2026-2027 BWA RENEWALS FINAL CONTRACT DOCUMENTS.pdf
PDF 6 MB Posted
- Attached to
- 2026-2027 Water Renewal Project
- Solicitation number
- BWA 2026-112
- Issued by
- Tarrant County, Austin City, Texas
About this file
2026-2027 Water Renewal Project - Contract Documents
This is a project manual and bid document package for construction services issued by the Benbrook Water Authority (BWA) in Fort Worth, Texas. The project encompasses the construction of 6-inch and 8-inch water main replacements and 6-inch, 8-inch, and 10-inch sanitary sewer main replacements across multiple streets in Benbrook, totaling approximately 9,450 linear feet of water mains and 2,750 linear feet of sanitary sewer mains, along with approximately 900 meter replacements. The project includes two bidding alternatives: Alternative A for open-cut construction methods and Alternative B for pipe-bursting methods. Sealed bids are due by 11:00 AM on Tuesday, September 22, 2026, at the BWA Office located at 1121 Mercedes, Benbrook, Texas 76126. A non-mandatory pre-bid conference is scheduled for 11:00 AM on Thursday, September 10, 2026, at the same location. The contract award is anticipated within 30 days of bid opening, with bids remaining open for evaluation for up to 60 days. The contractor must substantially complete the work within 180 calendar days and achieve final completion within 210 calendar days from the Notice to Proceed.
Bidders must submit a cashier's check, certified check, or bid bond equal to 5 percent of the maximum total bid price as bid security. Performance, payment, and maintenance bonds—each in the amount of 100 percent of the contract price—are required upon award. The contract structure utilizes unit pricing for individual pay items across both alternatives, with final payment based on actual quantities rather than estimated quantities. A qualified contractor statement of qualifications, including financial statements, experience records, and equipment schedules, must accompany all bids. Contractor shall perform work valued at no less than 50 percent of the total contract value with its own organization unless otherwise approved by BWA. Liquidated damages are assessed at $500 per day for delays beyond the completion deadline. The contract is subject to Texas Government Code Chapter 2252 regarding nonresident bidder bid adjustments. BWA qualifies as a tax-exempt agency under Texas statute. Project design was completed by Westwood Professional Services, with engineering inquiries directed to Dillon Burton, P.E., at 817-412-7155 or Dillon.Burton@westwoodps.com.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised: October 2021 BWA Standard Specifications
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
2026-2027 WATER RENEWAL PROJECT
BWA Project No. 2026-112
Prepared for
Benbrook Water Authority
PREPARED BY:
TX REG. ENGINEERING FIRM F-11756
4060 Bryant Irvin Road, Fort Worth, Texas 76109
(817) 412-7155 Fax (817) 412-7156
T
E
S
PR
FO
SXAET
ATE OF
ER
NISE
EL NG
D EC
O I I
E
NSS
L N A
DILLON R. BURTON
144901
08/21/2026 F-11756
TABLE OF CONTENTS
PART A – STANDARD SPECIFICATIONS
Table of Contents
Division 00 - General Conditions
00 00 00 Table of Contents
00 05 15 Addenda
00 11 13 Invitation to Bidders
00 21 13 Instructions to Bidders
00 35 13 Conflict of Interest Affidavit
00 41 00 Bid Proposal
00 43 37 Vendor Compliance to State Law Nonresident Bidder
00 45 10 Qualification of Bidder Statement Sworn Affidavit
00 45 26 Contractor Compliance with Workers' Compensation Law
00 52 43 Agreement
00 61 13 Performance Bond
00 61 14 Payment Bond
00 61 19 Maintenance Bond
00 61 25 Certificate of Insurance
00 72 00 General Conditions
00 73 00 Supplementary Conditions
Division 01 - General Requirements
01 11 00 Summary of Work
01 25 00 Substitution Procedures
01 31 19 Preconstruction Meeting
01 31 20 Project Meetings
01 32 16 Construction Progress Schedule
01 32 33 Preconstruction Video
01 33 00 Submittals
01 45 23 Testing and Observation Services
01 50 00 Temporary Facilities and Controls
01 55 26 Right-of-Way Excavation Permit and Modifications to Traffic Control
01 57 13 Storm Water Pollution Prevention Plan
01 60 00 Product Requirements
01 66 00 Product Storage and Handling Requirements
01 70 00 Mobilization and Remobilization
01 74 23 Cleaning
01 77 19 Closeout Requirements
01 78 39 Project Record Documents
Division 02 - Existing Conditions
02 41 14 Utility Removal/Abandonment
Division 03 - Concrete
03 30 00 Cast-In-Place Concrete
03 34 13 Controlled Low Strength Material (CLSM)
03 34 16 Concrete Base Material for Trench Repair
Division 32 - Exterior Improvements
32 01 17 Permanent Asphalt Pavement Repair
32 01 18 Temporary Pavement Repair
32 01 29 Concrete Pavement Repair
Division 33 – Utilities
33 01 30 Sewer and Manhole Testing
33 01 31 Closed Circuit Television (CCTV) Inspection
33 04 30 Temporary Water Services
33 04 40 Cleaning and Acceptance Testing of Water Mains
33 04 50 Cleaning of Sewer Mains
33 05 10 Utility Trench Excavation, Embedment, and Backfill
33 05 13 Frame Cover and Grade Rings – Cast Iron
33 11 11 Ductile Iron Fittings
33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe
33 11 13 Pipe Bursting of Water Main
33 12 10 Water Services 1-inch to 2-inch
33 12 20 Resilient Seated Gate Valve
33 12 25 Connection to Existing Water Mains
33 12 40 Fire Hydrants
33 31 15 HDPE Pipe for Sanitary Sewer
33 31 20 Polyvinyl Chloride Gravity SS Pipe
33 31 23 Sanitary Sewer Pipe Enlargement
33 31 50 Sanitary Sewer Service Connections and Service Line
33 39 20 Precast Concrete Manholes
33 39 60 Epoxy Liners for Sanitary Sewer Structures
Division 34 – Traffic
34 71 13 Traffic Control
Appendix
Appendix A Standard Product List
Appendix B Water Meter Replacement Schedule
END OF SECTION
00 05 15
ADDENDA
SECTION 00 05 15
ADDENDA
00 11 13
INVITATION TO BIDDERS
SECTION 00 11 13
INVITATION TO BIDDERS
Sealed Proposals addressed to Benbrook Water Authority will be received at the Benbrook Water
Authority Office, 1121 Mercedes, Benbrook, Texas 76126, until:
11:00 am, Tuesday, September 22, 2026 and then publicly opened and read aloud, for performing all work required for the construction of
Bids shall be submitted in sealed envelopes upon the form or proposal furnished as a part of the
Contract Documents. All proposals shall be accompanied by a cashier's check, certified check or a bid bond in an amount of not less than 5% of the maximum total bid price, as a guarantee that bidder will enter into a contract and execute all required bonds within ten (10) days after notice of a contract award. The bid security must be included in the same envelope as the bid proposal and bids received without a bid security will not be considered.
All bid securities will be returned to bidders within ninety (90) days.
All proposals shall be accompanied by a completed and executed Contractor’s Statement of
Qualification as described in Specifications. The Contractor’s Statement of Qualification must be included in the same envelope as the Bid Proposal and bids received without a Contractor’s
Statement of Qualification will not be considered.
A performance bond and payment bond, each in an amount of not less than one hundred percent
(100%) of the contract price, conditioned upon the faithful performance of the contract and upon payment of all persons supplying labor or furnishing materials, will be required. A maintenance bond in an amount of not less than one hundred percent (100%) of the contract price, conditioned upon maintenance of this project for a period of two years, shall also be required. The three aforementioned bonds shall be made payable to the "Benbrook Water Authority".
The above Addressee reserves the right to reject any or all bids and to waive any formalities in bids received.
Contract Documents may be examined without charge at the following addresses:
Westwood Professional Services Benbrook Water Authority
4060 Bryant Irvin Road 1121 Mercedes
Fort Worth, Texas 76109 Benbrook, Texas 76126
817-412-7155
Copies of the bid documents may be obtained from www.CivCastUSA.com. Bidders must register on this website in order to view and/or download specifications and plans for this project.
There is NO charge to view or download documents.
A non-mandatory pre-bid conference for the General Contractors will be held at the office of
Benbrook Water Authority, 1121 Mercedes Street, Benbrook, Texas, 76126 on 11:00 am, Thursday, September 10, 2026
00 11 13
INVITATION TO BIDDERS
Direct questions related to the design of the project to Dillon Burton P.E. Questions may be submitted via email, Dillon.Burton@westwoodps.com or by phone, 817-412-7155.
The project consists of construction of 6” and 8” water main replacements and 6”, 8”, and 10” sanitary sewer main replacements on the following streets:
• Bryant St. from N Cozby St. to Vernon Castle Ave. – 3,100 LF Water
• Estes St. from Davidson St. to Childers Ave. – 600 LF Water
• Mckinley Street 1000 Block – 300 LF Water
• Thornhill Rd. from Windward Rd. to Steppe Dr. – 1,250 LF Water
• Winding Way from Capra Way to Dead End – 3,200 LF Water & 1,200 LF Sewer
• One Main Pl. from Country Club Dr. to Dead End – 550 LF Water & 550 LF Sewer
• Capra Way – 400 LF Sewer
*A bid alternative for pipe bursting the segments has also been included.
If the Contract is to be awarded, Owner intends to give the Successful Bidder a Notice of Award within 30 days, but bids will remain open for up to 60 days.
The Benbrook Water Authority reserves the right to adopt the most advantageous interpretation of the Proposals submitted in the case of ambiguity or lack of clearness in stating proposal prices, to reject any or all Proposals, and/or waive formalities. Proposals may not be withdrawn within one hundred eighty (180) days from date on which Proposals are opened.
Advertisement Dates:
1st Advertisement - Tuesday September 1st, 2026
2nd Advertisement - Tuesday September 8th, 2026
00 21 13
INSTRUCTIONS TO BIDDERS
Revised: October 2021 BWA Standard Specifications
SECTION 00 21 13
1. Defined Terms
1.1. Terms used in these INSTRUCTIONS TO BIDDERS, which are defined in Section 00 72
00 - GENERAL CONDITIONS.
1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof.
1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract
Documents.
1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract
Documents whose principal place of business is not in the State of Texas.
1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom
BWA (on the basis of BWA’s evaluation as hereinafter provided) makes an award.
1.2.4. Bidding Documents: Documents including the Invitation to Bid, Instructions to Bidders, the Bid Form and the proposed Contract Documents
(including all Addenda issued prior to receipt of Bids).
1.2.5. Bid Form: Synonymous with Proposal.
2. Copies of Bidding Documents
2.1. Complete sets of Bidding Documents must be used in preparing Bids. Neither BWA or its Engineer assume any responsibility for errors or misinterpretations resulting from the
Bidders use of incomplete sets of Bidding Documents.
2.2. BWA in making copies of Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use.
3. Qualification Requirements
3.1. A verified financial statement, experience record and equipment schedule shall be submitted by each Bidder as described in Section 00 45 10 –QUALIFICATION OF
BIDDER STATEMENT.
Revised: October 2021 BWA Standard Specifications
3.1.1. The experience record must show that the bidder has performed work of the same nature and magnitude as this project and such experience must have been on projects completed within 3 years of the date bids are to be received.
3.1.2. The experience record shall also show a list of all projects currently under construction, showing the location, award date, amount bid, percentage complete and estimated completion date. The owner shall be the sole judge as to the acceptability of experience for qualification to bid.
3.1.3. Financial statements may be in separate sealed envelopes, and will be returned with the bid security, if requested.
3.2. Prospective bidders whose qualifications are not deemed to be appropriate to the nature or magnitude of this project will be so notified.
4. Bid Security
4.1. A cashier's or certified check or an acceptable Bidder's bond on form attached, issued by a surety meeting the requirements of Paragraphs 5.01 of the General Conditions, payable to Benbrook Water Authority, in an amount of not less than five percent (5%) of the largest possible total of the Bid submitted, must accompany the Bid.
4.2. The Bid Security of all Bidders will be retained until the conditions of the Notice of
Award have been satisfied. If the Successful Bidder fails to execute and deliver the complete Agreement within 10 days after the Notice of Award, BWA may consider
Bidder to be in default, rescind the Notice of Award, and the Bid Security of that Bidder will be forfeited. Such forfeiture shall be BWA’s exclusive remedy if Bidder defaults.
4.3. The Bid Security of all other Bidders whom BWA believes to have a reasonable chance of receiving the award will be retained by BWA until final contract execution.
5. Examination of Bidding and Contract Documents, Other Related Data, and Site
5.1. Before submitting a Bid, each Bidder shall, at bidder’s own expense:
5.1.1. Examine and carefully study the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to in Paragraph 5.2. below). No information given by BWA or any representative of BWA other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon BWA.
5.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work.
5.1.3. Consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work.
Revised: October 2021 BWA Standard Specifications
5.1.4. Study all: (i) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground
Facilities) that have been identified in the Contract Documents as containing reliable "technical data" and (ii) reports and drawings of Hazardous
Environmental Conditions, if any, at the Site that have been identified in the
Contract Documents as containing reliable "technical data."
5.1.5. Be advised that the Contract Documents on file with BWA shall constitute all of the information which BWA will furnish. All additional information and data which BWA will supply after promulgation of the formal Contract
Documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by
BWA other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon BWA.
5.1.6. Perform independent research, investigations, tests, borings, and such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. On request, BWA may provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies.
5.1.7. Determine the difficulties of the Work and all attending circumstances affecting the cost of doing the Work, time required for its completion, and obtain all information required to make a proposal. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal is prima-facie evidence that the Bidder has made the investigation, examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed.
5.1.8. Promptly notify BWA of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related documents.
The Contractor shall not take advantage of any gross error or omission in the
Contract Documents, and BWA shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents.
5.2. Reference is made to Section 00 73 00 – Supplementary Conditions for identification of:
Revised: October 2021 BWA Standard Specifications
5.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by BWA in preparation of the Contract Documents. The logs of Soil Borings, if any, on the plans are for general information only. Neither BWA nor its Engineer guarantee that the data shown is representative of conditions which actually exist.
5.2.2. those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by BWA in preparation of the
Contract Documents.
5.2.3. copies of such reports and drawings will be made available by BWA to any
Bidder on request. Those reports and drawings may not be part of the
Contract Documents, but the "technical data" contained therein upon which
Bidder is entitled to rely as provided in Paragraph 4.02. of the General
Conditions has been identified and established in Paragraph SC 4.02 of the
Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any "technical data" or any other data, interpretations, opinions or information.
5.3. The submission of a Bid will constitute an incontrovertible representation by Bidder (i) that Bidder has complied with every requirement of this Paragraph 4, (ii) that without exception the Bid is premised upon performing and furnishing the Work required by the
Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (iii) that Bidder has given BWA written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by BWA are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by BWA as described in
Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the
Work.
5.4. The provisions of this Paragraph 5, inclusive, do not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by
Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract
Documents.
6. Availability of Lands for Work, Etc.
6.1. The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by BWA unless otherwise provided in the
Contract Documents.
Revised: October 2021 BWA Standard Specifications
6.2. Outstanding right-of-way, easements, and/or permits to be acquired by BWA are listed in
Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right-of-way, easements, and/or permits are not obtained, BWA reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project.
6.3. The Bidder shall be prepared to commence construction without all executed right-of-way, easements, and/or permits, and shall submit a schedule to BWA of how construction will proceed in the other areas of the project that do not require permits and/or easements.
7. Interpretations and Addenda
7.1. Bidders wanting further information, interpretation or clarification of the Contract
Documents must make their request in writing to the Engineer at least three (3) days prior to bid opening. Questions received after this time may not be answered. Answers to all such requests will be bound and made a part of the Contract Documents. No other explanation or interpretation will be considered official or binding. Questions received less than seventy-two (72) hours prior to the date for opening of Bids may not be answered.
7.2. Should a bidder find discrepancies in or omissions from the Contract Documents or should he be in doubt as to their meaning, he should at once notify the Engineer in order that a written addendum may be sent to all bidders.
Direct questions related to the design of the project to Dillon Burton, P.E. Questions may be submitted via email, Dillon.Burton@westwoodps.com or by phone, 817-412-
7155.
7.3. The bid proposal, as submitted by the bidder, must be so constructed as to include any addenda issued by the Engineer prior to twenty-four (24) hours of the opening bids and with the appropriate recognition of addenda so noted in the Bid Proposal.
8. Contract Times
The number of days within which, or the dates by which, Milestones are to be achieved in accordance with the General Requirements and the Work is to be completed and ready for
Final Acceptance is set forth in the Agreement or incorporated therein by reference to the attached Bid Form.
9. Liquidated Damages
Provisions for liquidated damages are set forth in Agreement.
mailto:Dillon.Burton@westwoodps.com
Revised: October 2021 BWA Standard Specifications
10. Substitute and "Or-Approved Equal" Items
The Contract, if awarded, will be on the basis of materials and equipment described in the
Bidding Documents without consideration of possible substitute or "or-approved equal" items. Whenever it is indicated or specified in the Bidding Documents that a "substitute" or
"or-approved equal" item of material or equipment may be furnished or used by Contractor if acceptable to BWA, application for such acceptance will not be considered by BWA until after the Effective Date of the Agreement. The procedure for submission of any such application by Contractor and consideration by BWA is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General Conditions and is supplemented in Section 01 25 00 of the
General Requirements.
11. Subcontractors, Suppliers and Others
11.1. BWA may require the identity of certain subcontractors, suppliers and other persons and organizations (including those who are to furnish the principal items of material and equipment) to be submitted to BWA, prior to Notice of Award. The apparent
Successful Bidder and any other Bidder so requested, shall within seven (7) days after the Bid opening submit to BWA a list of all such subcontractors, suppliers and other persons and organizations proposed for those portions of the work for which such identification is required.
11.2. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such subcontractor, supplier, person or organization if requested by BWA.
11.3. The declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any Bidder. Any subcontractor, supplier, other person or organization listed and to whom BWA does not make written objection prior to the
Notice of Award will be deemed acceptable to BWA.
11.4. No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor has reasonable objection.
12. Bid Form
12.1. The Bid Form is included with the Bidding Documents.
12.2. All blanks on the Bid Form must be completed by printing or typing in ink and the
Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No
Bid," "No Change," or "Not Applicable" may be entered. Bidder shall state the prices, written in ink, or typed and signed, in both words and numerals, for which the
Bidder proposes to do the work contemplated or furnish materials required. All prices shall be written legibly. In case of discrepancy between price in written words and the price in written numerals, the price in written words shall govern.
Revised: October 2021 BWA Standard Specifications
12.3. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature.
12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature.
12.5. Bids by limited liability companies shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.
12.6. Bids by individuals shall show the Bidder's name and official address.
12.7. Bids by joint ventures shall be executed by each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.
12.8. All names shall be typed or printed in ink below the signature.
12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
12.10. Postal and e-mail addresses and telephone number for communications regarding the
Bid shall be shown.
12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of
Texas shall be provided in accordance with Section 00 43 37 – Vendor Compliance to State Law Non Resident Bidder.
13. Submission of Bids
Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, addressed to General Manager of BWA, and shall be enclosed in an opaque sealed envelope, marked with the BWA Project Number, Project title, the name and address of Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of envelope.
14. Modification and Withdrawal of Bids
14.1. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids.
Revised: October 2021 BWA Standard Specifications
14.2. If, within twenty-four (24) hours after Bids are opened, any Bidder files a duly signed, written notice with BWA and promptly thereafter demonstrates to the reasonable satisfaction of BWA that there was a material and substantial mistake in the preparation of his Bid, that Bidder may withdraw his Bid and the Bid security will be returned. Thereafter, that Bidder will be disqualified from further Bidding on the work to be provided under the Contract Documents.
15. Opening of Bids
Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids.
16. Bids to Remain Subject to Acceptance
All Bids will remain subject to acceptance for the time period specified for Notice of Award and execution and delivery of a complete Agreement by Successful Bidder. BWA may, at
BWA's sole discretion, release any Bid and nullify the Bid security prior to that date.
17. Evaluation of Bids and Award of Contract
17.1. BWA reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the work and to negotiate contract terms with the Successful Bidder. BWA reserves the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids. Also, BWA reserves the right to reject the Bid of any Bidder if BWA believes that it would not be in the best interest of the project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by BWA. Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.
17.2. Any or all bids will be rejected if BWA has reason to believe that collusion exists among the Bidders, Bidder is an interested party to any litigation against BWA, BWA or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the BWA will prevent or hinder the prompt completion of additional work if awarded.
17.3. BWA may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the
BWA.
17.4. BWA also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the
Notice of Award.
Revised: October 2021 BWA Standard Specifications
17.5. BWA may conduct such investigations as BWA deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract
Documents to BWA’s satisfaction within the prescribed time.
17.6. Contractor shall perform with his own organization, work of a value not less than
50% of the value embraced on the Contract, unless otherwise approved by the BWA.
17.7. If the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by BWA indicates that the award will be in the best interests of the BWA.
17.8. Pursuant to Texas Government Code Chapter 2252.001, BWA will not award contract to a Nonresident Bidder unless the Nonresident Bidder’s bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a
Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident’s principal place of business is located.
17.9. Failure or refusal to comply with the requirements may result in rejection of Bid.
18. Sales Taxes
18.1. BWA qualifies as an exempt agency as defined by the statutes of the State of Texas.
BWA’s purchasing department will issue exemption certificates. Comply with all statutes and rulings of the State Comptroller.
19. Signing of Agreement
When BWA gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract
Documents attached. Within fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to
BWA with the required Bonds. Within fifteen (15) days thereafter, BWA shall deliver two (2) fully signed counterparts to CONTRACTOR. Each counterpart is to be accompanied by complete sets of the drawings with appropriate identification.
00 35 13
CONFLICT OF INTEREST AFFIDAVIT
SECTION 00 35 13
CONFLICT OF INTEREST AFFIDAVIT
Each bidder, offeror, or respondent (hereinafter also referred to as “you”) to a Benbrook Water
Authority (also referred to as “BWA”) procurement are required to complete Conflict of Interest
Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts Disclosure
Statement (the attached CIS Form) below pursuant to state law. This affidavit will certify that the
Bidder has on file with the BWA the required documentation and is eligible to bid on BWA
Work. The referenced forms may be downloaded from the website links provided below.
Conflict of Interest Questionnaire https://www.ethics.state.tx.us/data/forms/conflict/CIQ.pdf
Local Government Officer Conflicts Discloser Statement https://www.ethics.state.tx.us/data/forms/conflict/CIS.pdf
CIQ Form is on file with BWA
CIQ Form is being provided to BWA
CIS Form is on File with BWA
CIS Form is being provided to BWA
BIDDER:
_____________________________________ By: ___________________________________
Company (Please Print)
_____________________________________ Signature: ______________________________
Address
_____________________________________ Title: __________________________________
City/State/Zip (Please Print) https://www.ethics.state.tx.us/data/forms/conflict/CIQ.pdf https://www.ethics.state.tx.us/data/forms/conflict/CIS.pdf
00 41 00 Bid Proposal
SECTION 00 41 00
BID PROPOSAL
For
(This proposal must not be removed from Contract Documents) Date: _____________
Pursuant to the foregoing "Notice to Bidders", the undersigned bidder, having thoroughly examined the Contract Documents, the site of project and understanding the amount of work to be done and the prevailing conditions, hereby proposes to fully complete all of the work and requirements as provided in the Plans and Contract Documents and binds himself upon acceptance of this proposal to execute a contract and furnish such bonds as required and proposes to complete the work within the time stated and for the following prices:
Contractor to complete bid for Alternative A
AND/OR
Contractor to complete bid for Alternative B
Contractor has the choice to bid the open cut alternative (Alternative A) and/or the pipe burst alternative
(Alternative B).
ITEM
NO.
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
1. 1 LS
Traffic Control
Dollars and
Cents per Lump Sum.
2.
1 LS
Temporary Erosion, Sedimentation And Water Pollution Prevention (SWPPP)
3. 1 LS
Temporary Water Services
4. 11 EA
Remove Gate Valve
Cents per Each.
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
5. 21 EA
Abandon Gate Valve
6.
8 EA
Remove Fire Hydrant
7.
17 EA
Remove and Replace Mailbox
8.
3 EA
Tree Removal
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
9.
7 EA
Remove and Replace Sign
10.
9,061 LF
Trench Safety
Cents per Linear Foot.
11.
5 EA
Remove and Replace Residential Light Pole
12. 9 EA
6” Water Abandonment Plug (Furnish & Install)
Cents per Each. $ $
13. 11 EA
8” Water Abandonment Plug (Furnish &
Cents per Each. $ $
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
14. 3,740 LF
6” PVC, DR-18 Water Pipe By Open Cut (Furnish & Install)
Cents per Linear Foot. $ $
15. 981 LF
6” HDPE, DR-17 Water Pipe By Pipe Burst
Cents per Linear Foot. $ $
16. 15 LF
6” HDPE, DR-17 Water Pipe By Open Cut
17. 4,890 LF
8” PVC, DR-18 Water Pipe By Open Cut
18. 80 LF
6” PVC, DR-18 Water Pipe in Casing Pipe
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
19. 80 LF
12” Steel Casing, By Other Than Open Cut
20. 20 LF
12” DR-18 Casing Pipe By Open Cut (Furnish & Install)
21. 3 TN
Ductile Iron Water Fittings with Restraint
Cents per Ton.
22. 8 EA
Fire Hydrant (Furnish & Install)
23. 30 EA
6” Gate Valve (Furnish & Install)
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
24. 18 EA
8” Gate Valve (Furnish & Install)
25. 119 EA
1” Bored Water Service
26. 62 EA
1” Water Service
27. 2 EA
2” Water Service
28. 20 EA
Connect To Existing Water Main
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
29. 1,640 LF
Permanent Asphalt Pavement Repair
30. 84 SY
Permanent Concrete Pavement Repair
Cents per Square Yard.
31. 175 LF
6” Concrete Curb and Gutter
32. 581 SY
6” Concrete Driveway
33. 71 SY
4” Concrete Sidewalk
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
34. 3 EA
Barrier Free Ramp
35. 6 SY
Concrete Paver Repair
36. 909 EA
Meter Replacement (Install)
37. 716 LF
6” HDPE, DR-17 Sanitary Sewer By Pipe Burst (Furnish & Install)
38. 613 LF
8” HDPE, DR-17 Sanitary Sewer By Pipe
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
39. 416 LF
12” PVC, SDR-26 Sanitary Sewer By Open Cut (Furnish & Install)
40. 497 LF
12” HDPE, DR-17 Sanitary Sewer By Pipe
41. 23.1 VF
Extra Depth Manhole (Furnish & Install)
Cents per Vertical Foot.
42. 1 EA
Remove Sanitary Sewer Manhole
43. 6 EA
4’ Diameter Sanitary Sewer Manhole (Furnish
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
44. 3 EA
5’ Diameter Sanitary Sewer Manhole (Furnish
45. 2 EA
Remove Sanitary Sewer Cleanout
46. 6 EA
Rehab Sanitary Sewer Manhole (Reconnect & Clean)
47. 53 EA
4” Sanitary Sewer Service (Furnish & Install)
48. 57 VF
Epoxy Manhole Liner (Furnish & Install)
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
It is understood that the TOTAL ALTERNATIVE A BID for the 2026-2027 WATER RENEWAL PROJECT will only be used as a basis for comparison of bids and award of Contract. The total payment to the Successful
Bidder will be the Amount Bid adjusted by additions and/or deletions of actual amounts or quantities used.
TOTAL ALTERNATIVE A BID $
AND/OR
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
1. 1 LS
Traffic Control
2.
Temporary Erosion, Sedimentation And Water Pollution Prevention (SWPPP)
3.
Temporary Water Services
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
4.
EA
Remove Gate Valve
5.
8 EA
Remove Fire Hydrant
6.
416 LF
Trench Safety
7. 4,736 LF
6” HDPE, DR-17 Water Pipe By Pipe
8. 4,890 LF
8” HDPE, DR-17 Water Pipe By Pipe
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
9. 80 LF
6” PVC, DR-18 Water Pipe in Casing Pipe (Furnish & Install)
10. 80 LF
12” Steel Casing, By Other Than Open Cut (Furnish & Install)
11. 3
TN
Ductile Iron Water Fittings with Restraint (Furnish & Install)
Cents per Ton.
12. 8 EA
Fire Hydrant (Furnish & Install)
13. 30 EA
6” Gate Valve (Furnish & Install)
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
14. 18 EA
8” Gate Valve (Furnish & Install)
15. 119 EA
1” Bored Water Service
16. 62 EA
1” Water Service
17. 2 EA
2” Water Service
18. 20 EA
Connect To Existing Water Main
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
19. 1,178 LF
Permanent Asphalt Pavement Repair
20. 15 SY
Permanent Concrete Pavement Repair
21. 93 LF
6” Concrete Curb and Gutter
22. 39 SY
6” Concrete Driveway
23. 7 SY
4” Concrete Sidewalk
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
24. 909 EA
Meter Replacement (Install)
25. 716 LF
6” HDPE, DR-17 Sanitary Sewer By Pipe Burst (Furnish & Install)
26. 613 LF
8” HDPE, DR-17 Sanitary Sewer By
27. 416 LF
12” PVC, SDR-26 Sanitary Sewer By Open Cut (Furnish & Install)
28. 497 LF
12” HDPE, DR-17 Sanitary Sewer By
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
29. 23.1 VF
Extra Depth Manhole (Furnish &
30. 1 EA
Remove Sanitary Sewer Manhole
31. 6 EA
4’ Diameter Sanitary Sewer Manhole
32. 3 EA
5’ Diameter Sanitary Sewer Manhole
33. 2 EA
Remove Sanitary Sewer Cleanout
ESTIMATED
QUANTITY
NAME OF PAY ITEM WITH
UNIT BID PRICE IN WORDS
UNIT BID
PRICE
AMOUNT
BID
34. 6 EA
Rehab Sanitary Sewer Manhole (Reconnect & Clean)
35. 53 EA
4” Sanitary Sewer Service (Furnish &
36. 57 VF
Epoxy Manhole Liner (Furnish &
It is understood that the TOTAL ALTERNATIVE B BID for the 2026-2027 WATER RENEWAL PROJECT will only be used as a basis for comparison of bids and award of Contract. The total payment to the Successful
Bidder will be the Amount Bid adjusted by additions and/or deletions of actual amounts or quantities used.
TOTAL ALTERNATIVE B BID $
BID SUMMARY
TOTAL ALTERNATIVE A BID $
TOTAL ALTERNATIVE B BID $
Within ten (10) days after acceptance of this Bid Proposal the undersigned will execute the formal Contract and will deliver an approved Surety Bond and other such bonds required by the Contract Documents, for the faithful performance of the Contract.
The Bid Security attached to this proposal in the amount of 5% GAB is to become the property of the above Addressed in the event the Contract or Bonds are not executed and delivered within the time stated.
The undersigned agrees to begin construction within ten (10) days after Award of Contract and to substantially complete the Contract within 180 calendar days and final completion within 210 calendar days from and including the day established for the start of work as set forth in the written Notice to Proceed issued by the Benbrook Water Authority.
The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are submitted as correct and final.
Receipt is acknowledged of the following Addenda:
Addendum No. 1: Dated: Received:
Addendum No. 2: Dated: Received:
Addendum No. 3: Dated: Received:
Respectfully Submitted, BY:
TITLE:
ADDRESS:
an individual
* Submitted by a partnership a corporation
Doing business as
00 43 37
VENDOR COMPLIANCE TO STATE LAW
BWA Standard Specifications
Revised: October 2021
SECTION 00 43 37
VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER
Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders.
This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest
Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident’s principal place of business is located.
The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder.
Resident bidders must check the box in Section B.
A. Nonresident bidders in the State of Texas, our principal place of business, are required to be
_______ percent lower than resident bidders by State Law. A copy of the statue is attached.
Nonresident bidders in the State of Texas, our principal place of business, are not required to underbid resident bidders.
B. The principal place of business of our company or our parent company or majority owner is in the state of Texas.
Company: By: Printed Name Here
(Signature)
Address: Title:
__________________________ Date: ________________________
00 45 10
QUALIFICATION OF BIDDER STATEMENT
SECTION 00 45 10
SWORN AFFIDAVIT
Pursuant to the Contract Documents and information for prospective bidders for the above mentioned proposed project, the undersigned is submitting the information as required with the understanding that the purpose is for BWA’s confidential use to assist in determining the qualifications of the undersigned entity to perform the type and magnitude of work included. The undersigned affirms, under oath, the trust and accuracy of all statements hereinafter made and that those statements are made based upon the personal knowledge of the signatory as of the date of this affidavit. The undersigned will accept BWA’s determination of qualifications without prejudice.
The Surety herein named, any other bonding or insurance company, bank, subcontractor, supplier, or any other person, firm or corporation with whom the undersigned has done business, or who has extended any credit to the undersigned is hereby authorized to furnish BWA with any information
BWA may request concerning the undersigned including, but not limited to, information concerning performance on previous work and credit standing, and the undersigned hereby releases any and all such parties from any legal responsibility whatsoever on account of having furnished such information to BWA.
On behalf of the undersigned entity, I ___________________________________________________ hereby affirm under oath that I am duly authorized to make this affidavit and that the answers to all questions on the attached forms herein and all other statements made herein are true and correct; that the financial statement, the experience record and the schedule of equipment are all made a part of this affidavit as though written in full herein, and that all statements made herein and answers to questions given in the financial statement, experience record and schedule of equipment are true and correct.
Signed this _____ day of __________________, 20___.
AUTHORIZED AGENT*
Sworn to before me this ______ day of _________________, 20___.
Notary Public
My Commission Expires:
(SEAL)
* For corporations, include copy of duly executed corporate resolution authorizing individual to execute affidavit and include date and place of incorporation, and corporate office held by signatory.
For LLC’s include copy of proper authorization for individual to execute affidavit, place of registration of LLC and proper title of signatory. For partnerships include copy of proper authorization for individual to execute affidavit, date and place partnership was formed, whether partnership is general or limited, and all members of the partnership.
SECTION 00 45 10
ADDRESS:
PHONE:
1. Number of years in business as a general contractor:
2. Classification of work done: Building Sewer Water
3. Types of work done in each classification:
Building:
Sewer:
Water:
4. Maximum number of contracts in excess of $10,000 under construction at one time:
5. Approximate dollar volume of incomplete work under contract at any one time:
6. List of complete projects of comparable type and magnitude of this project:
Project Owner Inspector/Phone# Year Built Contract Price
7. List of incomplete projects:
Project Owner Inspector/Phone# % Complete Contract Price
8. Have you or any present partners or officers failed to complete a contract:
If so, give names, amounts and explanation
9. Are there any unsatisfied demands upon you as to your accounts payable If so, give names, amounts and explanation
10. Name and phone number of bank and officer for reference
11. Other Credit References with phone number:
12. Name and address of Bidder’s Surety and name and phone number of agent used by Bidder:
EXPERIENCE RECORD
List of Projects your Organization has successfully completed:
Amount of Contract
Award Type of Work Date Accepted
Name and Phone of
Inspector
List of Projects your Organization is now engaged in completing:
Award Type of Work
Anticipated Date of
Completion
List of Surety Bonds in Force on above Uncompleted Work:
Award Type of Work
Anticipated Date of
Completion
EQUIPMENT SCHEDULE
List of Equipment owned by bidder that is in serviceable condition and available for use:
Portions of work Bidder proposes to sublet in case of Award of Contract including amount and type:
FINANCIAL STATEMENT
Condition of Bidder at close of Business month, ASSETS
1. Cash on Hand $
In Bank
Elsewhere $
1. Accounts receivable from completed contracts (Exclusive of claims not approved for payment). $
3. Accounts receivable from other sources than above $
4. Accounts earned on uncompleted contracts (not included in Item 3)
(Contract price on completed portion of uncompleted contracts less total cost of completed portions). $
5. Deposits for bids on other guarantees $
6. Notes Receivable Past Due $
Due 90 Days
Due Later $
7. Interest Earned $
8. Real Estate $
Business Property, present value
Other Property, present value $
9. Stocks and Bonds, listed on
Exchange $
Unlisted $
10. Equipment, machinery, fixtures $
Less Depreciation $
11. Other Assets $
Total Assets: $
LIABILITIES AND NET WORTH
1. Notes Payable to Banks Regular $ $
(For Certified Checks)
Equipment Obligations
Others $
2. Accounts Payable Current $ $
Past Due $
3. Real Estate Mortgages $
4. Other Liabilities $
5. Reserves $
6. Capital Stock Paid Up Common $ $
Preferred $
7. Surplus $
TOTAL LIABILITIES: $
FINANCIAL STATEMENT
EXPERIENCE RECORD
SCHEDULE OF EQUIPMENT
AFFIDAVIT
an individual
Submitted by a partnership a corporation
With principal office at
To be filled in by Corporation: To be filled in by Partnerships:
Date incorporated Date formed
Under the laws of State State whether partnership is general, limited or associated:
Executive Officer: List Members:
State of
County of
Being duly sworn, deposes and of
Say that he is
(Title) (Name of Organization) and that the answers to the foregoing questions on the attached forms and all statements therein are true and correct; that the financial statement, the experience record and the schedule of equipment are made a part of this affidavit as though written in full herein, and all statements and answers to questions given in the above mentioned financial statement, experience record and schedule of equipment are true and correct.
Sworn to before me this day of , A.D., 20
Notary Public
My Commission expires:
(SEAL)
00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker’s compensation insurance coverage for all of its employees employed on BWA
Project No.________. Contractor further certifies that, pursuant to Texas Labor Code, Section
406.096(b), as amended, it will provide to BWA its subcontractor’s certificates of compliance with worker’s compensation coverage.
CONTRACTOR:
_____________________________________ By: ___________________________________
Company (Please Print)
_____________________________________ Signature: ______________________________
Address
_____________________________________ Title: __________________________________
City/State/Zip (Please Print)
THE STATE OF TEXAS §
COUNTY OF TARRANT §
BEFORE ME, the undersigned authority, on this day personally appeared
___________________________________, known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of ____________________________________ for the purposes and consideration therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this ____________day of
_______________________, 20__.
Notary Public in and for the State of Texas
00 52 43
AGREEMENT
Revised: June 2024 BWA Standard Specifications
SECTION 00 52 43
BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)
THIS AGREEMENT is by and between Benbrook Water Authority
(“Owner”) and
(“Contractor”).
Owner and Contractor hereby agree as follows:
ARTICLE 1 – WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .