2026-111 G (1-1) Bidding Documents-Bid Specifications.pdf

PDF 12 MB Posted

Attached to
Old Main Sewer Replacement - Skagit Valley College
Solicitation number
2026-111 G (1-1)
Issued by
Skagit County, Washington

About this file

Summary

This is a bid specification document for a public works project issued by the Washington State Department of Enterprise Services on behalf of Skagit Valley College. The project involves replacing the old main sewer line at the college's Old Main building located at 1900 SE Pioneer Way, Oak Harbor, Washington 98277. The scope of work includes re-lining the existing sewer pipe serving the Old Main building, installing a new manhole for sewer access on college property, mechanically de-scaling the interior surface of the existing 6-inch sewer pipe, and installing approximately 135 linear feet of fiberglass liner with slab cutting to provide access for the lining machine. The estimated bid cost range is $225,000 to $245,000. Sealed bids were due by 1:00 PM on Thursday, July 23, 2026, with submission required through the DES Public Procurement Portal at https://deswa.bonfirehub.com. A pre-bid walk-through was scheduled for 9:00 AM on Thursday, July 9, 2026, at the project site. The virtual public bid opening was scheduled for approximately 1:30 PM on July 23, 2026, via Microsoft Teams. The contractor must achieve substantial completion within 60 calendar days after the Notice to Proceed, with final completion required within 30 calendar days after substantial completion. Liquidated damages of $500 per consecutive calendar day apply for delays beyond the contract time.

The contract includes prevailing wage requirements applicable to Skagit County, and the contractor must verify current rates through the Washington Department of Labor & Industries website. A 5% bid guarantee is required for bids exceeding $35,000. Voluntary diverse business goals have been established at 10% Minority Business Enterprise (MBE), 6% Women Business Enterprise (WBE), 5% Small Business Enterprise (SBE) or Persons with Disabilities Small Business Enterprise (PWSBE), and 5% Veteran-owned businesses; achievement of these goals is encouraged but not mandatory. The successful bidder must register with the DES Diversity Compliance program (B2Gnow) and submit monthly payment reports. The project does not require apprenticeship utilization as it is estimated under $350,000. Washington State Sales Tax must not be included in bid amounts but will be added by the Owner to progress payments. The contractor must maintain comprehensive general liability insurance with limits of $1,000,000 per occurrence and general aggregate limits of $1,000,000, along with automobile liability insurance at $1,000,000 combined single limit. All insurance must include the State of Washington as an additional named insured.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SET

VOLUME 1

DIVISIONS 00 THROUGH 31

SVC – REPLACE OLD MAIN SEWER LINE

OAK HARBOR, WA 98277

WA STATE PROJECT NO. 2026 – 111 G (1-1)

INTEGRUS PROJECT NO. 22547.01

CLIENT AGENCY:

SKAGIT VALLEY COLLEGE

2405 E. COLLEGE WAY

MOUNT VERNON, WA 98273

CONTRACTING AGENCY:

DEPARTMENT OF ENTERPRISE SERVICES,

ENGINEERING & ARCHITECTURAL SERVICES

1500 JEFFERSON STREET

OLYMPIA, WA 98501

PREPARED BY:

117 S. MAIN STREET

SEATTLE, WA 98104

JUNE 25, 2026

STATE CONTRACT NO: 2026-111 G (1-1)

STATE PROJECT NAME: SVC – REPLACE OLD MAIN SEWER LINE

DATE: JUNE 25TH, 2026

CLIENT AGENCY: SKAGIT VALLEY COLLEGE

CONTRACTING AGENCY: STATE OF WASHINGTON

DEPARTMENT OF ENTERPRISE SERVICES

A/E FIRM: ARCHITECT OF RECORD

INTEGRUS ARCHITECTURE

117 S. MAIN STREET

206.628.3137

CIVIL ENGINEER

FREELAND CIVIL ENGINEERS

2500 ELM ST. SUITE 1

BELLINGHAM, WA 98225

360.650.1408

PLUMBING ENGINEER

FSi ENGINEERS

PIER 54, 1001 ALASKAN WAY #200

360.622.3321

CLIENT AGENCY: __________________________________________

TITLE: EXECUTIVE DIRECTOR OF FACILITIES & CAPITAL PROJECTS,

SKAGIT VALLEY COLLEGE

DATE: ________________

E & AS: __________________________________________

TITLE: PM, WA STATE DEPARTMENT OF ENTERPRISE SERVICES

DATE: _______________

E & AS: __________________________________________

TITLE: APM, WA STATE DEPARTMENT OF ENTERPRISE SERVICES

DATE: _______________

6/18/2026

6-22-2026

SVC – REPLACE OLD MAIN SEWER LINE 001000

DES Project No. 2026-111 G (1-1) TABLE OF CONTENTS Integrus Project No. 22547.01 1 of 2

BID SET – 06/25/2026 00 0100 - 1

VOLUME 1

000100 TABLE OF CONTENTS

000101 DRAWING INDEX

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

001113 ADVERTISEMENT FOR BIDS

001113A WASHINGTON PREVAILING WAGE

001113B PLAN CENTER

001113C PRE-BID WALK THROUGH AGENDA

002113 INSTRUCTIONS TO BIDDERS CONSTRUCTION AND SMALL WORKS

004100 BIDDING TERMS AND CONDITIONS

004100C APPRENTICE UTILIZATION PLAN

004301 SUPPLEMENTAL BIDDER RESPONSIBILITY CRITERIA

004301A FORM 1 - CONTRACTOR EXPERIENCE DETAIL

004301B FORM 2 - RESUME OF KEY PERSONNEL

004301C FORM 5 - REFERENCE EVALUATION QUESTIONNAIRE

004301D FORM 6 - SUPPLEMENTAL RESPONSIBILITY CRITERIA EVAL SCORE SHEEET

007200 GENERAL CONDITIONS

007200A CERTIFICATE OF INSURANCE

007200B CONTRACTOR INVOICE FORM

007200C CONTRACTOR ESCROW & RETAINAGE FORM

007200D CONTRACTOR APPLICATION & CERTIFICATE FOR PAYMENT FORM

007200E CONTRACTOR CERTIFICATE OF MATERIAL STORED ON JOB SITE FORM

007200F CONTRACTOR STATEMENT OF APPRENTICESHIP FORM

007200G INVOICE INSTRUCTIONS FOR CONTRACTORS

007200H PRECONSTRUCTION CHECKLIST

DIVISION 01 - GENERAL REQUIREMENTS

011000 SUMMARY

011101 SUMMARY OF HAZARDOUS MATERIALS WORK

012000 PRICE AND PAYMENT PROCEDURES

012050 CONTRACT MODIFICATION PROCEDURES

012050A CONTRACT CHANGE ORDER PROPOSAL (COP)

012050B CONSTRUCTION FIELD AUTHORIZATION (FA)

012050C REQUEST FOR EQUITABLE ADJUSTMENT IN CONTRACT TIME FORM

012500 SUBSTITUTION PROCEDURES

012500A SUBSTITUTION PROCEDURES FORM

013000 ADMINISTRATIVE REQUIREMENTS

013000A CONSTRUCTION PROGRESS MEETING AGENDA

013000B CONSTRUCTION CLOSEOUT MEETING AGENDA

013000C RFI TEMPLATE

013000D REQUIRED SUBMITTAL SCHEDULE

013216 CONSTRUCTION PROGRESS SCHEDULE

014000 QUALITY REQUIREMENTS

014000A NOTICE OF NONCONFORMANCE TEMPLATE

014216 DEFINITIONS

015000 TEMPORARY FACILITIES AND CONTROLS

SVC – REPLACE OLD MAIN SEWER LINE 001000

DES Project No. 2026-111 G (1-1) TABLE OF CONTENTS Integrus Project No. 22547.01 2 of 2

BID SET – 06/25/2026 00 0100 - 2

016000 PRODUCT REQUIREMENTS

017000 EXECUTION REQUIREMENTS

017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

017800 CLOSEOUT SUBMITTALS AND PROCEDURES

017800A SUBSTANTIAL COMPLETION CHECKLIST

017800B FINAL COMPLETION & ACCEPTANCE CHECKLIST

DIVISION 02 – EXISTING CONDITIONS

024100 DEMOLITION

028200 ASBESTOS ABATEMENT

028300 LEAD PAINT CONTROLS

DIVISION 03 – CONCRETE

033000 CAST-IN-PLACE CONCRETE

DIVISION 06 – WOOD, PLASTIC AND COMPOSITES

062000 FINISH CARPENTRY

DIVISION 09 – FINISHES

092116 GYPSUM BOARD ASSEMBLIES

096500 RESILIENT FLOORING

099000 PAINTING AND COATING

DIVISION 22 – PLUMBING

220500 COMMON WORK RESULTS FOR PLUMBING

220507 PLUMBING DEMOLITION

220893.63 CURED-IN-PLACE PIPE INVERSION LINING

221005 PLUMBING PIPING

DIVISION 31 – EARTHWORK

310000 STANDARD SPECIFICATIONS

310100 EARTHWORK

311100 CLEARING & GRUBBING

312500 EROSION AND SEDIMENTATION CONTROLS

314100 TRENCH SAFETY

DIVISION 31 - UTILITIES

333100 SANITARY UTILITY SEWERAGE PIPING

APPENDIX

LIMITED HAZARDOUS BUILDING MATERIAL SURVEY REPORT – DATED JUNE 17, 2026

END OF SECTION

DIVISION 09 – FINISHES

092116 GYPSUM BOARD ASSEMBLIES

096500 RESILIENT FLOORING

099000 PAINTING AND COATING

DIVISION 22 – PLUMBING

220500 COMMON WORK RESULTS FOR PLUMBING

220507 PLUMBING DEMOLITION

220893.63 CURED-IN-PLACE PIPE INVERSION LINING

221005 PLUMBING PIPING

DIVISION 31 – EARTHWORK

310000 STANDARD SPECIFICATIONS

310100 EARTHWORK

311100 CLEARING & GRUBBING

312500 EROSION AND SEDIMENTATION CONTROLS

314100 TRENCH SAFETY

DIVISION 31 - UTILITIES

333100 SANITARY UTILITY SEWERAGE PIPING

APPENDIX

LIMITED HAZARDOUS BUILDING MATERIAL SURVEY REPORT – DATED JUNE 17, 2026

SVC – REPLACE OLD MAIN SEWER LINE 001001

DES Project No. 2026-111 G (1-1) DRAWING INDEX Integrus Project No. 22547.01 1 of 1

BID SET – 06/25/2026 00 0101 - 1

GENERAL

G000 COVER SHEET

SURVEY

1 of 3 SURVEY 2 of 3 SURVEY 3 of 3 SURVEY

CIVIL

C1.01 COVER SHEET & EXISTING CONDITIONS

C2.01 SITE & TEMPORARY EROSION & SEDIMENTATION CONTROL PLAN

C2.02 SWPPP & TESC DETAILS

C3.01 SEWER REPLACEMENT PLAN

C4.01 PROJECT DETAILS

ARCHITECTURAL DEMO

AD101 DEMOLITION PLAN

ARCHITECTURAL

A100 ARCHITECTURAL ABBREVIATIONS

A101 LEVEL 1 FLOOR PLAN

PLUMBING

P0.00 PLUMBING LEGEND, ABBREVIATIONS AND NOTES

P1.01 UNDER-FLOOR PLUMBING PLAN

P2.01 PLUMBING FLOOR PLAN MECHANICAL

END OF SECTION

ADVERTISEMENT FOR BIDS

Sealed bids will be accepted for the following project:

PROJECT NO.: 2026 - 111 G (1-1)

TITLE: Skagit Valley College Replace Old Main Sewer Line

AGENCY: FPS for Skagit Valley College

PROJECT MANAGER: Sean Martin

ESTIMATED BID COST RANGE: $225,000.00 to $245,000.00

SUBMITTAL

TIME/DATE/LOCATION:

No later than 1:00 PM, Thursday, July 23, 2026.

Submit Online at DES Public Procurement Portal:

https://deswa.bonfirehub.com.

(See additional information below)

Bids should be submitted no later than 1:00 PM for the

Virtual Public Bid Opening on Microsoft Teams which will be held at approximately 1:30 PM on

Thursday, July 23, 2026

Join on your computer, mobile app or room device

Click here to join the meeting Meeting ID: 232 943 171 100 Passcode: WPJKXj

Download Teams | Join on the web Or call in (audio only) +1 564-999-2000,,994059963# United States, Olympia

(833) 322-1218,,994059963# United States (Toll-free)

Phone Conference ID: 994 059 963# Find a local number | Reset PIN

(See additional information below)

ADVERTISEMENT Page 2 of 3 Effective May 1, 2026

ISSUED BY: Department of Enterprise Services

Facility Professional Services

PRE-BID WALK-THROUGH:

9:00 A.M. on Thursday, July 9, 2026 at Skagit Valley College Old Main Building, 1900SE Pioneer Way, Oak Harbor, WA 98277.

For specific directions for an on-site pre-bid meeting or site visit, please contact the Consultant listed below.

All Public Works Bid Openings will be conducted via live stream on Microsoft Teams. A link to the live stream for bid opening can be found above. We will strive to begin bid opening live streams within thirty minutes of the bid closing and appreciate your patience as we deploy this new process.

If you have questions, please contact the Project Manager, Sean Martin at sean.martin@des.wa.gov or 360-701-4122

This link provides support with the Euna Procurement Vendor processes and help:

https://customer.eunasolutions.com/public/s/. Visit site for help and details.

DES Public Procurement Portal is the official platform for accessing plans, specifications and detailed submissions for DES Public Works Projects. These documents can be obtained through the DES Public Procurement Portal https://deswa.bonfirehub.com. Contractors may also obtain plans and specifications from the Plan Centers listed below.

List of plan centers: Abadan Reprographics & Imaging, Spokane, WA; ARC Document Solutions, Seattle, WA; ARC Document Solutions, Tacoma, WA; Associated Builders & Contractors, Spokane, WA; Associated General Contractors, Boise, ID; Builder’s Exchange of Washington, Everett, WA; Daily Journal of Commerce Plan Center, Portland, OR; Daily Journal of Commerce, Seattle, WA; Hermiston Plan Center, Hermiston, OR; Contractor Plan Center, Milwaukie, OR;

Ridgeline Graphics (Wenatchee Plan Center), Wenatchee, WA; Spokane Regional Plan Center, Spokane, WA; Tri-City Construction Council, Kennewick, WA; Walla Walla Valley Plan Center, Walla Walla, WA; Weekly Construction Reporter, Bellingham, WA; Yakima Plan Center, Yakima, WA.

Please direct questions regarding this project through the DES Public Procurement Portal https://deswa.bonfirehub.com. Or to the office of the Consultant, Integrus Architecture, Attn: Sam Schafer, 206-628-3137, sschafer@integrusarch.com.

Bid Results will be available on the DES Public Procurement Portal: https://deswa.bonfirehub.com following the bid opening.

The State of Washington prevailing wage rates are applicable for this public works project located in Skagit County. Bidders are responsible to verify and use the most recent prevailing wage rates.

The “Effective Date” for this project is the bid submittal time and date above. The applicable prevailing wage rates may be found on the Department of Labor & Industries website located at https://secure.lni.wa.gov/wagelookup/.

ADVERTISEMENT Page 3 of 3 Effective May 1, 2026

The successful Bidder is required to register and create an account in the DES Diversity Compliance program (B2Gnow) at https://des.diversitycompliance.com. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.

Bidders may contact the Office of Minority and Women's Business Enterprise (OMWBE) at http://OMWBE.wa.gov/ to obtain information on certified firms. Bidders may also utilize Washington Small Businesses registered in B2Gnow at DES diversity compliance program B2Gnow and Veteran-owned Businesses at https://www.dva.wa.gov/veterans-their-families/veteran-owned-businesses/vob-search.

The State reserves the right to accept or reject any or all bids and to waive informalities.

STATE OF WASHINGTON

DEPARTMENT OF ENTERPRISE SERVICES

FACILITY PROFESSIONAL SERVICES

State of Washington

Department of Labor & Industries

Washington State Prevailing Wage

Contractor to pay Prevailing Wages: Contractor shall pay the prevailing rate of wages to all workers, laborers, or mechanics employed in the performance of any part of the Work in accordance with RCW 39.12 and the rules and regulations of the Department of Labor and

Industries. The schedule of prevailing wage rates for the locality or localities of the Work, is determined by the Industrial Statistician of the Department of Labor and Industries. It is the

Contractor’s responsibility to verify the applicable prevailing wage rate.

Phone Number: Prevailing Wage Section - (855) 545-8163

Mailing Address: Department of Labor and Industries

7273 Linderson Way SW, Tumwater, WA 98501

Web Site: https://secure.lni.wa.gov/wagelookup/

Plan Center List

Abadan Reprographics & Imaging 603 E. 2nd Ave.

Spokane, WA 99202 www.abadanplancenter.com www.abadanplanroom.com

(509) 747-2964 planroom@abadanplancenter.com repro@abadanspokane.com

Daily Journal of Commerce Plan Center 921 SW Washington Street, Suite 210 Portland, OR 97205-2810 www.djcoregon.com;

(503) 274-0624, fax (503) 802-7239 plancenter@djcoregon.com

Tri-City Construction Council 20 E Kennewick Avenue Kennewick, WA 99336-3756 www.tricityplancenter.com

(509) 582-7424, fax (509) 582-6815 bidinfo@tcplancenter.com

ARC Document Solutions 632 Broadway Tacoma, WA 98402

(253) 383-6363 www.e-arc.com/location/tacoma/ Tacoma.bidservices@e-arc.com

Daily Journal of Commerce – Seattle 83 Columbia Street, Suite 200 Seattle, WA 98104-1482 www.djc.com

(206) 622-8272, fax (206) 622-7086 plans@djc.com

Walla Walla Valley Plan Center 29 E Sumach Street Walla Walla, WA 99362-0230 www.tricityplancenter.com

(509) 525-0850, fax (509) 522-2038 trichards@wwvchamber.com

ARC Document Solutions 2730 Occidental Avenue S Seattle, WA 98134

(206) 622-6000 www.e-arc.com/location/seattle/ seattle.bid.services@e-arc.com

Hermiston Plan Center

1565 N 1st Street, Suite 8A Hermiston, OR 97838-1368 www.hermistonplancenter.com

(541) 564-0420, fax (541) 564-0396 office@hermistonplancenter.com

Weekly Construction Reporter 2215 Midway Lane, Suite 208 Bellingham, WA 98226-1219 www.wcrinc.com

(360) 738-0370, fax (360) 738-0371 info@wcrinc.com

Associated Builders & Contractors 1760 E. Trent Ave. Spokane, WA 99202 http://www.ipcabc.org/

(509) 534-0826, fax (509) 535-9967 abcplancenter@ipcabc.org

Plan Center NW, Inc.

P.O. Box 2486 Clackamas, OR 97015 www.plancenternw.com

(503) 650-0148 brie@plancenternw.com

Yakima Plan Center 1212 N 16th Avenue, Suite 2 Yakima, WA 98902-1348 www.yakmaplancenter.com

(509) 457-4271, fax (509) 457-0775 jacki@yakimaplancenter.com

Associated General Contractors - Idaho

1649 W Shoreline Dr. Suite 100

Boise, ID 83702 http://www.idahoagc.org/ 208-344-2531, fax (208) 772-6472 planroom@idahoagc.org

Ridgeline Graphics (Wenatchee Plan Center) 962 Valley Mall Pkwy East Wenatchee, WA 98802 www.wenatcheeplancenter.com

(509) 662-6858 ext. 123, fax (509) 663-8530 plancenter@ridgelinegraphics.com mercedes@ridgelinegraphics.com

MBE, WBE or SBE owned plan center

Builders Exchange of Washington 2607 Wetmore Avenue Everett, WA 98201-2926 http://www.bxwa.com/

(425) 258-1303, fax (425) 259-3832 production@bxwa.com

Spokane Regional Plan Center 209 N Havana Street Spokane, WA 99202-4723 www.plancenter.net

(509) 328-9600, fax (509) 328-7279 projectinfo@plancenter.net

Document updated: 12-16-25 http://www.abadanplancenter.com/ http://www.abadanplanroom.com/ mailto:planroom@abadanplancenter.com mailto:repro@abadanspokane.com http://www.djcoregon.com/ mailto:plancenter@djcoregon.com http://www.tricityplancenter.com/ mailto:bidinfo@tcplancenter.com http://www.e-arc.com/location/tacoma/ mailto:Tacoma.bidservices@e-arc.com http://www.djc.com/ mailto:plans@djc.com http://www.tricityplancenter.com/ mailto:trichards@wwvchamber.com http://www.e-arc.com/location/seattle/ mailto:seattle.bid.services@e-arc.com http://www.hermistonplancenter.com/ mailto:office@hermistonplancenter.com https://www.wcrinc.com/ https://www.wcrinc.com/ mailto:info@wcrinc.com http://www.ipcabc.org/ mailto:abcplancenter@ipcabc.org http://www.plancenternw.com/ mailto:brie@plancenternw.com http://www.yakmaplancenter.com/ mailto:jacki@yakimaplancenter.com http://www.idahoagc.org/ mailto:kwatson@idahoagc.org http://www.wenatcheeplancenter.com/ mailto:plancenter@ridgelinegraphics.com mailto:mercedes@ridgelinegraphics.com http://www.bxwa.com/ mailto:production@bxwa.com http://www.plancenter.net/ mailto:projectinfo@plancenter.net

Department of Enterprise Services

Facilities Division, Engineering & Architectural Services

Agenda for Pre-Bid Walk-Through

Date 07/09/2026

Project Number: 2026-111 G (1-1)

Project Name: Skagit Valley College Replace Old Main Sewer Line

Location: 1900 SE Pioneer Way, Oak Harbor, WA 98277

Project Manager: Sean Martin

PM Phone & Email: 360-701-4122 Email: sean.martin@des.wa.gov

MODIFY THIS DOCUMENT TO SUIT THE PROJECT

1. Project Manager Introduces Project Team Members

2. Project Manager: Sean Martin, DES (Contact and Agreements)

3. On-site Representative: Tim Wheeler, Capital Project Manager

4. Architect/Engineer and major subs

a. Sam Schafer, Integrus Architecture, Principal in Charge

b. Lindsay Crawford, Integrus Architecture, Project Manager

c. Inga Drechsel, Freeland Engineers, Civil Engineer

d. Daimian Bingham, FSi Engineers, Plumbing Engineer

Note: During the pre-bid walk-through meeting, all conversations are considered informal and are not contractually binding unless stated in the contract manual, drawings, or modified by a written addendum. The order of precedence is written addendum, project manual, and lastly contract drawings.

5. Route a sign-in sheet to all attendees

6. The Architect/Engineer Presents the General Description of Scope

A. Site Preparation

1) Construction security fencing: Contractor is responsible for construction security fencing for laydown area and construction site.

2) Owner provides power and water connections to existing facilities for contractor use during construction.

3) Contractor to provide and maintain temporary sanitary facilities within the project construction limits. Use of existing facilities in adjacent buildings will not be permitted.

B. Infrastructure Improvements

4) Sewer

5) Power

C. Building Description

1) Architectural materials

2) Plumbing systems

3) Sewer systems

D. Other Issues

1) Permits

7. Construction Site Access and Lay-Down Area

8. Discussion of Security Requirements necessary on this Project (Presented by facility security officer – Refer to Specifications Section – the facility may have their own checklist to use in addition.)

A. Personal Behavior

1) Depending on the project, security clearances and ID badges may be required. Like working on Dept of Health Labs where badges may be required.

a) The badge must be worn at all times

b) The badge must be clearly visible at all times

2) Items: tobacco, currency, cell phones, cameras, etc.

a) State facilities are tobacco free areas

b) Phones and cameras are addressed by the GC’s or Division 1.

3) Respectful conduct

a) At all times

b) Sexual harassment of any kind is cause for removal from the job

4) Work Hours

a) Established there may be limited work hours for access to a facility because sometimes all work is done at night.

b) Advance arrangements required for staying late or coming in early

c) Institutional holidays

5) Work Operations

a) Only company vehicles are allowed on construction site

b) Parking areas for workers are usually established to avoid conflict with faculty, staff and students or occupants

c) Requirements for company vehicles on site (keys, locking gas caps, etc.)

d) Specific equipment not allowed remaining overnight in specified areas.

e) Procedures for delivery vehicles

a. Impact on earth-moving operations

b. Ladders

c. Special equipment

f) Tool inventory/storage requirements if needed.

g) Dumpster requirements

h) Utility outage

i) Interception of materials

j) Flammable materials

k) Medical emergencies – the contractor’s site specific safety plan should address this.

9. Other Projects Currently Occurring on Site

10. Project Manager Outlines Project Schedule, Bid Submittal Process, Contracts, etc.

A. MWBE Requirements

B. Apprenticeship Requirements

C. Supplemental Bidder Responsibility

11. Site Walk

12. Schedule of Addendum Release Instructions

13. Questions and Answers

INSTRUCTIONS TO BIDDERS Effective May 1, 2026

Post Office Box 41476 Olympia, Washington 98504-1476

(360) 902-7272

Instructions to Bidders Effective: May 1, 2026

For Washington State Facility Construction and Small Works

Approved by: _____________________

Kimberly Sockle, Assistant Director

INSTRUCTIONS TO BIDDERS

FOR WASHINGTON STATE FACILITY CONSTRUCTION AND SMALL WORKS

PART 0 – GENERAL CONDITIONS

0.00 EXPLANATION TO PROSPECTIVE BIDDERS

A. In accordance with RCW 39.04.380 effective March 30, 2012, the State of Washington is enforcing a Reciprocal Preference for Resident Contractors. Any public works bid received from a nonresident contractor from a state that provides an in-state percentage bidding preference, a comparable percentage disadvantage must be applied to the bid of that nonresident contractor.

A nonresident contractor from a state that provides a percentage bid preference means a contractor that:

1. Is from a state that provides a percentage bid preference to its resident contractors bidding on public works contracts.

2. At the time of bidding on a public works project, does not have a physical office located in

Washington.

The state of residence for a nonresident contractor is the state in which the contractor was incorporated or, if not a corporation, the state where the contractor's business entity was formed.

All nonresident contractors will be evaluated for out-of-state Bidder preference. If the state of the nonresident contractor provides an in-state contractor preference, a comparable percentage disadvantage will be applied to their bid prior to contract award.

This section does not apply to public works procured pursuant to RCW 39.04.155, 39.04.280, or any other procurement exempt from competitive bidding.

B. Any prospective Bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit a request in writing to the Architect/Engineer (A/E) eight (8) business days before the bid due date or by logging into the DES Public Procurement Portal (https://deswa.bonfirehub.com) and submitting a vendor discussion. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective Bidder concerning a solicitation will be furnished promptly to all other prospective Bidders by addendum to the solicitation if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective Bidders.

C. In accordance with the legislative findings and policies set forth in RCW 39.19 the State of

Washington encourages participation in all of its contracts by MWBE firms certified by the Office of Minority and Women’s Business Enterprises (OMWBE). Participation may be either on a direct basis in response to this invitation or as a subcontractor to a Bidder. However, unless required by federal statutes, regulations, grants, or contract terms referenced in the contract documents, no preference will be included in the evaluation of bids, no minimum level of MWBE participation shall be required as a condition for receiving an award, and bids will not be rejected or considered non-responsive on that basis. Any affirmative action requirements set forth in federal regulations or statutes included or referenced in the contract documents will apply.

D. The State of Washington encourages participation in all of its contracts by Veteran-owned businesses (defined in RCW 43.60A.010) and located at:

http://www.dva.wa.gov/program/certified-veteran-and-servicemember-owned-businesses and Small, Mini and Micro businesses (defined in RCW 39.26.010) which have registered in WEBS at https://pr-webs-vendor.des.wa.gov/ and DES diversity compliance program B2Gnow.

1. In order to report payment detail, the Contractor must create an account in the DES Public https://deswa.bonfirehub.com/ http://www.dva.wa.gov/program/certified-veteran-and-servicemember-owned-businesses https://pr-webs-vendor.des.wa.gov/ https://des.diversitycompliance.com/

Works Diversity Tracking & Management System powered by B2GNow or verify if an account has already been created on behalf of the Contractor: https://des.diversitycompliance.com.

The DES Public Works Diversity Tracking & Management System is designed to streamline and automate compliance reporting requirements, empowering vendors to maintain accurate contact information and submit contract payment details online.

2. For account login or account creation details, go to the DES Public Works Diversity Tracking

& Management System home page by clicking on the URL listed above and clicking on Information for Vendors.

3. Every month for the duration of the contract, and while the contract is active in the DES Public

Works Diversity Tracking & Management System, submit and accurately maintain the following payment information through the DES Public Works Diversity Tracking & Management System:

(a) Payments received by the prime contractor from the Agency.

(b) Payments paid to each first tier subcontractor.

(c) Payments paid to each first tier supplier.

4. The Contractor must also ensure the following information is reported in the DES Public Works

Diversity Tracking & Management System by first tier subcontractors and suppliers for the duration of the contract:

(a) Confirmation of payments from the prime contractor to the subcontractor.

(b) Payment reporting to each supplier.

E. In accordance with RCW 39.04.320, for all public works estimated to cost one million dollars or more, the State of Washington requires no less than 15% of the labor hours be performed by apprentices, unless otherwise stated in the bid advertisement or on the Submittal Questionnaire/Bidding Terms and Conditions. A contractor or subcontractor may not be required to exceed the 15% requirement. On applicable projects, the Bidder shall establish in the DES

Public Procurement Portal and the Submittal Questionnaire/Bidding Terms and Conditions a minimum required percentage of apprentice labor hours compared to the total labor hours. The project’s apprenticeship utilization rate is calculated using the approved affidavits from the L&I portal.

Apprenticeship Requirements are not required for Small Works Projects estimated under $350K.

1. Incentives - The Contractor who meets or exceeds this utilization requirement on eligible contracts, will be awarded a monetary incentive described in the Apprentice Utilization Requirements of section 10.12 of the General Conditions.

2. Penalties - The Contractor who fails to meet the utilization requirement and fails to demonstrate a Good Faith Effort, as outlined below, is subject to penalties described in the Apprentice Utilization Requirements section in section 10.12 of the General Conditions.

Contractor will receive an invoice payable to the Owner within 30 days. The contractor will have 30 days to pay the penalty invoice at the time of receipt before the penalty is considered outstanding. Contractors with outstanding apprenticeship penalties may be considered non-responsive.

3. Cost Value - The expected cost value associated with meeting the goal is included in the

Base Bid as described in section 10.12 of the General Conditions.

4. Utilization Plan - The Contractor shall provide an Apprentice Utilization Plan (Plan) demonstrating how and when they intend to achieve the Apprenticeship Utilization Requirement. The Plan shall have enough information to track the Contractor’s progress in meeting the utilization requirement. The Contractor shall submit the Plan on the Apprentice Utilization Plan template (on the DES Public Works Forms website) within 10 business days of Notice to Proceed of the contract and prior to submitting the first invoice. The Contractor shall provide an updated Plan during the course of construction when there are significant changes to the Plan which may affect their ability to meet the requirement.

(a) The Plan shall be uploaded to the Department of Labor & Industries’ (L&I)

Prevailing Wage Intents and Affidavit (PWIA) system on L&I’s website.

(b) The Plan is not submitted for approval.

(c) It is expected that the Contractor will actively seek out opportunities to meet the

Apprentice Utilization Requirement during construction even if the Plan indicates a shortfall in meeting the requirement.

(d) If the Plan indicates that the Contractor will not attain the Apprentice Utilization

Requirement, then Contractor must submit “Good Faith Effort” (GFE) documentation with their Plan to L&I’s PWIA system.

5. Good Faith Effort (GFE)

(a) Good Faith Effort (GFE) documentation shall describe in detail why the Contractor is not or was not able to attain the Apprentice Utilization Requirement.

1. Contractors may submit Good Faith Effort (GFE) documentation at any time during the construction.

2. All GFE documentation must be submitted no later than 30 days before substantial completion.

(b) Good Faith Effort (GFE) documentation must be in signed letter format uploaded to the

PWIA system and include:

1. The contract number, title, and the apprentice utilization requirements.

2. The amount of apprentice labor hours the contract can or did attain along with the percentage of labor hours.

3. Contractors may receive a GFE credit for graduated Apprentice hours through the end of the calendar year for all projects worked on as long as the Apprentice remains continuously employed with the same Contractor they were working for when they graduated. If an Apprentice graduates during employment on a project of significant duration, they may be counted towards a GFE credit for up to one year after their graduation or until the end of the project (whichever comes first). Determination of whether or not Contract requirements were met in good faith will be made by subtracting the hours from the journeyman total reported hours for the project and adding them to the apprentice hour total. If the new utilization percentage meets the Contract requirement, the Contractor will be reported as meeting the requirement in good faith.

4. Anticipated or actual shortfall (in apprentice labor hours and percentage) and the reason(s) for not attaining the required apprentice labor hours.

5. Information from one or more of the following areas:

(a) Names of any State-Approved Apprentice Training Programs contacted with the name(s) of person(s) contacted and dates of contacts, and a copy of each response from the Training Program(s).

(b) Reference Contract Specifications or documents that affected the Contractor’s ability to attain apprentice utilization.

(c) Discuss efforts the Contractor has taken to require Subcontractors to solicit and employ apprentices.

6. Backup documentation to the letter consisting of the following:

(a) Letters, emails, phone logs including names dates and outcomes, posters, photos, payrolls, timecards, schedules, copies or references to other contract specifications or documents.

6 Additional Resource Information

(a) For questions regarding how to complete the Apprentice Utilization Plan template or Good Faith Effort documentation, please contact the Project Manager listed in the Bid Advertisement.

(b) Step-by-step instructions on how to access and navigate the L&I’s PWIA system, including uploading required documents can be found on the L&I website.

(c) Additional information about apprentice utilization on Public Works Project can be found on the L&I website.

0.01 PREPARATION OF BIDS

A. Bidders must be registered as a vendor through the DES Public Procurement Portal (https://deswa.bonfirehub.com). Bid submissions must be submitted through the DES Public

Procurement Portal (https://deswa.bonfirehub.com). The individual who has signed/submitted the Bid through the E Portal shall be the authorized designee responsible for bid submissions.

B. All bidders for Small Works Projects must be currently registered on the MRSC Small Works Roster (vendor list) found http://mrscrosters.org/.

C. Bidders are required to submit bid prices for one or more items on various bases through the DES Public Procurement Portal on the BidTable, including: (1) lump sum base bid; (2) lump sum bid alternate prices; (3) unit prices; or (4) any combination of items 1 through 3 above.

D. If the solicitation includes alternate bid items, failure to bid on the alternates may disqualify the bid. If bidding on all items is not required, Bidders should indicate “no bid” on the DES Public Procurement Portal BidTable for any item on which no price is submitted.

E. Substitute bid forms will not be considered unless this solicitation authorizes their submission.

0.02 BID GUARANTEE

A. When the sum of the base bid plus all additive bid alternates is $35,000.00 or less, bid security is not required.

When the sum of the base bid plus all additive alternates is greater than $35,000.00, a bid guarantee in the amount of 5% of the base bid amount is required. Failure of the Bidder to provide bid guarantee when required shall render the bid non-responsive.

https://deswa.bonfirehub.com/ http://mrscrosters.org/

B. Acceptable forms of bid guarantee are A bid bond or postal money order, or certified check or cashier’s check made payable to the Washington State Treasurer. At the time of bid, the bidder must upload an electronic copy of the acceptable bid guarantee to the DES Public Procurement Portal (https://deswa.bonfirehub.com).

If any of the 3 lowest responsive bidders has indicated a cashier’s check as their form of bid security, they will be contacted by DES with instructions on how to submit the original/valid cashier’s check within 48 hours of being notified. The Owner will return bid guarantees (certified check or cashier’s check) to unsuccessful Bidders as soon as practicable, but not sooner than the execution of a contract with the successful Bidder. The successful Bidder’s bid guarantee will be returned to the successful Bidder with its official notice to proceed with the work of the contract.

C. The Bidder will allow 60 days from bid opening date for acceptance of its bid by the Owner.

The Bidder will return to the Owner a signed contract, insurance certificate and bond or bond waiver within 15 days after receipt of the contract. If the apparent successful Bidder fails to sign all contractual documents or provide the bond and insurance as required or return the documents within 15 days after receipt of the contract, the Owner may terminate the award of the contract.

D. In the event a Bidder discovers an error in its bid following the bid opening, the Bidder may request to withdraw its bid under the following conditions:

1. The Bidder must submit written notification of the withdrawal to the Owner within 24 hours following the bid opening.

2. The Bidder provides written documentation of the claimed error to the satisfaction of the

Owner within 72 hours following the bid opening.

3. The Owner will approve or disapprove the request for withdrawal of the bid in writing. If the Bidder’s request for withdrawal of its bid is approved, the Bidder will be released from further obligation to the Owner without penalty. If it is disapproved, the Owner may retain the Bidder’s bid guarantee.

0.03 ADDITIVE OR DEDUCTIVE BID ITEMS

The low Bidder, for purposes of award, shall be the responsive Bidder offering the low aggregate amount for the base bid item, plus additive or deductive bid alternates selected by the Owner, and within funds available for the project.

The Bidder agrees to hold all bid alternate prices for sixty (60) days from date of bid opening.

0.04 ACKNOWLEDGEMENT OF ADDENDA

Bidders shall acknowledge receipt of all addenda to this solicitation by identifying the addenda numbers on the DES Public Procurement Portal Submittal Questionnaire. Failure to do so shall result in the bid being declared non-responsive.

0.05 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK

The Bidder acknowledges that it has taken steps necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to; (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and road; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during the work.

The Bidder also acknowledges that it has satisfied itself as to character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including exploratory work done by the Owner, as well as from the drawings and specifications made a part of this contract. Any failure of the Bidder to take the actions described and acknowledged in this paragraph will not relieve the Bidder from responsibility for estimating properly the difficulty and cost of successfully performing the work.

0.06 BID AMOUNTS

A. The bid prices shown for each item on the DES Public Procurement Portal BidTable shall include all labor, material, equipment, overhead and compensation to complete all of the work for that item.

B. The actual cost of building permit (only) and the public utility hookup fees will be a direct reimbursement to the Contractor or paid directly to the permitting agency by the Owner. Fees for these permits should not be included by the Bidder in the bid amount.

C. The Bidder agrees to hold the base bid prices for sixty (60) days from date of bid opening.

0.07 TAXES

The bid amounts shall not include Washington State Sales Tax (WSST). All other taxes imposed by law shall be included in the bid amount. The Owner will include WSST in progress payments. The Contractor shall pay the WSST to the Department of Revenue and shall furnish proof of payment to the Owner if requested.

[NOTE: Contractor must bond for contract amount plus the WSST.]

0.08 SUBMISSION OF BIDS

A. Bids must be submitted on or before the time as specified in the Advertisement for Bids.

B. The Bid shall be submitted electronically through the DES Public Procurement Portal as specified in the Advertisement for Bids.

C. Prior to the bid opening, the Owner’s representative will designate the official bid clock. Any part of the Bid Form, or in the rare situation of a bid modification, not received prior to the specified times, per the designated bid clock, will not be considered and the bid will be returned to the Bidder unopened.

D. A bid may be withdrawn electronically by a Bidder’s authorized representative before the bid submittal date and time specified in the Advertisement for Bids.

E. People with disabilities who wish to request special accommodation, (e.g., sign language interpreters, braille, etc.) need to contact the Owner ten (10) business days prior to the scheduled bid opening.

F. In the event the DES Public Procurement Portal is unavailable to all users at the bid submittal deadline, DES will contact the Bidders within 24 hours, and DES will extend the bid submittal time.

G. Neither DES nor DES Public Procurement Portal can guarantee the availability of Internet connectivity or related telecommunication and hosting services and will not be liable or responsible if the Bidder and its representative(s) or designee(s) cannot connect to the DES Public Procurement Portal.

H. The Bidder must comply with the Euna Procurement Portal’s Terms of Service

(https://gobonfire.com/terms-service/) when submitting the Bid through the DES Public Procurement Portal.

https://gobonfire.com/terms-service/

0.09 SUBCONTRACTOR LISTING

Pursuant to RCW 39.30.060, when the consultant’s estimated cost of the project, including the base bid and additive alternates, is $1 million or more, bidders shall comply with the following requirements

Subcontractor Listing Requirements are not required for Small Works Projects estimated under $350K.

A. Form A: (HVAC, Plumbing and Electrical) must be submitted at TIME OF BID to the DES Public Procurement Portal https://deswa.bonfirehub.com with bid submission; late submission will render the bid non-responsive.

1. Failure of the Bidder to submit the NAMES and LICENSE NUMBERS of such subcontractors, or to name itself to perform such work, shall render the bid nonresponsive.

(Failure to submit this form will render the bid nonresponsive)

B. Form B: (Structural Steel Installation and Rebar Installation) must be submitted no later than forty-eight (48) hours after bid deadline via email to FPSsubcontractorlist@des.wa.gov.

(Or may be submitted with the bid submittal through the Procurement Portal https://deswa.bonfirehub.com.)

1. Failure of the Bidder to submit the NAMES of such subcontractors, or to name itself to perform such work, shall render the bid nonresponsive. (Failure to submit this form will render the bid nonresponsive)

C. The Bidder can name itself for the performance of the work. Bidders who name themselves to perform the work are expected to perform the work and the Department of Enterprise Services reserves the right to reject substitution of the bidder with a subcontractor unless the bidder demonstrates a change in circumstances from the time of bid submission that is outside of the control of the bidder.

1. For any listed category not included in the project, the bidder may mark 'Not Applicable' or

'N/A' or leave that category blank, provided the form is signed.

D. Substitution of a listed subcontractor (at any tier) before or after the award of the prime contract is prohibited except for the following reasons:

1. Refusal of the listed subcontractor to sign a contract with the prime contractor,

2. Bankruptcy or insolvency of the listed subcontractor,

3. Inability of the listed subcontractor to perform the requirements of the proposed contract or the project,

4. Inability of the listed subcontractor to obtain the necessary license, bonding, insurance, or other statutory requirements to perform the work detailed in the contract,

5. Refusal or inability to provide a letter of bondability from a surety company, or

6. The listed subcontractor is barred from participating in the project as a result of a court order.

E. The Bidder shall not list more than one Subcontractor for each category of work identified

UNLESS Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor will be used for which alternate.

F. Failure of the Bidder to submit Form A with the NAMES and LICENSE NUMBERS of such Subcontractors and Form B with the NAMES of such Subcontractors or to name itself to perform such work within the specified times, shall render the Bidder's bid nonresponsive and, therefore, will be eliminated (withdrawn) from the DES Public Procurement Portal.

G. The Subcontractor List Form A and Form B are intended to discourage bid shopping.

mailto:FPSsubcontractorlist@des.wa.gov

0.10 BID RESULTS

After the Bid Opening, Bidders may obtain bid results from the office of DES Facility Professional Services (FPS) or by logging into the DES Public Procurement Portal (https://deswa.bonfirehub.com) and viewing public notices. Bid results may also be obtained from the A/E.

0.11 BID PROTESTS

A. Bidders may submit a bid protest to easmail@des.wa.gov within 2 business days of the Bid Opening, or within 2 business days after DES provided electronic copies of bid submissions received to those Bidders that timely requesting copies of bids received, if later. To be considered timely for purposes of this Section 0.11, a request for electronic copies of bid submissions received must be made within 2 business days after the bid opening.

1. DES will not acknowledge or accept any bid protest received more than 2 business days after the time set out in (A) above.

2. DES will not accept bid protests from non-bidders.

B. DES will review any bid protest received and shall maintain sole discretion on the merits of and resolution of any bid protest.

C. DES will provide written notice to protesting bidders of an intent to enter upon a Public Works

Contract with anyone other than the protesting bidder as follows:

1. Not less than 2 business days following the Bid Opening, if no bidders request electronic copies of bid submissions received, or

2. Not less than 2 business days following the date on which DES provided electronic copies of the bid submissions received to those bidders requesting electronic copies of bids received.

0.12 LOW RESPONSIBLE BIDDER

A. Mandatory Responsibility Criteria: Before awarding a public works contract, a Bidder must meet the following mandatory responsibility criteria under RCW 39.04.350 (1) & (2) to be considered a responsible Bidder and qualified to be awarded a public works project. The individual who has signed/submitted the Bid through the DES Public Procurement Portal shall be the authorized designee responsible for bid submissions. The Bidder must:

1. At the time of bid submittal, have a certificate of registration in compliance with RCW 18.27, a plumbing contractor license in compliance with RCW 18.106, an elevator contractor license in compliance with RCW 70.87, or an electrical contractor license in compliance with RCW

19.28 as required under the provisions of those chapters.

2. Have a current state unified business identifier number.

3. If applicable, have industrial insurance coverage for the Bidder's employees working in Washington as required in RCW 51; an employment security department number as required in RCW 50; and a state excise tax registration number as required in RCW 82.

4. Not be disqualified from bidding on any public works contract under RCW 39.06.010, or 39.12.065(3).

5. If bidding on a public works project subject to the apprenticeship utilization requirements in RCW 39.04.320, not have been found out of compliance by the Washington State Apprenticeship and Training Council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under RCW 49.04 for the one-year period immediately preceding the date of the bid solicitation.

mailto:easmail@des.wa.gov

6. Public Works and Prevailing Wage Training/Exemption. Bidders shall have received training on the requirements related to public works and prevailing wage under this chapter and chapter 39.12 RCW. The bidder must designate a person or persons to be trained on these requirements. The training must be provided by the department of labor and industries or by a training provider whose curriculum is approved by the department. The department, in consultation with the prevailing wage advisory committee, must determine the length of the training. Bidders that have completed three or more public works projects and have had a valid business license in Washington for three or more years are exempt from this subsection. The department of labor and industries must keep records of entities that have satisfied the training requirement or are exempt and make the records available on its website. Responsible parties may rely on the records made available by the department regarding satisfaction of the training requirement or exemption.

https://lni.wa.gov/licensing-permits/public-works-projects/contractors-employers/contractor-training

7. Within the three-year period immediately preceding the date of the bid solicitation, not have been determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgement entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of RCW 49.46, 49.48, or 49.52. A bidder shall submit a signed Contractor Certification form with the bid or within two (2) business days of request by Owner regarding this wage theft prevention responsible bidder criteria.

B. Supplemental Responsibility Criteria: In addition to the mandatory Bidder responsibility, the

Owner may adopt relevant supplemental criteria for determining Bidder responsibility applicable to a particular project which the Bidder must meet (RCW 39.04.350 (3)).

1. If applicable, the Owner shall consider an overall accounting of the attached supplemental criteria for determining Bidder responsibility “DIVISION 00 SUPPLEMENTAL

RESPONSIBILITY CRITERIA”.

2. At least eight (8) business days prior to the bid submittal deadline, a potential Bidder may request that the Owner modify the supplemental responsibility criteria. The Owner will evaluate the information submitted by the potential Bidder and respond before the bid submittal deadline through the DES Public Procurement Portal. If the evaluation results in a change of criteria, the Owner will issue an addendum to the bidding documents identifying the new criteria. The addendum will be posted as a public notice in the DES Public Procurement Portal.

3. Upon Owner’s request, the apparent low Bidder must supply the requested responsibility information within two (2) business days of request by Owner. Withholding information or failure to submit all the information requested within the time provided may render the bid non-responsive.

4. If the Owner determines that the apparent low Bidder is not responsible, the Owner will notify the Bidder of its preliminary determination in writing.

5. Within three (3) business days after receipt of the preliminary determination, the Bidder may withdraw its bid or request a hearing in writing to easmail@des.wa.gov, where the Bidder may appeal the preliminary determination and present additional information to the Owner.

6. The Owner will schedule a hearing within five (5) business days of receipt of the Bidder’s request. The hearing members will include a Client Agency Representative, EAS Assistant Director or designee, Deputy Assistant Director or designee, and Project Manager.

7. The Owner will issue a Final Determination after reviewing information presented at the hearing.

mailto:easmail@des.wa.gov

8. If the Owner determines a Bidder to be not responsible, the Owner will provide, in writing, the reasons for the determination. If the final determination affirms that the Bidder is not responsible, the Owner will not execute a contract with any other Bidder until two (2) business days after the Bidder determined to be not responsible has received the final determination.

9. The Owner’s Final Determination is specific to this project and will have no effect on other or future projects.

0.13 CONTRACT AWARD

A. The Owner will evaluate bids responsiveness and responsibility in the DES Public Procurement

Portal (https://deswa.bonfirehub.com).

1. A bid will be considered responsive if it meets the following requirements:

(a) It is received at the proper submittal time, date, and location online through the DES

Public Procurement Portal.

(b) It meets the required requested information through the DES Public Procurement Portal.

(c) It is submitted by a licensed/registered contractor within the state of Washington at the time of bid opening and is not banned from bidding by the Department of Labor and Industries.

(d) It is accompanied by a bid guarantee, if required.

2. A bid will be considered responsible if it meets the following requirements:

(a) It meets the mandatory responsibility criteria established in RCW 39.04.350 and an overall accounting of the supplemental responsibility criteria established for…

This is the start of the file's text. The full file is on GovTribe.