This is a Request for Proposals (RFP) issued by the State of Colorado Department of Human Services for an Integrated Project Delivery Design/Build Guaranteed Maximum Price contract to install IP cameras and infrastructure at the Colorado Mental Health Institute at Pueblo (CMHHIP) and the state Youth Services Center (SCYSC). The project involves modernizing facility monitoring through deployment of a comprehensive IP-based surveillance network, including site surveys, system design, hardware procurement, cabling, installation, integration with existing security and network infrastructure, testing, staff training, and post-installation support. The estimated project cost is $2,461,248.00. A mandatory pre-proposal conference and site tour is scheduled for August 31, 2026 at 10:00 AM at Building 49 in Pueblo, Colorado. The prequalification submittal deadline is September 23, 2026 at 1:00 PM, followed by public opening of submittals at 1:30 PM the same day. Shortlisted firms will be notified the week of September 28, 2026, with sealed fee proposals due October 6, 2026 at 1:00 PM and oral interviews scheduled for October 7-8, 2026. The selection will be announced October 13, 2026, with contract negotiation anticipated to begin October 15, 2026 and design work starting October 21, 2026.

Qualifications will comprise 70 percent of the award criteria and fee proposals 30 percent, with selection based on best overall value to the State. Minimum requirements include demonstrated experience in correctional environments for at least five years, verifiable experience with Avigilon, Indusoft/Aveva HMI Programming, and Omron PLC Programming, and completion of at least two prior projects exceeding $3,000,000 in hard costs. Respondents must demonstrate bonding capability up to $600,000 (20 percent of project value) and attend the mandatory pre-proposal conference to have submittals accepted. The project is subject to Colorado prevailing wage requirements, the Buy Clean Colorado Act for eligible materials, apprenticeship utilization certifications (15 percent of labor hours in mechanical, electrical, and plumbing trades), and an 80 percent Colorado labor requirement under C.R.S. 8-17-101. Design/Build Entity fees will include architect/engineer basic services, construction management fees, and reimbursable expenses on a not-to-exceed basis. Construction is anticipated to begin February 1, 2027 and be completed by December 15, 2027.

View the file

Other files

File Type Posted
Information for bidders.pdf PDF
Appendix F.pdf PDF
Appx B - SC-9.1 DBGMP GC 2022 09 clean.docx DOCX document
Certificate.pdf PDF
CDHSCP_Solicitation_Request_Documents_-_7-29-2026_-_66330298_-__-_0.00 (7).docx DOCX document
Appx B - SC-9.0 DB GMP A_2025 clean.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS

Integrated Project Delivery utilizing Design/Build Guaranteed Maximum Price State of Colorado Department of Human Services

Notice Number: RFP 2027000024 Project Number: 2024-057M23 Project Title: Install IP Cameras and Infrastructure, CMHHIP & SCYSC Estimated Project Cost: $2,461,248.00

Table of Contents

I. NOTICES1
II. PROJECT OVERVIEW2
Scope of Services4
III. MINIMUM REQUIREMENTS5
IV. MANDATORY PRE-PROPOSAL CONFERENCE AND SITE TOUR5
V. SCHEDULE6
VI. QUESTIONS, CLARIFICATIONS AND ADDENDA6
VII. POINT OF CONTACT/CLARIFICATION6
VIII. SUBMITTALS OF QUALIFICATIONS7
IX. METHOD OF SELECTION AND AWARD8
A.Short List8
B.Oral Interview8
X. EVALUATION OF QUALIFICATIONS11
A.PREQUALIFICATION SUBMITTAL CRITERIA11
1.QUALIFICATIONS OF THE FIRM(s)11
2.QUALIFICATIONS OF THE MANAGEMENT TEAM MEMBERS11
3.PROJECT MANAGEMENT APPROACH12
4.PRIOR PROJECT EXPERIENCE/SUCCESS12
5.EQUITY DIVERSITY AND INCLUSION13
6.MISCELLANEOUS CONSIDERATIONS13
XI. ORAL INTERVIEWS EVALUATION CRITERIA14
1. QUALIFICATIONS OF THE FIRM14
2.QUALIFICATIONS OF THE MANAGEMENT TEAM MEMBERS14
3.PROJECT MANAGEMENT APPROACH14
4.PRIOR PROJECT EXPERIENCE/SUCCESS15
5.MISCELLANEOUS CONSIDERATIONS15
XII. FEE PROPOSALS15
XIII. ACKNOWLEDGEMENT AND ATTESTATION FORM19
Appendix A:Evaluation Forms1
Appendix B:DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) AGREEMENT and THE GENERAL CONDITIONS OF THE DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) AGREEMENT1
Appendix C: Project Concept and Program Plan1
Appendix D: Aesthetic Guidelines And Construction Standards2
Appendix E: Project Budget and Direct Labor Burden Calculation (SBP-6.18)1
Appendix F: Applicable Prevailing Wage Rates & Apprenticeship Contribution Rates1
Appendix G: Apprenticeship Utilization Certifications1
Appendix H: Information Technology Provisions1

IPD-DBGMP-RFP pg. 2

REV 7/2025

I. NOTICES

For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.

