2024-IFB-1002132 Greer Restroom Renovations Bid Drawings.pdf

PDF 2 MB Posted

Attached to
Greer Elementary School Restroom Renovation
Solicitation number
57576
Issued by
Albemarle County, Charlottesville City, Virginia

About this file

The document is a series of bid drawings for the Greer Elementary School Restroom Renovation project being conducted by Albemarle County Public Schools in Charlottesville, Virginia. The project includes the in-kind replacement of toilet accessories and plumbing fixtures, installation of new wall and floor tiles, and re-use of existing toilet compartments in the restrooms. The work is limited to select restrooms, with no comprehensive building-wide analysis or compliance work specified. The bid documents are dated January 16, 2024, indicating this is an active solicitation.

The bid documents provide detailed plans, layouts, and specifications for the restroom renovations, including demolition requirements, new fixture and accessory locations, and tile patterns. Pricing terms, set asides, funding sources, and other commercial details are not included in these technical bid drawings. The key focus is on the scope of the construction work required to renovate the identified restrooms at the Greer Elementary School facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D-29 D-48

D-47

D-46 D-49

D-50

D-3

GRE-9

FRONT

OFFICE

OFFICE

OFFICE

WORK

ROOM

OFFICE

CLINIC

VAULT

OFFICE

CONFERENCE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CLASS

ROOM

CLASS

ROOM

CLASS

ROOM

CLASS

ROOM

CLASS

ROOM

CLASS

ROOM

CLASS

ROOMCLASS

ROOM

CLASS

ROOM

CLASS

ROOM

CLASS

ROOM

CLASS

ROOM

CLASS

ROOM

CLASS

ROOM

CLASS

ROOM

MEDIA

CENTER

MECHANICAL

ROOM

OFFICE

BOY

TOILET

GIRL

TOILET

JC

STORAGE

BOY

TOILET

BOY

TOILET

GIRL

TOILET

GIRL

TOILET

JC

JC

WORK

ROOM

TEACHER

LOUNGE

WORK

ROOM

OFFICEOFFICE

BOY

TOILET

GIRL

TOILET

KITCHEN

MULTI-PORPOSE

ROOM

STAGE

STO

R

AG

E

PLAN

NORTH

PROJECT SITE

MARY CARR GREER ELEMENTARY SCHOOL

190 LAMBS LANE, CHARLOTTESVILLE, VIRGINIA, 22901

US-250

US-29

H Y D

R A U

LI

C

R D

BARRACKS RD

SIMMONS, ROCKECHARLIE & PRINCE

MEP Engineers

10150 Staples Mill Road Suite A Henrico, Virginia 23060 v 804.262.7323 THE SCOPE OF THIS PROJECT INCLUDES IN-KIND REPLACEMENT OF TOILET ACCESSORIES AND

PLUMBING FIXTURES, INSTALLATION OF NEW WALL AND FLOOR TILES, AND RE-USE OF EXISTING

TOILET COMPARTMENTS IN RESTROOMS AT MARY CARR GREER ELEMENTARY ELEMENTARY

SCHOOL.

WHERE EXISTING ROOM DIMENSIONS AND FIXTURE LOCATIONS AND SPACING ALLOW, ADAAG

AND ICC/ANSI ARE MET. THE INTENT OF THIS PROJECT IS NOT A COMPLETE RESTROOM

REPLACEMENT NOR A COMPREHENSIVE BUILDING-WIDE ANALYSIS OF CODE/ADAAG

COMPLIANCE.

XX

ROOM NUMBER

FINISH TYPE

WALL TYPES

CONCRETE-PLAN

STEEL

RIGID INSULATION

MATERIAL SYMBOLS

PLAN / DETAIL

WORK POINT

NEW ELEVATION

EXISTING ELEVATION

DRAWING REFERENCE

SHEET REFERENCE

DRAWING REFERENCE

SHEET REFERENCE

INTERIOR ELEVATION

DETAIL CUT

DRAWING REFERENCE

SHEET REFERENCE

CMU

A101

SIM

A101

SIM

A101

SIM

WALL SECTION CUT

DRAWING REFERENCE

SHEET REFERENCE

BATT INSULATION

Room name

KEYNOTE

ALUMINUM

WOOD

PLYWOOD

STONE

XX-XX

MATERIAL DESIGNATION

(REFER TO MATERIALS

SCHED. ).

XX

SYMBOLS

A101

SIM

REVISION CLOUD

AND INDICATOR

XX CONSTRUCTION

ASSEMBLY

MATCHLINE

X/SHEET #

X/SHEET #

GROUT

CONCRETE-SECTION

PARTICLE BOARD

PLASTIC

SHIM

GYPSUM BOARD / PLASTER

SEALANT & BACKER ROD

METAL STUD

METAL TRACK

3rd GRADE BOYS

& GIRLS RESTROOMS

5th GRADE GIRLS RESTROOM

4th GRADE BOYS

& GIRLS RESTROOMS

5th GRADE BOYS RESTROOM

REF. PLAN

EQ EQ

TA-10

TA-01

AT GIRLS

ONLY

T Y

P

T Y

P

TYPICAL TOILET COMPARTMENT TYPICAL AMBULATORY TOILET

COMPARTMENT

TA-01

TA-10

AT GIRLS

ONLY

C L E

A R

TA-09

TA-07

T Y

P

T Y

P

NOTE: LOCATIONS AND DIMENSIONS OF NEW TOILET

COMPARTMENT LAYOUTS WILL VARY FROM TYPICAL

DIMENSIONS SHOWN HERE. REFER TO PLANS AND

COORDINATE WITH EXISTING CONDITIONS.

REF. PLAN

TA-09

TA-07

TA-01

TOILET TISSUE

DISPENSER

TA-02

PAPER TOWEL

DISPENSER

TA-06

SOAP

DISPENSER

TA-07

18"

GRAB BAR

TA-08/ TA-09

36"/ 42"

GRAB BAR

TA-10

SANITARY

NAPKIN

DISPOSAL

TA-14

24" X 60"

MIRROR

H

.S

2' - 0"

"36" @ TA-08

42" @ TA-09

NOTES:

1. THE FOLLOWING ACCESSORIES SHALL BE FURNISHED BY OWNER AND INSTALLED BY CONTRACTOR: TA-01, TA-02, TA-06

2. ACCESSORIES SHALL BE INSTALLED AT LOCATIONS INDICATED ON PLANS AND IN ACCORDANCE WITH ICC ANSI 1017.1

3. COORDINATE GRAB BAR INSTALLATION HEIGHT WITH SIZE & LOCATION OF TA-01 TOILET TISSUE DISPENSER.

5"

V A

R

IE

S

TA-02

TA-06

EQ EQ

E

.S

M

IN

E .S

E .S

DASHED LINES INDICATE EXISTING ELEMENTS

TO BE DEMOLISHED DURING CONSTRUCTION.

REFER TO SHEET KEYNOTES FOR ELEMENTS

TO BE REMOVED AND REINSTALLED.

INDICATES EXISTING WALL

TO REMAIN

PNT-1: DOOR AND FRAME COLOR, 3RD GRADE: MATCH EXISTING

PNT-2: DOOR AND FRAME COLOR, 4TH GRADE: MATCH EXISTING

PNT-3: DOOR AND FRAME COLOR, 5TH GRADE: MATCH EXISTING

DRAWN BY:PROJECT MANAGER:

1840 WEST BROAD STREET

SUITE 400

RICHMOND, VA 23220

v 804.788.4774

QUINNEVANS.COM

QUINN EVANS

Architect

1840 West Broad Street Suite 400 Richmond, Virginia 23220 v 804.788.4774

PROJECT TEAM DRAWING INDEX

PROJECT DATA

VICINITY MAPS

G001

COVER SHEET

LGKS

190 LAMBS LN, CHARLOTTESVILLE,

VIRGINIA 22901

BID DOCUMENTS

JANUARY 16, 2024

GREER ELEMENTARY SCHOOL RESTROOM RENOVATION

ALBEMARLE COUNTY PUBLIC SCHOOLS

190 LAMBS LN, CHARLOTTESVILLE, VIRGINIA 22901

GREER ELEMENTARY

SCHOOL RESTROOM

RENOVATION

ALBEMARLE COUNTY

PUBLIC SCHOOLS

NUMBER SHEET NAME

G001 COVER SHEET

A101 RESTROOM DEMO, NEW WORK, CEILING & FINISH PLANS

P101 PLUMBING PLANS

Grand total: 3

IFB#: 2024-IFB-1002132

ABBREVIATIONS GRAPHIC SYMBOLS

A/E ARCHITECT / ENGINEER

ABV ABOVE

ACCESS ACCESSIBLE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADJ ADJACENT/ADJUST

AFF ABOVE FINISHED FLOOR

ALT ALTERNATE

ALUM ALUMINIUM

APPROX APPROXIMATE(LY)

ARCH ARCHITECT(URAL, URE)

ASSOC ASSOCIATED

AUTO AUTOMATIC

BBT BIO-BASED TILE

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BLKHD BULKHEAD

BTWN BETWEEN

CEM CEMENT

CJ CONTROL JOINT

CL CENTER LINE

CLR CLEAR(ANCE)

CONC CONCRETE

COND CONDITION

CONST CONSTRUCTION

CONT CONTINUOUS

COORD COORDINATE

CORR CORRIDOR

CT CERAMIC TILE

CTR CENTER

DEG DEGREE

DEMO DEMOLISH, DEMOLITION

DETER DETERIORATING, DETERIORATED

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM(S) DIMENSION(S)

DN DOWN

DR DOOR, DRAIN

DTL DETAIL

DWG(S) DRAWING(S)

E-P EPOXY PAINT

EA EACH

EJ EXPANSION JOINT

EL ELEVATION (TOPO)

ELEC ELECTRICAL

ENCL ENCLOS(E,URE)

ENGR ENGINEER

ENTR ENTRANCE

EQ EQUAL

EQUIP EQUIPMENT

EST ESTIMATE(D)

EXH EXHAUST

EXHB EXHIBIT

EXIST EXISTING

EXP EXPOSED, EXPANSION

FAS FASTEN(ER)

FD FLOOR DRAIN

FF FINISH(ED) FACE

FIN(S) FINISH(ES)

FIXT FIXTURE

FL FLOOR(ING)

FOS FACE OF STUDS

FT FEET

FUR FURR(ED,ING)

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACT(OR)

GL GLASS, GLAZING

GOVT GOVERNMENT

GT GROUT

GWB GYPSUM WALLBOARD

HAZ MAT HAZARDOUS MATERIAL

HC HOLLOW CORE, HOSE CABINET

HDWR HARDWARE

HORIZ HORIZONTAL(LY)

HP HIGH POINT

HSS HOLLOW STRUCTURAL SECTION

HT HEIGHT(S)

HVAC HEATING, VENTILATION & AIR

CONDITIONING

HW HOT WATER

IN INCH(ES)

INCL INCLUDE(S,D,ING)

INFO INFORMATION

INT INTERIOR

INV INVERT

J-BOX JUNCTION BOX

JAN JANITOR

JT(S) JOINT(S)

KO KNOCK OUT

LAV LAVATORY

LBL LABEL

LP LOW POINT

LT GA LIGHT GAUGE

LTG LIGHTING

MAS MASONRY

MATL MATERIAL(S)

MAX MAXIMUM

MFR MANUFACTURE(R)

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTG MOUNTING

MTL METAL

N NORTH

NA NOT APPLICABLE

NC NOISE CRITERIA, NORMALLY

CLOSED

NIC NOT IN CONTRACT, NOISE

ISOLATION CLASS

NOM NOMINAL

NTS NOT TO SCALE

O-O OUT TO OUT

OC ON CENTER

OD OUTSIDE DIAMETER

OH OPPOSITE HAND, OVERHEAD

OPNG OPENING(S)

ORIG ORIGINAL

PART PARTITION(S), PARTIAL

PERF PERFORATE(D)

PFT PORCELAIN FLOOR TILE

PLAS PLASTER

PLWD PLYWOOD

PNL PANEL(ED)

PSF POUNDS PER SQUARE FOOT

PTD PAINTED

PVC POLYVINYL CHLORIDE

PWT PORCELAIN WALL TILE

QT QUARRY TILE

QTY QUANTITY

RB RUBBER BASE

REF REFERENCE

REINF REINFORCED

REPL REPLACE

REQ REQUIRED

REV REVISION(S) / REVISE(D)

RM ROOM

RO ROUGH OPENING

SALV SALVAGE

SAN SANITARY

SCHED SCHEDULE

SF SQUARE FEET

SIM SIMILAR

SPEC SPECIFICATION

SS STAINLESS STEEL

STD STANDARD

STL STEEL

SYS SYSTEM

T.O. TOP OF

TER TERRAZZO

THRS THRESHOLD

THRU THROUGH

TYP TYPICAL

UIO UNLESS INDICATED OTHERWISE

UL UNDERWRITER'S LABORATORY

UNFIN UNFINISHED

UR URINAL

VAR VARIES

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VEST VESTIBULE

VIF VERIFY IN FIELD

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WP WATERPROOFING, WORK POINT

WT WEIGHT

XFER TRANSFER

# NUMBER, POUND

& AND

@ AT

± PLUS / MINUS

GREER ELEMENTARY SCHOOL - KEY PLAN OF MAIN FLOOR

TYPICAL TOILET COMPARTMENT LAYOUTS 3/8" = 1'-0"

TOILET BATH LAUNDRY ACCESSORY MOUNTING HEIGHTS 3/8" = 1'-0"

DEMOLITION LEGEND

PAINT LEGEND

No. Date Description

01/16/24

GENERAL NOTES

G1 PERFORM WORK IN ACCORDANCE WITH APPLICABLE LAWS, ORDINANCES,

CODES, AND REQUIREMENTS. GC SHALL OBTAIN ALL PERMITS AND

APPROVALS AS REQUIRED FOR THE COMPLETION OF THE WORK BY THE

AUTHORITY HAVING JURISDICTION.

G2 FIELD VERIFY ALL CONDITIONS AND DIMENSIONS. REVIEW CONTRACT

DOCUMENTS. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES OR OMISSIONS

IN WRITING PRIOR TO COMMENCEMENT OF THE WORK. PROCEED AFTER

RECEIPT OF DIRECTION FROM THE ARCHITECT.

G3 DIMENSIONS ARE TO THE FINISH FACE UNLESS OTHERWISE NOTED.

G4 ALL WORK IS NEW UNLESS INDICATED OTHERWISE.

G4 REFER TO TYPICAL COMPARTMENT LAYOUTS FOR ALL TOILET ACCESSORY

INSIDE TOILET COMPARTMENTS.

NOTE:

PRIOR TO BEGINNING DEMOLITION

WORK, INSTALL NEW SHUT-OFF

VALVES ON HOT AND COLD WATER

SUPPLY PIPING TO RESTROOMS IN A

LOCATION THAT ALLOWS ISOLATION

OF RESTROOMS FROM BUILDING

WATER SUPPLY. THIS WILL ALLOW ALL

WORK TO OCCUR WITHIN RESTROOMS

WITHOUT WHOLE-BUILDING WATER

SUPPLY SHUT-DOWNS.

LOCATION OF NEW SHUT-OFF VALVES

SHALL BE COORDINATED WITH

OWNER AND BUILDING FACILITY

MANAGER. PROVIDE QUARTER-TURN

VALVE WITH SOLDERED CONNECTION

TO EXISTING 3/4" COPPER PIPING.

D2

D3

D4

D2

D3

D4

3rd GRADE GIRLS 3rd GRADE BOYS

D6D6

3rd GRADE GIRLS 3rd GRADE BOYS

2' - 7 1/2"

2' - 7"

1' - 2 1/4" +/-

1' - 3"

1'-3" 1'-3"

2' - 7 1/2"

2' - 7"

2' - 7"

1'

1/

4"

+/-1'

1' - 1 1/2" +/-

2' - 3 1/4"

1' - 1 3/4" +/-

TA14

TA06

TA02

TA06

TA02

TA14

TA02

TA06

TA02

TA06

1'

6"

3 4

5 7

3 4

5 7

9 T

IL

E P

A T

T E

R N

'B

TILE PATTERN 'A'

TIL

E P

A

TTE

R N 'B

TILE PATTERN 'A'

T

IL

E P

A T

T E

R N

'B

T

IL

E P

A T

T E

R N

'A

TIL

E 'B

TILE

PA

TTE

R N

'B' TILE

PA

TTE

R N 'A'

TIL

E 'A

TILE 'A'

TILE PATTERN 'B'

TIL

E 'B

TILE

PA

TTE

R N 'A'

TILE PATTERN 'B'

TILE 'A' TILE

'B

3rd GRADE GIRLS 3rd GRADE BOYS

'B

'B

TILE

'A

TILE PATTERN 'A'

4th GRADE GIRLS 4th GRADE BOYS

2' - 2 3/4"

1' - 3"

1' -6

1' - 11 3/4"

1' - 3"

11 3/4" +/-

2' - 2 3/4"

1' - 0" +/-

3' - 0"

2' - 6 1/4"

2' - 6 1/4"

3' - 0"

2' - 7"

1'

3/

4"

+/-2'

1/

2"

TA02

TA06

TA02

TA06

TA14

TA14

3 4

5 7

3 4

5 7

NOTE:

PRIOR TO BEGINNING DEMOLITION

WORK, INSTALL NEW SHUT-OFF

VALVES ON HOT AND COLD WATER

SUPPLY PIPING TO RESTROOMS IN A

LOCATION THAT ALLOWS ISOLATION

OF RESTROOMS FROM BUILDING

WATER SUPPLY. THIS WILL ALLOW ALL

WORK TO OCCUR WITHIN RESTROOMS

WITHOUT WHOLE-BUILDING WATER

SUPPLY SHUT-DOWNS.

LOCATION OF NEW SHUT-OFF VALVES

SHALL BE COORDINATED WITH

OWNER AND BUILDING FACILITY

MANAGER. PROVIDE QUARTER-TURN

VALVE WITH SOLDERED CONNECTION

TO EXISTING 3/4" COPPER PIPING.

D2

D3

D4

D2

D3

D4

4th GRADE GIRLS 4th GRADE BOYS

D6D6

TILE PATTERN 'A'

TIL

E P

A

TTE

R N 'A

TIL

E P

A

TTE

R N 'B

TILE

PA

TTE

R N 'A

TILE PATTERN 'A'

T

IL

E P

A T

T E

R N

'B

T

IL

E P

A T

T E

R N

'B

TILE PATTERN 'A'

TILE

PA

TTE

R N 'A

TILE

PA

TTE

R N 'B

TIL

E 'B

T

IL

E P

A T

T E

R N

'A

TILE PATTERN 'A'

TIL

E 'B

TILE PATERN 'B'

TILE 'A'

TIL

E 'A

TILE

'A

TILE 'A'

TILE PATTERN 'B'

TILE

'B

'B' 'B'

4th GRADE GIRLS 4th GRADE BOYS

NOTE:

PRIOR TO BEGINNING DEMOLITION

WORK, INSTALL NEW SHUT-OFF

VALVES ON HOT AND COLD WATER

SUPPLY PIPING TO RESTROOMS IN A

LOCATION THAT ALLOWS ISOLATION

OF RESTROOMS FROM BUILDING

WATER SUPPLY. THIS WILL ALLOW ALL

WORK TO OCCUR WITHIN RESTROOMS

WITHOUT WHOLE-BUILDING WATER

SUPPLY SHUT-DOWNS.

LOCATION OF NEW SHUT-OFF VALVES

SHALL BE COORDINATED WITH

OWNER AND BUILDING FACILITY

MANAGER. PROVIDE QUARTER-TURN

VALVE WITH SOLDERED CONNECTION

TO EXISTING 3/4" COPPER PIPING.

D3

D4

5th GRADE BOYS

D6

/4

5th GRADE BOYS

1'

3/

4"

+/-2'

3"

2'

/4

/4

TA02

TA06

TA02

TA06 TA14

3 4

5 7

TILE PATTERN 'A'

T

IL

E 'A

'B'

T

IL

E P

A T

T E

R N

'B

TILE 'B'

T

IL

E P

A T

T E

R N

'B

TILE

PA

TTE

R N 'B'

TIL

E P

A

TTE

R N 'A

T

IL

E P

A T

T E

R N

'A

T

IL

E P

A T

T E

R N

'A

TILE PATTERN 'A'

5th GRADE BOYS

5th GRADE GIRLS

1' - 9 1/4" +/-

2' - 8" +/-

2' - 11"

TA06

TA02

TA02

TA06

TA14

3 4

5 7

D2

D3

D4

NOTE:

PRIOR TO BEGINNING DEMOLITION

WORK, INSTALL NEW SHUT-OFF

VALVES ON HOT AND COLD WATER

SUPPLY PIPING TO RESTROOMS IN A

LOCATION THAT ALLOWS ISOLATION

OF RESTROOMS FROM BUILDING

WATER SUPPLY. THIS WILL ALLOW ALL

WORK TO OCCUR WITHIN RESTROOMS

WITHOUT WHOLE-BUILDING WATER

SUPPLY SHUT-DOWNS.

LOCATION OF NEW SHUT-OFF VALVES

SHALL BE COORDINATED WITH

OWNER AND BUILDING FACILITY

MANAGER. PROVIDE QUARTER-TURN

VALVE WITH SOLDERED CONNECTION

TO EXISTING 3/4" COPPER PIPING.

5th GRADE GIRLS

D6

TILE PATTERN 'A'TILE 'B'

T

IL

E P

A T

T E

R N

'B

TIL

E P

A

TTE

R N 'B

TILE

PA

TTE

R N 'A'

T

IL

E P

A T

T E

R N

'A

T

IL

E 'A

'B'

T

IL

E P

A T

T E

R N

'B

5th GRADE GIRLS

DASHED LINES INDICATE EXISTING CONSTRUCTION TO BE REMOVED U.I.O.,

REMOVAL OF PARTITIONS INCLUDES REMOVAL OF ALL ITEMS FIXED TO

PARTITIONS (DOORS, CASEWORK, ELECTRICAL, PLUMBING, ETC.). EXTENT

OF SELECTIVE DEMOLITION SHALL BE AS REQUIRED FOR INSTALLATION OF

NEW WORK. EXISTING WORK TO REMAIN, IF DAMAGED BY DEMOLITION

OPERATIONS, SHALL BE REPAIRED TO MATCH ORIGINAL SURFACE CONDITION

OR AS INDICATED IN THE DRAWINGS.

ALL CEILING FINISHES ARE TO REMAIN UNLESS NOTED OTHERWISE.

TYPICAL DEMO/REMOVE AND REINSTALL SCOPE AT RESTROOM UNLESS NOTED

OTHERWISE:

PLUMBING FIXTURES (TOILETS, URINALS): DEMOLISH TOILETS, URINALS,

LAVATORIES, AND FAUCETS. EXPOSED VALVES, SUPPLY AND WASTE

PIPING SHALL BE DEMOLISHED AS REQUIRED TO INSTALL NEW WORK.

DEVICES, ALARMS, SENSORS, SURFACE RACE WAYS, RECEPTACLE AND

SWITCH PLATES, DOOR STOPS, WALL MOUNTED LIGHT FIXTURES:

REMOVE AND PROTECT DURING WORK. REINSTALL AFTER FINISH WORK

IS COMPLETE. PROVIDE JUNCTION BOX EXTENDERS AS REQUIRED TO

ACCOMODATE NEW FINISHES. INSTALL BLANK COVER PLATES AT UNUSED

JUNCTION BOXES. SURFACE MOUNTED JUNCTION BOXES AND RACEWAY

SHALL REMAIN SURFACE MOUNTED UNLESS NOTED OTHERWISE.

WORK RELATED TO FIRE ALARM SYSTEMS SHALL BE PERFORMED BY A

CONTRACTOR QUALIFIED TO PERFORM SUCH WORK.

TOILET PARTITIONS: REMOVE AND PROTECT ALL EXISTING TOILET &

URINAL PARTITIONS UNLESS NOTED OTHERWISE FOR REINSTALLATION.

TOILET ACCESSORIES: REMOVE ALL SOAP DISPENSERS, TOILET PAPER

DISPENSERS, PAPER TOWEL DISPENSERS, HAND DRYERS, SANITARY

NAPKIN DISPOSALS, AND MIRRORS WITHOUT DAMAGING AND TURN

OVER TO OWNER.

PROTECT FLOORS IN AREAS USED TO ACCESS CONSTRUCTION AREAS WITH

MASONITE OR KRAFT PAPER. DAMAGED FLOOR FINISHES SHALL BE REPAIRED

AND/OR REPLACED BY CONTRACTOR.

ADJUST HEIGHT OF CLEAN OUTS AND FLOOR DRAINS WITH THREADED

EXTENSION SO THAT COVER IS FLUSH AND LEVEL WITH NEW FLOOR FINISH.

IF DRAIN CANNOT BE ADJUSTED, OR IS IN DISREPAIR. ADVISE OWER AND

ARCHITECT

FLOORS: REMOVE IN ITS ENTIRETY TILE FLOORING AND MORTAR BED. ASSUME

THICKSET MORTAR BED. PREPARE SLAB TO RECEIVE NEW TILE FLOORING,

INCLUDING STRIPPING, GRINDING, FILLING, PATCHING, LEVELING AND OTHER

METHODS AS REQUIRED TO PREPARE SLAB FOR INSTALLATION OF NEW WORK.

PLUMBING FIXTURES AND TOILET PARTITIONS SHALL BE REINSTALLED IN PER

EXISTING LOCATIONS, EXCEPT WHERE INDICATED OTHERWISE ON DRAWINGS.

1.

2.

3.

4.

5.

6.

7.

A.

B.

C.

D.

PWT OVER EXISTING TILE, INSTALLED

PER TILE COUNCIL OF NORTH AMERICA

DETAIL TR713-15

SECTION - NEW TILE OVER EXISTING WALL TILE

PFT COVE BASE

BOND COAT OVER EXISTING PWT & PFT

PLAN - TYPICAL OUTSIDE CORNER DETAIL

NEW TILE OVER EXISTING WALL TILE

METAL TRIM PIECE, AS SPECIFIED

PWT OVER EXISTING PWT AS

INDICATED, INSTALLED PER TILE

COUNCIL OF NORTH AMERICA

DETAIL TR713-15

BOND COAT OVER EXISTING PWT

PFT AS INDICATED

EPOXY GROUT, AS SPECIFIED,

TO BE USED AT ALL LOCATIONS

SHADOW GAP EDGE TRIM - METAL

TO MATCH CEILING MOLDING METAL TYPE

PWT-1: 100%

NOTE:

EPOXY GROUT,

AS SPECIFIED,

TO BE USED AT

ALL LOCATIONS

NOTES:

1. INSTALL TILE IN QUANTITIES AND ARRANGEMENTS INDICATED HERE AT THE LOCATIONS AND EXTENTS INDICATED ON FINISH PLANS.

2. FLOOR TILE PATTERNS ARE SHOWN ON FINISH PLANS

WALL PATTERN 'A'

PWT-1: 10%

PWT-2: 90%

WALL PATTERN 'B'

A L

L R

E S

T R

O O

M S

A L

L R

E S

T R

O O

M S

EXISTING VCT

MARBLE THRESHOLD

TILE FLOORING

/4

M

A X

P A

T H

F

IL

E

N A

M E

P L O

T T

IN

G

D A

T E

T

IM

E

A

DRAWN BY:PROJECT MANAGER:

1840 WEST BROAD STREET

SUITE 400

RICHMOND, VA 23220

v 804.788.4774

QUINNEVANS.COM

M

B

C

D

E

F

G

H

J

K

L

122 3 4 5 6 7 8 9 10 11

1 122 3 4 5 6 7 8 9 10 11

A u to d e s k D o c s /A

C P

S R e s tr o o m s /4

H u rt G re e r_

A C

P S

R e s tr o o m s

R

.r v t

/1

/2

:5

:1

P

M

A101

RESTROOM DEMO,

NEW WORK, CEILING

& FINISH PLANS

LGKS

190 LAMBS LN, CHARLOTTESVILLE,

VIRGINIA 22901

BID DOCUMENTS

JANUARY 16, 2024

GREER ELEMENTARY

SCHOOL RESTROOM

RENOVATION

ALBEMARLE COUNTY

PUBLIC SCHOOLS

REFERRED FROM:1/4" = 1'-0"A101

1 DEMO PLAN - 3rd GRADE BOYS & GIRLS

REFERRED FROM:1/4" = 1'-0"A101

2 NEW WORK - 3rd GRADE BOYS & GIRLS

REFERRED FROM:1/4" = 1'-0"A101

3 FINISH PLAN - 3rd GRADE BOYS & GIRLS

REFERRED FROM:1/4" = 1'-0"A101

5 NEW WORK PLAN - 4th GRADE BOYS & GIRLS

REFERRED FROM:1/4" = 1'-0"A101

4 DEMO PLAN - 4th GRADE BOYS & GIRLS

REFERRED FROM:1/4" = 1'-0"A101

6 FINISH PLAN - 4th GRADE BOYS & GIRLS

1/4" = 1'-0"A101

7 DEMO PLAN - 5th GRADE BOYS 1/4" = 1'-0"A101

NEW WORK PLAN - 5th

GRADE BOYS

1/4" = 1'-0"A101

FINISH PLAN - 5th

GRADE BOYS

REFERRED FROM:1/4" = 1'-0"A101

NEW WORK PLAN - 5th

GRADE GIRLS

1/4" = 1'-0"A101

10 DEMO PLAN - 5th GRADE GIRLS 1/4" = 1'-0"A101

FINISH PLAN - 5th

GRADE GIRLS

DEMOLITION KEYNOTES.

D1 NOT USED

D2 DEMOLISH TILE AND GROUT FROM FLOOR.

D3 DEMOLISH TOILETS, URINALS, FIXTURES, AND ASSOCIATED PIPING AND VALVES.

PREPARE FOR INSTALLATION OF NEW WORK

D4 REMOVE TOILET AND URINAL PARTITIONS AND ALL SUPPORTS AND FASTENERS

- PROTECT FOR REINSTALLATION. PATCH HOLES IN WALLS, FLOORS, AND

CEILINGS.

D5 NOT USED

D6 REMOVE EXISTING ACCESS WALL PANELS AND REINSTALL AFTER FINISHES

INSTALLATION. PAINT ACCESS WALL PANEL.

NEW WORK KEYNOTES

1 PAINT HOLLOW METAL DOOR FRAME, ALL SIDES.

2 PAINT EXISTING WOOD DOOR IN COLOR TO MATCH EXISTING

3 INSTALL NEW TOILET, URINAL, AND LAVATORY FIXTURES AT SAME LOCATION

AND HEIGHT AS EXISTING. REFER TO PLUMBING SPECIFICATIONS . PROVIDE

MISC. HARDWARE, FITTINGS, FASTENERS, ESCUTCHEONS, AND OTHER

ACCESSORIES REQUIRED FOR COMPLETE AND FINISHED INSTALLATION.

4 NEW FLOOR DRAIN COVER. ADJUST HEIGHT OF DRAIN WITH THREADED

EXTENSION SO THAT DRAIN COVER IS FLUSH AND LEVEL WITH NEW FLOOR

FINISH.

5 INSTALL TILE FLOORING.

6 ALL WALLS TO RECEIVE TILE. REFER TO WALL PATTERN TYPES 'A' AND 'B' ON

A101. NEW TILE IS TO BE INSTALLED OVER EXISTING TILE, REFER TO TYPICAL

DETAIL ON A101 FOR ASSEMBLY.

7 INSTALL SHADOW GAP EDGE METAL TRIM AT JOINT BETWEEN EXISTING CEILING

AND NEW WALL TILE. METAL TO MATCH CEILING METAL EDGE MOLDING. SEE

SHEET A101 TYPICAL DETAILS

INSTALL NEW URINAL SCREEN. COLOR AND MATERIAL TO MATCH EXISTING

TOILET SCREENS

RE-INSTALL SALVAGED TOILET PARTITIONS AT ALL RESTROOMS, CHANGE

STRIKES AND HINGES TO BE FULL HEIGHT. RE-INSTALL SALVAGED

URINAL SCREEN AT 5th GRADE BOY'S RESTROOM

GENERAL DEMOLITION NOTES

TYPICAL DETAILS 1 1/2" = 1'-0" TYPICAL TILE PATTERNS 1/2" = 1'-0" TYPICAL FLOOR TRANSITIONS

REFERRED FROM:3" = 1'-0"A101 A101x

13 TILE TO EXISTING VCT

No. Date Description

01/16/24

Sheets
A101 - RESTROOM DEMO, NEW WORK, CEILING & FINISH PLANS
G001 - COVER SHEET

File details come from the government source that posted it. Updated .