This is a set of construction design plans prepared by the Seattle Department of Transportation (SDOT) for the Highland Park Way SW Connection project located in Seattle, Washington between W Marginal Way SW and SW Holden Street. The project involves improving bicycle and pedestrian connections by widening an existing asphalt path and installing a downhill protected bicycle lane with concrete barriers, along with associated channelization, landscaping, paving, drainage improvements, and curb ramps. The design plans comprise 27 sheets including cover sheets, general notes, alignment plans, roadway sections, site preparation plans, lighting plans, paving plans, curb ramp plans, and channelization and signing plans. The project includes installation of new wood poles with bracket arms and luminaires for streetlighting, removal and relocation of existing lighting fixtures, new catch basins and inlets, ductile iron pipe drainage connections, and various utility coordination requirements with Seattle Public Utilities, Seattle City Light, and King County Metro.
The engineer's estimate for the project ranges from $1,700,000 to $1,800,000. The design includes specifications requiring compliance with the 2026 Edition of the City of Seattle Standard Specifications for Road, Bridge and Municipal Construction and the 2026 Edition of the City of Seattle Standard Plans. Contractors must prepare construction stormwater and erosion control plans, tree and vegetation protection plans, and spill prevention control plans prior to construction. The project requires coordination with multiple agencies including Seattle Public Utilities for water main protection and approval of new drainage features, Seattle City Light for electrical service and streetlight installations, and King County Metro for transit system impacts, with advance notification periods ranging from three to fifteen working days. The design specifies 2 new curb ramps for Americans with Disabilities Act compliance and includes protective measures for charged water mains, survey monuments, and existing utilities throughout the construction area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SW ORCHARD ST
H
IG
H
LA
N D
P
AR
K
W Y S W
SW OTHELLO ST
SO
U N D W
AY SW
TH
AV
S W
SW MYRTLE ST
TH
AV
S W
SW O
THELL
O ST 7TH
AV
S W
TH
AV
S W
SW PORTLAND ST
SW MICHIGAN ST
W MARGINAL WY SW
DETRO
IT AV W
SW HOLDEN ST
SW AUSTIN ST
TH
AV
S W
SW WEBSTER ST
TH
AV
S W
TH
AV
S W
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P C O
VR
.d w g
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND
O ct
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
LL
PT
SK
MH
AS NOTED
HIGHLAND PARK WAY SW
CONNECTION
01 27
COVER SHEET
894-33
TRC1679
TRC1679
127362 2026-040 CV01
BLUE
RIDGE
NORTHGATE
HILL
GREENWOOD
LAKE CITY
VICTORY
HEIGHTS
VIEW
RIDGE
WINDERMERE
LAURELHURST
RAVENNA
MAPLE
LEAF
WEDGEWOOD
SUNSET
HILL
BALLARD
FREMONT
W
AL
LI
N G
FO
R D
LAWTON U
N
IV
E R S
IT
Y
MAGNOLIA
IN
TE
R B
AY
QUEEN
ANNE
MADISON
PARK
MONTLAKE
CAPITOL
HILL
CENTRAL
BUSINESS
DISTRICT
M
AD
R O N A
HARBOR
ISLAND
ALKI
WEST
SEATTLE
MT BAKER
RAIN
IER
VALLEY
GEORGETOWN
COLUMBIA
SEWARD
PARK
BRIGHTON
DUNLAP
B
EAC
O N
H
ILL
SOUTH
SEATTLE
SOUTH
PARK
HIGHLAND
PARK
WHITE CENTER
FAUNTLEROY
ARROYO
CROWN
AV
N W
AV
N W
AV
N W
AV
N W
AV
N W
G R E E N W O O D
AV
N
AU
R O R A
AV
N
I-
R O O S E
VE
LT
W Y N E
N E N E
LEARY
W
Y NW
LA
KE
C
ITY
W Y N E
N 130 ST
NE NORTHGATE WY
NE 125 ST
NE 95 ST
NE 75 ST
HO
LM
AN
RD
NW
N 105 ST
NW 85 ST
NW 80 ST
NE 65 ST
NE 55 ST
NE 45 ST
N 50 ST
AU
R O R A
AV
N P O
IN
T W Y
SA
ND
N 40 ST
NW 65 ST
NW MARKET ST
I-
W NICKERSON ST
W EMERSON ST
W DRAVUS ST
W MCGRAW ST
MAGNOLIA BR
DENNY WY
E UNION ST
E CHERRY ST
E YESLER WY
I-90
S MCCLELLAN ST
S SPOKANE ST
S GENESEE ST
SW GENESEE ST
ADMIRAL WY
ELLIOTT AV E
MA
DI
SO
N
ST
R
AIN
IER
AV
S
B
EAC
O N
AV
S
AL
KI
A V
SW
AV
W
AV
W
AV
W
Q U E E N
AN
N E
AV
N
W E S
TL
AK
E
AV
N
E
AS
TL
AK
E
AV
E
AV
E
AV
E
E
B R O
AD
W
AY
B
LV
D
S
W
AS
H
IN
G
TO
N
LA
K E
I-
AV
S6
AV
S
AV
S
C
AL
IF
O R N
IA
AV
S W
FA
U N
TL
E R O Y
WY
S W
AV
S W
D E
LR
ID
G E
W Y S W
AV
S
AI
R P O R T
AV
S W
AV
S W
BEACH
DR
SW
W
M
AR
G
IN
AL
M L
K
IN
G
JR
Y
S
RENTON
AV S
SW ROXBURY ST
SW BARTON ST
SW THISTLE ST
SW HOLDEN ST
S LUCILE ST
S ORCAS ST
S OTHELLO ST
S CLOVERDALE ST
SR 520
ELLIOTT BAY
LAKE
WASHINGTON
LAKE
UNION
GREEN
LAKE
M
YERS W
Y S
AV
AL
O N
W
AY
SW
S M
ICHI
GAN
ST
E
M
AR
G
IN
AL
W Y
S
S DEARBORN ST
ALASKAN WAY
VIADUCT
MERCER ST
S
TO
N E
W Y N
N 45 ST
TH
AV
N E
NE 145 ST
AV
SW
WY SW
Y S
SCALE: 1" = 1 MILE
0 1 2
VICINITY MAP
SEE LOCATION MAP
DETAIL AND SECTION REFERENCING
(TITLE)
(SCALE)
DETAIL REFERENCE NUMBER
SHEET ON WHICH DETAIL APPEARS
DETAIL REFERENCE NUMBER
("TYP" SPECIFIES THAT DETAIL IS
UNIFORMLY TYPICAL THROUGHOUT
PROJECT EXCEPT WHERE OTHERWISE NOTED.)
("VAR" SPECIFIES THAT DETAIL WAS
TAKEN FROM SEVERAL SHEETS.)
SECTION A-A
SECTION A-A IS SHOWN ON SHEET 32.
SECTION A-A IS TAKEN FROM SHEET 30.30
A A
SHEET FROM WHICH DETAIL WAS TAKEN
SHEET INDEX
SHEET DRAWING SHEET DESCRIPTION
01 CV01 COVER SHEET
02-03 NT01-NT02 GENERAL NOTES
04 AL01 ALIGNMENT
05 RS01 ROADWAY SECTIONS
06-10 SP01-SP05 SITE PREPARATION PLANS
11-16 LT01-LT06 LIGHTING PLANS
17-21 PV01-PV05 PAVING PLANS
22 CR01 CURB RAMP PLANS
23-27 CH01-CH05 CHANNELIZATION AND SIGNING PLANS
LOCATION MAP
SCALE: 1" = 400'
PROJECT LOCATION
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT) Luke Larson https://seattlegov.na1.adobesign.com/verifier?tx=CBJCHBCAABAAKOgeQ98iP-0lJpFMmnQreVxKO78UKq8W
1. FOR REQUIREMENTS ON LAYOUT AND VERIFICATION OF CHANNELIZATION
FEATURES, SEE SECTION 8-22.3(1). REQUEST MUST BE MADE TO THE ENGINEER.
2. FOR SIGNING AND STRIPING DETAILS NOT SHOWN IN THESE DRAWINGS, SEE 600 SERIES AND
700 SERIES STANDARD PLANS.
3. COORDINATE PARKING/LOADING SIGN(S) AND PAY STATION REMOVAL/RELOCATION AND
INSTALLATION WITH SDOT CURBSPACE MANAGEMENT AT CURBSIDEOPS@SEATTLE.GOV AND
206-684-8175 WITH AT LEAST 10 BUSINESS DAYS NOTICE. SDOT WILL PERFORM THE WORK.
4. TO COORDINATE SDOT INSTALLATION OF SIGNS, SEE SECTION 8-21.3(1). ADVANCE NOTIFICATION
IS REQUIRED.
STORMWATER POLLUTION PREVENTION NOTES
UNLESS OTHERWISE NOTED ON THE DRAWINGS:
1. THE CONTRACTOR MUST PREPARE A CONSTRUCTION STORMWATER AND EROSION CONTROL PLAN (CSECP), A TREE, VEGETATION AND SOIL PROTECTION PLAN (TVSPP) AND A SPILL PREVENTION
CONTROL AND COUNTERMEASURES PLAN (SPCCP) FOR APPROVAL BY THE ENGINEER PRIOR TO
CONSTRUCTION. SEE SECTIONS 1-07.15 AND 8-01.
1. FOR INLET CONNECTION BEND AND SLOPE RESTRICTIONS, SEE SECTION 7-08.3(5).
2. WHEN CONNECTING TO EXISTING SEWER AND DRAINAGE LINES, THE CONTRACTOR MUST VERIFY INVERT ELEVATIONS PRIOR TO CONSTRUCTION. DISCREPANCIES IN INVERT ELEVATIONS MUST BE
IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER.
3. DUCTILE IRON PIPE BEDDING MUST BE CLASS B. SEE STD PLAN 285. TRENCH BACKFILL MUST BE
IMPORTED MINERAL AGGREGATE TYPE 17, AND IS NOT INCIDENTAL TO THE BID ITEMS.
4. ALL INLET AND CATCH BASIN PIPE RECONNECTIONS MUST USE FLEXIBLE GASKETED COUPLINGS
WITH STAINLESS STEEL SHIELDS PER SPECIFICATION 9-05.18.
5. SEATTLE PUBLIC UTILITIES (SPU) APPROVAL IS REQUIRED FOR ALL PROPOSED NEW CATCH BASINS, INLETS AND PIPES PRIOR TO FINAL SURFACE RESTORATION. CONTACT THE ENGINEER, 48 HOURS
IN ADVANCE.
6. DUCTILE IRON PIPE MUST BE ANSI A21.51 CLASS 50 WITH PUSH-ON JOINTS. FITTINGS FOR DUCTILE IRON PIPE MUST BE PER ANSI A21.10 OR ANSI A21.53 WITH PUSH-ON JOINTS. GLANDS
ON MECHANICAL JOINT PIPE AND FITTINGS MUST BE DUCTILE. SEE SECTION 9-05.3.
7. MAINTENANCE HOLES AND CATCH BASINS WITH RING AND COVER CASTINGS MUST BE 7-INCH OR 10-INCH HEIGHT. WHERE CASTING IS WITHIN ROADWAY, 10-INCH MUST BE USED. SEE STANDARD
PLAN 230 AND SECTION 7-05.
8. PERFORM TELEVISION INSPECTION FOR ALL NEW MAINLINE STORM DRAIN PIPE, GREATER THAN 6-INCH IN DIAMETER, AND FOR ALL NEW CATCH BASIN CONNECTIONS. SEE SECTION 7-17.3(3)G.
9. INSTALL POLYETHLENE FOAM (PEF) PROTECTION IF LESS THAN 6-INCH CLEARANCE BETWEEN UTILITIES. PEF IS INCIDENTAL TO COST OF PIPE PER SECTION 7-08.5 AND 7-17.5. SEE SECTION
9-05.9(2)B FOR MATERIAL REQUIREMENTS.
GENERAL NOTES
UNLESS OTHERWISE NOTED ON THE DRAWINGS:
1. PAVEMENT, SIDEWALK AND CURB REMOVALS MUST EXTEND TO EXISTING JOINTS, TO LIMITS IDENTIFIED AS "SAWCUT" ON THE DRAWINGS, OR TO LIMITS DETERMINED BY THE ENGINEER. SEE
SECTION 2-02.3.
2. ALL JOINTS AT THE MEET LINES OF NEW CONSTRUCTION AND EXISTING SURFACES MUST BE BUTT
JOINTS. SEE SECTION 5-04.3(10)B.
3. LONGITUDINAL JOINTS MUST BE COORDINATED WITH THE CHANNELIZATION DRAWINGS. LONGITUDINAL JOINTS MUST BE AT A LANE LINE OR EDGE OF TRAVELED WAY UNLESS APPROVED OTHERWISE IN
WRITING BY THE ENGINEER. SEE SECTION 5-05.3(8)E2.
4. PAVING AROUND INLETS AND CATCH BASINS MUST BE SLOPED TO ESTABLISH A DRAINAGE
TRANSITION ZONE PER STANDARD PLAN 260A.
5. THE ENGINEER WILL DIRECT THE LOCATIONS OF PRELEVELING. SEE SECTION 5-04.3(4)B2.
6. PRIOR TO SAWCUTS AND REMOVALS, THE CONTRACTOR MUST HAVE THE LIMITS VERIFIED BY THE
ENGINEER.
7. IF AN EXISTING WATER VALVE BOX REQUIRES ADJUSTMENT, IT MUST BE DONE BY EXCAVATING THE CASTING AND VERTICALLY ADJUSTING THE TOP SECTION OF THE VALVE BOX. THE FLANGE MUST
BE CAST IN TO SURROUNDING PAVEMENT AS SHOWN ON STD PLAN 315. DO NOT USE
EXTENSION RINGS. SEE SECTION 7-20.3(1)A.
8. CONTRACTOR MUST ADJUST CASTINGS IN ACCORDANCE WITH SECTION 7-20. CASTINGS MUST BE ADJUSTED TO FINISH GRADE PRIOR TO CONSTRUCTION OF FINAL SURFACE COURSE PER SECTION
5-04.3(9)B. WORN OR BROKEN CASTINGS TO BE REPLACED MUST BE REPLACED PRIOR TO
INSTALLATION OF THE FINAL SURFACE.
9. NEW LOOP DETECTORS MUST BE INSTALLED IN THE PAVEMENT SUBLAYER PRIOR TO FINAL
WEARING COURSE PAVING. SEE SECTION 8-31.3(5)A. WHEN INSTALLING IN NEW FULL DEPTH
CONCRETE PAVEMENT WITHOUT ASPHALT SURFACING, THE LOOPS MUST BE PREFORMED PER
SECTION 8-31.3(5)B.
ROADWAY NOTES
UNLESS OTHERWISE NOTED ON THE DRAWINGS:
SIGNING & CHANNELIZATION NOTES
UNLESS OTHERWISE NOTED ON THE DRAWINGS:
DRAINAGE NOTES
UNLESS OTHERWISE NOTED ON THE DRAWINGS:
CURB RAMP NOTES:
UNLESS OTHERWISE NOTED ON THE DRAWINGS:
1. ALL NEWLY CONSTRUCTED PEDESTRIAN ACCESS ROUTES INCLUDING SIDEWALK AND CURB RAMPS
MUST MEET CURRENT ADA STANDARDS AND GUIDELINES (2010 ADA STANDARDS, PROWAG 2023)
TO THE MAXIMUM EXTENT FEASIBLE.
2. WHERE THE DRAWINGS DENOTE "MEF" FOR CURB RAMP ELEMENTS, THIS DESIGNATION IS FOR THE
REFERENCE ONLY AND MUST BE FIELD VERIFIED BY THE ENGINEER. THE CONTRACTOR MUST
NOTIFY THE ENGINEER PER SECTION 8-14.3(7) AND ALLOW THE ENGINEER THE OPPORTUNITY TO INSPECT THE CURB RAMP LAYOUT AND DIRECT ADJUSTMENTS AS NECESSARY. EVERY EFFORT WILL
BE MADE TO ACHIEVE AN ADA COMPLIANT RAMP.
3. THE CONTRACTOR MUST NOTIFY THE ENGINEER IF A CURB RAMP CANNOT BE CONSTRUCTED PER
THE DRAWINGS, RESULTING IN NON-COMPLIANT SLOPES AND/OR DIMENSIONS. PRIOR TO
INSTALLING THE CURB RAMP, THE ENGINEER MUST APPROVE THE CURB RAMP LAYOUT.
4. PEDESTRIAN ACCESS THROUGH THE PROJECT MUST BE MAINTAINED IN COMPLIANCE WITH SDOT
PEDESTRIAN MOBILITY IN AND AROUND WORK ZONES, DIRECTOR'S RULE 10-2015, AND SDOT
2024 TRAFFIC CONTROL MANUAL FOR IN-STREET WORK.
5. FOR ASSET MANAGEMENT PURPOSES, THIS PROJECT INCLUDES THE FOLLOWING:
NEW CURB RAMPS 2
REBUILT CURB RAMPS 0
PROJECT TOTAL 2
1. ALL WORK MUST CONFORM TO THE 2026 EDITION OF THE CITY OF SEATTLE STANDARD
SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, THE 2026 EDITION OF THE CITY OF SEATTLE STANDARD PLANS FOR MUNICIPAL CONSTRUCTION, AND THE SEATTLE DEPARTMENT OF TRANSPORTATION DIRECTOR'S RULE 01-2017 FOR STREET AND SIDEWALK PAVEMENT OPENING
AND RESTORATION. A COPY OF THESE DOCUMENTS MUST BE ONSITE DURING CONSTRUCTION.
2. FOR REQUIREMENTS REGARDING THE PROTECTION AND RESTORATION OF PUBLIC AND PRIVATE
PROPERTY SEE SECTIONS 1-07.16 & 1-07.17.
3. THE CONTRACTOR IS RESPONSIBLE FOR REFERENCING AND REPLACING ALL SURVEY MONUMENTS THAT MAY BE DISTURBED, DESTROYED OR REMOVED BY THE PROJECT AND AT LEAST 2 WORKING DAYS PRIOR TO THE WORK, MUST FILE AN APPLICATION FOR PERMIT TO REMOVE OR DESTROY A
SURVEY MONUMENT WITH THE WASHINGTON STATE DEPARTMENT OF NATURAL RESOURCES,
PURSUANT TO WAC 332-120. THE CONTRACTOR MUST PROVIDE THE ENGINEER AND SPU LAND
SURVEY WITH A COPY OF THE APPROVED PERMIT AND COMPLETION REPORT.
SEE STANDARD SPECIFICATION 1-07.28 ITEM 17.
4. TREES, SHRUBS AND OTHER PLANT MATERIAL NOT DESIGNATED FOR REMOVAL MUST BE PROTECTED FROM DAMAGE. SEE SECTIONS 1-07.16(2) AND 8-01 FOR REQUIREMENTS REGARDING THE TREE, VEGETATION AND SOIL PROTECTION PLAN.
5. THE PROJECT WILL INVOLVE EXCAVATION OVER CHARGED WATER MAINS. FOR PROTECTION OF THIS INFRASTRUCTURE, SEE SECTIONS 1-07.16(1) AND 2-02.3(3)C. CONTRACTOR MUST NOT REPAIR
DAMAGE TO CHARGED WATER MAINS OR SERVICES BUT MUST IMMEDIATELY NOTIFY THE SPU
EMERGENCY DISPATCHER AT 206-386-1800.
6. THE CONTRACTOR MUST NOTIFY THE UTILITIES FOR UNDERGROUND UTILITY LOCATIONS BEFORE COMMENCEMENT OF ANY EXCAVATION. ADVANCE NOTIFICATION IS REQUIRED. SEE SECTION 1-07.28.
7. FOR NOTIFICATION AND COORDINATION REQUIREMENTS, INCLUDING COMMUNICATION WITH KCM
TRANSIT, SEE SECTIONS 1-07.17 AND 1-07.28.
8. ALL EXCAVATIONS ADJACENT TO SEATTLE CITY LIGHT POLES OR OTHER FACILITIES (VAULTS, HANDHOLES, ETC.) MUST COMPLY WITH WAC 296-155 PART N, EXCAVATION, TRENCHING AND
SHORING. POLE PROTECTION/ SUPPORTING SYSTEMS USED WHILE EXCAVATING MUST COMPLY
WITH WAC 296-155-655, GENERAL PROTECTION REQUIREMENTS, ITEM (9) AND MUST NOT AFFECT
THE STRUCTURAL INTEGRITY OF POLES WHILE THE SYSTEMS ARE IN PLACE OR AFTER THE
SYSTEMS HAVE BEEN REMOVED.
1. SEE APPENDIX OF PROJECT MANUAL FOR SURVEY CONTROL SHEETS.
SURVEY CONTROL NOTES
UNLESS OTHERWISE NOTED ON THE DRAWINGS:
1. ANY CONSTRUCTION OR INSTALLATION ACTIVITIES AFFECTING TRANSIT OPERATIONS OR FACILITIES
MUST BE COORDINATED THROUGH THE KING COUNTY METRO SYSTEM IMPACTS WORKGROUP. FOR
NOTIFICATION AND GUIDELINES, PLEASE VISIT HTTPS://KINGCOUNTY.GOV/EN/DEPT/METRO/ABOUT/
CONTRACTOR-RESOURCES/TRANSIT-SYSTEM-IMPACTS OR CONTACT CONSTRUCTION COORDINATORS
AT 206-477-1140. PLEASE PROVIDE TEN (10) BUSINESS DAYS NOTIFICATION FOR BUS REROUTES
AND FIVE (5) BUSINESS DAYS FOR BUS STOP IMPACTS.
2. TO SCHEDULE SHELTER REMOVAL, PLEASE CONTACT PLANSREVIEW@KINGCOUNTY.GOV TO SCHEDULE
REMOVAL. PLEASE NOTE THAT METRO REQUIRES 3 WEEKS PRIOR NOTIFICATION FOR REMOVAL.
3. PLEASE SEE FOLLOWING URL FOR INFORMATION ABOUT KING COUNTY METRO DESIGN STANDARDS:
HTTPS://KINGCOUNTY.GOV/DEPTS/TRANSPORTATION/METRO/ABOUT/CONSTRUCTION-CONTRACTORS/
CAPITAL-DELIVERY.ASPX
4. PRIOR TO CONSTRUCTION OF METRO FOOTINGS AND FACILITIES, PLEASE CONTACT METRO
INSPECTORS AND CONSTRUCTION AT BUSSTOPINSPECTIONS@KINGCOUNTY.GOV OR BY PHONE AT
206-263-2381. PLEASE NOTE THAT METRO REQUIRES NOTICE OF AT LEAST THREE WEEKS IN
ADVANCE TO SCHEDULE AN INSPECTION. ALL METRO FOOTINGS MUST BE INSPECTED AND
APPROVED BY METRO INSPECTORS BEFORE ANY CONCRETE IS POURED.
5. AFTER SHELTER FOOTING INSPECTION AND COMPLETED CONSTRUCTION, PLEASE CONTACT
PLANSREVIEW@KINGCOUNTY.GOV TO SCHEDULE SHELTER FRAME INSTALLATION AND BUS STOP
FLAGPOST INSTALLATION.
6. FOR ENGINEERING DESIGN QUESTIONS, PLEASE CONTACT KALE CHANG YUEN AT 206-263-0885
OR COLIN ASQUITH AT 206-477-5984 FOR ASSISTANCE.
7. PER SECTION 810 OF THE ADA STANDARDS FOR TRANSPORTATION FACILITIES, THE CROSS-SLOPE OF A BUS STOP BOARDING AND ALIGHTING AREA SHALL NOT BE STEEPER THAN 1:48 (~2%). THIS
STANDARD APPLIES TO ANY NEW OR MODIFIED BUS STOP.
8. THE CONSTRUCTION COORDINATOR (CONSTRUCTION.COORD@KINGCOUNTY.GOV) AND TRANSIT ROUTE FACILITIES PLANNER FOR THE AREA MUST BE INCLUDED IN THE PRE-CONSTRUCTION MEETINGS
BETWEEN THE CONTRACTOR, CONSTRUCTION MANAGEMENT FIRMS AND SDOT BEFORE THE NOTICE
TO PROCEED IS ISSUED.
GENERAL KING COUNTY METRO NOTES
UNLESS OTHERWISE NOTED ON THE DRAWINGS:
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P N O
TE
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
NONE
HIGHLAND PARK WAY SW
CONNECTION
02 27
GENERAL NOTES
894-33
TRC1679
TRC1679
127362 2026-040 NT01
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT) Luke Larson
1. ALL DISCONNECTIONS: TEMPORARY OR FINAL SERVICE CONNECTIONS WILL BE MADE BY SEATTLE CITY LIGHT (SCL) AT PROJECT'S EXPENSE. COORDINATE ALL ENERGIZING AND DE-ENERGIZING OF STREET LIGHTING SERVICE WITH SCL ELECTRICAL SERVICE REPRESENTATIVE AND STREETLIGHT ENGINEER FIFTEEN (15) WORKING DAYS IN ADVANCE. ADDITIONAL TIME MAY BE NEEDED FOR CREW
SCHEDULING AND MOBILIZATION.
2. CONTRACTOR MUST MAKE PRIOR COORDINATION FOR FLOOD OR STREETLIGHT REMOVAL.
CONTRACTOR MUST MAKE PRIOR DELIVERY COORDINATION FOR SALVAGED STREETLIGHT-RELATED
MATERIALS TO SEATTLE CITY LIGHT SALVAGE YARD AT 4TH AVE S & S SPOKANE ST, 98134.
CONTACT SALVAGE COORDINATOR AT 206-386-1765. NO ARTERIAL STREETLIGHT MAY BE DISABLED
WITHOUT PRIOR APPROVAL FROM SEATTLE DEPARTMENT OF TRANSPORTATION, (SDOT).
3. EXISTING STREET LIGHTING SYSTEM SHALL BE MAINTAINED DURING CONSTRUCTION.
4. WORK MUST BE SCHEDULED SUCH THAT NO TWO (2) ADJACENT OR OPPOSITE STREETLIGHTS ARE
DISABLED AT ANY ONE TIME.
5. ANY EXCAVATION IN PROXIMITY TO AN EXISTING STREETLIGHT POLE MUST BE DONE WITHOUT UNDERMINING ITS STABILITY. CONTRACTOR IS RESPONSIBLE FOR TEMPORARY STABILIZING SUPPORT.
6. INSTALLATION OF UNDERGROUND STREETLIGHT SYSTEMS, AND STREETLIGHT SYSTEM GROUNDING
AND BONDING MUST BE PER SEATTLE CITY LIGHT (SCL) CONSTRUCTION STANDARD 1714.50.
7. ALL WIRING, INCLUDING STREET LIGHTING, PEDESTRIAN LIGHTING AND FESTOON LIGHTING CIRCUITS MUST BE CLEARLY LABELED PER SEATTLE CITY LIGHT (SCL) CONSTRUCTION STANDARD 1714.10.
8. EACH LUMINAIRE MUST BE FUSED PER (SCL) CONSTRUCTION STANDARD 1730.00.
9. STREETLIGHT HANDHOLE AND CONDUIT REQUIREMENTS MUST CONFORM TO SCL CONSTRUCTION
STANDARD 1716.07.
10. PULL TAPE MUST BE INSTALLED THROUGH VACANT CONDUIT CAPPED PER (SCL) CONSTRUCTION
STANDARD U2-11.40/NDK-40.