For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.

All respondents accept the conditions of this RFP, including but not limited to, the following:

a. All submittals shall become the property of the State of Colorado and will not be returned.

b. Late submittals shall not be evaluated.

c. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information.

d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.

e. Any restriction as to the use of submitted materials must be clearly indicated as proprietary. The requested limitation or prohibition of use or release shall be identified in writing on a cover sheet. Blanket claims of proprietary submittals will not be honored. Fee proposals will be considered proprietary.

f. The respondent has reviewed Appendix B and by responding has agreed that the terms and conditions of the sample Construction Management/General Contracting Agreement are expressly workable without reservation.

The respondent has reviewed Appendix B: Sample Design/Build Guaranteed Maximum Price (GMP) Agreement (Form SC-9.0) and General Conditions (SC-9.1) and by responding has agreed that the terms and conditions of the sample are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the bid closes.

Per C.R.S. §24-92-115 unless prohibited by applicable federal law, contract for any public project in the amount of one million dollars or more, that does not receive federal money, in the amount of one million dollars or more shall require the general contractor to which the contract is awarded to submit, at the time the mechanical, electrical, or plumbing subcontractor is put under contract, documentation that Identifies the contractors or subcontractors that will be used for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing work required on the project and certifies that all firms identified participate in apprenticeship programs registered with the United States department of labor’s employment and training administration or state apprenticeship councils recognized by the United States department of labor and have a proven record of graduating a minimum of 15% of its apprentices for at least three of the past five years.

Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements. The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.

Per C.R.S. §24-92-Part 2, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors. Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. §24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application.

Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.

Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.

II. PROJECT OVERVIEW

Introduction

The State of Colorado, Department of Human Services (CDHS) is soliciting proposals from qualified contractors for the 2024-057M23 - Install IP Cameras and Infrastructure, CMHIP & SCYSC project.

Analog cameras and CCTV analog systems are no longer supported by vendors, and the technology has migrated to digital IP technology. Thus, finding replacement units, parts and service from our vendors is extremely difficult to obtain, if available at all. Program continues to request more camera coverage to the existing system on an ongoing basis. The analog systems cannot be extended to support program requests. Adding digital IP technology to the existing analog camera systems is not an option. In many locations, cameras are original to the installation of the video system and are at the end of the life cycle for security systems.

The existing analog camera systems are utilized continually by Program to monitor patients, clients and juveniles. These systems are mission critical to the wellbeing and safety of both staff and patients. Further, many of the camera monitoring systems are recording to DVR recording technology which has also migrated to IP technology. Thus, when security video is required, the Customer must go to the headend system for the particular area and obtain the video. In many instances, head-end equipment is located in a Nurse Station locked in a cabinet.

All existing analog camera systems are well beyond their useful life span and near impossible to replace.

CDHS is a state agency that empowers Coloradans to thrive by providing essential assistance, resources, and support services to individuals and families. CDHS is committed to ensuring stability, independence, and well-being through programs such as food and heating assistance, child welfare, behavioral health services, and support for people with disabilities. The state operates on a state-supervised and county-administered system, with county departments serving as the primary providers of services to residents.

Mission: To empower Coloradans to thrive.

Vision: To serve Coloradans through bold and innovative health and human services.

CDHS has evolved from a primarily administrative agency focused on delivering basic social services into a more data-driven, collaborative organization centered on prevention, equity, and community partnerships. Over the years, CDHS has expanded its role beyond managing assistance programs to address the root causes of social challenges—such as poverty, behavioral health, and child welfare—through integrated services and evidence-based practices. The department increasingly emphasizes innovation, local empowerment, and streamlined access to resources. Looking ahead, CDHS is moving toward a more holistic, person-centered model that leverages technology, cross-agency collaboration, and community engagement to build stronger, more resilient families and communities across Colorado.

The selected contractor shall implement and manage the project in alignment with the goals and standards established by the CDHS. The contractor must demonstrate the capacity, expertise, and resources necessary to deliver high-quality, client-centered services that support CDHS’s mission of promoting the well-being and self-sufficiency of individuals and families across Colorado.

Contractor Responsibilities

· The contractor shall maintain qualified and trained staff with experience relevant to the scope of work, including institutional security camera systems, low-voltage and high-voltage electrical systems, server room / area buildout and environmental control, and safety training.

· The contractor shall provide training and technical assistance to staff and partners as needed to ensure consistent program delivery and compliance with CDHS policies.

· The contractor must maintain confidentiality and data security standards consistent with CDHS, State and Federal regulations.

CDHS anticipates using a Design/Build Entity approach to project delivery where the Design/Build Entity will design, manage and construct the project as described within.

The process to be used in the selection of the Design/Build Entity is comprised of two steps. STEP I is the Submittal of Prequalification as described in Section X. STEP II is the Oral Interview/Fee Proposal as described in detail in Section XI. A Jury Panel of individuals who will be involved in the project and/or understand the required services associated with Construction Management/General Contracting will evaluate responses to this RFP for both steps. Upon completion of the evaluation of the Submittals of Prequalification, a limited number of firms will be invited to the oral interviews. Sealed fee proposals will be required only from those firms who are interviewed and are to be submitted as indicated in this RFP. Both qualifications and fee will be considered in the final ranking of firms with qualifications given 70% of the value of the weighted criteria and fees for the Fee Proposal given 30%.

Selection and award of this project will be based on a combination of qualifications and costs that represent the best overall value to the State.

Scope of Services The contractor shall provide all labor, materials, equipment, and expertise necessary to design, furnish, install, configure, and commission a complete security camera system at designated CDHS facilities. Services shall include site assessment, system design, equipment procurement, cabling, installation, integration with existing security and network infrastructure, testing, and staff training. The contractor must ensure all work complies with applicable building codes, State IT and security standards, and CDHS policies. The contractor shall also provide as-built documentation, system warranties, and post-installation support during the warranty period to ensure optimal system performance and reliability.

Environmental hazards assessment, testing and abatement (as necessary) are covered by CDHS outside of this scope.

The scope of services includes providing assistance to the State during the assessment, design, construction, and warranty periods. Specific tasks to be performed by the Design/Build Entity include those generally performed by the Design/Build construction community where the Construction Manager is also the Contractor. A sample copy of the State’s Design/Build contract is contained within the RFP. A Guaranteed Maximum Price (GMP) will be required at the completion of Design Development phase.

Appendix C of this RFP includes the project concept, program and specifications that apply to this project and are incorporated by reference into the contract agreement as required initial design criteria. Deviation from the project concept, program and specifications must be justified in writing and approved by the CDHS Representative before incorporation into the project.

Appendix D of this RFP includes mandatory construction standards and aesthetic guidelines that are incorporated by reference into the contract agreement. Deviation from the CDHS standards must be justified in writing and approved by the CDHS Representative before incorporation into the project. The building and site design is required to respond to the aesthetic guidelines. Formal presentation of the proposed design to a review committee for approval may be required.

III. MINIMUM REQUIREMENTS

Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:

1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.

1. If the contractor has not been in the same business under the same name for the last two (2) years, provide description of the companies worked for / as.

Demonstrated specific contracting experience in projects of similar scope and complexity for at least two (2) projects each in excess of $ 3,000,000 (hard costs), utilizing the expertise present in their Colorado Office; and Demonstrated bonding capability up to $600,000 (20%) for an individual project coincidentally with current and anticipated workloads; must provide letter from surety that affirms this capacity at time of award.

Respondents must acknowledge all issued addenda in their submittal and proposal.

Attended and signed-in at the Mandatory Pre-Proposal Conference Firms meeting the minimum requirements may obtain the solicitation documents on https://vss.state.co.us/.

IV. MANDATORY PRE-PROPOSAL CONFERENCE AND SITE TOUR

To ensure sufficient information is available to firms preparing submittals, a mandatory pre-submittal conference has been scheduled. The intent of this conference is to tour the site and to have CDHS staff able to discuss the project. Firms preparing submittals must attend and sign-in to have their submittals accepted.

A mandatory Pre-Proposal Meeting will be held at:

Building Address:Div of Facilities Mgmt - Southern District – Bldg 49 CMHHIP
Room:Conference Room ADate/Time:August 31, 2026 – 10:00 am MT

V. SCHEDULE

The following is a tentative schedule of events for the Proposal Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.

Solicitation PostedAugust 7, 2026
Mandatory Pre-Submittal Conference and TourAugust 31, 2026
Request for Clarifications DueSeptember 3, 2026
Labor Day HolidaySeptember 7, 2026
Final Addendum Issued (anticipated)September 9, 2026
Submittals Due (Prequalification: Step I)September 23, 2026 1:00 pm
Public Opening SubmittalsSeptember 23, 2026 1:30 pm
Interview Short List AnnouncedWeek of September 28th , 2026
Sealed Proposal DueOctober 6, 2026 @1:00 pm
St Frances Cabrini Day State HolidayOctober 5, 2026
Oral InterviewsOctober 7/8, 2026
Columbus Day Holiday – non-State HolidayOctober 12, 2026
Selection AnnouncedOctober 13, 2026
Negotiation of ContractOctober 15, 2026
Anticipated Design StartOctober 21, 2026
Thanksgiving HolidayNovember 26, 2026
Anticipated Design/Build Entity StartDecember 2, 2026
Christmas HolidayDecember 25, 2026
Anticipated Construction StartFebruary 1, 2027
Anticipated Construction FinishDecember 15, 2027

The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on ColoradoVSS website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.

VI. QUESTIONS, CLARIFICATIONS AND ADDENDA

Owner initiated changes to this RFP will be issued under numerically sequenced addenda.

Owner initiated changes to this RFP will be posted in the form of addenda on ColoradoVSS .

Questions and requests for clarification regarding this project shall be submitted before the deadline listed in the above Schedule.

Communication regarding the project during the procurement, outside of this submission process or scheduled procurement milestones is not permitted.

VII. POINT OF CONTACT/CLARIFICATION ( Clarification of Questions)

Name:Jamie GottAgency:CDHS
Email Address:jamie.gott@state.co.us

VIII. SUBMITTALS OF QUALIFICATIONS

1. This RFP document, it’s appendices, and any written addenda issued prior to the closing of the solicitation, and written clarifications shall serve as the only basis for the proposal.

1. All submittals must comply with the following items, a through h. The State retains the right to waive any minor irregularity, or requirement should it be judged to be in the best interest of the State.

1. Qualifications shall be formatted and tabbed in the exact form and numeric sequence of the Evaluation Form (1 through 7) in Appendix A. cover letter addressed to the State of Colorado, CDHS, Jamie Gott outlining the firm(s) qualifications is required at the front of the submittal. (Not counting the cover letter and required Acknowledgement and Attestation form, the entire submittal is to be no more than 30 pages 8 ½’ x 11” sized pages in portrait format, at least 10 font.

1. Qualifications shall be evaluated in accordance with criteria as indicated in PREQUALIFICATION SUBMITTAL CRITERIA and ranked on the corresponding Evaluation Form in Appendix A.

1. Response to all items shall be complete.

1. All references shall be current and relevant with accurate contact information.

1. Complete and execute the appropriate Acknowledgment and Attestation Form as provided in Section XIII and submit at the back of the Prequalification Submittal.

An electronic copy of the qualification package is due and shall be received no later than as noted on the schedule above, and shall be submitted/accepted as described in the Information for Bidders (SBP-6.12 attached) Late submittals will be rejected without consideration. The State of Colorado assumes no responsibility for costs related to the preparation of submittals.

Submit proposal separately. Do not include fee proposal data in the qualification’s submittal or with the oral interview presentation and handout. Also, do not enclose qualifications in the fee proposal.

An electronic (PDF) copy of the submittal is due September 23, 2026 and shall be Received no later than 1 PM (MD/ST), at the following:

JG_2027.dy04vcyb2txjm0ti@u.box.com

Public Submittals reading of firms that submitted September 23, 2026 1:30pm RFP Google Meet joining info:

Time zone: America/Denver Google Meet joining info Video call link: https://meet.google.com/hrh-zxwr-ruf Or dial:

Please be aware of email server file size limitations. The maximum file size the Department can accept is 15 GB.

Only Attachments. Only the zip file goes through. The Department cannot see any text or messages sent to the email address identified above. Written questions may be emailed to the Single Point of Contact.

File Names. The zip file name should start with the solicitation type, solicitation number, and vendor name (e.g., “RFP 2027000024 …”). Vendors may include additional information in the zip file name.

Timing. The zip file typically uploads within five minutes; however, vendors should submit zip files at least thirty minutes prior to any deadline to ensure the file is received.

Confirmation. Vendors will receive an email confirmation from box.com that the zip file was uploaded correctly. If not, please contact the Single Point of Contact.

No Encryption. Do not encrypt emails sent to the submission email as it may prevent full submission.

Pre-bid Conference. There will be a mandatory pre-bid conference. August 31,2026 10:00am CMHHIP Building 49, 1600 W. 24th Pueblo, CO 81003 Contact Aaron Short 719-240-4953.

Questions. Vendors may submit questions by email to the Single Point of Contact prior to the Questions Due Date identified in the Basic Information and Timeline above. The Department may answer some, all, or none of the questions asked by posting them publicly.

Late Proposals will not be accepted unless specifically allowed by rule and at the Department’s sole discretion.

The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the schedule date and time.

IX. METHOD OF SELECTION AND AWARD

A. Short List

1. From the submittals received, may be a short list of at least Four (4) pending on how many submit. Qualified respondents shall be identified using the scoring indicated on the enclosed Evaluation Form, Appendix A.

2. Firms failing to meet the minimum required qualifications will not receive further consideration.

B. Oral Interview

1. Mandatory oral interviews shall be conducted for the short-listed firm(s) only. Interview times and location will be as noted above, and all short-listed firms will be notified in advance. At the option of the State, a visit to the short-listed firm(s) managing home office and/or representative field office may be required.

C. Fee Proposals

1. Only those firms shortlisted for interview are required to submit their sealed proposals. (Only one copy is required on the scheduled submission date.) Fee Proposals will remain sealed until after the qualitative scoring and will then be opened. The Fee Proposal will then be considered (equivalent to 30 percent of the weighted criteria) in conjunction with the qualitative score from the response and interview (equivalent to 70 percent of the weighted criteria).

2. Fee Proposals shall be submitted on the form provided in Section XII, without modification. A Fee Proposal shall be accompanied with sufficient detail to clearly identify the fee for service and include a detailed schedule of estimated (not-to-exceed) reimbursable and non-reimbursable costs. The percentage of the cost of work is not acceptable value. The Fee Proposal should be prepared independently in accordance with the following:

a. Fees are outlined in Exhibit A of the Sample Agreement attached to this solicitation as Appendix B.

b. Any specific services requested in the RFP and its appendices that are not included should be clearly identified. Exclusion of any required service may result in the proposal being found non-responsive.

c. Provide a Design/Build Entity staff schedule with staff by name, position and man-hours (assume 8-hour days) per month estimated on the project.

d. Provide a detailed estimate of reimbursable costs including breakdown of direct salaries and payroll fringes (DPE) for on-site Design/Build Entity personnel associated with the services. Not-to-exceed reimbursable expenses shall be provided at direct cost.

e. Provide a detailed estimate of non-reimbursable expenses (included in fee).

f. The State reserves the right to reject any Fee Proposal not prepared in the above manner. Proposals that exceed the available funds may be rejected outright but the State reserves the right to negotiate a reasonable fee for service within the available funds. The DESIGN/BUILD ENTITY contract will be a bonded lump sum contract including not-to-exceed reimbursables with a Guaranteed Maximum Price to encompass all construction work; some not-to-exceed allowances may be included as directed by the State.

3. This Fee Proposal is a binding offer to perform the services associated with the Scope of Services described in this RFP and the Designated Services and Method of Payment Matrix in Appendix B. The State reserves the right to negotiate a cost adjustment based on scope clarification after selection and prior to contract execution.

D. Method of Selection and Award

1. The Jury Panel shall complete a combined evaluation of qualifications and fee in accordance with the criteria as indicated in SECTION X, EVALUATION OF QUALIFICATIONS and Section XI ORAL INTERVIEWS EVALUATION CRITERIA. Numerical ranking and selection of the most qualified firm (including fee) will then occur on the corresponding evaluation forms in Appendix A.

2. The final fee amount and scope of services may be negotiated at the State’s discretion. The award and contract will be contingent on the availability of key proposed Project Management Team staff.

E. After selection and award all bids, qualifications and ranking documents will be made available to the public on the agency or institutions solicitation platform.

X. EVALUATION OF QUALIFICATIONS

A.PREQUALIFICATION SUBMITTAL CRITERIA
1.QUALIFICATIONS OF THE FIRM(s)

Interested contractors must have verifiable proof of experience working in a correctional environment of no less than 5 years. This project will require the integration of video surveillance and PLC/HMI controls across multiple buildings. Interested contractors must have verifiable experience in Avigilon, Indusoft /Aveva HMI Programming and Omron PLC Programming.

Provide a description of the composition and management structure of your firm. Identify the firm’s roles and responsibilities and relevant experience with projects of similar scope and complexity and similar fast track project delivery methods. Describe how the firm’s experience will relate to the success of this project.

Provide a description and separate graphic organizational chart complete with working titles identifying the lines of authority, responsibility and coordination.

Provide a detailed description of the process of how your firm selects qualified sub-contractors and manages them effectively on complex multi-phased projects. How does your organization attempt to utilize disadvantaged and small businesses Provide a detailed description of how your firm will maximize the Colorado construction workforce on this project.

Provide your firm’s safety record over the last ten years and describe your firm’s efforts to retain and support employees.

2. QUALIFICATIONS OF THE MANAGEMENT TEAM MEMBERS

Describe the qualifications and relevant experience of the lead design architect/engineer including demonstrated experience working on projects of similar scope and complexity and time commitment for this project.

Describe the qualifications and relevant experience of the construction manager/general contractor including demonstrated experience working on projects of similar scope and complexity and time commitment for this project.

Describe the qualifications and relevant experience of other key in-house staff and time commitments for this project.

Identify all current office locations of the assigned staff and any other resident expertise intended to be provided under this RFP.

3. PROJECT MANAGEMENT APPROACH

Provide a strategic project approach summary: Include discussion of your firm’s approach in providing successful Construction Management/General Contracting services based on prior experience in cost, schedule and quality effectiveness. Include specific examples (1–2-page excerpts) of actual products (estimates, progress reports, schedules, constructability reviews, value engineering studies, forms, general conditions budgets, organizational structures, etc.).

Providing a description of construction work Project Management Team has capability to competitively bid and self-perform, including qualifications to do such. It is the perception of the CDHS subcontracting DESIGN/BUILD ENTITY construction work is in the State’s best interest in terms of price competition. CDHS may, at its discretion, limit the types and amount of work Project Management Team bids and self-performs.

4. PRIOR PROJECT EXPERIENCE / SUCCESS

Select your three (3) most relevant projects and provide, at a minimum, the following:

The project/contract name Description of services provided Overall construction cost of project, as applicable, including initial contract value and change orders including reasons for change orders Organizational structure of service delivery under the contract (include the owner’s organization as it interfaced with the respondent’s contract) Key assigned in-house staff (name and title) Subcontracts (service) used in the performance of the contract Schedule history Reference(s) for Owner and Architect as described in Section VIII, SUBMITTALS OF QUALIFICATIONS Continuing services, if any Timeliness In general, Design/Build Contracting work is seen as successful if it is on time, on budget, and of high quality of workmanship. Timeliness is generally based on completion by the originally scheduled date and is indicated by a Certificate of Occupancy. Please demonstrate for each of the above projects how timely delivery occurred.

Budget Considerations Similar to timeliness, being on budget historically means the work was completed within the originally identified available budget. Demonstrate for the above projects examples of how you accomplished the following cost control services. For the purposes of this RFP, the State is interested not only in being within budget but also in the respondents’ ability to address these issues:

Conceptual estimating Value analysis Alternate solutions Scope reduction that maintains project function Cost/benefit analysis

Demonstrate for the above projects examples of how you accomplished the above cost control services.

Quality Construction quality has the obvious traditional connotations (workmanlike, in compliance with the specifications, normal standard of care, etc.). Demonstrate for the above project examples how a high quality of workmanship was achieved.

Services Disruption Demonstrate how your services on the above project examples dealt with issues of disruption at existing facilities, etc. if applicable.

Project Acceptability Discuss how your Construction Management/General Contracting services helped achieve owner satisfaction regarding project quality and acceptability with your project examples.

Compliance Provide information on how compliance with industry standards of care, building codes, etc. was achieved.

5. EQUITY DIVERSITY AND INCLUSION

0. Describe how your team is incentivized to hire and promote diverse individuals

0. Describe how your team attempts to contract with Service-Disabled Veteran Owned Small Businesses or historically disadvantaged businesses

6. MISCELLANEOUS CONSIDERATIONS

0. Claims/Litigation History of Firm Provide information on any past, current or anticipated claims (i.e., knowledge of pending claims) on respondent contracts; explain the litigation, the issue, and its outcome or anticipated outcome.

Apprenticeship Training Program (Optional for Step I) Where a certified Apprentice Training Program exists, or a comparable program for the training of apprentices is available:

1. Each submitter shall demonstrate access to the certified program or a comparable alternative (Note that it is the responsibility of the submitter to demonstrate the comparability of a non-certified program) and, Each submitter’s subcontractor at any tier with a contract value of two hundred fifty thousand dollars or more shall demonstrate access to the certified program or a comparable alternative.

Apprenticeship Training Program (Optional for Step I) Other This category is included for other items provided by the submitter. Inclusions may include standard firm promotional literature, testimonials, awards, corporate memberships in professional organizations or sponsorships, additional project/contract histories, etc., intended to demonstrate why your firm is uniquely qualified for this project.

XI. ORAL INTERVIEWS EVALUATION CRITERIA

(Note that the primary focus of the Oral Interview evaluation in addition to the Fee Proposal will be the proposed project management team members’ capabilities).

1. QUALIFICATIONS OF THE FIRM

Explain the composition and structure of your project management team and how the firm will support their efforts in the field throughout this project.

Are the lines of authority, responsibility and coordination clearly identified?

2. QUALIFICATIONS OF THE MANAGEMENT TEAM MEMBERS

Explain the prior experience with projects of similar scope and complexity and similar fast track project delivery methods of the superintendent and all other project management team members. Explain their roles and responsibilities and authority and why they are the right team members for this project.

Explain anticipated project management team staff current and projected workload.

Identify all current office locations and the resident expertise intended to be provided under this RFP. Identify the location of the staff for the performance of this contract, their expertise, and generic equipment that will be located in Colorado and act in support of the anticipated contract.

3. PROJECT MANAGEMENT APPROACH

Explain the strategic project approach for this project in summary: Include discussion of your team’s approach in providing successful Design/Build Entity services based on the needs of this specific project utilizing the team’s prior past experience including cost, schedule, and quality control.

Explain the construction work, the project management team has the capability to competitively bid and self-perform including qualifications to do such work.

Provide a detailed description of how your project management team will select qualified sub-contractors and manage them effectively on this project.

4. PRIOR PROJECT EXPERIENCE/SUCCESS

Explain the most relevant projects the superintendent and the team members have completed together and/or separately and what their role was. CDHS at its discretion contact references and/or conduct independent performance analysis on projects on which the team member has worked).

Provide descriptions of other related experiences of superintendent and other project management team members.

5. MISCELLANEOUS CONSIDERATIONS

Craft Labor Capabilities: Describe the availability of resources that will be utilized to successfully complete the project.

Apprenticeship Training Program (Mandatory for Step II): Describe access to federal or state-approved apprenticeship programs, as available.

Other: This category is included for other items provided by the presenter. Inclusions may include testimonials, awards, corporate memberships in professional organizations or sponsorships, additional project/contract histories, etc., intended to demonstrate why this management team is uniquely qualified for this project.

XII. FEE PROPOSALS

1. Only those firms short listed for interview are required to submit their sealed proposals. Shortlisted teams will receive correspondence noting their scheduled time for their interview as well as where to send their Fee Proposal. Fee Proposals are due on the scheduled submission date prior to the start of oral interviews. Only one sealed copy is required. Fee Proposals will remain sealed until after the qualitative scoring and will then be opened. The fee amount will then be considered (30 percent) in conjunction with the qualitative score from the response and interview (70 percent).

1. Carefully review the Design/Build Entity Contract sample (Appendix B) before initiating your response submittal. Any exceptions to the contract must be communicated formally in accordance with Section VI. QUESTION, CLARIFICATIONS AND ADDENDA.

Appendix G of this RFP includes mandatory State apprenticeship and prevailing wage requirements based on the construction value of the project.

Per C.R.S. §38-26-106, if a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor’s proposal.

The State reserves the right to make non-material changes to the appended model agreement, including additions and /or modifications that may be necessary to more completely describe the services defined or implied herein.

Any approved reimbursable expenses made under the terms of the final agreement shall be a direct pass-on cost with no adjustment to the fee described therein.

Any and all products, systems, methods, and procedures developed, as a result of this agreement shall remain the exclusive property of the State.

Immediately following the Acknowledgement and Attestation Form is a Fee Proposal Form to be utilized to summarize the fee proposal for the services.

This RFP document, it’s appendices, and any written addenda issued prior to the submitting proposals, and written clarifications prior to the interview shall serve as the only basis for proposals.

The respondent, by submitting this proposal, does hereby accept that minor changes by the State to the exhibited contract and its exhibits, which do not adversely affect the respondent, shall not be cause for withdrawal or modification of the amounts submitted herein. Exceptions to the RFP documents and/or modification of the proposal may render the proposal non-responsive.

Upon due consideration and review of this document along with its appendices, written addenda, and written clarifications prior to the interview, the respondent does hereby submit the following proposal for Construction Management/General Contracting fees, consistent with the schedules provided in the Scope of Services. Respondents are hereby advised that it is the State’s desire to accelerate design and construction schedules where reasonably possible, without adverse cost impact.

Respondent should complete the Fee Proposal Form by filling in all blanks on the form that follows.

Respondents should include a separate detailed not-to-exceed reimbursable estimate.

Fee Proposals shall be submitted on the form provided below, without modification.

XII. FEE PROPOSAL FORM

DESIGN/BUILD GUARANTEED MAXIMUM PRICE CONTRACTING (DB-GMP) SERVICES

Project Number: 2024-003P21 Project Title: Install IP Cameras and Infrastructure, CMHIP & SCYSC

Design Build Entity’s Architect/Engineer Basic Services Fee

.1D/B Pre-Design Phase (If Applicable)$
.2Schematic Design Phase$
.3Design Development Phase$ N/A
.4Construction Document Phase$
.5Construction Administration Phase$
.6Post Construction Phase (If Applicable)$
.7Reimbursable Expenses (Not to Exceed)$
.8Total Design Build Entity’s Architect/Engineer’s Fee$

Construction Management Fee

.9Pre-Construction Phase Fee$
.10Construction Phase Fee$
.11General Conditions Direct Personal Expenses$
.12Other Reimbursable General Conditions$
.13Total Construction Management Fee$

Total D/B Fee (.8 +.13) $

Fees are to be calculated per Exhibit A (SC-9.0), D/B Designated Services and Method of Payment.

Please provide a detailed breakdown to adequately describe the D/B staff provided, term of their services, and associated anticipated reimbursable costs so as to demonstrate as complete an understanding as possible of the services provided.

Reimbursable general condition expenses are generally confined to the on-site D/B construction phase staff reimbursed at direct personnel expense, plus those on-site materials, equipment and facilities to support the work of the D/B staff and construction subcontractors.

Acknowledge receipt of Addendum Nos.

Anticipates Services outside the United States or Colorado[footnoteRef:1]* |_| Yes |_| No [1: Does not apply to projects for Institutions of Higher Education that have opted out of the State Procurement Code.

If the respondent anticipates services under the contract or any subcontracts will be performed outside the United States or Colorado, the respondent shall provide in a written statement which must include, but need not be limited to the type of services that will be performed at a location outside the United States or Colorado and the reason why it is necessary or advantageous to go outside the United States or Colorado to perform such services. (Does not apply to any project that receives federal moneys)

Will comply with 80% Colorado Labor |_| Yes |_| No For State Public Works Project per C.R.S 8-17-10, Colorado labor shall be employed to perform at least 80% of the work. “Colorado Labor” means any person who is a resident of the state of Colorado at the time of the Public Works project. Respondents indicating that their bid proposal will not comply with the 80% Colorado Labor requirement are required to submit written justification along with the proposal submission. A governmental body that allows a waiver shall post notice and justification for the waiver on its web site. (Does not apply to any project that receives federal moneys)

Bidder is a Service-Disabled Veteran Owned Small Business[footnoteRef:2]* |_| Yes |_| No [2: Does not apply to projects for Institutions of Higher Education that have opted out of the State Procurement Code.

A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-905, means a business that is incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and is officially registered and verified by the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs. Attach proof of certification along with the proposal submission.

Applicant or Corporate Officer Signature

Title

XIII. ACKNOWLEDGEMENT AND ATTESTATION FORM

1. Several versions of the Acknowledgment and Attestation Form follow this section. Proper completion of the appropriate form is a mandatory requirement for a respondent to be considered responsive to this RFP Prequalification Submittal.

1. Qualifications made by a respondent in executing this form may render a submittal non-responsive as determined by the State.

(Partnership Format)

Date:

By responding to this RFP, the respondent(s) certify that he/she has reviewed the Construction Management/General Contracting sample contract, and its exhibits contained herein, and is familiar with their terms and conditions and finds them expressly workable without change or modification.

We certify and declare that the foregoing is true and correct.

Subscribed on _______________________________ at ____________________________
DateCity
___________________________, State of _______________________________________
CountyState
1)___________________________________________
Partner Signature[footnoteRef:3] [3: Add additional signatures if there are more than two partners.

Typed Name:_________________________

2)___________________________________________
Partner Signature

Typed Name:_________________________

Notary:________________________________________________ ________________
Date

Commission Expires:_____________________________________

Offeror Acknowledges Receipt of Addendum No. ____, ____, ____, ____ (Addenda MUST be acknowledged)

IPD D/B GMP RFP

Rev 07/2025

XIII. ACKNOWLEDGEMENT AND ATTESTATION FORM

(Joint Venture Format)

Date: ______________________

By responding to this RFP, the respondent(s) certify that he/she has reviewed the Construction Manager/General Contractor sample contract, and its exhibits contained herein, and is familiar with their terms and conditions and finds them expressly workable without change or modification.

Subscribed on _______________________________ at _________________________,
DateCity
___________________________, State of _____________________________________.
CountyState
1)______________________________________________________________
Venture PartnerBinding SignatureDate
________________________Typed Name: _____________________________
Type of BusinessTitle: ____________________________________
_______________________________________
WitnessDate

Typed Name: _____________________________

2)______________________________________________________________
Venture PartnerBinding SignatureDate
________________________Typed Name: _____________________________
Type of BusinessTitle: ____________________________________
_______________________________________
WitnessDate

Typed Name: _____________________________

Note:

1. Add additional venture partners as necessary.

2.Witnesses of venture partners shall be corporate secretary for corporations, partners for partnerships, and notaries for sole proprietorships.
3.Attach venture agreement
4.Type of business shall identify the venture partner as a corporation, venture, partnership, sole proprietorship, or other legal entity.

IPD DBGMP RFP

Rev 07/2025

XIII. ACKNOWLEDGEMENT AND ATTESTATION FORM

(Corporate Format)

Date: ______________________

By responding to this RFP, the respondent(s) certify that he/she has reviewed the Construction Management/General Contracting sample contract, and its exhibits contained herein, and is familiar with their terms and conditions and finds them expressly workable without change or modification.

Subscribed on _______________________________ at _________________________,
DateCity
___________________________, State of _____________________________________.
CountyState
_______________________________________________________________
Corporate Officer SignatureDate
_______________________________________________________________
SecretaryDate

Note: Use full corporate name and attach corporate seal here.

(SEAL)

(Sole Proprietorship Format)

Date: ______________________

By responding to this RFP, the respondent(s) certify that he/she has reviewed the Construction Management/General Contracting sample contract, and its exhibits contained herein, and is familiar with their terms and conditions and finds them expressly workable without change or modification.

Subscribed on _______________________________ at _________________________,
DateCity
___________________________, State of _____________________________________.
CountyState
_______________________________________________________________
RespondentDate

Typed Name: ________________________

Notary: __________________________________________________________
Date

Commission Expires: ___________________

Appendix A: Evaluation Forms to follow

Appendix A1: Prequalification Submittal/Evaluation Form

Appendix A2:Oral Interview /Evaluation Form
Appendix A3:Submittal and Interview Ranking Matrix (for State use only)

2. Appendix A1

STATE BUILDINGS PROGRAM

PREQUALIFICATION SUBMITTAL/EVALUATION FORM

DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES

Name of Team:_______________________________________________________________ Name of Project: Install IP Cameras and Infrastructure, CMHIP & SCYSC ________________ Evaluator No:__________________________________________ Date:_______________________

RFP REFERENCE

MINIMUM REQUIREMENTS Y ____ N ____

If the minimum requirements (including letter from surety) have not been met, specify the reason(s): __________________________________________________________________________________________________________________________________________________________________

Acknowledgement and Attestation included: Y _____ N _____

SCORE

Weight2 x Rating3 = Score

1. QUALIFICATIONS OF THE FIRM(S)1

· Qualifications of the team x

· Organizational structure/lines of authority x

· Subcontractor selection and management x

· Colorado workforce x

· Safety/Employee support x

2. QUALIFICATIONS OF THE MANAGEMENT TEAM MEMBERS1

· Qualifications and relevant experience of the architect/engineer x

· Qualifications and relevant experience of the construction manager/general contractor x

· Qualifications and relevant experience of in-house staff x

· Location/Access x

3. PROJECT MANAGEMENT APPROACH1

· Approach to successful D/B or CM/GC Services

a. Cost effectiveness x

b. Schedule effectiveness x

c. Quality effectiveness x

· Competitively Bid/Self Performed Work x

4. PRIOR PROJECT EXPERIENCE/SUCCESS1

· Project #1 x

a. Timelinessd. Disruption
b. Budget Considerationse. Acceptability
c. Qualityf. Compliance

· Project #2 x

a. Timelinessd. Disruption
b. Budget Considerationse. Acceptability
c. Qualityf. Compliance

· Project #3 x

a. Timelinessd. Disruption
b. Budget Considerationse. Acceptability
c. Qualityf. Compliance

· Related experience of the team x

5. MISCELLANEOUS1

· Claims/litigation history x

· Apprenticeship Training Program x

· Other x

TOTAL SCORE:

NOTES:

1. Criteria: Agencies/Institutions are encouraged to include additional criteria that reflect unique characteristics of the project under each category to help determine the…