2026-09-16 TRSD Middle-High Sch Local Ad CMR RFQ.pdf
PDF 65 KB Posted
- Attached to
- RFQ CMAR new Triton Regional-Middle High School
- Solicitation number
- BD-27-2103-CO111-CO111-133569
- Issued by
- Essex County, Massachusetts
About this file
This is a local advertisement for a Request for Qualifications (RFQ) issued by the Triton Regional School District in Massachusetts for Construction Manager at Risk (CMR) services under Massachusetts General Law Chapter 149A. The project involves the design and construction of a new Regional Middle-High School at 114 Elm Street, Byfield, MA. The facility will serve grades 6 to 12 (approximately 1,070 students) or grades 7 to 12 (approximately 895 students) and will be approximately 286,368 square feet. The estimated total construction cost is $250 million to $300 million with a projected construction duration of 61 months. The project is currently in the early Feasibility Study phase, with a Preliminary Design Program submission anticipated in October 2026 and a Preferred Schematic Report (PSR) submission anticipated in February 2027. Estimating documents for the PSR are anticipated to be issued on December 17, 2026. The full RFQ will be available at 9:00 AM on Wednesday, September 23, 2026, via www.projectdoc.com (Project ID 262092). The deadline for submission of Statement of Qualifications (SOQs) is Friday, October 9, 2026, at 3:00 PM, with all submissions required to be made electronically. The District anticipates completion of the prequalification process by October 23, 2026, after which only pre-qualified firms with acceptable ratings will advance to the Request for Proposal (RFP) phase.
The project is being funded in part through a grant from the Massachusetts School Building Authority (MSBA). Prospective bidders must create a new account on www.projectdoc.com, as existing accounts from the previous platform (www.projectdog.com) will not transfer. The successful CMR bidder will be required to provide a construction cost estimate for inclusion with the PSR submission. Project documentation and submission portal information are available through Projectdoc at 978-499-9014.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 16, 2026 CMR Request for Qualifications (RFQ) Local Paper Advertisement Copy Triton New Regional Middle-High School
Request for Qualifications Construction Manager at Risk (CMR)
Triton Regional School District : Middle-High School Project Byfield, MA
The Triton Regional School District is issuing a Request for Qualifications (RFQ) for Construction Manager at Risk Services (under MGL C. 149A) for the new Regional Middle-High School at 114 Elm Street, Byfield, MA 01922. This project is being funded in part through a grant from the Massachusetts School Building
Authority (MSBA). Estimated total cost of construction is $250M-$300M with estimated project construction duration of 61 months. The project is currently in the early phases of the Feasibility Study
(FS). Preliminary Design Program submission is anticipated in Oct. 2026 with Preferred Schematic Report (PSR) submission anticipated in Feb. 2027. Successful CMR bidder will be required to provide a construction cost estimate for inclusion with the PSR submission. PSR estimating documents anticipated to be issued Dec. 17, 2026. Current middle-high school is a 3-level concrete structure of ~286,368 SF.
The Project includes vetting 10+ construction build options during FS based on enrollments of up to
1,070 students grades 6 to 12 or 895 students grades 7 to 12. For additional information please see the full RFQ which will be available at 9:00AM on Wednesday, September 23, 2026, at www.projectdoc.com
EXISTING www.projectdog.com accounts WILL NOT TRANSFER to www.projectdoc.com. Users must create a new Projectdoc.com account which is free to do. Click “Create FREE Account” to create new account. Enter Project ID 262092 to access project related documents and complete all required submissions. The deadline for submission of Statement of Qualifications (SOQ) is Friday, October 9, 2026 at 3:00PM. SOQs must be submitted electronically at www.projectdoc.com. The District anticipates completion of the prequalification process by October 23, 2026. Only construction management at risk firms achieving an acceptable rating and prequalified by the Committee as defined in Section D “Evaluation Criteria of Selection” within the RFQ will be selected to proceed to the Request for Proposal (RFP) phase.
http://www.projectdoc.com/ http://www.projectdog.com/
File details come from the government source that posted it. Updated .