11. MAINTAIN MINIMUM HORIZONTAL & VERTICAL CLEARANCES BETWEEN SCL UNDERGROUND
STRUCTURES AND VARIOUS OTHER UTILITY STRUCTURES PER SCL CONSTRUCTION STANDARD
0214.00.
12. FOR STREET LIGHTING INSPECTIONS CONTACT SCL ELECTRICAL REVIEWER TEN (10) WORKING DAYS
IN ADVANCE.
13. CONTRACTOR MUST CALL FOR AN ELECTRICAL REVIEWER INSPECTION OF THE STREET LIGHTING SYSTEM AT VARIOUS STAGES OF INSTALLATION/CONSTRUCTION OR AS INSTRUCTED BY THE SCL
INSPECTOR.
14. CONTRACTOR MUST PROVIDE AN OPERATOR AND MAN LIFT TRUCK FOR USE DURING INSPECTION
OF INSTALLED STREETLIGHT FACILITIES.
15. CONTRACTOR MUST ASSIST THE INSPECTOR DURING INSPECTIONS, COMMISSIONING, AND FINAL
CONNECTION PHASES OF THE PROJECT AS INSTRUCTED BY THE INSPECTOR. SUCH ASSISTANCE
WILL INCLUDE, BUT NOT BE LIMITED TO OPENING HANDHOLES, MANHOLES AND VARIOUS ACCESS
COVERS, DISCONNECTING AND RECONNECTING FUSE HOLDERS AND MECHANICAL SPLICE
CONNECTIONS, VERIFYING CONDUIT RUNS, ETC.
16. PRIOR TO REQUESTING FINAL STREETLIGHT SERVICE CONNECTION, CONTRACTOR MUST CORRECT ALL
PUNCH LIST ITEMS AND CALL FOR A RE-INSPECTION WHERE REQUIRED BY THE INSPECTOR.
CONTRACTOR MUST PREPARE A SIGNED AS-BUILT AND WIRING DIAGRAM WHICH INCLUDES WHICH
DUCT IS USED IN EACH DUCT BANK.
LIGHTING NOTES
UNLESS OTHERWISE NOTED ON THE DRAWINGS: UNLESS OTHERWISE NOTED ON THE DRAWINGS:
1. THE CONTRACTOR MUST IMMEDIATELY REPORT ANY DAMAGE TO THE TRAFFIC SIGNAL SYSTEM, INCLUDING CONDUIT AND THE DETECTOR LOOPS. SEE SECTION 1-07.28 NOTE 16.
2. THE TRAFFIC SIGNAL SYSTEM INTERCONNECT CABLE AND SIGNAL WIRE SERVICE, VIDEO, OR MASTER
CABLE MUST NOT BE SPLICED. SEE SECTIONS 8-31.3(8)A AND 8-31.3(9)B.
3. THE CONTRACTOR MUST CONTACT SDOT TRAFFIC SIGNAL OPERATIONS WHEN THE TRAFFIC SIGNAL
SYSTEMS OR THE TRAFFIC DETECTOR LOOPS MAY BE IMPACTED BY CONSTRUCTION. ADVANCE
NOTIFICATION IS REQUIRED. SEE SECTION 1-07.28, SIGNALIZED INTERSECTIONS.
4. THE CONTRACTOR MUST PROVIDE PRELIMINARY LAYOUT FOR THE TRAFFIC DETECTION. THE LAYOUT
MUST BE VERIFIED BY THE ENGINEER PRIOR TO SAW CUTTING. ADVANCE NOTIFICATION IS
REQUIRED. SEE SECTION 8-31.3(5)A.
5. FINAL POLE AND CABINET LOCATIONS MUST BE FIELD VERIFIED BY THE ENGINEER PRIOR TO
EXCAVATION.
6. CONTRACTOR MUST INVESTIGATE FOR UNDERGROUND UTILITIES PRIOR TO ANY FOUNDATION
EXCAVATION OR CONDUIT TRENCHING TO AVOID DAMAGE TO ANY UNDERGROUND UTILITIES
(INCLUDING SIDE SEWERS). ANY CONFLICTS MUST BE BROUGHT TO THE ATTENTION OF THE
ENGINEER PRIOR TO ANY CONSTRUCTION WORK.
7. CONTRACTOR MUST VERIFY THE CAPACITIES OF ALL EXISTING CONDUITS DESIGNATED FOR USE ON
THIS PROJECT. ANY DISCREPANCIES MUST BE BROUGHT TO THE ATTENTION OF THE ENGINEER
PRIOR TO ANY CONSTRUCTION WORK.
8. CONTRACTOR MUST COORDINATE WITH SDOT/SCL/SDCI/KCM INSPECTOR AT THE START OF
CONSTRUCTION FOR INSPECTION REQUIREMENT AT VARIOUS STAGES OF CONSTRUCTION AS
INSTRUCTED BY THE INSPECTOR AND PROVIDE ASSISTANCE AS NECESSARY.
9. CONTRACTOR MUST COMBINE TRAFFIC, LIGHTING AND ITS CONDUITS IN THE SAME TRENCH WHERE
FEASIBLE.
10. ALL ELECTRICAL SERVICE DISCONNECTIONS, TEMPORARY CONNECTIONS AND FINAL SERVICE
CONNECTIONS WILL BE MADE BY SEATTLE CITY LIGHT (SCL).
SIGNAL & ELECTRICAL NOTES
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P N O
TE
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
NONE
HIGHLAND PARK WAY SW
CONNECTION
03 27
GENERAL NOTES
894-33
TRC1679
TRC1679
127362 2026-040 NT02
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT)
9+ 0010+
0011+ 0012+
0013+
14+
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
L= 1.
R= 0.
Δ= °5 3'
S66 °20
'42 "W467
.95
S86°03'22"W 160.96' S86°03'22"W
372.38' L=272.33 R=800.00
Δ=19°30'15"
S °2 '2 "W
.8
L= .0
R .4
Δ °3 '5
L=86.20 R=1599.41 =3°05'17"
36+09
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
36+00
S °2 '0 "E
.5
S °4 '2 "W
.9
S02°41'24"W 486.92'
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P
AL
G N .d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=100'
HIGHLAND PARK WAY SW
CONNECTION
ALIGNMENT
04 27
894-33
TRC1679
TRC1679
127362 2026-040 AL01
R
ERSGE I TE
D
23002897
WEST MARGINAL WAY SW
HIG
HLA
ND
PAR
K W
AY
SW
SW O
THELL
O ST
H
IG
H
LA
N D
P
AR
K
W
AY
S W
SW WEBSTER ST
SW AUSTIN ST
SW HOLDEN ST
SW HOLDEN ST
TH
AVE
S W
SW PORTLAND ST
SCALE IN FEET
100 50 0 100 200
CONSTRUCTION ALIGNMENT BEGIN: STA 0+00.00
= (HIGHLAND PARK WAY SW) 100+00.00
N=200741.823 E=1268225.570
NOTES:
1. SEE APPENDIX OF PROJECT MANUAL FOR SURVEY CONTROL SHEETS
CONSTRUCTION ALIGNMENT END: STA 36+08.84
= (HIGHLAND PARK WAY SW) STA 52+00.86
CONSTRUCTION ALIGNMENT: STA 35+93.90
= (HIGHLAND PARK WAY SW) STA 51+85.92
= (SW HOLDEN ST) STA 54+50.04
CONSTRUCTION ALIGNMENT: STA 24+07.98
= (HIGHLAND PARK WAY SW) 124+07.98
MIC: 40390303, PT#25
N: 199548.82 E: 1266553.01
CONSTRUCTION ALIGNMENT: STA 24+00.00
= (HIGHLAND PARK WAY SW) STA 124+00.00
= (HIGHLAND PARK WAY SW) STA 40+00.00
CONSTRUCTION ALIGNMENT: STA 32+09.25
= (HIGHLAND PARK WAY SW) STA 48+01.27
= (SW AUSTIN ST) STA 68+69.34
MIC: 40390201, PT#21
N: 198751.63 E: 1266490.51
Luke Larson (10/06/2026 12:21:20 PDT)
ASPH/CONC
R/W R/W
ASPH WALKLANDSCAPE
SB VEHICLE LANE NB VEHICLE LANE
2'
5'
TYPICAL SECTION
HIGHLAND PARK WAY SW
PIONEER INDUSTRIES TO SW OTHELLO ST
NTS
80' - 126' VAR.
4'
SB VEHICLE LANE
0.5'
VAR. 10'
1.5% MAX
(TYP.)
1' 1'
2% MAX
(TYP.)
ASPH/CONC
R/W R/W
ASPH WALKLANDSCAPE
SB VEHICLE LANE NB VEHICLE LANE
5'
TYPICAL SECTION
HIGHLAND PARK WAY SW
SW OTHELLO ST TO SW HOLDEN ST
NTS
80'
4'
SB VEHICLE LANE
0.5' 2.5' 8'
2'1' 1'
1.5% MAX
(TYP.)
2% MAX
(TYP.)
NOTES
3" HOT MIX ASPHALT CL 12". SEE PV SHEETS
4" MINERAL AGGREGATE TYPE 2. SEE PV SHEETS
LANDSCAPING. SEE PV SHEETS
CONCRETE BARRIER, TYPE F, PER WSDOT STD
PLAN C-60.10-04
COMMON EXCAVATION
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P S E C T.
d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
NOT TO SCALE
HIGHLAND PARK WAY SW
CONNECTION
05 27
ROADWAY SECTIONS
894-33
TRC1679
TRC1679
127362 2026-040 RS01
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT)
VO 123516
H P
O H P
MATCH EX
ASPHALT LIMIT
15' TYP.
TYP
. STA 6+70.19, 31.99'LT
21'
SITE PREPARATION LEGEND:
REMOVE ASPHALT SIDEWALK (REMOVE ASPHALT PAVEMENT)
REMOVE ASPHALT OVERLAY
REMOVE PAVEMENT
REMOVE ASPHALT PAVEMENT
REMOVE DRIVEWAY (REMOVE PAVEMENT)
CLEARING AND/OR GRUBBING, OR COMMON EXCAVATION
FOR CUT/FILL AS NEEDED
SAWCUT ASPHALT CONCRETE, FULL DEPTH
REMOVE CURB
ADJUST EX MH, CB, OR VC
ADJUST EX GAS VALVE
REPLACE EX GRATE WITH NEW 265A GRATE AND
REGRADE PER STD PLAN 260A
TIE OUT MONUMENT PRIOR TO DISTURBING. SEE PV
SHEETS
ADJUST EX HANDHOLE
ADJUST EX WATER METER BOX. SEE SECTION 7-20
CONSTRUCTION NOTES:
GENERAL NOTES:
1. THE CONTRACTOR MUST VERIFY ALL SAWCUT AND
DEMOLITION LIMITS BY THE ENGINEER AND ALLOW
FOR FIELD ADJUSTMENTS. THE CONTRACTOR
MUST NOT DAMAGE CONCRETE ROAD PANELS OR
SIDEWALK WITH SAWCUT OVERCUTS. THE
CONTRACTOR IS RESPONSIBLE FOR DAMAGES PER
1-07.13
2. PRESERVE AND PROTECT ALL EXISTING FEATURES
UNLESS OTHERWISE NOTED. SEE SECTIONS
1-07.16 AND 1-07.17
3. INSTALL INLET PROTECTION ON ALL NEW AND
EXISTING INLETS AND CATCH BASINS UNLESS
OTHERWISE NOTED. SEE SECTION 8-01.3(12)B
4. ALL EXCAVATIONS OVER OR UNDER SPU WATER
MAIN MUST BE BY VACUUM EXCAVATION
5. PRUNE TREES AND VEGETATION AS NECESSARY
FOR SIDEWALK AND POLE INSTALLATIONS. TREE
AND VEGETATION REMOVAL MUST BE LIMITED TO
AREAS REQUIRED FOR CONSTRUCTION OF SITE
IMPROVEMENTS. ALL AREAS WITH VEGETATION
REMOVALS MUST BE PROTECTED FROM POTENTIAL
EROSION AND MIGRATION OF SEDIMENT UNTIL
FULLY REVEGETATED.
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P S
IT
E .d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
HIGHLAND PARK WAY SW
CONNECTION
SCALE IN FEET
402001020
SITE PREPARATION PLANS
06 27
TRC1679
127362 2026-040 SP01
HIGHLAND PARK WAY SW
W MARGINAL WAY SW
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT)
EX CONCRETE BLOCK FOR DEAD
END WATER MAIN. NO EXCAVATION
WITHIN 10' AND USE VACUUM
EXCAVATION IF NEEDED NEARBY
STA 10+39.91, 22.04'LT
STA 11+91.38, 30.38'LT
6 1
SITE PREPARATION LEGEND:
REMOVE ASPHALT SIDEWALK (REMOVE ASPHALT PAVEMENT)
REMOVE ASPHALT OVERLAY
REMOVE PAVEMENT
REMOVE ASPHALT PAVEMENT
REMOVE DRIVEWAY (REMOVE PAVEMENT)
CLEARING AND/OR GRUBBING, OR COMMON EXCAVATION
FOR CUT/FILL AS NEEDED
SAWCUT ASPHALT CONCRETE, FULL DEPTH
REMOVE CURB
ADJUST EX MH, CB, OR VC
ADJUST EX GAS VALVE
REPLACE EX GRATE WITH NEW 265A GRATE AND
REGRADE PER STD PLAN 260A
TIE OUT MONUMENT PRIOR TO DISTURBING. SEE PV
SHEETS
ADJUST EX HANDHOLE
ADJUST EX WATER METER BOX. SEE SECTION 7-20
CONSTRUCTION NOTES:
GENERAL NOTES:
1. THE CONTRACTOR MUST VERIFY ALL SAWCUT AND
DEMOLITION LIMITS BY THE ENGINEER AND ALLOW
FOR FIELD ADJUSTMENTS. THE CONTRACTOR
MUST NOT DAMAGE CONCRETE ROAD PANELS OR
SIDEWALK WITH SAWCUT OVERCUTS. THE
CONTRACTOR IS RESPONSIBLE FOR DAMAGES PER
1-07.13
2. PRESERVE AND PROTECT ALL EXISTING FEATURES
UNLESS OTHERWISE NOTED. SEE SECTIONS
1-07.16 AND 1-07.17
3. INSTALL INLET PROTECTION ON ALL NEW AND
EXISTING INLETS AND CATCH BASINS UNLESS
OTHERWISE NOTED. SEE SECTION 8-01.3(12)B
4. ALL EXCAVATIONS OVER OR UNDER SPU WATER
MAIN MUST BE BY VACUUM EXCAVATION
5. PRUNE TREES AND VEGETATION AS NECESSARY
FOR SIDEWALK AND POLE INSTALLATIONS. TREE
AND VEGETATION REMOVAL MUST BE LIMITED TO
AREAS REQUIRED FOR CONSTRUCTION OF SITE
IMPROVEMENTS. ALL AREAS WITH VEGETATION
REMOVALS MUST BE PROTECTED FROM POTENTIAL
EROSION AND MIGRATION OF SEDIMENT UNTIL
FULLY REVEGETATED.
07 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P S
IT
E .d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
HIGHLAND PARK WAY SW
CONNECTION
TRC1679
127362 2026-040 SP02
SITE PREPARATION PLANS
SCALE IN FEET
402001020
HIGHLAND PARK WAY SW
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT)
STA 18+10.84, 5.52'LT
STA 11+91.38, 30.38'LT
SITE PREPARATION LEGEND:
REMOVE ASPHALT SIDEWALK (REMOVE ASPHALT PAVEMENT)
REMOVE ASPHALT OVERLAY
REMOVE PAVEMENT
REMOVE ASPHALT PAVEMENT
REMOVE DRIVEWAY (REMOVE PAVEMENT)
CLEARING AND/OR GRUBBING, OR COMMON EXCAVATION
FOR CUT/FILL AS NEEDED
SAWCUT ASPHALT CONCRETE, FULL DEPTH
REMOVE CURB
ADJUST EX MH, CB, OR VC
ADJUST EX GAS VALVE
REPLACE EX GRATE WITH NEW 265A GRATE AND
REGRADE PER STD PLAN 260A
TIE OUT MONUMENT PRIOR TO DISTURBING. SEE PV
SHEETS
ADJUST EX HANDHOLE
ADJUST EX WATER METER BOX. SEE SECTION 7-20
CONSTRUCTION NOTES:
GENERAL NOTES:
1. THE CONTRACTOR MUST VERIFY ALL SAWCUT AND
DEMOLITION LIMITS BY THE ENGINEER AND ALLOW
FOR FIELD ADJUSTMENTS. THE CONTRACTOR
MUST NOT DAMAGE CONCRETE ROAD PANELS OR
SIDEWALK WITH SAWCUT OVERCUTS. THE
CONTRACTOR IS RESPONSIBLE FOR DAMAGES PER
1-07.13
2. PRESERVE AND PROTECT ALL EXISTING FEATURES
UNLESS OTHERWISE NOTED. SEE SECTIONS
1-07.16 AND 1-07.17
3. INSTALL INLET PROTECTION ON ALL NEW AND
EXISTING INLETS AND CATCH BASINS UNLESS
OTHERWISE NOTED. SEE SECTION 8-01.3(12)B
4. ALL EXCAVATIONS OVER OR UNDER SPU WATER
MAIN MUST BE BY VACUUM EXCAVATION
5. PRUNE TREES AND VEGETATION AS NECESSARY
FOR SIDEWALK AND POLE INSTALLATIONS. TREE
AND VEGETATION REMOVAL MUST BE LIMITED TO
AREAS REQUIRED FOR CONSTRUCTION OF SITE
IMPROVEMENTS. ALL AREAS WITH VEGETATION
REMOVALS MUST BE PROTECTED FROM POTENTIAL
EROSION AND MIGRATION OF SEDIMENT UNTIL
FULLY REVEGETATED.
08 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P S
IT
E .d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
TRC1679
127362 2026-040 SP03
SITE PREPARATION PLANS
SCALE IN FEET
402001020
HIGHLAND PARK WAY SW
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT)
STA 18+10.84, 5.52'LT
STA 25+04.17, 5.95'LT
SITE PREPARATION LEGEND:
REMOVE ASPHALT SIDEWALK (REMOVE ASPHALT PAVEMENT)
REMOVE ASPHALT OVERLAY
REMOVE PAVEMENT
REMOVE ASPHALT PAVEMENT
REMOVE DRIVEWAY (REMOVE PAVEMENT)
CLEARING AND/OR GRUBBING, OR COMMON EXCAVATION
FOR CUT/FILL AS NEEDED
SAWCUT ASPHALT CONCRETE, FULL DEPTH
REMOVE CURB
ADJUST EX MH, CB, OR VC
ADJUST EX GAS VALVE
REPLACE EX GRATE WITH NEW 265A GRATE AND
REGRADE PER STD PLAN 260A
TIE OUT MONUMENT PRIOR TO DISTURBING. SEE PV
SHEETS
ADJUST EX HANDHOLE
ADJUST EX WATER METER BOX. SEE SECTION 7-20
CONSTRUCTION NOTES:
GENERAL NOTES:
1. THE CONTRACTOR MUST VERIFY ALL SAWCUT AND
DEMOLITION LIMITS BY THE ENGINEER AND ALLOW
FOR FIELD ADJUSTMENTS. THE CONTRACTOR
MUST NOT DAMAGE CONCRETE ROAD PANELS OR
SIDEWALK WITH SAWCUT OVERCUTS. THE
CONTRACTOR IS RESPONSIBLE FOR DAMAGES PER
1-07.13
2. PRESERVE AND PROTECT ALL EXISTING FEATURES
UNLESS OTHERWISE NOTED. SEE SECTIONS
1-07.16 AND 1-07.17
3. INSTALL INLET PROTECTION ON ALL NEW AND
EXISTING INLETS AND CATCH BASINS UNLESS
OTHERWISE NOTED. SEE SECTION 8-01.3(12)B
4. ALL EXCAVATIONS OVER OR UNDER SPU WATER
MAIN MUST BE BY VACUUM EXCAVATION
5. PRUNE TREES AND VEGETATION AS NECESSARY
FOR SIDEWALK AND POLE INSTALLATIONS. TREE
AND VEGETATION REMOVAL MUST BE LIMITED TO
AREAS REQUIRED FOR CONSTRUCTION OF SITE
IMPROVEMENTS. ALL AREAS WITH VEGETATION
REMOVALS MUST BE PROTECTED FROM POTENTIAL
EROSION AND MIGRATION OF SEDIMENT UNTIL
FULLY REVEGETATED.
09 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P S
IT
E .d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
TRC1679
127362 2026-040 SP04
SITE PREPARATION PLANS
SCALE IN FEET
402001020
HIGHLAND PARK WAY SW
HIGHLAND PARK WAY SW
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT)
COORDINATE WITH SPU
IF ANY CHANGES ARE
NEEDED TO EXISTING
CULVERT AND DITCH
VO 8
2 MATCH EX
ASPHALT LIMIT
EX CONCRETE
BLOCK AT BEND.
DO NOT DISTURB
STA 34+07.18, 6.22'LT
SITE PREPARATION LEGEND:
REMOVE ASPHALT SIDEWALK (REMOVE ASPHALT PAVEMENT)
REMOVE ASPHALT OVERLAY
REMOVE PAVEMENT
REMOVE ASPHALT PAVEMENT
REMOVE DRIVEWAY (REMOVE PAVEMENT)
CLEARING AND/OR GRUBBING, OR COMMON EXCAVATION
FOR CUT/FILL AS NEEDED
SAWCUT ASPHALT CONCRETE, FULL DEPTH
REMOVE CURB
ADJUST EX MH, CB, OR VC
ADJUST EX GAS VALVE
REPLACE EX GRATE WITH NEW 265A GRATE AND
REGRADE PER STD PLAN 260A
TIE OUT MONUMENT PRIOR TO DISTURBING. SEE PV
SHEETS
ADJUST EX HANDHOLE
ADJUST EX WATER METER BOX. SEE SECTION 7-20
CONSTRUCTION NOTES:
GENERAL NOTES:
1. THE CONTRACTOR MUST VERIFY ALL SAWCUT AND
DEMOLITION LIMITS BY THE ENGINEER AND ALLOW
FOR FIELD ADJUSTMENTS. THE CONTRACTOR
MUST NOT DAMAGE CONCRETE ROAD PANELS OR
SIDEWALK WITH SAWCUT OVERCUTS. THE
CONTRACTOR IS RESPONSIBLE FOR DAMAGES PER
1-07.13
2. PRESERVE AND PROTECT ALL EXISTING FEATURES
UNLESS OTHERWISE NOTED. SEE SECTIONS
1-07.16 AND 1-07.17
3. INSTALL INLET PROTECTION ON ALL NEW AND
EXISTING INLETS AND CATCH BASINS UNLESS
OTHERWISE NOTED. SEE SECTION 8-01.3(12)B
4. ALL EXCAVATIONS OVER OR UNDER SPU WATER
MAIN MUST BE BY VACUUM EXCAVATION
5. PRUNE TREES AND VEGETATION AS NECESSARY
FOR SIDEWALK AND POLE INSTALLATIONS. TREE
AND VEGETATION REMOVAL MUST BE LIMITED TO
AREAS REQUIRED FOR CONSTRUCTION OF SITE
IMPROVEMENTS. ALL AREAS WITH VEGETATION
REMOVALS MUST BE PROTECTED FROM POTENTIAL
EROSION AND MIGRATION OF SEDIMENT UNTIL
FULLY REVEGETATED.
10 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P S
IT
E .d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
TRC1679
127362 2026-040 SP05
SITE PREPARATION PLANS
SCALE IN FEET
402001020
HIGHLAND PARK WAY SW
SW OTHELLO ST
HIGHLAND PARK WAY SW
SW AUSTIN ST
SW HOLDEN ST
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT)
H P
O H P
FUTURE INTERSECTION WORK
AND BIKE CROSSING TO BE
DONE BY SDOT CREWS
R4
P1 1R1 P21 1R5
CONSTRUCTION NOTES (BY SCL)
INSTALL NEW WOOD POLE. INSTALL BRACKET ARM AND
LUMINAIRE ON THE POLE. NEW LOCATION MUST MAINTAIN 18"
CLEARANCE FROM THE FACE OF CURB AND 12" FROM EDGE OF
PATHWAY. SEE SHEET LT06 FOR POLE LOCATION.
MAINTAIN EXISTING LUMINAIRE.
INSTALL NEW WOOD POLE. INSTALL BRACKET ARM AND
LUMINAIRE ON THE POLE. SEE SHEET LT06 FOR POLE LOCATION.
INSTALL BRACKET ARM AND LUMINAIRE ON EXISTING POLE.
REMOVAL/RELOCATE NOTES
REMOVE LUMINAIRE, BRACKET ARM AND WOOD POLE (BY SCL).
REMOVE LUMINAIRE AND BRACKET ARM (BY SCL)
REMOVE WOOD POLE (BY SCL).
REMOVE WOOD POLE (BY SDOT CREWS).
REMOVE LUMINAIRE, BRACKET ARM, POLE AND FOUNDATION (BY
SCL).
R1
R2
R3
R4
R5
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P
LI
TE
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
HIGHLAND PARK WAY SW
CONNECTION
SCALE IN FEET
402001020
LIGHTING PLANS
11 27
TRC1679
127362 2026-040 LT01
HIGHLAND PARK WAY SW
W MARGINAL WAY SW
R
ERSGE I TE
D
47675Wassim Kebab (10/06/2026 12:38:17 PDT) Wassim Kebab
P2 1
P3 3
P21
P8 1
R5
CONSTRUCTION NOTES (BY SCL)
INSTALL NEW WOOD POLE. INSTALL BRACKET ARM AND
LUMINAIRE ON THE POLE. NEW LOCATION MUST MAINTAIN 18"
CLEARANCE FROM THE FACE OF CURB AND 12" FROM EDGE OF
PATHWAY. SEE SHEET LT06 FOR POLE LOCATION.
MAINTAIN EXISTING LUMINAIRE.
INSTALL NEW WOOD POLE. INSTALL BRACKET ARM AND
LUMINAIRE ON THE POLE. SEE SHEET LT06 FOR POLE LOCATION.
INSTALL BRACKET ARM AND LUMINAIRE ON EXISTING POLE.
REMOVAL/RELOCATE NOTES
REMOVE LUMINAIRE, BRACKET ARM AND WOOD POLE (BY SCL).
REMOVE LUMINAIRE AND BRACKET ARM (BY SCL)
REMOVE WOOD POLE (BY SCL).
REMOVE WOOD POLE (BY SDOT CREWS).
REMOVE LUMINAIRE, BRACKET ARM, POLE AND FOUNDATION (BY
SCL).
R1
R2
R3
R4
R5
12 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P
LI
TE
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
TRC1679
127362 2026-040 LT02
LIGHTING PLANS
SCALE IN FEET
402001020
HIGHLAND PARK WAY SW
R
ERSGE I TE
D
47675Wassim Kebab (10/06/2026 12:38:17 PDT)
P3
P5 3
P6 3
R3
P7 3
P4 3
CONSTRUCTION NOTES (BY SCL)
INSTALL NEW WOOD POLE. INSTALL BRACKET ARM AND
LUMINAIRE ON THE POLE. NEW LOCATION MUST MAINTAIN 18"
CLEARANCE FROM THE FACE OF CURB AND 12" FROM EDGE OF
PATHWAY. SEE SHEET LT06 FOR POLE LOCATION.
MAINTAIN EXISTING LUMINAIRE.
INSTALL NEW WOOD POLE. INSTALL BRACKET ARM AND
LUMINAIRE ON THE POLE. SEE SHEET LT06 FOR POLE LOCATION.
INSTALL BRACKET ARM AND LUMINAIRE ON EXISTING POLE.
REMOVAL/RELOCATE NOTES
REMOVE LUMINAIRE, BRACKET ARM AND WOOD POLE (BY SCL).
REMOVE LUMINAIRE AND BRACKET ARM (BY SCL)
REMOVE WOOD POLE (BY SCL).
REMOVE WOOD POLE (BY SDOT CREWS).
REMOVE LUMINAIRE, BRACKET ARM, POLE AND FOUNDATION (BY
SCL).
R1
R2
R3
R4
R5
13 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P
LI
TE
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
TRC1679
127362 2026-040 LT03
LIGHTING PLANS
SCALE IN FEET
402001020
HIGHLAND PARK WAY SW
R
ERSGE I TE
D
47675Wassim Kebab (10/06/2026 12:38:17 PDT)
P103
P93
P113
R2
P12 3 P13 3
P14 3
2 2
CONSTRUCTION NOTES (BY SCL)
INSTALL NEW WOOD POLE. INSTALL BRACKET ARM AND
LUMINAIRE ON THE POLE. NEW LOCATION MUST MAINTAIN 18"
CLEARANCE FROM THE FACE OF CURB AND 12" FROM EDGE OF
PATHWAY. SEE SHEET LT06 FOR POLE LOCATION.
MAINTAIN EXISTING LUMINAIRE.
INSTALL NEW WOOD POLE. INSTALL BRACKET ARM AND
LUMINAIRE ON THE POLE. SEE SHEET LT06 FOR POLE LOCATION.
INSTALL BRACKET ARM AND LUMINAIRE ON EXISTING POLE.
REMOVAL/RELOCATE NOTES
REMOVE LUMINAIRE, BRACKET ARM AND WOOD POLE (BY SCL).
REMOVE LUMINAIRE AND BRACKET ARM (BY SCL)
REMOVE WOOD POLE (BY SCL).
REMOVE WOOD POLE (BY SDOT CREWS).
REMOVE LUMINAIRE, BRACKET ARM, POLE AND FOUNDATION (BY
SCL).
R1
R2
R3
R4
R5
14 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P
LI
TE
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
TRC1679
127362 2026-040 LT04
LIGHTING PLANS
SCALE IN FEET
402001020
HIGHLAND PARK WAY SW
HIGHLAND PARK WAY SW
R
ERSGE I TE
D
47675Wassim Kebab (10/06/2026 12:38:17 PDT)
P14 3 P16 3
P15 3 P17 3
VO 8
P183
P193
EX.P20 4
CONSTRUCTION NOTES (BY SCL)
INSTALL NEW WOOD POLE. INSTALL BRACKET ARM AND
LUMINAIRE ON THE POLE. NEW LOCATION MUST MAINTAIN 18"
CLEARANCE FROM THE FACE OF CURB AND 12" FROM EDGE OF
PATHWAY. SEE SHEET LT06 FOR POLE LOCATION.
MAINTAIN EXISTING LUMINAIRE.
INSTALL NEW WOOD POLE. INSTALL BRACKET ARM AND
LUMINAIRE ON THE POLE. SEE SHEET LT06 FOR POLE LOCATION.
INSTALL BRACKET ARM AND LUMINAIRE ON EXISTING POLE.
REMOVAL/RELOCATE NOTES
REMOVE LUMINAIRE, BRACKET ARM AND WOOD POLE (BY SCL).
REMOVE LUMINAIRE AND BRACKET ARM (BY SCL)
REMOVE WOOD POLE (BY SCL).
REMOVE WOOD POLE (BY SDOT CREWS).
REMOVE LUMINAIRE, BRACKET ARM, POLE AND FOUNDATION (BY
SCL).
R1
R2
R3
R4
R5
15 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P
LI
TE
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
TRC1679
127362 2026-040 LT05
LIGHTING PLANS
SCALE IN FEET
402001020
HIGHLAND PARK WAY SW
SW OTHELLO ST
HIGHLAND PARK WAY SW
SW AUSTIN ST
SW HOLDEN ST
R
ERSGE I TE
D
47675Wassim Kebab (10/06/2026 12:38:17 PDT)
POLE SCHEDULE
POLE
NO.
LOCATION (NOTE1)
POLE TYPE
(NOTE 2) FOUNDATION TYPE
POLE SHAFT
LENGTH (FT)
BRACKET ARM
LENGTH (FT)
FIXTURE TYPE
(NOTE 3)
CIRCUIT NOTES
STATION/LOCATION
AND OFFSET TYPE
MOUNTING
HEIGHT (FT)
P1 STA. 6+15.47, 41.56'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P2 STA. 8+67.043, 45.11'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P3 STA. 11+65.02, 34.86'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P4 STA. 12+86.81, 32.84'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P5 STA. 14+20.23, 34.41'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P6 STA. 16+07.24, 34.31'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P7 STA. 17+37.82, 33.96'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P8 STA. 10+10.52, 35.62'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P9 STA. 19.32.15, 32.64'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P10 STA. 20+65.41, 32.74'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P11 STA. 21+90.36, 32.85'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P12 STA. 23+12.69, 32.93'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P13 STA. 24+52.59, 32.76'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P14 STA. 26+02.84, 30.42'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P15 STA. 27+66.60, 32.41'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P16 STA. 29+18.65, 32.50'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P17 STA. 30+27.46, 32.39'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P18 STA. 31+42.54, 32.33'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
P19 STA. 32+89.86, 31.79'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
EX.P20 EXISTING WOOD EXISTING EXISTING 10 195W 35
P21 STA. 7+43.88, 45.81'LT WOOD REF TO SCL STD NO. 0100.07 40 10 195W 35
16 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P
LI
TE
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
NONE
TRC1679
127362 2026-040 LT06
LIGHTING PLANS
R
ERSGE I TE
D
47675
SCHEDULES
Wassim Kebab (10/06/2026 12:38:17 PDT)
H P
O H P
M
AT
C H
E X
M
AT
C H
E X
'1
' 4
'7
FUTURE INTERSECTION WORK
AND BIKE CROSSING TO BE
DONE BY SDOT CREWS
.5 % 1
.5
.5
~20'
4 TYP.
STA 7+08.92, 40.16'LT
11'
STA 6+69.18, 32.03'LT
5'5'
SET CURB HEIGHT (6"-8")
TO MATCH NECESSARY 1.5%
GRADE FOR BUS PAD
PAVING LEGEND:
2" HMA CL 12" OVER 6" HMA CL 1" OVER 6" MINRL
AGG TYPE 2, OR MATCH EXISTING
3" HMA CL 12" OVER 4" MINRL AGG TYPE 2
2" HMA CL 12"
CEM CONC DRIVEWAY, PER STD PLAN 430A
SIDEWALK, CEM CONC W/25% POZZOLANS, PER STD
PLANS 420 OR 421
SEEDED LAWN INSTALLATION, PER STD PLAN 142
COMPACTED NATIVE SOIL FOR POLE BACKFILL PER
SCL STD 0100.07
DETECTABLE WARNING, PER STD PLAN 422K
CEM CONC CURB TYPE 410C, W/25% POZOLLANS
CEM CONC CURB AND GUTTER TYPE 410B W/ 25%
POZZOLANS
PRECAST CONCRETE BARRIER TYPE F, PER WSDOT
STD PLANS C-60.10-04 & C-60.80-02
PLASTIC CURBS WITH POSTS, 40"L X 12"W X 3.5"H
IMPACT ATTENUATOR, 30" WIDE (MASH 16 OR NCHRP
350 COMPLIANT)
REPLACE EX GRATE WITH NEW TYPE 265A GRATE AND
REGRADE PER STD PLAN 260A
COORDINATE HYDRANT RELOCATION WITH SPU
MATCH EX JOINT OR ANGLE POINT
RESET MONUMENT AND MONUMENT FRAME AND COVER
PROVIDE 20' GAP IN BARRIER FOR ACCESS TO UTILITIES,
TYP.
CONSTRUCTION NOTES:
GENERAL NOTES:
1. ALL BUS PADS MUST BE MAXIMUM 1.5% CROSS
SLOPE TO MEET ADA REQUIREMENTS
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P R O
AD
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
HIGHLAND PARK WAY SW
CONNECTION
SCALE IN FEET
402001020
PAVING PLANS
17 27
TRC1679
127362 2026-040 PV01
HIGHLAND PARK WAY SW
W MARGINAL WAY SW
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT)
.8
.7
15'
~150'
~150'
11'
M
IN
.5
.5
~30' 1 '6 .5
4 TYP.
4TYP.
STA 7+08.92, 40.16'LT
STA 11+36.07, 22.59'LT
STA 11+13.21, 34.05'LT
STA 10+60.09, 37.85'LT
STA 10+38.91, 22.11'LT
END AT BEGINNING OF MEDIAN STRIPING
APPROX. STA 12+21.51, 5.26'RT
SET CURB HEIGHT (6"-8")
TO MATCH NECESSARY 1.5%
GRADE FOR BUS PAD
PAVING LEGEND:
2" HMA CL 12" OVER 6" HMA CL 1" OVER 6" MINRL
AGG TYPE 2, OR MATCH EXISTING
3" HMA CL 12" OVER 4" MINRL AGG TYPE 2
2" HMA CL 12"
CEM CONC DRIVEWAY, PER STD PLAN 430A
SIDEWALK, CEM CONC W/25% POZZOLANS, PER STD
PLANS 420 OR 421
SEEDED LAWN INSTALLATION, PER STD PLAN 142
COMPACTED NATIVE SOIL FOR POLE BACKFILL PER
SCL STD 0100.07
DETECTABLE WARNING, PER STD PLAN 422K
CEM CONC CURB TYPE 410C, W/25% POZOLLANS
CEM CONC CURB AND GUTTER TYPE 410B W/ 25%
POZZOLANS
PRECAST CONCRETE BARRIER TYPE F, PER WSDOT
STD PLANS C-60.10-04 & C-60.80-02
PLASTIC CURBS WITH POSTS, 40"L X 12"W X 3.5"H
IMPACT ATTENUATOR, 30" WIDE (MASH 16 OR NCHRP
350 COMPLIANT)
REPLACE EX GRATE WITH NEW TYPE 265A GRATE AND
REGRADE PER STD PLAN 260A
COORDINATE HYDRANT RELOCATION WITH SPU
MATCH EX JOINT OR ANGLE POINT
RESET MONUMENT AND MONUMENT FRAME AND COVER
PROVIDE 20' GAP IN BARRIER FOR ACCESS TO UTILITIES,
TYP.
CONSTRUCTION NOTES:
GENERAL NOTES:
1. ALL BUS PADS MUST BE MAXIMUM 1.5% CROSS
SLOPE TO MEET ADA REQUIREMENTS
18 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P R O
AD
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
TRC1679
127362 2026-040 PV02
PAVING PLANS
SCALE IN FEET
402001020
HIGHLAND PARK WAY SW
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT)
11'
8'
4.
5'
3.
4.
5'
4.
5'
5' TYP.
2' T
YP
R
~150'
20'
1.5%
1.
5%
STA 18+49.83, 13.12'LT
STA 18+09.84, 5.53'LT
APPROX. STA 17+38.31, 7.44'RT
BEGIN AT PC OF CURVE
PAVING LEGEND:
2" HMA CL 12" OVER 6" HMA CL 1" OVER 6" MINRL
AGG TYPE 2, OR MATCH EXISTING
3" HMA CL 12" OVER 4" MINRL AGG TYPE 2
2" HMA CL 12"
CEM CONC DRIVEWAY, PER STD PLAN 430A
SIDEWALK, CEM CONC W/25% POZZOLANS, PER STD
PLANS 420 OR 421
SEEDED LAWN INSTALLATION, PER STD PLAN 142
COMPACTED NATIVE SOIL FOR POLE BACKFILL PER
SCL STD 0100.07
DETECTABLE WARNING, PER STD PLAN 422K
CEM CONC CURB TYPE 410C, W/25% POZOLLANS
CEM CONC CURB AND GUTTER TYPE 410B W/ 25%
POZZOLANS
PRECAST CONCRETE BARRIER TYPE F, PER WSDOT
STD PLANS C-60.10-04 & C-60.80-02
PLASTIC CURBS WITH POSTS, 40"L X 12"W X 3.5"H
IMPACT ATTENUATOR, 30" WIDE (MASH 16 OR NCHRP
350 COMPLIANT)
REPLACE EX GRATE WITH NEW TYPE 265A GRATE AND
REGRADE PER STD PLAN 260A
COORDINATE HYDRANT RELOCATION WITH SPU
MATCH EX JOINT OR ANGLE POINT
RESET MONUMENT AND MONUMENT FRAME AND COVER
PROVIDE 20' GAP IN BARRIER FOR ACCESS TO UTILITIES,
TYP.
CONSTRUCTION NOTES:
TYP.
GENERAL NOTES:
1. ALL BUS PADS MUST BE MAXIMUM 1.5% CROSS
SLOPE TO MEET ADA REQUIREMENTS
19 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P R O
AD
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
TRC1679
127362 2026-040 PV03
PAVING PLANS
SCALE IN FEET
402001020
HIGHLAND PARK WAY SW
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT)
~170' 11'
~20'
.5
.5
STA 18+49.83, 13.12'LT
STA 18+09.84, 5.53'LT
APPROX. STA 17+38.31, 7.44'RT
.5
115'
.5
11'
.0 % 1
.0
~20'
15'
STA 25+58.29, 13.56'LT
STA 25+03.16, 5.98'LT
.5
PAVING LEGEND:
2" HMA CL 12" OVER 6" HMA CL 1" OVER 6" MINRL
AGG TYPE 2, OR MATCH EXISTING
3" HMA CL 12" OVER 4" MINRL AGG TYPE 2
2" HMA CL 12"
CEM CONC DRIVEWAY, PER STD PLAN 430A
SIDEWALK, CEM CONC W/25% POZZOLANS, PER STD
PLANS 420 OR 421
SEEDED LAWN INSTALLATION, PER STD PLAN 142
COMPACTED NATIVE SOIL FOR POLE BACKFILL PER
SCL STD 0100.07
DETECTABLE WARNING, PER STD PLAN 422K
CEM CONC CURB TYPE 410C, W/25% POZOLLANS
CEM CONC CURB AND GUTTER TYPE 410B W/ 25%
POZZOLANS
PRECAST CONCRETE BARRIER TYPE F, PER WSDOT
STD PLANS C-60.10-04 & C-60.80-02
PLASTIC CURBS WITH POSTS, 40"L X 12"W X 3.5"H
IMPACT ATTENUATOR, 30" WIDE (MASH 16 OR NCHRP
350 COMPLIANT)
REPLACE EX GRATE WITH NEW TYPE 265A GRATE AND
REGRADE PER STD PLAN 260A
COORDINATE HYDRANT RELOCATION WITH SPU
MATCH EX JOINT OR ANGLE POINT
RESET MONUMENT AND MONUMENT FRAME AND COVER
PROVIDE 20' GAP IN BARRIER FOR ACCESS TO UTILITIES,
TYP.
CONSTRUCTION NOTES:
GENERAL NOTES:
1. ALL BUS PADS MUST BE MAXIMUM 1.5% CROSS
SLOPE TO MEET ADA REQUIREMENTS
20 27
PC
JO
B
SHEET OFSCALE:
ORDINANCE NO. PW NO.
REVISED AS BUILT
RECEIVED
SDOT
DES.
REVIEWED:
INITIALS AND DATE
CONST.
PROJ. MGR.
INITIALS AND DATE
DESIGNED
CHECKED
DRAWN
CHECKED
APPROVED FOR ADVERTISING
SEATTLE, WASHINGTON
BY:
FAS PURCHASING AND CONTRACTING DIRECTOR
R E V' D
C H K 'D
M
AD
E
R E
VI
S
IO
N S
N
AT
U R E
M
AR
K
D
AT
E
VA
U
LT
S E R
IA
L N O
P S D O
TC
P tr c1 h ig h la n d p a rk w a y sw co n n ec ti o n a p lo t sh ee ts
TR
C P R O
AD
.d w g
:4 a m CO
VPI #
FAS PURCHASING AND CONTRACTING DIRECTOR
1"=20'
TRC1679
127362 2026-040 PV04
PAVING PLANS
SCALE IN FEET
402001020
HIGHLAND PARK WAY SW
HIGHLAND PARK WAY SW
R
ERSGE I TE
D
23002897Luke Larson (10/06/2026 12:21:20 PDT)
.5 ' 1
'2 .5
R2 0'
R2 0'
~80'
15'
15'
END BARRIER BEFORE MH
VO 8
.5
R
~20'
14.5'
~20'
4 STA 34+06.19, 6.22'LT
PAVING LEGEND:
2" HMA CL 12" OVER 6" HMA CL 1" OVER 6" MINRL
AGG TYPE 2, OR MATCH EXISTING
3" HMA CL 12" OVER 4" MINRL AGG TYPE 2
2" HMA CL 12"
CEM CONC DRIVEWAY, PER STD PLAN 430A
SIDEWALK, CEM CONC W/25% POZZOLANS, PER STD
PLANS 420 OR 421
SEEDED LAWN INSTALLATION, PER STD PLAN 142
COMPACTED NATIVE SOIL FOR POLE BACKFILL PER
SCL STD 0100.07
DETECTABLE WARNING, PER STD PLAN 422K
CEM CONC CURB TYPE 410C, W/25% POZOLLANS
CEM CONC CURB AND GUTTER TYPE 410B W/ 25%
POZZOLANS
PRECAST CONCRETE BARRIER TYPE F, PER WSDOT
STD PLANS C-60.10-04 & C-60.80-02
PLASTIC CURBS WITH POSTS, 40"L X 12"W X 3.5"H
IMPACT ATTENUATOR, 30" WIDE (MASH 16 OR NCHRP
350 COMPLIANT)
REPLACE EX GRATE WITH NEW TYPE 265A GRATE AND
REGRADE PER STD PLAN 260A
COORDINATE HYDRANT RELOCATION WITH SPU
MATCH EX JOINT OR ANGLE POINT
RESET MONUMENT AND MONUMENT FRAME AND COVER
PROVIDE 20' GAP IN BARRIER FOR ACCESS TO…