About this file
The document is a set of construction drawings and specifications for the Myoma Dunes Mutual Water Company Intertie Project, located in Indio, California, involving the Indio Water Authority and the City of Indio. The project focuses on installing a water main interconnection, including an 18"x12" tapping saddle, 12" butterfly valve, and approximately 60 linear feet of 12" ductile iron pipe with restrained joints. The project is scheduled for implementation in October 2025, with specific dates including an approval drawing date of 10/2/2025 and a construction completion date of 10/28/2025.
The drawings provide detailed technical specifications for water infrastructure installation, including precise meter vault configurations, trench repair details, and utility crossing requirements. The project involves careful coordination with multiple utility providers, including cable, irrigation, gas, electric, and water services. Specifications include detailed instructions for pipe installation, meter placement, surface restoration, and adherence to local engineering standards. The project emphasizes safety, utility conflict avoidance, and comprehensive restoration of disturbed areas, with specific requirements for asphalt concrete layering, aggregate base preparation, and roadway repair techniques.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025-10-28 Myoma Dunes Inter-Tie - NIB Contract Documents signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TELEPHONE
( 760 ) 391-4038
FAX
( 760 ) 391-6433
86-101 Avenue 45, Indio, CA 92201 www.indio.org/water/water.htm
DATE
OF
DATEBY REMARKSNO.
SHEET
IWA NO.
DRAWINGREVISIONS INDIO WATER AUTHORITY APPROVAL
DATE
CITY OF INDIO
WATER PROJECT CONSTRUCTION MANAGER
DATEROMAN GONZALEZUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
GDI
DIAL TOLL FREE
1-800-227-2600
BEFORE YOU DIG
AT LEAST TWO DAYS
RTE
ENGINEERS SEAL
CHECKED :
DRAWN :
DESIGN :
PREPARED UNDER THE SUPERVISION OF: APPROVER'S SEAL
PRESIDENT/MANAGING ENGINEER
THOMAS R. HOLLIMAN, P.E.
RCE C 33108
XXXXXX
XXX
XXX
1 5
Project Location
IN THE COUNTY OF RIVERSIDE, CALIFORNIA
MYOMA DUNES MUTUAL WATER COMPANY
INTERTIE PROJECT
AVENUE 42, INDIO, CA
MYOMA DUNES MUTUAL WATER
COMPANY INTERTIE PROJECT
GENERAL WATER NOTES
1. THE WATER SYSTEM SHALL BE CONSTRUCTED IN ACCORDANCE WITH INDIO WATER AUTHORITY (IWA)
WATER STANDARDS AND SPECIFICATIONS AND THESE PLANS.
2. IN ACCORDANCE WITH ORDINANCE 1528 ADOPTED MARCH 5, 2008, NO CUSTOMER, CONTRACTOR, OR ANY OTHER PERSON SHALL TAMPER WITH BACKFLOW DEVICES OR DISTRIBUTION VALVES WITHOUT CONSENT OF IWA. REPAIRS OF BACKFLOW DEVICES SHALL BE DONE BY COMPANIES APPROVED AND
AUTHORIZED BY IWA.
3. FIRE HYDRANTS SHALL BE WET BARREL WITH ONE (4”) AND TWO (2 ½”) OUTLETS WITH RESTRAINED JOINTS. BLUE HYDRANT REFLECTORS ARE REQUIRED FOR EACH HYDRANT AND LOCATED AS REQUIRED BY THE FIRE DEPARTMENT. REFER TO LIST OF APPROVED MATERIALS AND IWA STANDARD DRAWING NO.
704.
4. WATER SERVICES SHALL BE TYPE "K" SOFT DRAWN COPPER.
5. SERVICE LINES SHALL HAVE A MINIMUM COVER OF THIRTY-SIX INCHES (36”) FROM TOP OF FINISHED
GRADE TO TOP OF PIPE.
6. SERVICES SHALL BE RUN IN PAIRS IN A COMMON TRENCH TO COMMON LOT CORNERS, EXCEPT WHERE
OTHERWISE INDICATED ON THE PLAN.
7. WATER METERS SHALL BE AS APPROVED AND AS SHOWN ON THE PLANS. METER BOXES SHALL BE POLYMER BOX WITH TRAFFIC COVERS WHERE REQUIRED (REFER TO LIST OF APPROVED MATERIALS).
8. ALL WATER MAINS SHALL BE DUCTILE IRON PIPE (DIP), RESTRAINED JOINTS AND ENCASED IN POLYETHELYNE PER AWWA AND IWA STANDARDS. PIPE LARGER THAN TWELVE INCH (12”) DIAMETER SHALL BE CLASS 250 AND TWELVE INCH (12”) DIAMETER AND SMALLER SHALL BE CLASS 350.
9. ALL WATER MAINS SHALL HAVE A MINIMUM COVER OF FORTY-TWO INCHES (42”) FROM FINISHED GRADE.
10. ALL VALVES, ELBOWS, AND TEES SHALL BE RESTRAINED JOINT AND SUPPORTED BY THRUST BLOCKS
PER IWA STANDARD DRAWING NOS. 718A, 718B AND 718C.
11. TRENCH EXCAVATION, PIPE BEDDING, AND BACKFILL SHALL CONFORM TO THE IWA SPECIFICATIONS.
12. THE CONTRACTOR SHALL NOTIFY IWA FORTY-EIGHT (48) HOURS PRIOR TO STARTING ANY WORK, (760) 391-4044.
13. THE CONTRACTOR SHALL TEST AND CHLORINATE ALL NEW WATER MAINS. BACTERIOLOGICAL SAMPLES SHALL BE CLEARED BY A CERTIFIED TESTING LAB AND IWA SHALL HAVE THE WRITTEN RESULTS IN HAND
PRIOR TO TAPPING INTO EXISTING MAINS.
14. WATER METER BOXES SHALL BE PLACED IN ACCORDANCE WITH STANDARD DRAWING NOS. 700A, 700B
OR 700C, WHICHEVER APPLIES.
15. EXISTING UTILITIES MAY OR MAY NOT BE SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY UNDERGROUND SERVICE ALERT AT 1-800-422-4133, FORTY-EIGHT (48) HOURS IN ADVANCE OF DIGGING AND TO VERIFY AND PROTECT ALL UTILITIES IN THE
CONSTRUCTION AREA, WHETHER SHOWN OR NOT SHOWN HEREON.
16. PRIOR TO FINAL APPROVAL AND ACCEPTANCE, THE CONTRACTOR SHALL SUBMIT "AS-BUILT" RECORD DRAWINGS TO IWA. THE DESIGN ENGINEER SHALL PROVIDE UPDATED DIGITIZED AUTOCAD FILES THROUGH E-MAIL (IWAENGINEERING@INDIO.ORG) OR ON A CD IF SIZE OF FILE ATTACHMENTS EXCEEDS 9
MB.
17. WITH REGARD TO HOT TAPPING EXISTING CITY MAINS; THE CONTRACTOR SHALL PLACE AND PRESSURE TEST TAPPING TEE AND FLANGED X FLANGED RESILIENT WEDGE GATE VALVES. THE ACTUAL HOT TAP
WILL BE MADE BY CONTRACTOR.
18. ALL VALVES LESS THAN TWELVE INCH (12”) IN SIZE SHALL BE RESILIENT WEDGE GATE VALVES. VALVES TWELVE INCH (12”) OR GREATER IN SIZE SHALL BE BUTTERFLY VALVES (REFER TO LIST OF APPROVED
MATERIALS).
19. ALL VALVES SHALL BE ADJUSTED TO FUTURE GRADE PER INDIO WATER AUTHORITY STANDARD
DRAWING NOS. 713 A & 713 B.
20. THE CONTRACTOR SHALL TAKE EXTRA CARE TO ASSURE THAT THE BACKFILL AROUND METER BOXES IS COMPACTED SUFFICIENTLY TO PREVENT SETTLEMENT (REFER TO IWA STANDARD DRAWING NOS. 700 A, 700 B OR 700 C).
21. THE CONTRACTOR SHALL PROVIDE COMPACTION TEST RESULTS TO IWA PRIOR TO WATER MAIN
PRESSURE TESTING.
22. ANY WATER MAIN SHUTDOWN REQUIRES FIVE (5) WORKING DAYS NOTICE TO IWA AND ANY APPLICABLE
FEES.
23. NO WATER SHALL BE OBTAINED FROM IWA FIRE HYDRANT WITHOUT THE USE OF AN AUTHORIZED
CONSTRUCTION HYDRANT METER OBTAINED FROM IWA.
CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS
DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND
PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING
HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK
ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE
ENGINEER.
NOTICE TO CONTRACTOR
UTILITY NOTE
ALL UNDERGROUND UTILITY LINES ARE SHOWN PER THE PLANS FURNISHED BY THE RESPECTIVE UTILITY
COMPANIES. CONTRACTORS SHALL CONTACT UNDERGROUND SERVICE DIG ALERT (USA) AT 811 TO VERIFY THE
UTILITIES ON SITE BEFORE COMMENCING CONSTRUCTION.
NOTE
THE CONTRACTOR SHALL POTHOLE ALL LOCATIONS OF UTILITY CROSSINGS TO VERIFY DEPTH AND LOCATION
PRIOR TO BEGINNING CONSTRUCTION OF THE NEW WATER LINE SERVICES. IF CONFLICTS EXIST REQUIRING ANY
ADJUSTMENTS TO THE PROPOSED WATER LINE PIPELINE GRADES, THE CONTRACTOR SHALL ADJUST THE GRADE
OF THE PIPELINE TO AVOID ANY CONFLICTS. ALL COST FOR THIS WORK SHALL BE CONSIDERED INCIDENTAL TO
THE VARIOUS UNIT PRICE BID ITEMS AND NO ADDITIONAL PAYMENT WILL BE ALLOWED. THE PROPOSED WATER
LINE SHALL HAVE AT A MINIMUM A 1-AND 2-FOOT VERTICAL AND HORIZONTAL SEPARATION, RESPECTIVELY FROM
CROSSING WITH GAS AND ELECTRICAL UTILITIES.
10/2/2025
10/28/2025
:~?y:y·_,"i f".,,; .. _, ·•,re..:
. ,,, • • i.
II NIDlllO water authority
ABBREVIATIONS:
C/1. GENTEf~lJIIIE
R/ ~· RIGHT □F W,l('f ,., CIJR8 N¥J CVTm!
" ANISH SURfil,CE ,. EOOE o, PJ.VE~NT 11' TOP or f'IPE ,,. ST~TlOt-1 ilC 8EGINNIHG Of'" CLRVE
(C END OF CUM
'"' POINT Of" Rf:1/D,SE cu,:ry,e PO: f'CINT Of' COMf>OUNO CURVE ev ounrnn.vw,LY=:
0V ~TEV>.L\IE
"' REDUCER
m ASS\' FIR£ M'l'DflAl.lT ASS~J:8LY BO ..SSY 8LOW Off ASSCNBLY srnv """"' PP POWE:R POLE
LEGEND
lll!DIC'ATES PROPOSED WATER l,jA/N
INDI.C,4,,TES EXISTINC: W1'TE.R l,(~N lfl!DrCI.TES PRDP05m 50'.'ER M.IJN
IIJ[)(Cl,,TES £:ilSTl~C SEWER W.IM
F INDIO.TES F"lf!E lfY~AHT
INDl<'.>,T[S l'UiTE"R ... IVER
INDIO'ITES GATE "\l'/tl,,.E
INDI.O.TES BUTTE11FLY 1/.-.i..VE _,_ lfliDJC,l,H:S I.IANHOI...£ - INOIC-.TES ClEANOIJT
I-- INDIC,..,TE$ St!WER LATERAL
UTILITT CONTACTS
CABLE:
TIM[ll:IAl!:R CNIIE 4 1-7'.6 CClOt( sma,., ~- Dl'.S0:1, CA fil2U1 (7IIO}'«l-1Jl2
IRRIGATION:
'"" ~lll,'(N,JE 52 ~ru ..... c...t~lll (7ll0},lll:,-?~1
GAS,
Tl-£1JM~lif ~.:I. SOX :Dn. :st~IJJI fl:£DI.J,~.c:<iHJ73--0JQ' (?60J.34'- '927
ELECTRIC:
!~-~~:::&lRCI
(71D JJH-58211
WATER:
IN'JIOW,(l'Do'J.IOI~ 1000 ... c.:-...u..
1NOI() . C,, nzoi (7BO)l,4-l-U50
FAX
( 760 ) 391-6433
86-101 Avenue 45, Indio, CA 92201 www.indio.org/water/water.htm
DATE
OF
DATEBY REMARKSNO.
SHEET
IWA NO.
DRAWINGREVISIONS INDIO WATER AUTHORITY APPROVAL
DATE
CITY OF INDIO
DATEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
GDI
DIAL TOLL FREE
1-800-227-2600
BEFORE YOU DIG
AT LEAST TWO DAYS
RTE
ENGINEERS SEAL
CHECKED :
DRAWN :
DESIGN :
PREPARED UNDER THE SUPERVISION OF: APPROVER'S SEAL
PRESIDENT/MANAGING ENGINEER
THOMAS R. HOLLIMAN, P.E.
RCE C 33108
XXXXXX
XXX
XXX
MYOMA DUNES INTERTIE
2 5 1/25/10MDS Added Irrig. Service1
TRH2
Sta 37+40, Install 18"X12" Tapping Saddle, with 12" FLG BFV, with 60 LF 12" DIP, CL350, Poly-wrapped, all restrained joints.
Install 8-inch Meter Assembly per Sheet 4, centerline 5-ft from back of curb.
37+40
INSTALL 18"x12"
TAPPING SADDLE
AND 12" FLG BFV
Added hot tap at Sta 37+40, 12" BFV, lateral, and 8" meter
9/15/25
10/2/2025
WATER PROJECT CONSTRUCTION MANAGER
ROMAN GONZALEZ
10/28/2025
CURVE DATA
• DELTA RAD.
Cl 18°21'53" 823.00' C2 75s•54• 823.00' C3 10'22'59" 823.00' C4 2'33'18" 877.00' cs 2'58'49" 877.00' C6 1'19'4T 877.00' C7 31'27'1T 838.00' CB 1·1s·•1'" 896.83'
COURSE DATA
L£N.
263.79' 114.65' 149.H' 65.97' 45.62' 20.35'
637.75' 20.00'
I
I I
I I
I
I I
I I
I I
I I
I I
I I
BEARING DISTANCE I
I
I
L1 N 72'49'26"W 53.97' / L2 N 61'23'51'E 55.09' I I
Dlg~Safely
DIAL TOLL FREE
1-800-227-2600 ,o:r LEASTlWO DAYS
BEFORE '!OU DtG
Uf.lOERGRCU-.:i SEFMCEA!.E~ OFSOl.rlERNCAUFORNIA
I I
I
I
UNDERGROUND UTILITIES
A.LL UNDERGROUND UTIUTIES OR STRUCTURES REPORTED BY THE OWt.ER OR OTHERS AND THOSE SHOWN ON THE RECORDS EXAMINED ARE INDICATED wrm TI!ER APPROXIMATE LOCATION AHO ElCTENT. TI-£ O~ER, BY ACC£f'1 1NG THESE PLANS OR PROCE£Dlt-K. wrrn IMPRCNEMENTS PURSUANT THERflO, AGREES TO ASSUM( LIABILITY AND TO HOLD UNDERSIGNED HARMLESS FOR Nl'f DAMAGES RESULTING FROM EXISTENCE Of UNDERGROUND UTILITIES OR STRUCTURES NOT
REPORT£0 TO TH£ UNDERSIGNED. NOT INOICATID OR SHOWN ON THE RECORDS
EXAMINEC. THE CONTAACTOR IS REQUIRED 10 TAKE DUE PRECAUTIONARY
M£ASURES TO PROTECT THE UTILITTES OR STRUCTURES SHOWN -'ND ANY OTHER
UTIUTIES OR STRUCTURES FOUND Al THE SITE. IT SHALL BE CONTRACTOR'S RESPONS!BIUTY TO NOTIFY THE OWNERS OF Tl-IE UTIUTIES OR STRUCTURES
PRIVATE ENGINEERING NOTE
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENEIW..LY
ACCEPTED CONSTRUCTION PAACTICES, CONSTRUCTION CONTRACTOR WlU B£ Rl:'.:QUIRED 10 ASSUME SOL£ ANO COMPlET£ R£SPONSIBILIIY FOR JOH SHE
CONDITIONS DURING THE COURSE OR CONSTRUCTION OF THE PROJECT.
INCLUDING SAFETY Of AL.l PERS0r6 ANO PROPERTY; THAT THIS REOUlREMENT
SHAU. BE MADE TO APPLY CONTINUOUSLY ANO NOT BE LIMITED TO NORMAL
WORi<INC HOURS, AND CONSTRUCTION CONTRACTOR FURTHER ACREES TO
DEFDIO, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM
ANY ANO AL1. LIABILITY, REAL OR AL..l.£GED, IN CONNECTION W!TH THE PERFORMANCE Of" WORK ON THIS PROJECT, D(CEPffiG UABIUlY ARISING
FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL.
PARCEL 1 PARCEL 9
11 lNI IDl II 0 water authority
PARCEL 11
GRAPHIC SCALE
(m.rtET)
1 in<:h "" ◄0 ft.
1 96
11j.r'fv~ /1 4" 8.0. ASSEll.Y
F.ASEMENT FOR
Sf'IKR & WATER
PARCEL 7
T
LINE J
(SEE SH££T 11)
--~~ _= _= _= .... = _= --i=I~
FAX
( 760 ) 391-6433
86-101 Avenue 45, Indio, CA 92201 www.indio.org/water/water.htm
DATE
OF
DATEBY REMARKSNO.
SHEET
IWA NO.
DRAWINGREVISIONS INDIO WATER AUTHORITY APPROVAL
DATE
CITY OF INDIO
DATEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
GDI
DIAL TOLL FREE
1-800-227-2600
BEFORE YOU DIG
AT LEAST TWO DAYS
RTE
ENGINEERS SEAL
CHECKED :
DRAWN :
DESIGN :
PREPARED UNDER THE SUPERVISION OF: APPROVER'S SEAL
PRESIDENT/MANAGING ENGINEER
THOMAS R. HOLLIMAN, P.E.
RCE C 33108
XXXXXX
XXX
XXX
Existing Myoma 12" Water Main Install 8" water meter per Sheet 4 of 5
Install 60 LF of 12" DIP. CL 350, from 18"X12" hot tap and 12" FLG BFV, all joints to be restrained joints per IWA Std. 718 A/B/C. Pothole length of pipeline for utility conflicts and adjust with fittings if conflict found.
Minimum clearance between utilities and water main 12".
Trench repair per IWA Std. Dwg. 715 A/B. Pavement repair per City of Indio Std. Dwg. 172. Repair curb and gutter and restore landscaping to original condition.
Replace any damaged roadway markers.
MYOMA DUNES MUTUAL WATER
COMPANY INTERTIE PROJECT
City of Indio Boundary
New Myoma 12" DIP, by others.
10/2/2025
WATER PROJECT CONSTRUCTION MANAGER
ROMAN GONZALEZ
10/28/2025
IINDIIO
ii!kB§f\1h®tiM
FAX
( 760 ) 391-6433
86-101 Avenue 45, Indio, CA 92201 www.indio.org/water/water.htm
DATE
OF
DATEBY REMARKSNO.
SHEET
IWA NO.
DRAWINGREVISIONS INDIO WATER AUTHORITY APPROVAL
DATE
CITY OF INDIO
DATEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
GDI
DIAL TOLL FREE
1-800-227-2600
BEFORE YOU DIG
AT LEAST TWO DAYS
RTE
ENGINEERS SEAL
CHECKED :
DRAWN :
DESIGN :
PREPARED UNDER THE SUPERVISION OF: APPROVER'S SEAL
PRESIDENT/MANAGING ENGINEER
THOMAS R. HOLLIMAN, P.E.
RCE C 33108
XXXXXX
XXX
XXX
4 5
SHT 2
" BUTTERLY VALVE FxF
PIPE
x 8"
SIEMENS MAG5100W OR APPROVED EQUAL
PER IWA STANDARDS.
PER IWA STD W-713.
MYOMA DUNES MUTUAL WATER
COMPANY INTERTIE PROJECT
IWA APPROVED MATERIAL LIST.
IWA APPROVAL, VAULT DEPTHS GREATER THAN 5 FT SHALL
IWA
IWA CCCMP.12"
12"
FLANGED TEE
ARMORCAST MODEL A6001506X48
ARMORCAST MODEL A6001633T
10/2/2025
WATER PROJECT CONSTRUCTION MANAGER
ROMAN GONZALEZ
10/28/2025
SEE
CONNECTION
TO MAINLINE
co
" N
0 0
VARIES SEE NOTE 2 & 22
DIRECTION
OF FLOW
NOTTO SCALE
-+ 12" f 9" +- 24" ------f
MATERIALS LIST
VIEW A-A
NOTTO SCALE
T
SUMP 4.
VAULT
••.---SE-E _ __,_,
NOTE 2
SEE
NOTE 2
20"
T
SEE NOTE 4
NOTES:
• 1. METER SUPPORT AS REQUIRED.
•• 2. METER DIMENSIONS MAY VARY. CONTRACTOR SHALL VERIFY METER DIMS
& SUPPLY UTILITY BOX WITH SPECIFIED CLEARANCE, WALL THICKNESS PER
MANUFACTURER SPECIFICATION.
3. IF VAULT IS PLACED IN DIRT/LANDSCAPE, PLACE TOP 4" ABOVE GRADE
AND GRADE AWAY FROM VAULT TO PREVENT WATER FROM ENTERING.
4. PROVIDE A MINIMUM 4" CLEARANCE BETWEEN PIPE AND KNOCKOUT
HOLE WITH A MINIMUM OF 6" CLEARANCE ABOVE THE VAULT FLOOR.
5. ALL MATERIALS PER
6. METER TYPE SHALL BE APPROVED BY DEVELOPMENT SERVICES OR METER
SERVICES.
7. METER REGISTERS TO BE IN CUBIC FEET.
8. PRESSURE TEST PER EMWD SPECIFICATIONS.
9. POTABLE SERVICE LATERAL HORIZ & VERT ALIGNMENT MUST MEET DOW
SEPARATION REQUIREMENTS WHEN RECYCLED WATER IS EXISTING OR
PROPOSED.
10. READ HOLES ARE TO BE INSTALLED PER
11. A FLANGED REDUCER SHALL BE INSTALLED AT EACH RSGV TO ACCOMODATE
A 4" METER CONNECTION.
**** 12. CONCRETE VAULT BASE IS TO BE INCLUDED WITH VAULT.
13. STEEL VAULT LIDS TO BE PRIMED & PAINTED
14. ALL BARE IRON AND STEEL SHALL BE COATED WITH CEMENT MORTAR AS PER
THE FIELD ENGINEER. VALVES AND OTHER APPURTENANCES AND FITTINGS
AT THE PIPELINE SHALL BE PRIMED AND WRAPPED WITH PROTECTO-WRAP
NO. 200 OR 300 TAR RESIN TAPE.
* * ~------~<( QTY
DESCRIPTION
8" METER*
15. ALL SERVICE PIPE SHALL BE LAID ON A CONSTANT SLOPE UP FROM THE
WATER MAIN TO THE METER. NO DIPS OR POCKETS IN THE LINE WILL BE
PERMITED. 36" COVER SHALL BE MAINTAINED AT GAS MAIN CROSSINGS.
16. TEST PORT (COUPLING & PLUG) SHALL BE 2" (IP). NOTE: ALL MATERIALS SHALL MATCH THE SERVICE LATERAL PIPELINE SIZE EXCLUDING BYPASS LINE.
PLACEMENT OF METER VAULT
A. PLACE FRONT EDGE OF VAULT 6" BEHIND EXISTING OR
PROPOSED 6' OR 8' SIDEWALKS.
B. WHEN PROPOSED OR EXISTING SIDEWALK IS 12' WIDE,
PLACE FRONT EDGE OF VAULT 1.5' BEHIND CURB USING
APPROPRIATE BOX.
C. WHEN NO SIDEWALK IS PROPOSED, PLACE FRONT EDGE
OF VAULT 6.5' BEHIND CURB.
D. WHEN NO CURBS ARE EXISTING OR TO BE INSTALLED
UPON COMPLETION OF THE WATER SYSTEM, PLACE
BACK EDGE OF VAULT ON PROPERTY LINE.
E. WHEN INSTALLED IN CONCRETE (SIDEWALK), USE COVER
ASSEMBLY THAT AVOIDS TRIPPING HAZARDS, AND
WHICH INCLUDES READING LID.
F. A MINIMUM 5' SEPARATION IS TO BE MAINTAINED
BETWEEN THE SEWER LATERAL, WATER SERVICE, AND
RECYCLED WATER SERVICE.
REVISIONS
NO. DATE INITIAL DESCRIPTION
REFERENCES:
FILE I.D.:
APP'D DATE
SCALE: NONE
DRAWN BY:
L 2
3 1
15'+/-
LF
7 1
18 2
19 1
APPROVALS
VICTAULIC COUPLING
FLG x VICTAULIC NIPPLE FLG x VICTAULIC NIPPLE (MIN. LENGTH EQUALS (3) THREE X PIPE DIAM.)
F x F SPOOL (MIN. LENGTH EQUALS (3) THREE X PIPE DIAM.)
12"
15'+/-2" COPPER TUBING TYPE K
2"x90 DEG COPPER SWEAT ELL
2" COPPER SWxlPM ADAPTER, (CORP STOP W/PVC)
2-1/2"x4" SERVICE SADDLE W/2-1/2"x2"BRASS
RED BUSHING, (2" SERVICE CLAMP W/PVC)
BLIND FLANGE
2" BRASS CURB STOP
UTILITY BOX/VAULT
TORSION SPRING 2-PC LID:
PARKWAY OR TRAFFIC COVER (ALUMINUM),
ROADWAY APPLIC. TO MEET AASHTO H-20 DIRECT
TRAFFIC RATING (STEEL).
PRECAST CONCRETE BASE W/8" SUMP****
FLANGED REDUCER
(IP) COUPLING AND PLUG (SEE NOTE 15)
17. VALVE CAN AND CAP SHALL BE INSTALLED PER
18. SYSTEMS WITH ONSITE PUMPS SHALL NOT EXCEED 5 FPS VELOCITY WITHIN
THE SERVICE LATERAL. SYSTEMS WITHOUT PUMPS, SHALL NOT EXCEED 10
FPS. (SEE FLO\/\
19. CONTRACTOR SHALL RETURN AFTER ROAD SHOULDER OR PARKWAY IS
COMPLETE TO INSTALL METER VAULT, AND SHALL BE RESPONSIBLE
FOR COORDINATING WORK OF OTHER CONTRACTORS FOR SAFEGUARDING
SERVICES UNTIL METER VAULT IS SET.
20. UPON
LADDER ("DANGER" PERMITTED CONFINED SPACE DO
NOT ENTER) SHALL BE PAINTED ON THE VAULT LID PER
SPECIFICATIONS.
21. DEPTH OF METER SHALL BE 5 FT. MAX. FROM VAULT LID TO TOP OF METER.
22. JUMPER ASSEMBLY FOR THE CONSTRUCTION OF THE METER SERVICE SHALL
BE MADE OF BRASS AND MEET METER MANUFACTURES SPECIFICATIONS FOR
METER INSTALLATION. THE TOTAL LANE LENGTH SHALL ACCOMMODATE THE
METER AND ANY REQUIRED GASl(ETS OR SEALS. JUMPER ASSEMBLY TO BE
PAINTED BLUE (POTABLE WATER JUMPERS ARE NOT TO BE USED FOR
RECYCLED WATER).
23. WHEN VAULT IS PLACED IN HIGH LOAD OR TRAFFIC PRONE AREAS, VAULT
AND LID SHALL BE ABLE TO WITHSTAND H-20 VEHICULAR LOADS.
24. VAULT LIDS SHALL HAVE SPRING ASSIST FOR BOTH LIDS.
25. SERVICES THAT REQUIRE BACKFLOW PROTECTION PER
CODE, SHALL BE PER
INITIAL DATE
DESIGN
CONSTRUCTION
INSPECTION 8" METER INSTALLATION
OPERATIONS
SUBMITTED
IINDIIO
ii!kB§f\1h®tiM
FAX
( 760 ) 391-6433
86-101 Avenue 45, Indio, CA 92201 www.indio.org/water/water.htm
DATE
OF
DATEBY REMARKSNO.
SHEET
IWA NO.
DRAWINGREVISIONS INDIO WATER AUTHORITY APPROVAL
DATE
CITY OF INDIO
DATEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
GDI
DIAL TOLL FREE
1-800-227-2600
BEFORE YOU DIG
AT LEAST TWO DAYS
RTE
ENGINEERS SEAL
CHECKED :
DRAWN :
DESIGN :
PREPARED UNDER THE SUPERVISION OF: APPROVER'S SEAL
PRESIDENT/MANAGING ENGINEER
THOMAS R. HOLLIMAN, P.E.
RCE C 33108
XXXXXX
XXX
XXX
5 5
MYOMA DUNES MUTUAL WATER
COMPANY INTERTIE PROJECT
10/2/2025
WATER PROJECT CONSTRUCTION MANAGER
ROMAN GONZALEZ
10/28/2025
4" A.C. (MIN.) OVER 4" A.B. (MIN.)
ALL OTHER STREETS:
5" A.C. (MIN.) OVER a• A.B. (MIN.) !SIBEEI SIRUCTI.JRAI SECTION REOUIBEP
RESIDENTIAL STREETS:
JOIN EXISTING A.C. PAVT. OlE: IF EITHER THE EXISTIN G A.C. OR A.B. IS THICKER THAN THE ABOVE, Wlll-l SMOOTH BUTT JOINT THEN THE EXISTING A.C. OR A.B. THICKNESS SHALL BE USED.
NO FEATHERING)
GRIND/
0\-1::RLAY"
. 1' MIN TRENrH WIDTH .1' M GRIND/ ~
/SAW CUT
.rr- cur•I JVARIES IT-CU OVERLAY"
~EXISTING A.C. PAVT.
A.8 . ./ '--.._,_ /.s • ~y, :~ :~e!fr 1;N~E~~~f ~~R~.EPLACEMENT OF BOTH
COMPACTED EARTH fill., MIN. RELATIVE COMPACTION 95X, 6"
~l/ ......._ MAX. LIFTS OR USE A CLASS 100-E-100 ·coNCRETE SLURRY'
........... PER THE "GREEN BOOKN
TRENa-t SIDE_/
SLOPES MAY
COMPACTED EARTH FILL, MIN. RELAllVE COMPACTION 90-X, a· MAX. LIFTS OR USE A CLASS 100-E-100 · coNCRElE
SLURRY" PER THE "GREEN BOOK"
VARY
□ ~BEDDING PER PLANS AND SPEOFICATIONS
{MIN. 90,& RELATIVE COMPACTION)
"T- TRENCH" DETAIL • AS REQUIRED (SEE BELOW)
NOT TO SCALE
LONGIJUDINAL TRENCH CUTS IN DRl'v1NG LANES o• TO 12" 'MDE - REPAIR TRENQ-l WIDlH, PLUS 1.5" GRIND AND OVERLAY FROM
LANE LINE TO LANE LINE.
> 12" IMDE - REPAIR TRENQ-l WIDlH PLUS ADDITIONAL 1' "T-CUT" O,"I BOTH
SIDES, PWS 1S GRIND/OVERLAY FROM LANE LIN!:: TO LANE
LINE.
IRANSVERSE IRENCH CUTS (PERPENDICULAR TO CENTERLINE OD ROAD)
o• TO 12" 'MDE - REPAIR TREND-I WIOlH ONLY.
12" TO 24" 'MOE - REPAIR TRENQ-l WIOlH PLUS ADDITIONAL 1' "T-CUT" ON BOTH
SIDES.
>24" WIDE - REPAIR TRENQ-l WIOTH PLUS ADDITIONAL 1' "T-CUT" ON BOTH
SIDES, PWS GRIND/OVERLAY 1.5"' MIN. lHICK FOR AN
ADOITIONAL J' ON BOTH SIDES.
SHOULDER TRENCH CUTS
AT EDGE OF GUTTER - REPAIR TRENCH WIOTli ONLY (NO "T-TRENCH").
OFF EDGE OF GUTTER - NO LESS THAN 2' " FLOAlER" BETWEEN TRENCH AND GUTTER.
SLURRY OR FOG SEAL MAY BE REQUIRED UNLESS TI-lE ROADWAY IS A DESIGNAlED
BIKE ROUlE, WHICH WOULD REQUIRE A 1S THICK GRIND/01/ERLAY
FROM EDGE OF GUTTER TO LANE LINE.
Indio Water Authority ~ itu-W..:OirReJpon,t,litJ.
Nowmber 2016
TRENCH REPAIR
DETAIL
STANDARD PLAN NUMBER
715A
SHEET_..1_0F_1__
RE\1SION OATI RE\1SION OATE
SPECIAL NOTES FOR TRENCH REPAIR DETAIL
A. ASPHALT CONCRETE (A.C.):
1. A.C. SU RFACE LAYER, OR CAP, SHALL BE 1/2-INCH MAXIMUM, MEDIUM, PG 70- 10
MATERIAL PER CALTRANS SPECIFICATIONS.
2. A.C. BASE OR BOTTOM, LAYER(S) SHALL BE 3/4-INCH MAXIMUM, MEDIUM, PG 70-10
MATERIAL PER CALTRANS SPECIFICATIONS.
J. MAXIMUM A.C. LIFT THICKNESS - J .OM
+. AU. A.C. BASE LAYERS AND All. EDGES TO RECEI\/E HEAVY TACK COAT.
5. WHEN SURFACE WIOTH Of A.C. TREND-i TO BE PAI/ED IS 10', OR WIDER, A
BARBARA-GREEN PAVER, OR EQUAL, SHAU. BE USED.
B. AGGREGATE BASE (A.B.):
1. AGGREGATE BASE (A.B.) SHALL BE CLASS II A.B. PER CALTRANS SPECIFICATIONS .
2. AU. A.B. AS PART OF STRUC1URAL SECTION SHAU. BE COMPACTED TO 95~
RELATIVE COMPACTION.
J. A.B. MAY BE USED AS TREND-I BACKFlLL: HOWEVER, THE PORTlCl'I TI-l AT IS PART OF iHE STREET STRUC1URAL SECTION AliO.. THE ADDITIONAL TOP 12" OF A.B.
SHALL BE COMPACTED TO 95% RELATIVE cmAPACTION.
C CONCRETE SLURRY·
,. FOR TRENQ-l 'MOTHS o· TO 1r, CONCRETE SLURRY t.4AY BE BROUGHT TOY
BELOW TOP OF A.C. SURFACE.
2. FOR TRENQ-l 'MDTHS > 12", CONCRETE SLURRY MAY BE BROUGH T TO BOTTOM Cf" A.B. LAYER (I. E. NEED COMPLETE A.B. AND A.C. LAYERS) .
D. TIMING OF FINAL A.C. LAYER (OR CAP):
1. TI-lE A.C. SURFACE LAYER, OR CAP, SHALL BE PLACED THE SAME DAY AS TI-l E
BASE A.C. UNLESS SPECIFICALLY APPROVED OTHER'NISE BY CITY ENGINEER.
2. IF THE A.C. SURFACE LAYER IS NOT PLACED TliE SA~E DAY AS TliE BASE A.C.
LAYER{S), THEN,
• NO "ups· SHALL BE LEFT OPEN TO lRAFflC c·ups" SHALL BE RA~PED, lRENCH CAPPED 'nlTH COLO-MIX, OR OTHERWISE ADDRESSED TO SATISFACTl(),,I OF THE CITY ENGINEER).
THE A.C. SURFACE LAYER SHALL BE PLACED AS SOON AS POSSIBLE, BUT
IN NO CASE LONGER THAN 14 CALENDAR DAYS, AFTER THE BASE A.C.
LAYER(S) ARE PLACED.
E. SPECIAL SITUATIONS:
1. TI-lE CITY ENGINEER NIAY REQUIRE ADDITIONAL REQUIREMENTS FOR TRENCH
REPAIR FOR SPECIAL SITUATIONS.
2 TRENCHING ON ROAD CAPPED WITH RUBBER I\SPHAL T, ANO
2. SPECIAL Sl1UATIONS SHALL INCLUDE, BUT NOT BE UMITEO TO:
1\ MULTIPLE lRENCHES IN SAME AREA, 3 TRENCHING IN ROADWAY lHAT WAS PAVED 'MlHIN THE PAST .3 YEARS (THIS WI LL ONLY BE ALLO'ltED IN LIMITED CIRCUMSTANCES).
STANDARD PLAN NUMBER
Indio Water Authority ~ 'Au-Wor.O.............,_ FULL WIDTH
TRENCH
DETAIL
715 B
~ November201&
I I I
SHEET _1__0F_2_
RE'.1S1~ DATE RE\1510N DATE
STREET SJRUCWRAL SECTION REQUIRED
PER STANDARD Pl AN NUMBER 171
JOIN EXISTING AC PAVT OTE IF EITHER THE EXISTING AC OR AB IS THICKER THAN PER
WITH SMOOTH BUTT JOINT STANDARD PLAN NUMBER 171, THEN THE EXISTING AC OR A.B.
{NO FEATHERING) THI CKNESS SHALL BE USED
, , i / :SAW CUTGRINO AND ~I TRENOi WI OTH I~ ,..,,.-- OVERLAY' IT- CU P IVARIES r-:....cuf•I /
GRIND AND./ '°'"' \:,+-t--A._a._./ __ ~- -f'--...
OVERLAY•
·~ ~EXISTING A.C. PAVT.
THE -T-CUT" IS REMOVAL ANO REPLACEMEN T OF BOTH
THE ASPHALT ANO BASE LAYERS
COMPACTED EARTH FlLL. MIN. RELATIVE COMPACTION 95%, 6"
0:: 1 '" '-,_ MAX. LIFTS FOR LONGITUDINAL TRENCH CUTS AND FOR
~I/ "--...._ TRANSVERSE TRENCH CUTS USE A 2-SACK CONCR ETE
_/+-•----""~:URRY PER THE ~GREEN BOOK•.
TRENCH SIOE ·-,,$~;/~ COMPACTED EARTli FILL, MIN. RELATIVE COMPACTION 95%, SLOPES MAY ~ :fff!f:Jf:////, ;::'./_; 8" MAX. LIFTS FOR LONGIT\JOINAL TRENCH CUTS AND FOR
VARY §m /,ij:f' o ~~ :~~:1:~~ :~N:~ECEUNTSBi;._A 2-SACK CONCRETE if!%:, ))~ ~ BEDDING PER PLANS AND SPECIFICATIONS
/½' ,-...:. ~ (MIN. 90% RELATIVE COMPACTION)
"I-TRENCH" DETAIL • AS REQUIRED (SEE BELOW)
NOT TO SCALE
LONGITUDINAL TRENCH CUTS IN DRIVING LANES
O" TO 12" "'10E - REPAIR TRENCH WIDTH, PLUS 1.5" GRIND AND OVERLAY FROM
LANE LINE TO LANE LINE.
> 12" WIDE - REPAIR TRENCH WIDTH PLUS AN ADDITIONAL 1' "T- CU T" ON
BOTH SIDES, PLUS 1.5" GRIND AND OVERLAY FROM LANE LI NE TO
LANE LINE.
TRANSVERSE TRENCH CUTS (PERPENPICUI AR JO CfNJFRI INf Of ROAD}
O" TO 12" WIOE - REPAIR TRENCH WIDTH ONLY.
12" TO 24" WIDE - REPAIR TRENCH WIDTH PLUS AN ADDITIONAL 1' "T- CU T" ON
BOTH SIDES.
>24" 'MDE - REPAIR TRENCH WIDTH PLUS AN ADDITIONAL 1' ·r- cur ON
BOTH SIDES, PLUS 1.5" GRIND AND OVERLAY FOR AN
ADDITIONAL J' ON BOTH SIDES.
SHOULDER TRENCH CUTS
AT EDGE OF GUTTER - REPAIR TRENCH 'MDTii ONLY (NO "T-lRENCH").
OFF EDGE OF GU TTER - NO LESS THAN 2' "FLOATER" BETWEEN TRENCH AND GUTTER.
SLURRY OR FOG SEAL MAY BE REQUIRED UN LESS TH E ROADWAY IS A DESIGNATED
BIKE ROUTE, WHICH WOU LO REQUIRE A 1.S- TlilCK GRIND ANO OVERLAY FROM EDGE OF
GU TTER TO LANE LINE.
IINDIIO
-4B@i\10iMtiM
SPECIAL NOTES FOR TRENCH REPAIR DETAIL
A ASPHALT CONCRfJF (A C }·
1 A.C. SUR FACE LAYER, OR CAP, SHALL BE 1/2-INCH MAXIMUM, MEDIUM, PG 70-10
MATERIAL PER CALTRANS SPECIFICATI ONS.
2. A.G. BASE OR BOTTOM, LAYER{S) SHALL BE .3/4-INCH MAXIMUM, MEDIUM, PG 70-10
MATERIAL PER CALTRANS SPECIFICATI ONS.
3. MAXIMUM A.G. LIFT lHI CKNESS - 3.0" .
4. ALL A.C. BASE LAYERS AND ALL EDGES TO RECEIVE HEAVY TACK COAT.
5. WHEN SURFACE 'MDTli OF A.C. TRENCH TO BE PAVED IS 10·, OR WIOER. A
BARBER- GREENE PAVER, OR EQUAL. SHALL BE USED.
B AGGREGAJF BASE [A B l·
1. AGGREGATE BASE (A.B.) SHALL BE CLASS II A.B. PER CALTRANS SPEOFICATI ONS.
2. ALL A. B. AS PART OF STRUCTURAL SECTION SHALL BE COMPACTED TO 95%
RELATIVE COMPACTION
.3. A.B. MAY BE USED AS TRENCH BACKFILL: HO\ltfVER. THE PORTION THAT IS PART OF THE STREET STRUCTURAL SEC TION At:1.Q. THE AOOITIONAL TOP 1r Of A.8.
SHALL BE COMPACTED TO 95% RELATIVE COMPACTION.
C CONCREJF 2 SACK SLURRY:
1. FOR TRENCH WIDTHS LESS THAN 12". CONCRETE SLURRY MAY BE BROUGH T TO 4" MIN.
BELOW TOP OF A.C. SURFACE.
2. FOR TRENCH WIDTHS GREATER THAN 12", CONCRETE SLURRY MAY BE BROUGHT TO BOTTOM
OF A.8. LAYER (I. E. NEED COMPLETE A.8. AND A.C. LAYERS).
D TIMING OE E!NAL A C LAYER /OR CAP)·
1. THE A.C. SURFACE LAYER, OR CAP, SHALL BE PLACED THE SAME DAY AS THE
BASE A.C. UNLESS SPECIFICALLY APPROVED OTH ERWISE BY CITY ENGINEER
2. IF THE A.C. SURFACE LAYER IS NOT PLACED THE SAME DAY AS THE BASE A.C.
LAYER(S), THEN,
NO "UPS" SHALL BE LEFT OPEN TO TRAFFIC ("LIPS" SHALL BE RAMPED .
TRENCH CAPPED WITH COLO-MIX, OR OTHERWISE ADDRESSED TO
SATISFACTION OF THE CITY ENGINEER).
THE A.C. SURFACE LAYER SHALL BE PLACED AS SOON AS POSSIBLE, BUT
IN NO CASE LONGER TH AN 14 CALENDAR DAYS. AFTER THE BASE A.C.
LAYER(S) ARE PLACED.
f SPfCIAL SITUATIONS·
1 THE CI TY ENGINEER MAY REQUIRE ADDITIONAL REQUIREMENTS FOR TRENCH
REPAIR FOR SPECIAL S11UATIONS
2. SPECIAL SITUATIONS SHALL INCLUDE. BUT NOT BE LIMI TED TO:
t) MULTIPLE TRENCHES IN SAME AREA, 5~ :gjg~:~g ~N R~~~~f¢P~~T ~~ ~~~6R Ytl;~~A~[ ~~~T 3 YEARS
(TH IS WILL ONLY BE ALLOWED IN LIMITED CIRCUMSTANCES).
| Myoma Cover Page Sheet 1 of 5 FINAL 9.15.2025 |
| Sheets and Views |
| Model |
| Myoma Intertie Sheet 2 of 5 FINAL 9.15.2025 |
| Sheets and Views |
| Model |
| Myoma Intertie Sheet 3 of 5 REV FINAL 9.22.2025 |
| Sheets and Views |
| Model |
| Myoma Meter Detail Profile Sheet 4 of 5 FINAL 9.15.2025 |
| Sheets and Views |
| Model |
| Myoma Meter Detail Profile Sheet 5 of 5 FINAL 9.15.2025 |
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .