This is a Statement of Work for underwater hull inspection, cleaning, and maintenance services for the USCGC RAYMOND EVANS, a Coast Guard cutter. The contractor must conduct a comprehensive survey of the vessel's underwater body during the period of July 16-26, 2026, at 100 Trumbo Road in Key West, Florida. The work encompasses inspection of hull plating, underwater coatings, transducers, drive systems, appendages, and the cathodic protection system, followed by cleaning of designated surfaces and replacement of all bolted-on anodes. The contractor must employ a certified diving team with tender support and continuous two-way communications capability, adhering to 29 CFR 1910.401-440 (Commercial Diving Operations). Inspections must document findings using specific rating scales for paint deterioration and biofouling severity, supported by audio-video documentation with narration and linear measuring devices for scale reference.
The government will furnish specific cathodic protection anodes and fasteners valued at approximately $1,800 total, including stern tube anodes, sea chest grate anodes, propeller zinc plates, and bow thruster anodes. The contractor must complete written inspection reports on standardized Coast Guard forms and submit both written documentation and two DVDs of underwater video within 24 hours of inspection completion, along with a Change Request Form recommending surface cleaning requirements. The work is designated as a total small business set-aside with a NAICS code of 336611 and a small business size standard of 1,300 employees. Award will be made on a firm-fixed-price basis using simplified acquisition procedures, with the government reserving the right to award on an all-or-none basis to the lowest aggregate price offeror.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 52000QR260026246 FAR CLAUSES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hull Plating, U/W Body, Diver’s Inspect, Clean Perform
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to conduct a hull inspection and cleaning of the vessel’s U/W body and renewal of all bolted-on anodes in accordance with the referenced maintenance procedure cards. Affected surfaces or components include, but are not limited to the following:
· U/W hull plating.
· U/W body coating system.
· Transducer(s)/sonar dome.
· Drive Systems
· Appendages
· Cathodic Protection
1.2 Cutter, Address, Availability, and POC. USCGC RAYMOND EVANS, 100 Trumbo Road Key West, Florida 33040. Cutter Availability: 16-26 July 2026. POC: EM1 Emily R. Donnadio, Contact: (305) 680-8363, Emily.R.Donnadio@uscg.mil
1.3 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| N |
| Anode, stern tube |
| P/N: Z0020202H3 |
NIIN: 016445483
| 28 ea. |
| $11.15 |
| N |
| Nut, Self-Locking |
| P/N: 90715A145 |
NIIN: 015085774
2 Bx *24 in a bx $7.24
| N |
| Anode, Sea Chest Grate |
| P/N: GA-4 |
NIIN: 016476179
| 4 ea. |
| $21.93 |
| N |
| Screw, Prop zinc plate |
| P/N: 950756 |
NIIN: 016340210
| 8 ea. |
| $9.42 |
| N |
| Screw, Sea Chest Grate Anode, |
| P/N: 93190A634 |
NIIN: 016197182
| 4 ea. |
| $9.70 |
| N |
| Screw Cap, Stern Tube Covers |
| P/N: 90585A626 |
NIIN: 016161107
| 42 ea. |
| $1.81 |
| N |
| Zinc plate, propeller |
| P/N: 950733 |
NIIN: 016278941
| 2 ea. |
| $618.85 |
| N |
| Anode, Bow Thruster, Gear Case, Bolt On |
| P/N: 1081226 |
NIIN: 123561870
| 1 ea. |
| $64.97 |
| N |
| Anode, Bow Thruster, Tunnel, Bolt On |
| P/N: CM2000Z |
NIIN: 200126334
| 12 ea. |
| $29.46 |
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 154 WPC 565-201, Rev -, Fin Stabilizer System A & D Coast Guard Drawing 154 WPC 997-302, Rev -, Docking Plan Coast Guard Drawing 154B WPC 111-301, Rev A, Shell Expansion Coast Guard Drawing 154B WPC 161-301, Rev -, Skegs and Stern Tubes Support Structures Coast Guard Drawing 154B WPC 562-201, Rev -, Rudder Details Coast Guard Drawing 154B WPC 568-201, Rev B, Bow Thruster System A & D Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Maintenance Procedure Card B10015.D (MPC B10015.D), 10/31/24, Insp/Cln U/W Equipment (Hull Plate) Surface Forces Logistics Center Maintenance Procedure Card B10018.D (MPC B10018.D), 5/31/23, Replace Underwater Zinc Anodes
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 2007, Commercial Diving Operations
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor must remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 The Contractor must provide the Coast Guard Inspector 24 hours advance notice of when the diver inspection will occur. Before diving procedures are commenced, meet with the COR and the Coast Guard Inspector, to discuss diving safety requirements and the securing of cutter machinery, as applicable.
NOTE
At Contractor’s request, Ship’s force will secure and tag out the cathodic protection system, main engines, steering gear, generator set, A/C unit, fire pumps, and all other machinery which may cause a hazard while a diver is in the water.
3.2 Pre-diving clearance. The Contractor must ensure that the diving team obtains clearance from the Officer-of-the-Deck before beginning diving operations. Ensure the Coast Guard Inspector has capability for maintaining continuous two-way communication with diving personnel at all times, during the performance of this work item.
3.2.1 The Contractor must, in accordance with 29 CFR 1910.401-440, provide a certified diver and a tender team, as well as necessary support personnel and equipment, to accomplish the tasks specified herein.
WARNING
Mixed gas diving and live boating are not permitted.
3.3 Hull inspection requirements - general. The Contractor must survey the entire U/W body of the vessel to inspect for abnormal conditions or situations, which may include, but not be limited to the below listed.
· Hull plating and appendage damages.
· Coating system defects or failures.
· Welding corrosion and erosion.
· Deformation in appendages.
· Zinc performance.
3.3.1 Hull plating. The Contractor must inspect the exterior condition of the hull for presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action. Inspect for deformation along the stem and keel areas, condition of butt-welded seams, doubler plates, lap seams, and any signs of damaged plating or unusual waviness in the plating.
3.3.2 Coating system inspection. The Contractor must inspect the condition of the U/W body coating system, for signs of the following:
· Peeling.
· Blistering.
· Abrasion.
3.3.2.1 Use the guidelines provided in Table I (Paint Deterioration Ratings (PDR) for Antifouling/Anticorrosion (AF/AC) Paint System) and Table 2 (Fouling Ratings (FR) In Order of Increasing Severity) to assist in proper documentation of the coating system degradation and fouling rate, respectively.
TABLE 1 - PAINT DETERIORATION RATINGS (PDR) FORANTIFOULING/ANTICORROSION (AF/AC) PAINT SYSTEM
| PAINT DETERIORATION RATING (PDR) |
| DESCRIPTION |
| 10 |
| AF paint intact, red in color or with mottled pattern of light green and red. |
| 20 |
| AF paint missing from edges, corners, seams welds, river or boll head to expose AC paint. |
| 30 |
| AF paint missing from slightly curved or flat areas to expose AC paint. |
| 40 |
| AF paint missing from intact blisters to expose AC paint. |
| 50 |
| AF blisters ruptured to expose intact AC paint. |
| 60 |
| AF/AC paint missing or peeling to expose steel substrate, no corrosion present. |
| 70 |
| AF/AC paint removed from edges, corners, seams, welds, river or bolt heads to expose steel substrate with corrosion present. |
| 80 |
| Ruptured AF/AC blisters on slightly curved or flat surfaces with corrosion stains present. |
| 90 |
| Area corrosion of steel substrate with no AF/AC paint cover due to peeling or abrasion damage. |
| 100 |
| Area corrosion showing visible surface evidence of pitting, scaling, and roughening or steel substrate. |
TABLE 2 - FOULING RATINGS (FR) IN ORDER OF INCREASING SEVERITY
| TYPE |
| FOULING RATING |
(FR)
DESCRIPTION
| Soft |
| 0 |
| A clean, foul-free surface; red and/or black AF paint or a bare metal surface. |
| Soft |
| 10 |
| Light shades of red and green (incipient slime). Bare metal and painted surfaces are visible beneath the fouling. |
| Soft |
| 20 |
| Slime as dark green patches with yellow or brown colored areas (advanced slime). Bare metal and painted surfaces may by obscured by the fouling. |
| Soft |
| 30 |
| Grass as filaments up to 3 inches (76 mm) in length, projections up to 1/4 inch (6.4 mm) in height; or a flat network of filaments, green, yellow, or brown in color; or soft non calcareous fouling such as sea cucumbers, sea grapes, or sea squirts projecting up to 1/4 inch (6.4 mm) in height. The fouling cannot be easily wiped off |
by hand.
| Hard |
| 40 |
| Calcareous fouling in the form of tubeworms I less than ¼ inch in diameter or height. |
| Hard |
| 50 |
| Calcareous fouling in the form of barnacles less than ¼ inch in diameter or height. |
| Hard |
| 60 |
| Combination of tubeworms barnacles, less I than ¼ inch (6.4 mm) in diameter or height. |
| Hard |
| 70 |
| Combination of tubeworms and barnacles, greater than ¼ inch in diameter or height. |
| Hard |
| 80 |
| Tubeworms closely packed together and growing upright away from surface. Barnacles growing one on top of another, ¼ inch or less in height. Calcareous shells |
appear clean or white in color.
| Hard |
| 90 |
| Dense growth of tubeworms with barnacles, ¼ inch or greater in height; Calcareous shells brown in color (oysters and mussels); or with slime or grass overlay. |
| Composite |
| 100 |
| All forms of fouling present, Soft and Hard, particularly soft sedentary animals without calcareous covering (tunicates) growing over various forms of hard growth. |
3.3.3 Sea chests and other hull penetrations. The Contractor must accomplish the following:
· Inspect all sea chests and other hull penetrations for signs of any obstructions/marine growth in the openings that might prevent proper suction and discharge of water.
· Inspect for bare metal areas (surrounding penetrations) and for bare metal pitting.
· Inspect for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolt.
3.3.4 Propeller and shaft associated components. The Contractor must inspect the condition of the propeller shafts, struts, fairwaters, and rope guards. Note any loose or missing fairwater or rope guard fasteners.
3.3.4.1 Inspect propellers for corrosion, pitting, erosion, fouling, cracks, dings, curls, and nicks by side and blade.
3.3.4.2 Inspect the condition of the struts, keel drain plugs, rudders, rudder stocks, and rudder bearings, including any damage, pitting on leading and trailing edges of the rudder, and the presence of drain plugs.
3.3.5 Transducers. The Contractor must inspect the general condition of the fathometer transducer. Record condition of rubber coating and amount of marine growth present. Note in the inspection report any cuts, gouges, or other surface defects found.
3.3.6 Cathodic protection system. The contractor must inspect the general condition and performance of the cathodic protection system. Record condition of zinc anodes on Table 7, Zinc Wastage.
3.4 Inspection documentation. The Contractor must document the hull survey as follows:
3.4.1 Written report. The Contractor must record the U/W body coating system fouling rating on the attached “Pre-Clean Bio-fouling Inspection Data” Form.
3.4.1.1 Note all inspection findings and observations, as applicable, on attached observations on the following attached inspection data forms, as applicable, on the attached: “Diver Hull Inspection Data” Form.
3.4.1.2 In addition to completing the” Diver Hull Inspection Data” Form, do the following, as applicable:
· Document condition of running gear on attached “Running Gear Inspection Data” Form for each shaft.
· Document propeller condition on attached “Propeller Inspection Data” Form for each propeller.
· Document condition of rudders on attached “Port and Starboard Rudder Data Inspection” Form.
· Document condition of all U/W zincs on Table 7, Zinc Wastage.
3.4.2 Audio-video report. In addition to the written documentations specified above, The Contractor must produce an audio-video report, with narration, of all inspected surfaces. Place linear measuring devices, as applicable, in the field of view when videotaping hull damages, to provide scale for these damages.
3.4.3 Documentation submission. Within 24 hours after the completion of the diver inspection, The Contractor must do the following:
3.4.3.1 Submit a CFR indicating the amount of recommended U/W body surface cleaning, if any.
3.4.3.2 Submit both, the written and audio-video reports to the COR. Submit the audio-video report on two digital video discs (DVD) formatted to USCG requirements.
3.4.3.2.1 Ensure that all video equipment have the following characteristics/functions:
· Remote video/sound recorder.
· Suitability for underwater use.
· Auto-focus and auto-exposure.
· Color pictures.
· Two-way communication devices, to allow for communication and recording of communications between the diver operating the video camera and the Person-in-Charge, COR, and Coast Guard Inspector.
· Audio/visual cables long enough to transmit the video picture and two-way communications to the recorder and monitor.
· Online video monitor large enough, to allow the Person-in-Charge, the COR, and the Coast Guard Inspector to observe the video picture.
· Sufficient lighting to ensure a quality color video picture and depth of field.
· A yardstick or other suitable linear measuring device with clear measurement marks which can be read from the monitor.
3.4.3.2. 2 Closely monitor the video and sound quality during the survey, to ensure that the pictures on the monitor and the communication sounds remain of high quality. When either video or audio quality deteriorates, ensure that the survey is temporarily halted, until all problems have been corrected.
3.5. Hull cleaning requirements. Contractor must employ suitable means to clean the designated U/W body surfaces free of all marine growth, debris, and all other surface contaminants. The Contractor must ensure the following:
3.5.1 Ensure that existing U/W body coating system or non-coated surfaces do not incur any damage during cleaning process.
4. NOTES
4.1 Unit responsibilities. The ship's force will tag-out systems in accordance with COMDINST M9077.1 (series) and MPC B10015.D including the below.
· All propulsion machinery and shafting, including auxiliary propulsion machinery such as the bow thruster, and all steering machinery whenever the diver is in the water.
· All underwater body transducers, including the sonar equipment, for the duration of the underwater inspection operation.
· All active cathodic protection equipment for the duration of the underwater inspection operation.
· Each sea suction while the diver is inspecting the sea suction's sea chest strainer.
4.2 Mailing of video record. Upon receipt, the EPO will retain the diver report and underwater video inspection locally and forward a copy to the Engineering Section of the Product Line Division to which the vessel is assigned.
4.3 MPC Completion. Cutter EPO is responsible for ensuring MPC’s B10015.D and B10018.D are properly completed and submitted.
4.4 Cutter POC. Cutter POC is EPO EM1 Emily R. Donnadio, Contact: (305) 680-8363, Emily.R.Donnadio@uscg.mil
4.5 Period of performance must fall within 16July-26July2026. Work to be performed at 100 Trumbo Road Key West, Florida 33040
TABLE 3. PRE-CLEAN BIOFOULING INSPECTION DATA
PRE-CLEAN BIOFOULING INSPECTION DATA
| VESSEL NAME: |
| HULL TYPE / NUMBER |
| LOCATION (CITY) |
| DATE (mm/dd/yy) |
| PRODUCT LINE: |
| INSPECTING ACTIVITY |
| VISIBILITY (ft) |
| LOCATION OF LAST DRYDOCKING |
| UNDOCKING DATE |
| LOCATION OF LAST PAINTING |
| DATE |
PAINT
TYPE: ANTIFOULING: ANTICORROSION:
| DATE OF THE LAST WATERBORNE FULL HULL CLEANING |
| DATE OF THE LAST WATERBORNE INTERIM CLEANING |
| UNDERWATER PHOTOGRAPHS TAKEN □ YES □ NO |
| VIDEO TAKEN □YES □ NO |
| COMPONENTS |
| ( CHECK IF: ) |
N/A NOT INSPECTED
( PERCENTAGES MUST ADD UP TO 100 )
FOULING RATING FOULING RATING FOULING RATING
PROPELLER Centerline
| FR- % |
| FR- % |
| FR- % |
Port Outboard
| FR- % |
| FR- % |
| FR- % |
Port Inboard
| FR- % |
| FR- % |
| FR- % |
Starboard Inboard
| FR- % |
| FR- % |
| FR- % |
Starboard Outboard
| FR- % |
| FR- % |
| FR- % |
SHAFT Centerline
| FR- % |
| FR- % |
| FR- % |
Port Outboard
| FR- % |
| FR- % |
| FR- % |
Port Inboard
| FR- % |
| FR- % |
| FR- % |
Starboard Inboard
| FR- % |
| FR- % |
| FR- % |
Starboard Outboard
| FR- % |
| FR- % |
| FR- % |
RUDDER Centerline
| FR- % |
| FR- % |
| FR- % |
Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
SONAR DOME Port Side
| FR- % |
| FR- % |
| FR- % |
Starboard Side
| FR- % |
| FR- % |
| FR- % |
SEA CHEST Typical
| FR- % |
| FR- % |
| FR- % |
BOW Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
SIDES Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
BOTTOM Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
STERN Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
TRANSOM Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
Signature (Ship’s Engineer): Signature (Diving Supervisor):
TABLE 4. DIVER HULL INSPECTION DATA
DIVER HULL INSPECTION DATA
| VESSEL NAME: |
| HULL TYPE / NUMBER |
| LOCATION (CITY) |
| DATE (mm/dd/yy) |
| PRODUCT LINE: |
| INSPECTING ACTIVITY |
VISIBILITY (ft)
LOCATION OF LAST DRYDOCKING
UNDOCKING DATE
LOCATION OF LAST PAINTING
DATE
PAINT
TYPE: ANTIFOULING: ANTICORROSION:
DATE OF THE LAST WATERBORNE FULL HULL CLEANING
UNDERWATER PHOTOGRAPHS TAKEN □ YES □ NO UNDERWATER WORK ACCOMPLISHED THIS DATE
| □ FULL CLEAN | □POLISH | □MULTI-BRUSH |
| □INTERIM | □HYDRO | □HAND-HELD |
DATE OF THE LAST WATERBORNE INTERIM CLEANING
UNDERWATER COLOR VIDEO TAKEN □ YES □ NO
| □INSPECT | □PAINT |
| □REPAIR | □OTHER |
1. HULL COATING SYSTEM (PDR )
a. ANTIFOULING PAINT
PERCENTAGE REMAINING IS THE A/F □ HARD □ SOFT
PERCENT REJUVENATION
| PERCENTAGE | |
| PEELING | |
| LOCALIZED or | |
| GENERAL |
| BLISTERING | |
| LOCALIZED or | |
| GENERAL |
| ABRASION | |
| LOCALIZED or | |
| GENERAL |
CONDITION SUMMARY [ IF PAINT DAMAGE IS LOCALIZED, GIVE LOCATION(s) ]
b) ANTICORROSION PAINT
PERCENTAGE REMAINING
| PERCENTAGE | PEELING | |
| LOCALIZED or | ||
| GENERAL |
| BLISTERING |
| LOCALIZED or |
| GENERAL |
| ABRASION |
| LOCALIZED or |
| GENERAL |
c) DOCKING BLOCK AREAS (PDR )
AVERAGE PERCENTAGE OF BLOCK AREAS PAINTED %
BARE METAL PITTING % IN. DIAMETER IN. DEEP
TABLE 5. DIVER HULL INSPECTION DATA (CONT.)
DIVER HULL INSPECTION DATA (CONTINUED)
2. CATHODIC PROTECTION SYSTEM
a. SACRIFICIAL ANODES (ZINCS)
| AVERAGE PERCENTAGES OF ANODES REMANING | % | |
| ANODES ARE: | □ UNIFORMLY WASTED | □WASTAGE GREATEST IN FOLLOWING AREAS: |
ANODES ARE : □WELDED □BOLTED □ BOTH NUMBER AND LOCATION OF ANY ANODES MISSING OR INACTIVE:
MISSING
INACTIVE
b. IMPRESSED CURRENT
| □ DAMAGE NOTED ON ATTACHED DRAWING | (Port/Stbd) | (FRAME | ) |
| □WIRES LOOSE, BROKEN, OR MISSING | (Port/Stbd) | (FRAME | ) |
| □CAPASTIC SHIELD DAMAGE | (Port/Stbd) | (FRAME | ) |
| □ INSULATORS LOOSE OR DAMAGED | (Port/Stbd) | (FRAME | ) |
| □ OTHER | (Port/Stbd) | (FRAME | ) |
3. GENERAL HULL DAMAGE (HULL PLATING, BILGE KEELS, etc.):
4. HULL PENETRATIONS (PDR )
% CLOGGED WITH MARINE GROWTH (POST CLEAN)
% BARE METAL (AREA SURROUNDING PENETRATION)
% BARE METAL PITTING
AVERAGE PIT SIZE: in. DIAMETER, in. DEPTH
CONDITION SUMMARY:
TABLE 6. DIVER HULL INSPECTION DATA (CONT.)□ NO DAMAGE
□ DAMAGE SHOWN ON
STARBOARD
ATTACHED DRAWINGS
PORT
PERCENT BARE METAL
PDR
ACCESS PLATES INTACT?
□ YES □ NO
□ YES □ NO
WAS RUDDER SOUNDED?
□ YES □ NO
□ YES □ NO
ANY SIGNS OF FLOODING?
□ YES □ NO
□ YES □ NO
ANY SIGNS OF DROPPING?
DIVER HULL INSPECTION DATA (CONTINUED)
5. SONAR DOME
□ NO VISIBLE DAMAGE □ DAMAGE NOTED ON ATTACHED DRAWING □CUTS □LAYER SEPARATION □WIRE PILES EXPOSED
| 6. | PROPULSION SHAFTING | |
| VISIBLE BARE METAL □ YES □ NO | RUST BLEEDING □ YES □NO | PITTING □ YES □NO CONDITION SUMMARY (TYPE OF DAMAGE, LOCATION AND SIZE): |
| 7. | STRUTS AND BEARING HOUSING | |||||
| PERCENT BARE METAL: | STARBOARD | PORT MAIN | % | % | ||
| INTERMEDIATE | % | % | ||||
| PDR | CONDITION OF STRUT LEADING AND TRAILING EDGES: |
CONDITION OF ROPE GUARDS:
CONDITION OF FAIRWATERS:
8. RUDDER
CONDITION SUMMARY:
| 9. | PROPELLERS | ||||||||||
| PROP #1: | NICKS | □ NO DAMCAUGRELS□ DAMAGE SHOWN ONCRAATCTKASC–HELADRDGREASWT ICNRGASCK LENGTH | in. PROP #2: | NICKS | CURLS | CRACKS – LARGEST CRACK LENGTH | in. | ||||
| PROP #3: | NICKS | CURLS | CRACKS – LARGEST CRACK LENGTH | in. PROP #4: | NICKS | CURLS | CRACKS – LARGEST CRACK LENGTH | in. |
PROPELLERS NUMBERED STARBOARD TO PORT.
Diving Supervisor: Ship’s Engineer:
TABLE 7. ZINC WASTAGE
FIGURE 1. PROPELLER INSPECTION DATA
FIGURE 2. STARBOARD RUNNING GEAR INSPECTION
FIGURE 3. PORT AND STARBOARD RUDDER INSPECTION
image1.png image2.png image3.png image4.png
File details come from the government source that posted it. Updated .