2025-2026 2026-2027 Sewer Manhole Rehabilitation Project.pdf

PDF 43 MB Posted

Attached to
2025-2026/2026-2027 Sewer Manhole Rehabilitation Project
Solicitation number
389
Issued by
Orange County, California

About this file

This is a Scope of Work document for the 2025-2026/2026-2027 Sewer Manhole Rehabilitation Project in California. The project encompasses furnishing all necessary labor, materials, equipment, and incidental work to complete sewer manhole rehabilitation throughout the specified fiscal years. The contractor will be responsible for the complete rehabilitation of multiple sewer manholes, including structural repairs, cleaning, and restoration work as detailed in the contract documents. The project spans two fiscal years, providing continuity in rehabilitation efforts across the service area. Bidders are required to review all contract documents, including the Scope of Work and supporting exhibits, to understand the full extent of work requirements and project specifications before submitting proposals.

The contract will be awarded to a qualified contractor capable of performing specialized sewer infrastructure rehabilitation work over the two-year period. Pricing will be structured according to the bid format specified in the contract documents, likely including unit prices for various rehabilitation methods and manhole types. All work must comply with applicable California standards, codes, and environmental regulations. The successful bidder must demonstrate experience with sewer manhole rehabilitation, proper equipment operation, and adherence to safety protocols during all phases of construction and restoration activities.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

-i-

CITY OF BUENA PARK

COUNTY OF ORANGE

STATE OF CALIFORNIA

CONTRACT DOCUMENTS

2025-2026 / 2026-2027 SEWER MANHOLE

REHABILATION PROJECT

PROJECT NO. 389

BID NO. 2027-05

AUGUST, 2026

Prepared under the Supervision of:

Mina Mikhael, P.E.

Director of Public Works/ City Engineer

Recommended by:

Deepthi Arabolu, P.E., T.E.

Assistant City Engineer

R.C.E. 75742

Approved by:

Mina Mikhael, P.E.

Director of Public Works/City Engineer

R.C.E. 84166

-ii-

TABLE OF CONTENTS

NOTICE INVITING SEALED BIDS AND PROPOSAL………………………........................ I-1

INSTRUCTIONS TO BIDDERS…………………………………………………………………. I-4

BID………………………………………………………………………………………………….. B-1

CONTRACT………………………………………………………………………….................... C-1

PAYMENT BOND (LABOR AND MATERIALS)……………………………………………….. C-9

FAITHFUL PERFORMANCE BOND…………………………………………………………… C-11

WORKERS’ COMPENSATION CERTIFICATE OF INSURANCE………………….………. C-13

PROGRESS PAYMENT SIGNATURE AUTHENTICATION…………………………………. C-14

ADDITIONAL INSURED ENDORSEMENT

COMPREHENSIVE GENERAL LIABILITY……………………………………………. C-15

ADDITIONAL INSURED ENDORSEMENT AUTOMOBILE LIABILITY…………………….. C-17

ADDITIONAL INSURED ENDORSEMENT EXCESS LIABILITY…………………………… C-19

SPECIAL PROVISIONS………………………………………………………………………. SP-1

PART 1: SPECIAL PROVISIONS DEFINED…………………………………. SP-1

SECTION 1. TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF

MEASURE, AND SYMBOLS………………………………………….. SP-1

SECTION 2. SCOPE AND CONTROL OF THE WORK…………………………… SP-5

SECTION 3. CONTROL OF THE WORK…………………………………………… SP-9

SECTION 4. CONTROL OF MATERIALS…………………………………………... SP-15

SECTION 5. LEGAL RELATIONS AND RESPONSIBILITIES……………………. SP-15

SECTION 6. PROSECUTION AND PROGRESS OF THE WORK………………. SP-21

SECTION 7. MEASUREMENT AND PAYMENT…………………………………… SP-26

SECTION 8. FACILITIES FOR AGENCY PERSONNEL………………………….. SP-35

SECTION 9. ADDITIONAL TERMS………………………………………………….. SP-36

-iii-

PART 2: CONSTRUCTION MATERIALS…………….. ……………………….. SP-40

PART 3: CONSTRUCTION METHODS………………………………………… SP-44

PART 4: EXISTING IMPROVEMENTS…………………………………………. SP-54

PART 5: PIPELINE SYSTEM REHABILITATION……………………………… SP-57

PART 6: TEMPORARY TRAFFIC CONTROL…………………………………. SP-68

PART 7: STREET LIGHTING AND TRAFFIC SIGNAL SYSTEM……………. SP-70

PART 8: LANDSCAPE AND IRRIGATION……………………………………... SP-72

TECHNICAL SPECIFICATIONS:

A: MANHOLE REHABILITATION

B: MAHOLE CCTV INSPECTION SERVICES

EXHIBITS:

A: SEWER MANHOLE REHABILITATION EXHIBITS

B: CONSTRUCTION INFORMATION SIGN

C: CWA REQUIREMENTS

NOTICE INVITING

SEALED BIDS

I-1

NOTICE INVITING SEALED BIDS AND PROPOSALS

FOR

2025-2026 / 2026-2027 SEWER MANHOLE REHABILATION PROJECT

“Project”

Project Number: 389 Bid Number: 2027-05

NOTICE IS HEREBY GIVEN that the City of Buena Park, California (“City”) invites sealed Bids for the Project. The City will receive such Bids at the City Clerk’s office, City Hall, City of Buena Park, California, 6650 Beach Boulevard, Buena Park, CA 90621, at the hour of 2:00 P.M. on Thursday, August 27th, 2026, at which time and place they will be publicly opened and read aloud.

All Bids must be made in writing in either ink or typed on the form included in the Contract Documents. Each Bid must be submitted in a sealed envelope addressed to the City Clerk with the Project Name, Project Number, and Bid Number typed or clearly printed on the lower left corner of the envelope, with the words “Sealed Bid Enclosed” clearly written on the front of the envelope. Bids must remain valid and shall not be subject to withdrawal for sixty (60) Days after the Bid opening date. Faces or any electronic format is not acceptable.

INCORPORATION OF STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS. The Latest Edition of “Standard Specifications for Public Works Construction” (“Standard Specifications”), as amended by the Contract Documents (as “Contract Documents” is defined in the Contract) and the Special Provisions of the City of Buena Park, Latest Edition (“Special Provisions”), is incorporated by reference.

SCOPE OF WORK. The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents (“Work”). This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the Engineer. Each prospective bidder (“Bidders”) is responsible for fully acquainting themselves with the conditions of the scope of work as it relates to doing work in the City.

OBTAINING BID DOCUMENTS. The “Project Documents” are available online from American Reprographics Company (“ARC”). To order Project Documents from ARC as a download or hardcopy: visit www.e-arc.com, click on “Public Planroom,” and search by City of Buena Park from the dropdown list, with “Show Active Bid Projects Only” selected. You can contact ARC at

(714) 424-8525 and request plans. Downloads are available at no charge through the site. The costs for all hardcopy Project Documents, plus shipping, are non-refundable and are purchased directly from ARC.

PLANHOLDER REGISTRATION. All Bidders shall register with ARC as a “Planholder.” All Addenda transmission and other Contract Document-related information will be relayed via ARC.

A Bidder shall have no recourse due to its any inability to register with ARC, “whitelist” ARC http://www.e-arc.com/ca/costamesa

I-2 communications, or to view or access any of the Project Documents, Addenda transmission, or other information.

REGISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS. In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5; with limited exceptions for bid purposes only under Labor Code Section 1771.1(a).

PREVAILING WAGES. In accordance with Labor Code Section 1770 et seq., the Project is a “public work” to which the requirements of prevailing wage apply. Pursuant to the provisions of Section 1773.2 of the Labor Code, the successful Bidder (hereinafter “Contractor”) and its subcontracts, if any (“Subcontractors”) shall pay wages in accordance with the determination of the Director of the Department of Industrial Relations (“DIR”) regarding the prevailing rate of per diem wages. Copies of such general prevailing rates of per diem wages are on file in the office of the City Clerk of the City of Buena Park, 6650 Beach Boulevard, Buena Park, California, 90621, and are available to any interested party on request. The Contractor shall post a copy of the DIR’s determination of the prevailing rate of per diem wages at each job site. This Project is subject to compliance monitoring and enforcement by the DIR.

ADHERENCE TO THE COMMUNITY WORKFORCE AGREEMENT. This project is subject to the Community Workforce Agreement (CWA) between the City and the Los Angeles/Orange Counties Building and Construction Trades Council and the Signatory Craft Councils and Local Unions. The CWA is a master labor agreement that establishes employment and labor relations procedures, and applies to all Contractors and Subcontractors that are awarded or perform work on the project. The awarded Contractor and its Subcontractors of all tiers must agree to be bound by the CWA. A Letter of Assent (in the form attached to this request for bids, must be submitted with a Bid in order for the Bid to be considered. A copy of the CWA is attached to this request for bids. The City has retained a third-party CWA Administrator that will act on the City’s behalf and aid parties in administering the CWA.

BONDS. Each Bid must be accompanied by a cash deposit, cashier’s check, certified check or Bidder’s Bond issued by a Surety insurer, made payable to the City and in an amount not less than ten percent (10%) of the total Bid price submitted. Personal or company checks are not acceptable. Upon Contract award, the Contractor shall provide faithful performance and payment Bonds, each in a sum equal to the Contract Price. The Bonds shall be dated on or after the Effective Date of the Contract, and before the date a “notice to proceed” from the City is issued.

All Bonds must be issued by a California admitted Surety insurer, as defined in Code of Civil Procedure Section 995.120, with a current A.M. Best’s rating no less than A:VII, using the forms set forth in the Contract Documents, or in any other form approved by the City Attorney. Failure to enter into the Contract with the City, including the submission of all required Bonds and insurance coverage, within ten (10) Days after the date of the mailing of written notice of contract award to the Bidder, shall subject the Bid security to forfeiture to the extent provided by law.

LICENSES. Each Bidder shall possess a valid Class A Contractor’s license issued by the California State Contractors License Board, at the time of the Bid submission; provided that if this Project utilizes any federal funding, the successful Bidder must possess such a license at the time of Contract award. The successful Contractor, and Subcontractors, must also possess a current City business license.

RETENTION SUBSTITUTION. Five percent (5%) of any progress payment will be withheld as retention. In accordance with Public Contract Code Section 22300, and at the request and expense of the Contractor, securities equivalent to the amount withheld may be deposited with the City or with a State or federally chartered bank as escrow agent, which shall then pay such moneys to the Contractor. Upon satisfactory completion of the Project, the securities shall be returned to the Contractor. Alternatively, the Contractor may request that the City make payments of earned retentions directly to an escrow agent at the Contractor's expense. No such substitutions shall be accepted until all related documents are approved by the City Attorney.

TRADE NAMES OR EQUALS. Requests to substitute an equivalent item for a brand or trade name item must be made by written request submitted no later than ten (10) working days before the Bid submission deadline. Requests received after this time shall not be considered. Requests shall clearly describe the product for which approval is requested, including all data necessary to demonstrate acceptability.

LIQUIDATED DAMAGES. Liquidated damages shall accrue in the amount of i for each Day that Work remains incomplete beyond the Project completion deadline specified in the Contract

Documents.

BIDDING PROCESS, The City reserves the right, after opening bids, to reject any Bid or all Bids, and to waive any irregularities or informalities in any Bid or in the bidding, as deemed to be in the best interest of the City.

NONDISCRIMINATION. The City hereby affirmatively ensures that all business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status religion in any consideration leading to the award of contract.

A'd-r/ia M. -Vicu;a'. M' MC)

Director of Government and

Community Relations/City Clerk

Posted Date: August 6, 2026

I, Anna Patricia B. Almquist, CMC, Assistant City Clerk, do hereby certify that a full and correct copy of this notice was posted at the Buena Park Civic Center, 6650 Beach Boulevard; the Ehlers

Event Center, 8150 Knott Avenue; and, the Orange County Fire Authority, Fire Station 61, 7440

La Palma Avenue, Buena Park, CA.

ATTEST: aqt DATE: 091ns /rn3(, POST BY: o0/orsl>srs REMAIN POSTED THROUGH: oe:*/pe />bzti

I-4

INSTRUCTIONS TO BIDDERS

FORM OF BID. Bids shall be made on the Bid forms found herein. Bidders shall include all forms and fill in all blank spaces by ink or by typing, including inserting “N/A” (for not applicable) where necessary. The Bid shall be enclosed in a sealed envelope bearing the Bidder’s name and the Project Name, Project Number, and Bid Number as described in the Notice Inviting Bids. A Bid not submitted on the Bid forms and in the manner found herein will be considered non-responsive.

DELIVERY OF BIDS. The Bid shall be delivered by the time and date, and to the place specified in the Notice Inviting Bids. No oral, faxed, emailed, or telephonic Bids or alternatives will be considered. The time of delivery shall be conclusively determined by the time-stamping clock located at the City Clerk’s office. Bidders are solely responsible for ensuring that their Bids are received at the proper time and at the proper location, and Bidders assume all risks arising out of their chosen means of delivery. Any Bid received after the Bid submission deadline shall not be considered and shall be returned to the Bidder unopened. Bidders or their authorized agent are invited to be present for Bid opening. Accepted Bids shall become the property of the City.

AMENDED BIDS. Unauthorized conditions, limitations or provisos attached to a Bid may cause the Bid to be deemed incomplete and non-responsive.

WITHDRAWAL OF BID. A Bid may be withdrawn without prejudice upon written request by the Bidder filed with the City Clerk at any time before the Bid submission deadline fixed in the Notice Inviting Bids. Withdrawal of a Bid does not prejudice the right of the Bidder to file a new Bid at any time prior to the time fixed for receiving Bids in the Notice Inviting Bids.

BIDDER’S SECURITY. Each Bid shall be accompanied by cash, a certified or cashier’s check payable to the City of Buena Park, or a satisfactory Bid Bond in favor of the City executed by the Bidder as principal and an admitted surety insurer as Surety, in an amount not less than ten percent (10%) of the amount set forth in the Bid. All Bonds must be issued by a California admitted Surety insurer, as defined in Code of Civil Procedure Section 995.120, with a current A.M. Best’s rating no less than A:VII, using the forms set forth in the Contract Documents, or in any other form approved by the City Attorney. The cash, check or Bid Bond shall be given as a guarantee that, if selected, the Bidder will execute the Contract in conformity with the Contract Documents, and will provide the evidence of insurance and furnish the specified Bonds, within ten (10) Days after the date of delivery of the Contract Documents to the Bidder. In case of the Bidder’s refusal or failure to do so, the City may award the Contract to the next lowest responsible bidder, and the cash, check, or Bond (as applicable) of the lowest Bidder shall be forfeited to the City to the extent permitted by law. No Bid Bond will be accepted unless it conforms substantially to the form provided in the Contract Documents.

QUANTITIES APPROXIMATE. Any quantities shown in the Bid form or elsewhere herein shall be considered as approximations listed to serve as a general indication of the amount of Work or materials to be performed or furnished, and as basis for the Bid comparison. The City does not, expressly or by implication, represent or guarantee that the actual amounts required will correspond with the quantities given. As deemed necessary or convenient, the City may increase or decrease the amount of any item or portion of Work or material to be performed or furnished or omit any such item or portion, in accordance with the Contract Documents.

I-5

ADDENDA. The Engineer may, from time to time, issue Addenda to the Contract Documents.

Bidders are responsible for ensuring that they have received any and all Addenda. Bidders must acknowledge receipt of all Addenda, if any, in their bids. Failure to acknowledge receipt of all Addenda may cause a Bid to be deemed incomplete and non-responsive.

DISCREPANCIES IN BIDS. Each Bidder shall set forth as to each item of Work, in clearly legible words and figures, a unit or line item Bid amount for the item in the respective spaces provided for this purpose.

In case of discrepancy between the unit price and the extended amount set forth for the item, the unit price shall prevail. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or if the unit price is the same amount as the entry in the “extended amount” column, then the amount set forth in the “extended amount” column for the item shall prevail in accordance with the following:

(1) As to lump sum items, the amount set forth in the “extended amount” column shall be the unit price.

(2) As to unit price items, the amount set forth in the “extended amount” column shall be divided by the estimated quantity for the item set forth in the Bid documents, and the price thus obtained shall be the unit price.

In case of discrepancy between words and figures, the words shall prevail.

COMPETENCY OF BIDDERS. Bidders must meet all qualification requirements contained in the Contract Documents. In evaluating Bidder responsibility, consideration will be given not only to the financial standing, but also to the general competency of the Bidder for the satisfactory performance of the Project. Each Bidder shall set forth in the designated area of the Bid form a statement of its experience. No Contract will be executed with a Bidder that is not licensed and registered with the DIR in accordance with State law, and with any applicable specific licensing requirements specified in these Contract Documents. These licensing and registration requirements for Contractors shall also apply to all Subcontractors.

BIDDER’S EXAMINATION OF SITE AND CONTRACT DOCUMENTS. Each Bidder must carefully examine the Project site and the entirety of the Contract Documents. Upon submission of a Bid, it will be conclusively presumed that the Bidder has thoroughly investigated the Work and is satisfied as to the conditions and difficulties that may be encountered and the character, quality, and quantities of Work to be performed and materials to be furnished. Upon Bid submission, it also shall be conclusively presumed that the Bidder is familiar with and agrees to the requirements of the Contract Documents, including all Addenda. No information derived from an inspection of records or investigation will in any way be construed as a waiver of the aforesaid provisions, relieve the Contractor from its obligations under the Contract Documents, nor entitle the Contractor to any additional compensation. The Contractor shall not make any claim against the City based upon ignorance or misunderstanding of any condition of the Project site or of the requirements set forth in the Contract Documents. No claim for additional compensation will be allowed which is based on a lack of knowledge of the above items. Bidders assume all risks in connection with performance of the Work in accordance with the Contract Documents, regardless of actual conditions encountered, and waive and release the City with respect to any and all claims and liabilities in connection therewith, to the extent permitted by law.

I-6

DISQUALIFICATION OF BIDDERS. No person or entity shall be allowed to make, file or be interested in more than one Bid for the Project, unless alternate Bids are specifically called for. A person that has submitted a sub-bid to a Bidder, or that has quoted prices of materials to a Bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other Bidders or from making a prime Bid. Bids in which unit prices are obviously unbalanced may be rejected.

If there is a reason to believe that collusion exists among the Bidders, all affected Bids will be rejected. Bidders are put on notice that any collusive agreement fixing the prices to be Bid so as to control or affect Awarding of the Contract is in violation of competitive bidding requirements of the Public Contract Code and may render void any Contract let under such circumstances.

Among other grounds, A Bid may be rejected on the basis of a Bidder, any officer of such Bidder, or any employee of such Bidder who has a proprietary interest in such Bidder, having been disqualified, removed or otherwise prevented from Bidding on, or completing a federal, state or local project because of a violation of a law or a safety regulation. The City will review the circumstances presented in the Bid Form certification and determine if acceptance of the Bid is in its best interest.

RETURN OF BID SECURITY. The successful Bidder’s Bid security shall be held until the Contract is executed. Bid security shall be returned to the unsuccessful Bidders within a reasonable time, which in any case shall not exceed sixty (60) Days after the successful Bidder has signed the Contract and returned all required documents to the City.

AWARD OF CONTRACT. The City reserves the right to reject any or all Bids or any parts thereof or to waive any irregularities or informalities in any Bid or in the bidding. The Contract award, if made, will be to the lowest responsible, responsive Bidder and is anticipated to occur within sixty (60) Calendar Days after the Bid opening. The City reserves the right to extend the award of contract period an additional thirty (30) calendar days. Bids shall remain valid for a minimum of ninety (90) Calendar days after the Bid opening. The Contract award may be made after that period if the selected Bidder has not given the City written notice of the withdrawal of its Bid.

LISTING SUBCONTRACTORS. Each Bidder shall submit a list of the proposed Subcontractors on the Project, as required by the Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100, et seq.).

EXECUTION OF CONTRACT. The selected Bidder shall execute and return to the City the Contract in the form included in these Contract Documents within ten (10) Days from the date of delivery of the Contract Documents to the Bidder. Additionally, the selected Bidder shall also secure all required documents, including insurance and Bonds as herein specified, and provide copies to the City, within ten (10) Days from the date of delivery of the Contract Documents to the Bidder. Failure or refusal to execute the Contract or to conform to any of the requirements shall be just cause for the annulment of the award and forfeiture of the Bidder’s security. In such event, the City may declare the Bidder’s security forfeited to the extent permitted by law, and the City may award the Contract to the next lowest responsible, responsive Bidder or may reject all bids.

SIGNATURES. The Bidder shall execute all documents requiring signatures, and shall cause to be notarized all documents that indicate such a requirement. The Bidder shall provide evidence satisfactory to the City, such as an authenticated resolution of its board of directors or a power of attorney, indicating the capacity of the person(s) signing the Bid to bind the Bidder to the Bid and any contract arising therefrom.

I-7

INSURANCE AND BONDS. The Contractor shall not begin Work until it has given the City evidence of all required insurance coverage (including all additional insured endorsements), a Bond guaranteeing the Contractor’s faithful performance of the Contract, and a Bond securing the payment of claims for labor and materials. Should the Contractor begin Work in advance of the start date for the Work, as stated in the Notice to Proceed, the Work will be considered as having been done at Contractor’s risk as a volunteer. The Bonds shall be dated on or after the Effective Date of the Contract, and before the date a Notice to Proceed from the City is issued.

TELEPHONES. Bidders are hereby notified that the City will not provide telephones for their use at the time of Bid submission.

INTERPRETATION OF CONTRACT DOCUMENTS. Any Bidder that is in doubt as to the intended meaning of any part of the Contract Documents, or that finds discrepancies in or omissions from the Contract Documents, may submit to the Engineer a written request for an interpretation or correction not later than seven (7) working days before the Bid submission deadline. Requests for clarification received after this date will be disregarded. Please indicate the Project Name, Project Number, and Bid Number in the request for clarification. Telephonic requests will not be taken. Any interpretation or correction of the Contract Documents will be made only by a written Addendum, and will be delivered to each person included on the City’s planholder’s list for the Project. The City is not responsible for any oral explanation or interpretation of any provision in the Contract Documents, and no such explanation or interpretation shall be binding.

TAXES. Except as may be otherwise specifically provided herein, all sales and/or use taxes assessed by federal, State or local authorities on materials used or furnished by the Contractor in performing the Work shall be paid by the Contractor. The Bidder shall calculate payment for all sales, unemployment, pension and other taxes imposed by federal, State, and local law and shall include these payments in computing the Bid.

NOTICE TO BIDDERS. If further information is needed regarding this Work, please contact the person whose name is indicated by an “X” below:

☒ Ruben Adame (714) 562-3689

☐ Carina Coles (714) 562-3696

☐ Deepthi Arabolu (714) 562-3679

☐ Hector Guzman (714) 562-3688

☐ Hysun Lee (714) 562-3691

☐ Jaden Miller (714) 562-3685

☐ Jason Tran (714) 562-3680

☐ Mina Mikhael (714) 562-3679

☐ Nader Alqam (714) 562-3698

☐ Norman Wray (714) 562-3699

Monday through Thursday, from 7:00 a.m. to 6:00 p.m., except holidays when City Hall is closed.

All interested bidders, or persons obtaining bid packets, shall register with American Reprographics Company (ARC) as this Contract’s planholder immediately.

I-8

FAILURE TO PROPERLY REGISTER MAY RESULT IN LATE NOTIFICATION.

MANDATORY PRE-BID COMPLETE JOB-WALK IS REQUIRED FOR ALL POTENTIAL

BIDDERS. PLEASE CALL/COORDINATE WITH FRANK MOORE (SEWER AND STORM

DRAIN SERVICES SUPERINTENDENT) VIA PHONE: (714) 334-6061 OR EMAIL:

FMOORE@BUENAPARK.COM. JOB WALK WILL BE ON WEDNESDAY, AUGUST 19, 2026

BEGINNING AT 10:00 AM. MEET AT BUENA PARK CITY MAINTENANCE YARD AT 6955

ARAGON CIRCLE. FAILURE TO ATTEND JOB WALK WILL RESULT IN BIDDER BEING

CONSIDERED NON-RESPONSIVE.

I-9

BID PROTEST PROCEDURES

SECTION 1. BID PROTEST. Any bid protest must be in writing and received by the City Clerk at City Hall, City Clerk’s Office, 6650 Beach Blvd., Buena Park, CA 90621, before 5:30 p.m.

no later than two working days following the bid opening (the “Bid Protest Deadline”) and must comply with the following requirements:

SECTION 2. GENERAL. Only a bidder who has submitted a Bid Proposal is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests.

A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest. If required by the City, the protesting bidder must submit a non-refundable fee in the amount specified by City, based upon City’s reasonable costs to administer the bid protest. Any such fee must be submitted to City no later than the Bid Protest Deadline, unless otherwise specified. For purposes of this Section 1, a “working day” means a day that City is open for normal business, and excludes weekends and holidays.

SECTION 3. PROTEST CONTENTS. The bid protest must contain a complete statement of the basis for the protest and all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address, email address, and telephone number of the person representing the protesting bidder if different from the protesting bidder.

SECTION 4. COPY TO PROTESTED BIDDER. A copy of the protest and all supporting documents must be concurrently transmitted by fax, email or in person by or before the Bid Protest Deadline, to the protested bidder and any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest.

SECTION 5. RESPONSE TO PROTEST. The protested bidder may submit a written response to the protest, provided the response is received by the City Clerk before 5:30 p.m., within two working days after the Bid Protest Deadline or after actual receipt of the bid protest, whichever is sooner (the “Response Deadline”). The response must include all supporting documentation. Material submitted after the Response Deadline will not be considered. The response must include the name, address, email address, and telephone number of the person representing the protested bidder, if different from the protested bidder.

SECTION 6. COPY TO PROTESTING BIDDER. A copy of the response and all supporting documents must be concurrently transmitted by fax, email or in person by or before the Bid Protest Deadline, to the protesting bidder and any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest.

SECTION 7. EXCLUSIVE REMEDY. The procedure and time limits set forth in this section are mandatory and are the bidder’s sole and exclusive remedy in the event of bid protest. A bidder’s failure to comply with these procedures will constitute a waiver of any right to further pursue a bid protest, including filing a Government Code Claim or initiation of legal proceedings.

SECTION 8. RIGHT TO AWARD. The City Council reserves the right to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest

I-10 responsive bid, and to issue a notice to proceed with the Work notwithstanding any pending or continuing challenge to its determination.

BID

B-1

BID

CITY OF BUENA PARK

TO THE HONORABLE MAYOR AND CITY COUNCIL OF THE CITY OF BUENA PARK:

The undersigned, as Bidder, declares that: (1) this Bid is made without collusion with any other person and that the only persons or parties interested as principals are those named herein;

(2) the undersigned has carefully examined the Contract Documents (including all Addenda) and the Project site; and (3) the undersigned has investigated and is satisfied as to the conditions and difficulties to be encountered, the character, quality and quantities of Work to be performed, and the materials to be furnished. Furthermore, the undersigned agrees that submission of this Bid shall be conclusive evidence that such examination and investigation have been made and agrees, in the event the Contract be awarded to it, to execute the Contract with the City of Buena Park to perform the Project in accordance with the Contract Documents in the time and manner therein prescribed, and to furnish or provide all materials, labor, tools, equipment, apparatus, transportation, services, and other means necessary so to do, except as may otherwise be furnished or provided under the terms of the Contract Documents, for the following stated unit prices or lump-sum price as submitted on the Bid herein.

The undersigned submits as part of this Bid a completed copy of its Industrial Safety Record. This Safety Record includes all construction Work undertaken in California by the undersigned and any partnership, joint venture or corporation that any principal of the undersigned participated in as a principal or owner for the last five (5) calendar years and the current calendar year before the date of Bid submittal. Separate information is being submitted for each such partnership, joint venture, or corporate or individual Bidder. The undersigned may attach any additional information or explanation of data that it would like to be taken into consideration in evaluating the Safety Record. An explanation of the circumstances surrounding any and all fatalities is attached.

Accompanying this Bid is cash, a cashier’s check, a certified check or a Bid Bond in an amount equal to at least ten percent (10%) of the total aggregate Bid price based on the quantities shown and the unit prices quoted. The undersigned further agrees that, should it be awarded the Contract and thereafter fail or refuse to execute the Contract and provide the required evidence of insurance and Bonds within ten (10) Days after delivery of the Contract to the undersigned, then the cash, check or Bid Bond shall be forfeited to the City to the extent permitted by law.

The undersigned certifies to have a minimum of three (3) consecutive years of current experience in the type of Work related to the Project and that this experience is in actual operation of the firm with permanent employees performing a part of the Work as distinct from a firm operating entirely by subcontracting all phases of the Work. The undersigned also certifies to be properly licensed by the State as a contractor to perform this type of Work. The undersigned possesses California Contractor’s License.

B-2

Contractor/Bidder:

Address:

City/Zip Code: /

Phone/Fax /

Email

Contractor’s License No.: /Classification: /Exp. Date:

By: Date:

Title:

Names and addresses of all members of the firm or names and titles of all officers of the corporation:

Surety or sureties:

B-3

City of Buena Park - Bid Sheet

SCHEDULE OF WORK ITEMS

Bidder’s Name: ____________________________________________________________

To the Honorable Mayor and Members of the City Council:

In compliance with the Notice Inviting Bids, the undersigned hereby agrees to execute the Contract to furnish all labor, materials, equipment and supplies for the Project in accordance with the Contract Documents to the satisfaction and under the direction of the Engineer, at the following prices:

BASE AMOUNT:

ITEM

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

1.

9th ST, MH 20-36, 4’

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

B-4

ITEM

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

2.

9th ST, MH 20-37, 3’2”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

3.

9th ST, MH 20-38, 3’

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-5

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

4.

8145 LOS

ALTOS DR,

MH 46-49,

5’4”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

5.

5777 LOS

ARCOS

WAY,

MH 46-55,

5’4”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-6

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

6.

5807 LOS

ARCOS

WAY,

MH 46-54,

6’8”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

7.

5849 LOS

ARCOS

WAY,

MH 46-53,

8’6”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-7

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

8.

5861 LOS

ARCOS

WAY,

MH 46-52,

8’2”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

9.

5879 LOS

ARCOS

WAY,

MH 46-51,

7’11”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-8

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

10.

5920 LOS

ARCOS

WAY,

MH 46-50,

6’5”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

11.

5952 LOS

ARCOS

WAY,

MH 46-V01,

4’10”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-9

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

12.

8205 LOS

ALTOS DR,

MH 46-48,

4’11”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

13.

8253 LOS

ALTOS DR,

MH 46-44,

6’4”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-10

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

14.

5833 LOS

MOLINAS

DR,

MH 46-45,

7’7”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

15.

5881 LOS

MOLINAS

DR,

MH 46-46,

8’6”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-11

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

16.

5941 LOS

MOLINAS

DR,

MH 46-47,

9’4”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

17.

5977 LOS

MOLINAS

DR,

MH 46-22,

11’2”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-12

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

18.

VALLEY

VIEW ST,

MH 46-23,

10’2”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

19.

8301 LOS

ALTOS DR,

MH 46-40

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR TOP 12” OF MANHOLE

STRUCTURE.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

B-13

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

20.

5789 LOS

ANGELES

WAY,

MH 46-41,

6’

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

21.

5819 LOS

ANGELES

WAY,

MH 46-42,

5’9”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-14

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

22.

5849 LOS

ANGELES

WAY,

MH 46-43,

5’11”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

23.

5879 LOS

ANGELES

WAY,

MH 46-39,

6’7”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-15

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

24.

5908 LOS

ANGELES

WAY,

MH 46-38,

6’9”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

25.

5940 LOS

ANGELES

WAY,

MH 46-37,

6’11”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-16

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

26.

8359 LOS

ALTOS DR,

MH 46-26,

7’3”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

27.

VALLEY

VIEW ST,

MH 46-20,

11’10”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-17

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

28.

VALLEY

VIEW ST,

MH 46-21,

11’

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

29.

5763 LOS

ALTOS DR,

MH 46-25,

7’3”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-18

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

30.

5833 LOS

ALAMOS

ST,

MH 46-34,

6’10”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

31.

5893 LOS

ALAMOS

ST,

MH 46-35,

6’8”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-19

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

32.

5953 LOS

ALAMOS

ST,

MH 46-36,

6’7”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

33.

5952 LOS

AMIGOS

ST,

MH 46-33,

6’8”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-20

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

34.

5893 LOS

AMIGOS

ST,

MH 46-32,

6’9”

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

INSPECTION ON MANHOLE.

EA 1 $ $

35.

5833 LOS

AMIGOS

ST,

MH 46-31,

7’

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR DESIGNATED DEPTH.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

PERFORM LEVEL 2 MACP CCTV

B-21

NO.

ADDRESS,

MH#,

DEPTH

DESCRIPTION UNIT QTY UNIT

PRICES

EXTENDED

AMOUNT

36.

5762 LOS

AMIGOS

ST,

MH 46-24

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR TOP 12” OF MANHOLE

STRUCTURE.

CONSTRUCT 4’ CIRCULAR

CONCRETE COLLAR TO GRADE

WITH BLACK MIX COLOR

AROUND NEW FRAME AND

COVER PER DETAIL A ON

EXHIBIT NO. E-09.

EA 1 $ $

37.

CRESCENT

AVE,

MH 46-15

REMOVE EXISTING MANHOLE

FRAME AND COVER, PROCURE

AND INSTALL COMPOSITE

UTILITY ACCESS FRAME AND

COVER.

CLEAN AND PREPARE MANHOLE

INTERIOR STRUCTURE AND

INSTALL SAUEREISEN

SEWERGARD 210S OR EQUAL

FOR TOP 12” OF MANHOLE

STR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .