20260310145041459 AMI Project Timeline and Milestones.pdf

PDF 141 KB Posted

Attached to
Advanced Metering Infrastructure Program State and local contract opportunity
Solicitation number
138260
Issued by
Polk County, Florida

About this file

This document is a project timeline and milestones exhibit for the Advanced Metering Infrastructure (AMI) Program being implemented by the Central Florida Tourism Oversight District (CFTOD) in Florida. The AMI solution encompasses the deployment of a multi-utility metering system, replacement of all existing meters, migration of legacy data from FoxPro to a modern SQL database, and establishment of data retention and ownership protocols. The project is structured in seven phases: Assessment & Planning (system evaluation and requirements review), Data Mapping & Design (schema design and mapping documentation), Migration Development (ETL tools and test migrations), Integration Setup (AMI connectivity established and tested), Testing & Validation (data and system testing completion), Training & Go-Live (user training, documentation, and production rollout). Bidders must submit a detailed milestone schedule with target completion timeframes measured in days from the Notice to Proceed (NTP) for each phase and milestone.

The document specifies that qualified vendors must provide comprehensive project timelines with defined completion targets for all phases to ensure systematic implementation and timely delivery of the modernized metering infrastructure. GIS Garmin GPX files for most meter locations are available upon request to prospective bidders registered in the CFTOD BID PORTAL, which must be obtained by emailing the designated buyer. The project objective is to modernize metering operations, enhance operational efficiency, and ensure secure, scalable, and compliant data management throughout the organization.

View the file

Other files for this state and local contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C

AMI Project Timeline and Milestones

Bidder:

Vendors must submit a milestone schedule and project timeline based on the phases listed below.

Phase Milestone

Target Completion (in days) from NTP

Assessment & Planning System evaluation: requirements review

Data Mapping & Design Schema design and mapping documentation

Migration Development ETL tools, test migrations

Integration Setup AMI connectivity established and tested

Testing & Validation Data/system testing completed

Training & Go-Live User training; documentation; production rollout

Bidder:
Target Completion in days from NTPSystem evaluation requirements review:
Target Completion in days from NTPSchema design and mapping documentation:
Target Completion in days from NTPETL tools test migrations:
Target Completion in days from NTPAMI connectivity established and tested:
Target Completion in days from NTPDatasystem testing completed:
Target Completion in days from NTPUser training documentation production rollout: