”
C. If the RFP Schedule provides for a pre-proposal briefing (“Briefing”), RTD will not respond to any questions regarding the RFP until the Briefing. Firms that have received this RFP, whether present for the Briefing or not, will receive: (1) a copy of the minutes; (2) answers to all questions presented; (3) a listing of all recipients of the RFP (current to date of Briefing), and (4) a copy of the sign-in sheet from the Briefing.
If a Respondent needs assistance using the online procurement portal, Respondents may access the Help Center for vendor training guides provided by OpenGov ("Software
Administrator"). Respondents may also contact the Software Administrator using the real-time chat function on the online procurement portal (located in lower right-hand corner of the screen), or via email at procurement-support@opengov.com for support.
3.5. Submission & Withdrawal
Respondents shall register on RTD’s online procurement portal. Once registered, Respondents may view and click "Follow" to be a Prospective Respondent for this RFP and will appear on the Follower’s list. Respondents that fail to Follow this project will not receive automated Addenda notifications, nor will they be able to submit a
Response in the online procurement portal, and therefore will be unable to participate, nor be considered for this RFP. Respondents must click “Draft Response” to properly begin and submit a Response via the online procurement portal.
RTD will accept responses to this RFP electronically via the online procurement portal until 2:00 pm on Monday, November 9, 2026. Responses received after the scheduled due date and time for submission will not be accepted. Responses submitted in any https://help.procurement.opengov.com/en/articles/5815468-video-guides-opengov-procurement-vendor-training mailto:procurement-support@opengov.com other format other than via the online procurement portal, including but not limited to, hard copy (mailed or hand delivered), facsimile, or emailed submittals, will not be accepted.
RTD and the Software Administrator are not responsible for untimely submissions due to personal or company internet or hardware limitations, settings or restrictions, internet speed, power outage, network connection, or use of a malfunctioning electronic device, or the like. Respondents are solely responsible for the capability of their computer system while responding to this RFP and for the stability of their internet service. Failure of the Respondent to successfully submit an electronic Response before the deadline indicated herein shall be at the Respondent’s sole risk, and RTD will not accept late and/or improperly submitted Responses. Once file(s) have been uploaded and the Submission Status shows as “Submitted,” a submission is complete. At that point, the Respondent will also receive an email confirmation from the online procurement portal. Respondents may withdraw their submittal electronically via the online procurement portal at any time prior to the scheduled due date and time for submission.
Proposals that are late will not be accepted.
4. PROPOSALS
4.1. Submission Requirements
A. Any alteration, insertion, or erasure by the proposer in the form of the RFP documents as originally prepared by RTD shall render the accompanying proposal non-responsive and may constitute cause for rejection. Conditional proposals or those that take exception to the RFP documents or Scope of Work may be treated as non-responsive.
B. Proposal Submission. RTD’s Procurement Specialist II must receive through
RTD’s online procurement portal all required documents in a format that complies with Level AA of the Web Content Accessibility Guidelines 2.1 of the
World Wide Web Consortium (W3C) Web Accessibility Initiative. Proposal submittal requirements are located in the PROPOSAL CONTENTS CHECKLIST
(FORMS TO BE SUBMITTED).
Your proposal must be received no later than the time and date set forth in the
RFP Schedule.
C. Signatures. Proposals must be signed by a duly authorized official of the firm.
Proposals submitted by consortiums, joint ventures, or teams, although permitted and encouraged, will not be considered responsive unless it is established that all contractual responsibility rests solely with one contractor or one legal entity which shall not be a subsidiary or affiliate with limited resources.
Each submittal should indicate the entity responsible for execution on behalf of the consortium, joint venture, or team.
D. Proposal Format.
1. Technical proposals should not exceed 40 pages. (One “page” is defined as one standard 8½ x 11-inch sheet of paper in Times New Roman, in no less than 12-point font.) All charts, graphic displays, etc., must be of readable size. Foldouts to illustrate particular items are permitted but will be included in page count. Cover letters should be no longer than two pages.
2. Submission of standard promotional material and corporate literature not specifically requested by RTD is discouraged. Any such information may not be fully considered in the evaluation.
4.2. Technical Proposal
In addition to any information required elsewhere in this RFP and in the Scope of Work, all proposals shall contain and will be evaluated based on the following sections:
https://procurement.opengov.com/portal/rtd-denver/projects/305976?section=undefined https://procurement.opengov.com/portal/rtd-denver/projects/305976?section=undefined
A. A cover letter (maximum two pages) briefly describing the firm or firms
(including subcontractors, if any) on the proposed project team, referencing the
RFP by name and number.
B. A detailed technical proposal (maximum 40 pages) in narrative form describing the proposer and proposed team. Proposals shall include the following items in the order listed below and shall not exceed the page limit indicated above, excluding attachments. Items that will not be counted in the page limit are, the firm’s cover letter, résumés, and certifications. Proposals shall address the following:
1. Previous experience of the proposed team (including subcontractors) and key personnel in performing on projects of a similar nature and scope.
2. A demonstrated ability to perform under the Contract.
3. Company Information
a. Address of headquarters and location(s)
b. Main phone number
c. Website
d. Legal Entity Type (ex. corporation, partnership, sole proprietor, other)
e. State or Country of incorporation/registration
f. If you are a subsidiary of any other company, please specify your parent company
4. Company Background
a. Number of years has your company been in business
b. Describe the key point of difference between your company and its competitors
c. Total number of projects by year for the last three years
d. Provide by name a minimum of three customers references
5. Company Experience
a. Provide the number of program assessments and service plans that your firm contributed to or completed within the last five years
b. Provide a short description of one to five significant projects within the last five years --that are relevant to this project. Please include:
i. Customer/Agency name
ii. Customer company/agency size (number of employees or revenue, for example)
iii. Duration of the project
iv. Number and type of staff assigned to the project
v. A key lesson learned, or a challenge and how you overcame the challenge o Impact of the project’s final outcome
c. Provide a brief overview of your firm’s experience and expertise in the following areas related to the scope of work:
o Program Assessments or similar with preference to assessments for government and especially pertaining to paratransit o Service Plans or similar with preference to assessments for government and especially pertaining to paratransit o Compliance Reports
6. Personnel Qualifications
a. Describe how your firm will provide or structure the staff required to support this project. Firm may provide a project organizational chart
b. Confirm whether your firm will be employing any subcontractors or subcontractor services in the fulfillment of the scope of work
c. Describe your firm’s project management, knowledge management, and documentation practices
d. Provide the period(s) or spans of time for which the key personnel are available for this project
7. Project Plan and Schedule
a. Approach to accomplishing the scope of work, ensuring that entire scope of work is fully executed to the satisfaction of RTD
b. A draft schedule demonstrating how your firm will deliver the following:
• Tasks 2 - 7 no later than June 30, 2027
• Tasks 8 & 9 no later than November 30, 2027
1. Résumés of all proposed key personnel and the availability during Contract performance periods of all key personnel.
C. One “Open Records” copy of your technical proposal per the Colorado Open
Records Act, C.R.S. § 24-72-200.1 et seq. (as amended), including the redaction of any confidential or proprietary information. Submit as the Open Records
Technical Proposal in the Proposal Contents Checklist (FORMS TO BE
COMPLETED).
4.3. Contract Cost Proposal
Each proposer shall submit one copy only of the information required below:
1. Cost proposals must clearly identify pricing proposed for the type of Contract to be awarded. If there are option years available, include option pricing on the cost proposal.
2. One “Open Records” copy of your cost proposal per the Colorado Open Records
Act, C.R.S. § 24-72-200.1 et seq. (as amended), including the redaction of any confidential or proprietary information. To do this you will have to export the
Pricing Form or Cost Submittal Form, redact sensitive data, and then submit it as the Open Records Cost Proposal in the Proposal Contents Checklist (FORMS TO
BE COMPLETED).
3. To provide backup information for the fixed pricing proposed in the cost proposal, complete the Detailed Cost Form attached as Attachment B.
4.4. Only One Proposal Accepted
RTD will accept only one proposal for the Work from any one proposer. This includes proposals that may be submitted under different names by one firm or corporation.
4.5. Conflicting Information from Proposer
The information and/or pricing provided by the proposer in the required proposal will control in the event of a conflict with any information and/or pricing the proposer types into RTD’s online procurement portal when submitting the proposal.
5. AWARD PROCESS
A. Notification to Successful Proposer. Award decisions of RTD shall be reduced to writing by the Director of Contracting and Procurement, or delegate, and shall be final. RTD will notify the successful proposer, if any, by sending a notice of intent to award, which is subject to any required RTD approval. Following RTD approval, the Procurement Specialist II will initiate the Contract signature process and then issue the notice to proceed with the executed Contract.
B. Notifications to Unsuccessful Proposers.
1. Pre- and Post-Award Notices of Exclusion. The Procurement Specialist II shall notify unsuccessful proposers through RTD’s online procurement portal of exclusion from award. Requests for a debriefing must be submitted to the
Procurement Specialist II within three days of receipt of such notice.
Debriefings requested for and provided prior to Contract award shall address only the requesting proposer’s proposal; post-award debriefings may address all proposals submitted. Only one pre-award or post-award debriefing shall be provided per proposer.
2. Protests. Proposers must submit protests related to this RFP in writing to
Procurement Specialist II pursuant to the procedures set forth in RTD's procurement standards manual. Copies of RTD's protest procedures are available upon request to Procurement Specialist II. Proposers must exhaust all administrative remedies prescribed by RTD’s protest procedures before proceeding to court.
C. Evaluation Criteria. Proposals will be evaluated according to the following criteria, listed in descending order of importance:
5.1. Phase 1
No. Evaluation Criteria Scoring Method Weight (Points)
1. Approach
Approach to accomplishing the scope of work, ensuring that entire scope of services is fully executed to the satisfaction of
RTD
0-10 Points 35
(35% of Total)
2. Cost
Complete the OpenGov Pricing form as well as the detailed
2027 Paratransit Program
Assessment_Detailed Cost Form
Reward Low Cost 10
(10% of Total)
3. Past Relevant Experience
Past relevant experience with the subject matter. Consider references. Experience working with government entities, and particularly with a focus in paratransit operations
0-10 Points 35
(35% of Total)
4. Staff Qualifications
Qualifications of staff proposed
0-10 Points 20
(20% of Total)
5.2. Phase 2
No. Evaluation Criteria Scoring Method Weight (Points)
1. SBE Evaluation
10% SBE goal
Pass / Fail 100
(100% of Total)
6. LEGAL NOTICE TO PROPOSERS
6.1. Organizational Conflict of Interest
A. The proposer shall review the attached Organizational Conflicts of Interest
Disclosure Requirements and submit its Organizational Conflicts of Interest
Certification with the proposal.
B. If the proposer prepared or assisted RTD in the preparation of a statement of work, work program, or system specifications to be used in a competitive procurement by RTD, the proposer will be ineligible to supply the same in connection with this Contract. The proposer may otherwise compete for RTD business on an equal basis with other parties.
C. Except as provided above, if RTD determines that a potential conflict exists, the proposer shall be excluded from award unless the conflict can be avoided or otherwise resolved through the inclusion of a special Contract provision or other appropriate means.
6.2. Allowable Costs
If this Contract provides for payment of reimbursable costs, all costs submitted for reimbursement shall comply with the cost principles of FAR Part 31.
6.3. Insurance and Bond Requirements
Proposer's attention is directed to the section entitled Insurance and Bond
Requirements herein. It is highly recommended that proposers confer with their insurance carriers or brokers in advance of proposal submission to determine the availability of bonds, insurance certificates and any endorsements. The cost of such insurance and bonds shall be included in the proposal.
6.4. SBE Compliance
Proposers must make adequate good faith efforts to meet this goal in order to be deemed as a responsive and responsible proposer. Award of the Contract will be conditioned on meeting the requirements of this section. 49 CFR Part 26.53, Appendix A of 49 CFR Part 26 and SBE Contract Requirements shall serve as the criteria for evaluating compliance with the good faith efforts requirements.
6.5. News Releases
RTD’s written approval is required prior to any communication with the press or any public disclosure relating to this RFP or any subsequent awards.
6.6. Pre-Award Audit
RTD reserves the right to conduct a pre-award audit to verify labor rates, overhead rates, etc. should RTD determine that such an audit is required prior to negotiation or award of a Contract.
6.7. Cost of Proposal Preparation
RTD shall not reimburse proposers for costs incurred for preparation of proposals or required documentation.
6.8. Materials Submitted
All materials submitted shall become the property of RTD and will not be returned to the proposer.
6.9. Confidentiality
RTD is a public entity subject to the provisions of the Colorado Open Records Act, C.R.S. § 24-72-200.1 et seq. (“CORA”), and all materials submitted with this RFP, with the exception of trade secrets, privileged information, and confidential commercial, financial, geological, or geophysical data pursuant to C.R.S. § 24-72-204(3)(a)(IV), may become public records subject to inspection by the public at any time after the Contract is executed. Therefore, any confidential or proprietary information that the proposer discloses to RTD with respect to this RFP must be clearly designated as confidential or proprietary at the time of disclosure by the proposer to RTD. RTD shall not disclose properly designated information unless such information is required to be disclosed by law or court order. In the event of a legal challenge to the confidentiality of records so designated by the proposer, RTD shall make reasonable efforts to notify the proposer prior to disclosing any such information, and in some cases may tender to the proposer the defense of any action filed. By submitting a proposal under this RFP, the proposer agrees to accept such tender of defense and in all cases assumes exclusive responsibility for defending its position as to the confidentiality of the requested information. RTD is not obligated to assist in such defense, and cannot and does not guarantee that the confidentiality of records so designated will be upheld by a reviewing court. If the proposer fails to submit a copy of its redacted proposal that may be released under CORA, the proposer acknowledges that RTD has the authority to disclose, and may disclose in its discretion, any information contained in the proposal in response to a CORA request.
6.10. Rights Reserved to RTD
A. All proposers are notified that the award of a Contract pursuant to this RFP is dependent upon execution of a Contract with the successful proposer(s) and appropriation by RTD’s Board of Directors of the necessary funds. Successful proposers must be prepared to execute the Contract that is provided with this RFP. RTD has no obligation to accept requested changes to the form of the Contract . PROPOSERS’ REQUESTED CHANGES, INCLUDING ADDITIONAL TERMS, CONDITIONS, AND AGREEMENTS
(SUCH AS LICENSE AGREEMENTS, MASTER SERVICES AGREEMENTS,
AND USER AGREEMENTS), MUST BE SUBMITTED WITH PROPOSALS. At
RTD’s sole discretion, RTD may deny any requested changes submitted after the deadline for proposal submission. Requested changes must be specific (including, as applicable, section reference, reason for requested change and proposed revised language) and clearly identified in a proposal. If a proposer does not submit any requested
Contract changes, the proposer will be deemed to have accepted the terms, conditions, and requirements of this solicitation, including the form of Contract.
RTD will not accept blanket exceptions to any or all terms, conditions or requirements of this solicitation to be negotiated at a later date. At
RTD’s sole discretion, RTD may deny requested changes that are embedded by hyperlink or cited by reference in a proposal and related documents. FAILURE TO ACCEPT THE TERMS AND CONDITIONS IN
THIS SOLICITATION MAY RESULT IN A PROPOSER BEING DEEMED
NON-RESPONSIVE.
B. It is the intent of RTD to make an award within 60 days from the proposal due date; however, all proposals shall be valid for no less than ninety (90) days.
C. RTD reserves the right to reject all offers and re-solicit or cancel this RFP if deemed by RTD to be in its best interest.
D. RTD reserves the right to enter into a Contract with any proposer based upon the initial proposal or on the basis of a best and final offer without conducting oral discussions.
6.11. Prohibited Interests
A. No employee of RTD or any member of its governing body shall have any personal or financial interest, direct or indirect, in this Contract or any contract executed subsequently in connection with this Contract during his or her tenure or for one year thereafter. No director, officer, employee, or agent of RTD shall be interested in any contract or transaction with RTD except in his or her official representative capacity.
B. No member of or delegate to Congress, or resident commissioner, shall be admitted to any share or part of any Contract awarded, or to any benefit arising from it.
6.12. Competition in Subcontracting
Proposers shall select subcontractors (including suppliers) on a competitive basis to the maximum practicable extent consistent with the objectives and requirements of any
Contract awarded.
6.13. Personnel Availability
By submitting its proposal, the proposer certifies that it and each of its subcontractors possess an adequate supply of workers qualified to perform the work specified within the Contract schedule; that there is no existing or impending dispute between it and any labor organization; and that it is prepared to comply fully with prevailing wage requirements, minimum wages, maximum hours of work, and equal opportunity provisions contained in the Contract Terms and Conditions.
7. PROPOSAL CONTENTS CHECKLIST (FORMS TO BE SUBMITTED)
Note to Respondents: In order to download the submittal forms in the
"Forms to be Completed and Submittal Requirements section," Respondents must download them directly from the online procurement portal.
Please only include cost in designated "cost" sections, or cost table if provided. Any cost information submitted or duplicated in other sections may result in response disqualification.
7.1. In addition to any information required elsewhere in this Solicitation and in the Scope of Work, all responses shall contain and will be evaluated based on the following sections:
7.1.1. Name and Title of Individual(s) Authorized to Sign the Contract* Please enter the full name(s) and title(s) and email address(es) of the individual(s) authorized to sign the contract if awarded to your company. Only list multiple names if multiple individuals are required to sign.
*Response required
7.1.2. Name and Title of Respondent’s Authorized Official*
The following questions are prepared in electronic format, and the Respondent is required to respond in this format. All required certifications, documentation, and response information below shall be answered and provided by an authorized official with binding authority. Electronic selections and confirmations shall be as binding as a signature from the authorized official submitting this response on behalf of the
Respondent.
Please type the full name and title of the authorized official electronically submitting this response.
*Response required
7.1.3. I certify that I have read, understood, and agree to be bound to the terms in the General Instructions, Solicitation Instructions, Award Process, and Legal Notice in this solicitation, and that I am authorized to submit this response on behalf of my organization.*
☐ Please confirm
*Response required
7.1.4. I certify that I have read, understood and agree, on behalf of the firm submitting this response, to the terms and conditions including, but not limited to, the insurance requirements set forth herein with the exception of any modification requests approved by RTD during the Q&A period.*
☐ Please confirm
*Response required
7.1.5. TECHNICAL PROPOSAL*
Submit your Technical Proposal per the instructions in the solicitation.
DO NOT INCLUDE ANY COST PROPOSAL INFORMATION IN YOUR
TECHNICAL PROPOSAL OR IT MAY BE DEEMED NON-RESPONSIVE.
*Response required
7.1.6. Open Records Copy of Technical Proposal
Submit your Open Records Copy of Technical Proposal per the instructions in the solicitation.
DO NOT INCLUDE ANY COST PROPOSAL INFORMATION IN YOUR
TECHNICAL PROPOSAL OR IT MAY BE DEEMED NON-RESPONSIVE.
7.1.7. Detailed Cost Proposal
Submit your completed "2027 Paratransit Program Assessment_Detailed Cost Form".
THIS SECTION IS FOR COST ONLY. PLEASE DO NOT INCLUDE ANY
ADDITIONAL INFORMATION HERE.
7.1.8. Open Records Copy of Detailed Cost Proposal
Submit your Open Records Copy of Cost Proposal per the instructions in the solicitation.
THIS SECTION IS FOR COST ONLY. PLEASE DO NOT INCLUDE ANY
ADDITIONAL INFORMATION HERE.
7.1.9. SBE CONTRACT REQUIREMENTS CERTIFICATION*
The Respondent hereby certifies that it has reviewed, understands, and agrees to comply with the requirements of RTD’s SBE Contract Requirements (the SBE Contract
Requirements may be accessed directly at https://www.rtd-denver.com/downloads/sbe-contract-requirements) and 49 CFR Part 26 for the entire duration of this Contract. The
Respondent also agrees to:
https://www.rtd-denver.com/downloads/sbe-contract-requirements https://www.rtd-denver.com/downloads/sbe-contract-requirements
A. Comply with and implement all requirements of RTD’s SBE Contract
Requirements and 49 CFR Part 26 in the award and administration of subcontracts under this Contract;
B. Perform its obligations and shall require each Subcontractor regardless of the tier to perform its respective obligations under this Contract and the Subcontract(s) in accordance with RTD’s SBE Contract Requirements;
C. Provide each Subcontractor with a copy of RTD’s SBE Contract Requirements;
and
D. Insert all flow-down provisions in SBE Flow-Down Provision section of the
Contract into each Subcontract regardless of the tier.
☐ Please confirm
*Response required
7.1.10. SBE Required Enclosures*
Please download the documents available at this link https://www.rtd-denver.com/downloads/sbe-enclosures. Complete and upload the enclosures.
*Response required
7.1.11. ORGANIZATIONAL CONFLICT OF INTEREST DISCLOSURE REQUIREMENTS*
A. Organizational conflict of interest means that, because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to RTD, or the person's objectivity in performing the Work is or might be otherwise impaired, or a person has an unfair competitive advantage.
B. Each firm responding to the Solicitation shall provide the statement described in paragraph (c). This requirement will apply individually to any of the firm’s consultants or lower-tier subcontractors that also furnish Work in performance of the Contract to be awarded.
C. The statement must contain the following:
1. Name of the firm and the number of the Solicitation in question.
2. The name, address, telephone number, and federal taxpayer identification number, if applicable, of the firm.
3. A description of the nature of the Work rendered by or to be rendered on the
Contract or related to the Contract.
https://www.rtd-denver.com/downloads/sbe-enclosures https://www.rtd-denver.com/downloads/sbe-enclosures
4. A statement of any past (within the past 12 months), present, or currently planned financial, contractual, organizational, or other interests relating to the performance of the Contract. For contractual interests, such statement must include the name, address, and telephone number of the client or client(s), a description of the services rendered to the previous client(s), and the name of a responsible officer or employee of the firm who is knowledgeable about the services rendered to each client, if, in the 12 months preceding the date of the statement, services were rendered to RTD or any other client respecting the same subject matter of the Solicitation or directly relating to such subject matter. The client and contract number under which the services were rendered must also be included, if applicable. For financial interests, the statement must include the nature and extent of the interest and any entity or entities involved in the financial relationship. For these and any other interests, enough information must be provided to allow a meaningful evaluation of the potential effect of the interest on the performance of the
Contract.
5. A statement that no actual or potential conflict of interest or unfair competitive advantage exists with respect to the Work to be provided in connection with the Contract or that any actual or potential conflict of interest or unfair competitive advantage that does or may exist with respect to the
Contract or related to the Contract has been communicated as part of the statement required by section (c).
D. Failure of a firm to provide the required statement may result in the firm being determined ineligible for award. Misrepresentation or failure to report any fact may result in the assessment of penalties associated with false statements or such other provisions provided for by law or regulation.
ORGANIZATIONAL CONFLICT OF INTEREST CERTIFICATION
If the Respondent is aware of information bearing on whether a potential conflict may exist, the Respondent shall provide a disclosure statement describing this information as described in the Disclosure Requirements above.
☐ The Respondent IS aware of any information bearing on the existence of any potential organizational conflict of interest as described in the Disclosure Requirements.
☐ The Respondent IS NOT aware of any information bearing on the existence of any potential organizational conflict of interest as described in the Disclosure Requirements.
*Response required
7.1.12. Current W9 *
Please download the below documents, complete, and upload.
• 02.12_W9_updated_1822.pdf
*Response required
7.1.13. KEY PERSONNEL*
Please download the below documents, complete, and upload.
• Key_Personnel.docx
*Response required
7.1.14. The Respondent understands that any condition stated above, clarification of the above, or information submitted on or with this form other than requested will render the quotation non-responsive.*
☐ Please confirm
*Response required
7.1.15. Background Investigations
Please download the below documents and review. Only the awarded contractor will be required to complete this form.
• 04.12.01_Background_Investi...
https://procure-now.s3.us-west-2.amazonaws.com/shared-sections/production/36/2715a66a-0788-44f4-923d-4592ac83cb02_02.12_W9_updated_1822.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4J3LDPNEH%2F20261014%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261014T205117Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEPT%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCzA%2BeVtGMK3TVY%2FE7qnrMNfwsODRvs9wimMMtcgAkwzwIgOhBLFpVg3Jub3x69RCSm8YhC9iZngmZvJcBmdsSIc24qlQUIvP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDPEs5KC2AqxxhFpoLirpBOagnfzp4tjhs98mknxjRmdBWpyZDHyzGfoluk86nYI%2FWt1OT4zReeWqpxUQnkGUto1Cs%2FPIGL7na%2BLOWUX4peO2EUWMweuKiKpjnz3qevFkwV2zUEgfq%2BwOzyAwLByOS7fdW4I4EIS%2Fp2%2B1Wnu8oTuph7bGJ7S7sF2FypC1dqyAyPvJsDWE0ox%2BeCSrgxaYZC8QrK1B07ymun%2FCw%2BytACiuTObSEk0jZaqJ1MNI6iHZWrFnRwP3nQD8OXHPn7UFOPtXHtsdByBDHzIWlBOpiAXZmVY4PXd4I3VjxDRrfjfbRDTHohbtUgLSHzbwG5WAvuC2VDv8FFWg6s4bg6Aplcb0VnTWMpRPUc8vWxVXONgruiQR%2BRFq8MdGT3tAcIzwxr3tvQE1v52rVa4cqiL5i0YrRBQxPq3GGp0LtJtCUIw0elqAB%2BXDdXSsPxJFMCRFxtefo%2BiOo1f%2FDB8m5h0oBQT3G%2F124mMyNvuAiVV1FAvocLD5SPhS6iS0RhZ%2ByUaDjpgVU9adKJf2Xv0%2BrL33lfgg3ndUztLPnbDRzWvxqhl%2FEgkTEprlHsS%2BjvVleOanngJGXlfeDzkvSEqlytgntChQK1In0je519Uc2NcLnZB%2F7Jtvs4DUz6Q%2Bh3hf3VJNQS2niH6DbA9nNwg4aC0ly8T3oR5ePizuaOrDOFceI9FdQME%2FD%2F%2FaRIwW6ocT0jlCcaiVIf65NActO%2FcQx%2Bl1DW3N9Uo2YdvF8VBAQALl%2BWZV5Q1h9TipIN499rjD%2B7wdhDHG464i4ws%2Bjvt7vEtASG7tIZnN6PptH8ZB5FH%2BpzVjvqJTnS3R0qMVMOGrv9YGOpkBTYL5fE1RMtLvGiQb6RaEcZhEO%2BnJZEibJzyeARZ0kgU2OLtHWnk1YlUDJ01S4S5NZY3deKn7p8GDqc0qBP0t3CuATsTCrrrkNfDWOkrRPv3aGQEf7LWptIeaeDaKKZzSI%2FwFk5rWIb6AEM8pPHzNqnozAQxf5RNSqRi710gCeW5J0eXk9zWagQn3%2BMzM8P%2FbU4mVSGnFPHh2&X-Amz-Signature=738abf96a036bebd70e45276d3cb5196de89e1ade14645c8d8c8bb11e2f71641&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%2202.12_W9_updated_1822.pdf%22&x-id=GetObject https://procure-now.s3.us-west-2.amazonaws.com/shared-sections/production/36/387664a0-f1d1-4e62-b529-fc5284b50777_Key_Personnel.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4J3LDPNEH%2F20261014%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261014T205117Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEPT%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCzA%2BeVtGMK3TVY%2FE7qnrMNfwsODRvs9wimMMtcgAkwzwIgOhBLFpVg3Jub3x69RCSm8YhC9iZngmZvJcBmdsSIc24qlQUIvP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDPEs5KC2AqxxhFpoLirpBOagnfzp4tjhs98mknxjRmdBWpyZDHyzGfoluk86nYI%2FWt1OT4zReeWqpxUQnkGUto1Cs%2FPIGL7na%2BLOWUX4peO2EUWMweuKiKpjnz3qevFkwV2zUEgfq%2BwOzyAwLByOS7fdW4I4EIS%2Fp2%2B1Wnu8oTuph7bGJ7S7sF2FypC1dqyAyPvJsDWE0ox%2BeCSrgxaYZC8QrK1B07ymun%2FCw%2BytACiuTObSEk0jZaqJ1MNI6iHZWrFnRwP3nQD8OXHPn7UFOPtXHtsdByBDHzIWlBOpiAXZmVY4PXd4I3VjxDRrfjfbRDTHohbtUgLSHzbwG5WAvuC2VDv8FFWg6s4bg6Aplcb0VnTWMpRPUc8vWxVXONgruiQR%2BRFq8MdGT3tAcIzwxr3tvQE1v52rVa4cqiL5i0YrRBQxPq3GGp0LtJtCUIw0elqAB%2BXDdXSsPxJFMCRFxtefo%2BiOo1f%2FDB8m5h0oBQT3G%2F124mMyNvuAiVV1FAvocLD5SPhS6iS0RhZ%2ByUaDjpgVU9adKJf2Xv0%2BrL33lfgg3ndUztLPnbDRzWvxqhl%2FEgkTEprlHsS%2BjvVleOanngJGXlfeDzkvSEqlytgntChQK1In0je519Uc2NcLnZB%2F7Jtvs4DUz6Q%2Bh3hf3VJNQS2niH6DbA9nNwg4aC0ly8T3oR5ePizuaOrDOFceI9FdQME%2FD%2F%2FaRIwW6ocT0jlCcaiVIf65NActO%2FcQx%2Bl1DW3N9Uo2YdvF8VBAQALl%2BWZV5Q1h9TipIN499rjD%2B7wdhDHG464i4ws%2Bjvt7vEtASG7tIZnN6PptH8ZB5FH%2BpzVjvqJTnS3R0qMVMOGrv9YGOpkBTYL5fE1RMtLvGiQb6RaEcZhEO%2BnJZEibJzyeARZ0kgU2OLtHWnk1YlUDJ01S4S5NZY3deKn7p8GDqc0qBP0t3CuATsTCrrrkNfDWOkrRPv3aGQEf7LWptIeaeDaKKZzSI%2FwFk5rWIb6AEM8pPHzNqnozAQxf5RNSqRi710gCeW5J0eXk9zWagQn3%2BMzM8P%2FbU4mVSGnFPHh2&X-Amz-Signature=c47407356320fa1fd3abd3704c1631cdae39ddbbf38c4f036be0352d75436ba6&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Key_Personnel.docx%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/305976/0ac3cabe-0adf-428a-8192-a2424d3fa0b6_04.12.01_Background_Investigation_Certification_%28Rev._02.2022%29_%282%29.docx
8. PRICING FORM
2027 PARATRANSIT PROGRAM ASSESSMENT
Please provide your lump sum costs for each task.
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Task 1a: Project Plan and Project
Schedule 1 Lump Sum
2 Task 1b: Overall Project
Management and Administration 1 Lump Sum
3 Task 2: Stakeholder Engagement 1 Lump Sum
4 Task 3: Review of OtherTransit
Agencies 1 Lump Sum
5 Task 4: Current Program and
Service Performance Analysis 1 Lump Sum
6 Task 5: Needs and Service Gaps
Analysis 1 Lump Sum
7 Task 6: Cost-Benefit Analysis 1 Lump Sum
8 Task 7: Performance Framework and Strategies for Service
Improvement
1 Lump Sum
9 Task 8: Development of Accessible
Transportation Service Plan 1 Lump Sum
10 Task 9: FTA and USDOT
Compliance Report 1 Lump Sum
11 Not-To-Exceed Amount for
Reimbursable Travel Costs (to be reimbursed based on actual cost in accordance with 2.3 of the contract)
1 Lump Sum
TOTAL
9. SCOPE OF WORK SERVICES
See Attachments for the Scope of Work/Technical Specifications.
9.1. See attachments
"SOW 2027 Paratransit Program Assessment"
| 1. INTRODUCTION |
| 1.1. Summary |
| 1.2. Background |
| 1.3. Contact Information |
| 1.4. Timeline |
| 2. INSTRUCTIONS TO PROPOSERS |
| 2.1. Work |
| 2.2. Cost Type |
| 2.3. Award of Contract |
| 2.4. Period of Performance |
| 2.5. Options for this Contract |
| 2.6. Small Business Requirement for Contracts with an SBE Goal |
| 2.7. Proposals Valid |
| 3. GENERAL INSTRUCTIONS |
| 3.1. General |
| 3.2. Option(s) |
| 3.3. Addenda to RFP |
| 3.4. Inquiries |
| 3.5. Submission & Withdrawal |
| 4. PROPOSALS |
| 4.1. Submission Requirements |
| 4.2. Technical Proposal |
| 4.3. Contract Cost Proposal |
| 4.4. Only One Proposal Accepted |
| 4.5. Conflicting Information from Proposer |
| 5. AWARD PROCESS |
| 5.1. Phase 1 |
| 5.2. Phase 2 |
| 6. LEGAL NOTICE TO PROPOSERS |
| 6.1. Organizational Conflict of Interest |
| 6.2. Allowable Costs |
| 6.3. Insurance and Bond Requirements |
| 6.4. SBE Compliance |
| 6.5. News Releases |
| 6.6. Pre-Award Audit |
| 6.7. Cost of Proposal Preparation |
| 6.8. Materials Submitted |
| 6.9. Confidentiality |
| 6.10. Rights Reserved to RTD |
| 6.11. Prohibited Interests |
| 6.12. Competition in Subcontracting |
| 6.13. Personnel Availability |
| 7. PROPOSAL CONTENTS CHECKLIST (FORMS TO BE SUBMITTED) |
| 7.1. In addition to any information required elsewhere in this Solicitation and in the Scope of Work, all responses shall contain and will be evaluated based on the following sections: |
| 7.1.1. Name and Title of Individual(s) Authorized to Sign the Contract* |
| 7.1.2. Name and Title of Respondent’s Authorized Official* |
| 7.1.3. I certify that I have read, understood, and agree to be bound to the terms in the General Instructions, Solicitation Instructions, Award Process, and Legal Notice in this solicitation, and that I am authorized to submit this response on behalf ... |
| 7.1.4. I certify that I have read, understood and agree, on behalf of the firm submitting this response, to the terms and conditions including, but not limited to, the insurance requirements set forth herein with the exception of any modification requ... |
| 7.1.5. TECHNICAL PROPOSAL* |
| 7.1.6. Open Records Copy of Technical Proposal |
| 7.1.7. Detailed Cost Proposal |
| 7.1.8. Open Records Copy of Detailed Cost Proposal |
| 7.1.9. SBE CONTRACT REQUIREMENTS CERTIFICATION* |
| 7.1.10. SBE Required Enclosures* |
| 7.1.11. ORGANIZATIONAL CONFLICT OF INTEREST DISCLOSURE REQUIREMENTS* |
| 7.1.12. Current W9 * |
| 7.1.13. KEY PERSONNEL* |
| 7.1.14. The Respondent understands that any condition stated above, clarification of the above, or information submitted on or with this form other than requested will render the quotation non-responsive.* |
| 7.1.15. Background Investigations |
| 8. PRICING FORM |
| 9. SCOPE OF WORK SERVICES |
| 9.1. See attachments |
File details come from the government source that posted it. Updated .